Loading...
HomeMy WebLinkAboutBLOCK 85 LOTS 7 AND 8 401 WEST MULBERRY STREET GROUP OFFICE - Filed CS-COMMENT SHEETS - 2008-07-21dafre: ITEM: artment: 4-87 THE GROUP OFFICE EXPANSION R-H Review COMMENTS: rGNLC�if. C � �`�✓"' r CITY OF FORT COLLINS OFFICE OF DEVELOPMENT SERVICES, PLANNING DEPARTMENT January 23, 1987 Glen G. Magee c/o Junge, Reich, Magee, AIA 4141 Arapahoe Boulder, CO 80202 Dear Mr. Magee, The City Staff has reviewed the suhmittal for the Group Office Expansion, Non-residential Use request in the_R-H zoning district and has the follow- ing comments to offer: 1. Parking space #1 may not be closer to the street than the building wall. If you are unable to adjust the parking space location you may request a variance from the Zoning Board of Appeals. However, this variance must be granted prior to the review of the site plan by the Planning and Zoning Board. 2. The Developer must provide parking spaces for motorcycles and bicycles and they should be labeled on the site plan. 3. Al small car parking must be labeled "compact parking" and the employees parking spaces should also be labeled. 4. The staff suggests that the landscaping plan be revised to incorporate the following: a. additional landscaping at the Meldrum entrance. b. gravel areas should be replaced with landscaping as much as pos- sible. c. each island should have at least one tree, mixture of shrubs and other material. d. shrubs and plantings should be added to the sides of the trash enclosure. e. hoth islands at the southwest entrance to the parking area should have more plantings. f. the Staff promotes a diversity of plantings. OFFICE OF r DLV[LUJVJCN I SERVICES, PLANNING 3U0 LaPorte. Ave. • P.O. Box 580 • Fort Collins, Colorado 80522 • (303) 2216750 Page 2 5. The increase in building size increases the fire flow requirements. A fire hydrant may be required to be installed on the southside of "Iul- berry. The Staff suggest that the applicant meet with representatives from the Poudre Fire Authority and the Building Inspection Department to review the code requirements and determine the need for fire protec- tion. 6. Mountain Bell has an existing 50 pair entrance cable to the existing building, which crosses the area planned for the addition. If it is necessary to relocate or replace the cable, billing will apply. 7. The parking space for the handicapped needs to be a full size space. 8. The 2 parking spaces located in the south entrance from Meldrum Street need to have a curb or stops. 9. The benches located at the corner of Mulberry Street and Meldrum Street may need a revocable permit to locate in the right-of-way ; also they must be low enough so that visibility is not obstructed. Revisions reflecting these comments are due by noon on February 4, 1987. Items that cannot be shown graphically or noted on the plans should be addressed in writing. PMT reductions of all plans and color renderings, including 10 full size copies of all plans should be submitted by Feb. 17, 1987. All final documents are due by Feb. 19, 1987. Included in the final documents should be signed mylars (building elevations, site plan, and plat), the signed site and landscaping covenants, and the Development Agreement. If you have any questions or would like to set up a meeting to review these comments, please call me at 221-6750. Sincerely, i Debbie de8esche City Planner DdB/bh