Dear Dan,
The staff has reviewed your request for a one year extension to the
Raintree PUD Phase 1. There appears to be a few issues that need to be
resolved before the staff could recommend approval of the extension
request. These issues are as follows:
1. The street design does not meet current City standards.
2. The utility plans are no longer current (i.e. street alignment for
Drake Road) and require revisions.
3. There may be the need for an additional utility easement for storm
drainage purposes for a outfall line for storm sewer through Rollin
Moore Park.
The extension request has been tentively scheduled to be reviewed by
the Planning and Zoning Board at their November 19, 1984 meeting. In
order to allow enough time for staff to review any changes to the final
plans, revisions must be submitted no later than Monday, October 29,
1984. If you should require any additional information, please feel
free to call me.
!eni
in rely,
e F a k
o City Planner
cc. Bonnie Tripoli
OFFICE OF PLANNING T 300 LaPorte Ave.. P.O. Box 580 . Fort Collins, Colorado 80522 . (303) 221-6750
& DEVELOPMENT, COMPREHENSIVE PLANNING
November 15, 1984
Re: Raintree P.U.D.
Job No.: 84-439-001
City of Fort Collins
Planning Department
300 Laporte Avenue
Fort Collins, CO 80521
Attn: Bonni Tripoli
In discussion with Rick Ensdorf, preliminary planning shows that the intersection
of Shields and Raintree Drive may become a signalized intersection. This would
mean that a valley pan across Raintree Drive would not be the optimum design.
The modified design of that intersection does not have a valley pan, therefore
it is necessary to provide drainage for water coming down Shields.
Storm drainage modifications include a new catch basin on Raintree Drive with
storm sewer, carrying it to Detention Pond B. The drainage area consists of
the west side of Shields from Drake Street, and a small portion of Raintree
Drive. The total area is .95 acres. Runoff produced by this basin is Q100 _
7.33 cfs and Q2 = 2.08 cfs. Attached is the original storm drainage report
with modifications resulting from the contribution of the new basin "L". Pages
12, 13 and 15 show the contribution to the detention pond. The volume required
changed from 1.21 ac - ft to 1.35 acre - feet. The capacity of the pond is
1.64 acre - feet, so the pond does not need to be changed. Pages 22„ 23A. 24
and 25 show the effect on sewer design and also the new suer along Raintree
Drive. Plan sheet 15 shows the new storm sewer line.
If you have any questions, please feel free to call.
Respectfully,
�
J. Brian ick
TARANTO, STANTON & TAGGE
CONSULTING ENGINEERS
enclosure
F
TARANTO, STANTON & TAGGE
Consulting Engineers
748 Whalers Way • Building D • Fort Collins, CO 80525
(303) 226-0557 • Metro Denver Number (303) 595-9103
*00
� eC �
EVERITT
COMP Es
corpow 46
November 7, 1985
Dick Wartenbe
Transportation Services
City of Fort Collins
P.O. Box 580
Fort Collins, Colorado 80522
Dear Dick:
We have just completed a portion of Drake Road north of our Meadows East
Subdivision. The westernmost portion of this roadway dead -ends into the
Union Pacific Railroad right-of-way. Drake was not widened across the
railroad property, and as a result, some form of barricade/warning
sigaage is necessary where the roadway "necks down" in order to protect
the more unobservant members of the driving public (the dumb ones) from
dropping off the end of the pavement into one large size hole.
Please complete this work at your earliest convenience. You can
consider this your authorization to bill Everitt for any portion of this
signage for which you feel we are responsible.
Sincerely,/
"Robert T. Zakely
/ rtz
cc: Mauri Rupel
3000 South College Avenue
P.O. Box 2125, 80522
Fort Collins, Colorado 80525
(303)226-1500
Development • Brokerage • Construction • Management • Investment • Financing • joint Ventures • Computer Services • Building Materials
CITY OF FORT COLLINS
ENGINEERING SERVICES
April 22, 1986
Pacific Development Corporation
2555 S. Shields Street
Fort Collins, Colorado 80525
Attn: Mr. Bob Berry, Project Manager
Dear Mr. Berry:
In September of 1985, a meeting was held in regard to the improper
location of the two islands - one in Shields Street and the one in
Drake Road. Attending the meeting were Mike Jones and Jeff Wynne
of Parsons & Associates, (Project Manager for Raintree & Associates),
Josh Richardson, Rick Richter and myself representing the City of
Fort Collins. After some discussion, Mike Jones agreed to reconstruct
the islands to eliminate the current obstruction to traffic.
The island in Shields Street was reconstructed last fall, however,
the island in Drake Road has not been reconstructed as agreed.
We will require that this work be completed prior to issuance
of a Certificate of Occupancy for any of the buildings in the
Raintree Commercial P.U.D.'s.
We thank you for your assistance in this matter.
Sincerely,
Mike Herzig
Assistant City Engineer
ENGINEERING SERVICES
%W
15
CITY OF FORT COLLINS
ENGINEERING SERVICES
June 23, 1986
Pacific Development
Attn: Bob Berry
Dear Mr. Berry:
This is to inform you that currently the City Street Oversizing
Fund is continuing to meet its reimbursement obligations.
If you submit invoices and supporting documentation with no delay,
processing of your payment will proceed as normal, with submittal
to reimbursement time approximately ten (10) days.
Please indicate the address you wish payment to be sent on your
submittal.
If you have any further questions, please feel free to call me
at 221-6605.
Sincerely,
zonB er
S.I.D. Coordinator
T
y
,t�4
r� x II`'.
.,.... .. .�. ........_.. .--` •. us<r...ti.. �,•..,..a�..`.:Yu..aeirz:..i�v1�u'Y,l,j.:.:a������ttiL.�e...i..Sn.
ENGINEERING SERVICES 300 LaPorte Ave. P.O. Box 580 Fort Collins, Colorado 80522 (303) 221-6605
u
CITY OF FORT COLLINS
STORM WATER UTILITY
July 18, 1986
Mr. Bob Berry
Pacific Development Corp.
2555 S. Shields Street
Fort Collins, CO 80525
Re: Approval of Raintree P.U.D. Storm Drainage System
Dear Mr. Berry,
The spillway elevation of the Westmost detention pond has been raised to
5042.4 and based on the information provided by Intermill Land Surveying
will provide the required capacity. Therefore, this letter represents
final approval of the stormwater improvements, subject to the normal one
year.warranty period for materials and workmanship.
Please note that the ponds will NOT be maintained by the City. In
addition, it is incumbent upon the owner to come to an agreement with the
New Mercer Irrigation Company regarding the placement of spoils from their
ditch cleaning operations in the ponds. Although the ponds are privately
owned and maintained, they were required to protect downstream property
from flood damage. Non -maintenance by the owner will place him at risk
for said flood damage as well as jeopardize the continued occupancy of the
buildings served by the ponds as per chapter 99 of the City Code.
Sinc rely,
h mas Ga a n
i it Engin er II
cc: Project File
4-