Loading...
HomeMy WebLinkAboutREGENCY PARK PUD - Filed CS-COMMENT SHEETS - 2008-07-07DATE. 31 Ma 8 DEPARTMENT: ITEM. 25-81H REGENCY PARK PUD, Phase 1 Final No Problems !i Problems or Concerns (see below) Date / e7 Signatures Fe DATE: 31 Ma' �� DEPARTMENT: - ITEM: 25-81G REGENCY PARK PUD Preliminary No Problems L , Problems or Concerns (see below) Date 912/K17 Signature *4W CITY OF FORT COLLINS OFFICE OF DEVELOPMENT SERVICES. PLANNING DEPARTMENT April 21, 1987 Mr. Eldon Ward Cityscape Ruilding 21 Old Town Square, Suite 242 Fort Collins, CO. 80524 Dear Mr. Ward: Staff has reviewed the Regency Park PIID, Phase T Final and offers the fol- lowing comments: 1. It will be necessary to vacate all easements from previous platting that are not indicated on this new plat. The vacation procedure hand- out is available. Vacatinns require two readings by City Council after the new plat is filed, and before any huilding permits can be issued. Mike Herzig, Development Fngineer, will coordinate the vacation proce- dure. 2. Not all the facilities indicated on the original Relair Plm plans have been constructed. These will have to be constructed as part of the Regency PIID. (See grading/drainage plan for specifics.) 3. The outlet on culvert crossing on Regency at the Harmony intersection needs to he cleaned up, regraded, and erosion control provided. 4. On the grading/drainage plan: a. Continue contours a minimum of 5n feet off site. b. Indicate proposed contours c. The summary tables should include site hydrningy, gross and net acres, and gross and net 'C' values. 5. The Stormwater Ilti lity requests that snme work be done on the regiona 1 detention faci lity. This would include cleaning up,- regrading, seed- ing, and finishing various appurtenant structures such as the outlet and emergency spillway. f,. See the utility plan for any additional comments from the Stormwater Ilti lity. OFFICE OF DEVELOPMENT 11 300 LaPorte Ave. • P.O. Box 580 • Fort Collins, Colorado 80522 • (303) 221 6750 SERVICES, PLANNING Page 2 % %a 7. Significant modifications to existing electric facilities will be nec- essary at the developer's expense. 8. Please add this note to the site plan: "nue to water pressure in excess of 90 psi., pressure reducing valves will be squired on all water service lines." 9. Building 5 in the multi -family area exceeds 150 feet access measure- ment. 10. The Poudre Valley Fire Authority requests that a second point of access be provided. 11. Condominium buildings appear to be three story structures, and may require special building code requirements. 12. The previous PUD had residential sprinkler condition allowing omission of the second point of access and significant building code trade-offs in the large multi -family buildings. 13. The landscape plan is preliminary. Please add this note to the final landscape plan: "A free (no charge) permit must be obtained from the City Forester before any trees or shrubs as noted on this plan are planted, pruned, or removed on the public right-of-way." The following comments apply to the Preliminary: 1. On the cul-de-sacs, use 35 feet radius with 44 feet right-of-way line rather than the larger 40 feet radius on a 49 feet R-O-W. 2. The site distances at the intersections should he checked to make sure the typical landscape treatment is acceptable. 3. Include the street width dimensions on all cul-de-sacs. 4. A number of water and sewer mains and services exist on this site. All unused utilities must be abandoned and removed from the right-of-way. Services must be reduced to the appropriate size and 20 feet unob- structed easements must he dedicated for utility lines outside the right-of-way. 5. Pressure reducing valves will he required on all water service lines. 6. Additional comments are on the preliminary utility plans. 7. All buildings south of Hilburn must meet the 150 feet access measure- ment. 8. Fire flow capability of 6 inch water line in the multi -family area must be provided. Page 3 %W 14d 9. Project must be provided with a second point of access. lJakerohin or Seneca must be completed back to a second point of access. 10. A, rep lat of Block three area wi 11 be required if property lines have changed from the original POn. 11. All landscape maintenance shall be the respnnsibi lity of homeowners or the developer. This concludes staff comments at this time. Please note the following deadlines for the May 18, 1g87 Planning and Zoning 9oard hearing: Plan revisions are due April 30, 1987 PMT's, colored renderings, final prints are due May 11, 1987 Final documents are due May 14, 1987. Please call me at 221-6750, if there are any questions. Sincerely,��-� Ted Shard Project Planner TS/bh