Selected Issues Report
Citvof Fort Collins
4/10/2008 Date:
SEVEN GENERATIONS OFFICE PARK PDP - TYPE I AND FINAL
PLANS (FORMERLY EASTBROOK OFFICE PARK)
SELECTION CRITERIA: Status = All
ISSUES:
Department: Engineering Issue Contact: Susan Joy
Topic: Detail Sheet
Number:57 Created:4/18/2006 Resolved
[4/18/06] Final Compliance - Please add details 701, 1602, 2501, and the new ramp detail (I
can send that to you email if you don't have it because I don't think its online yet).
Topic: General
Number:28 Created:3/7/2006 Resolved
[3/7/06] The existing attached 4' sidewalk along Eastbrook does not meet current standards
and this development is responsible for upgrading their frontage to either an 8' attached
walk OR a 4.5' detached walk. As discussed, Lance Newlin with Inspection went out to take
a look at the sidewalk and reported back that the existing sidewalk is in very good shape
and that no removals will be required (there is some broken curb that will need to be
replaced but that's it). Engineering then discussed this with Transportation Planning and
agreed that in this particular instance, we will only ask that you widen out the sidewalk to an
8' attached walk from the north drive entrance to the bike trail where the need is the
greatest. We will not require the rest of the sidewalk to the southern property line to be
widened out at this time. Please install a ramp in accordance with detail 1602 (T-
Intersection Ramp requirement).
Number:29 Created:3/7/2006 Resolved
[3/7/06] Parking setbacks from Eastbrook are 50'. The current layout does not meet
minimum requirements. (note: should be 40' setback and they are meeting requirements)
Number:30 Created:3/7/2006 Resolved
[3/7/06] Driveways must be perpendicular (plus or minus 10 degrees) for a minimum of 25'.
Number:32 Created:3/7/2006 Resolved
[3/7/06] Minimum inside turning radii for Emergency Access Easements is 25' and minimum
outside turning radii is 50'. 1 will need an exhibit showing that PFA's requirements are being
met - an 8.5x11 is fine.
Number:33 Created:3/7/2006 Pending
[9/26/06] Please submit the legals & exhibits for each of the easement dedications along
with the completed TDRF application.
[4/18/06] Final Compliance comment -just carrying this through until then.
[3/7/06] Please provide legals and exhibits for all easements being dedicated by separate
document for our review.
Page 1
Number:34 Created:3/7/2006 Pending
[9/26/061
[4/18/061 Final Compliance comment -just carrying this through until then.
[3/7/06] All easements to dedicated by separate document have a $250 processing fee
each plus the appropriate Larimer County filing fee.
Number:35 Created:3/7/2006 Resolved
[4/18/06] I'm checking with Stormwater to see if we can get by with just a letter of
permission from Lot 4 versus an actual easement since Lot 4 is owned by this development
as well.
[3/7/06] Please show, label and dimension all easements on all plan sets. All plan sets
need to match. The landscape plans are showing offsite grading along the north side of the
property line that the utility plans do not.
Number:53 Created:4/18/2006 Resolved
[4/18/06] The utility easement vacation request was routed and approved provided that this
project does not require any portion of the easement to remain. It appears from the plans
that this is not going to be a problem. In addition, a $400 fee for vacating the easement is
required. Please forward a check made out to "City of Fort Collins" prior to going to hearing
if possible or we can put the payment off until Final Compliance if you need to. The legals
and exhibit as well as the actual vacation can take place during Final Compliance.
Number:59 Created:4/18/2006 Resolved
(4/18/061 Engineering is ready for this project to go to Hearing.
Number:67 Created:9126/2006 Pending
[9/26/06] 1 can email you the Development Agreement (DA) Information sheet if you email
me at sjoy@fcgov.com. Please fill it out and fax or email it back to me when convenient and
we can start on the DA.
Number:68 Created:9/26/2006 Pending
[9/26/061 Will you be starting construction soon? If so, we can start on the Development
Construction Permit. I can email all of that information as well. If the project is going to wait
awhile, then call us when you're ready and we'll fill everything out then.
Number:69 Created:9/27/2006 Pending
[9/27/061 Change the name on all plan sets to match the new title.
Topic: Grading Sheet
Number:56 Created: 4/1812006 Resolved
[4/18/06) Final Compliance - Label all slope ratios.
Number:58 Created:4/18/2006 Resolved
[4/18/06] Final Compliance - Please provide spot elevations for the lot comers.
Topic: Site Plan
Number:55 Created:4/18/2006 Resolved
[4/18/06] Final Compliance - Please dimension and label all easements to match the utility
plans.
Topic: Utility Plans
Number: 31
Created:3/7/2006 Resolved
Page 2
[3/71061 Grading Sheet - Drainage at the driveways must have the HP at the row line. That
way drainage goes back into the site from the row back and into the street from the row
forward. (Final Compliance)
Number:36 Created:3/7/2006 Resolved
[317/06] Grading Plan - please refer to detail D10/Sheet 8 for the sidewalk chases (Final
Compliance).
Number:37 Created:3/7/2006 Resolved
[3/7/06] More detailed comments to follow with Final Compliance submittal.
Number:54 Created:4/18/2006 Resolved
[4/18/061 Final Compliance - Station the driveway curb cuts.
Department: Traffic Operations Issue Contact: Eric Bracke
Topic: Traffic
Number:I Created:2/16/2006 Unresolved
[2/16/061 On page 4 of the TIS, it incorrectly states that the area is a mixed use district and
the level of service standards are E for overall operation and F for approach leg. The
structure plan defines this area as an industrial district, where the LOS standards are D and
E, respectively. The intersection of Timberline/Danfield currently has the WB approach leg
failing the standard. However, since the project does not add trips to this leg, they should
not be held accountable for the deficiencies.
A direct pedestrian connection from the parking area to the Vermont Trail/underpass may be
appropriate.
Department: Transportation Planning Issue Contact: David Averill
Topic: General
Number:49 Created:3/10/2006 Resolved
[3/10/06] 1 concur with comment # 4 above. More bicycle parking should be provided and
should be located nearer to building entrances. Pleae coordinate all bicycle rack locations
on utility/landscape/site sheets. Thanks.
Number:50 Created:3/10/2006 Resolved
[3/10/06] This project will be able to better address some Ped LOS deficiency's if you can
figure out a way to connect directly to the multi -use path that lies on the parcel to the north.
A connection could cross that northern drive -aisle and tie directly into the ped circualtion
system that you have proposed on site. This would more adequately address the Failing
"Directness" measure for the neighborhood to the west of this site.
Number:51 Created:3/10/2006 Resolved
[3/10/06] Need to provide a ramp near the handicap parking located off of the northern drive
aisle.
Number:52 Created:3/10/2006 Resolved
13/10/06] Need to intall a crosswalk ramp south of the northern drive aisle entrance that
aligns with the existing ramp on the SE corner of Vermont/Eastbrook. See redlined site plan
for clarification.
Number:60 Created:4125/2006 Pending
[10/3/06] Still ready for hearing ;).
[4/25/06] No further comments. Ready for hearing.
Page 3