HomeMy WebLinkAboutROSSBOROUGH FOURTH - Filed GC-GENERAL CORRESPONDENCE - 2008-06-09%W
n
CITY OF FORT COLLINS
OFFICE OF DEVELOPMENT SERVICES, PLANNING DEPARTMENT
March 28, 1988
Roger Strauss
1800 W. Horsetooth Rd.
Fort Collins, CO. 80526
Dear Mr. Strauss,
The City Staff has completed its review of Rossborough, Fourth Filling, and
has the following comments:
1. Please provide a letter, submitted by an engineer, that states the replat
does/doesn't affect runoff. If any increase is expected it must be
addressed.
2. A repay exists on the water line in Horsetooth and Taft. Payment must be
made for Rossborough's entire frontage along these water lines before any
permits are issued in the 4th filing.
3. The plans do not show an existing side easement on lot #156. Any reloca-
tion of existing facilities will be at the developers expense.
4. Mountain Bell requests a 6' easement on the east property line of lots 81
and 102.
5. The development agreement needs to be amended to cover the improvements
to Taft Hill and the ,timing for removing the factory.
6. There was a landscape plan which addresses landscape, fencing, and retain-
ing walls along Taft Hill and Horsetooth when the project was approved.
Please address how this replat effects this plan. We may need a revised
landscape plan.
7. There are a couple of streets with out names, please provide the names on
the plans.
SERVICES, PLANNING """ -"' "" " "' 1 "" �uluis, �aioraao ouozz • (auu) 221-6750
Page 2
Revisions reflecting these comments are due by noon on 1Vednesday. April 6
19888.' Items that cannot be shown graphically or noted on the plans should be
addressed in writing.
PMT reductions of all plans, color renderings, and 10 full size copies of all
plans are due by Monday April 18 1988
All final documents are due by Thursday April 21 1988. The final documents
should include the development agreement, signed mylars, and signed landscape
covenants.
If you have any qucstions or would like to set up a meeting to discuss these
comments, please call me at 221-6750.
Sincerely, J
414�el d>ojA�
Debbie deBesche
City Planner
xc: Mike Herzig, Development Coordinator
Jim Faulhaber, Civil Engineer I
Joe Frank, Assistant Planning Director
s
STEWART&ASSOCIATES
Consulting Engineers and Surveyors
April 6, 1988
Ms. Debbie de Besche
City Planner
City of Fort Collins
P 0 Box 580
Fort Collin, Co. 80522
Dear Debbie:
This is to inform you that Rossboroug Fourth
of a part of Rossborough, Third Filing and t a e configurationeofat
the lots has not changed. The reason for the replat is to=change the
covenants. The impervious ground cover will not change and therefore
the storm water runoff is not affected.
Roger Strauss will work with the Water Department regarding the
repay for the water line in Horsetooth and Taft Hill Roads. The repay
should not be required until building permits are applied for on the
lots West of Dunbar Avenue. Trend Homes built and paid for the water
line on Horsetooth Road from their East property line to Dunbar Avenue.
The lots East of Dunbar Avenue included in the Fourth Filing therefore
should not trigger the repay.
Mike Herzig is taking care of the amended development agreement
regarding Taft Hill Road improvements and the removal of the factory.
The replat does not affect the landscape plan for Horsetooth Road
and Taft Hill Road. The lots do not change. The landscaping has been
completed on Horsetooth Road. The fencing on both roads and the
landscaping on Taft Hill Road will be done when they finish the
improvements on Taft Hill Road.
call. If you have any further questions regarding this project, please
1km
cc: Roger Strauss
James H. Stewart
and Associates, Inc.
214 N. Howes Street
PO Box 429
Ft. Collins. CC 80522
303/482-9331
Sincerely,
Richard A. Rutherford, P.E. & L.S.
President
Deve )went Services
Engineering Department
November 27, 1989
Jeff Strauss
Tri-Trend Homes
1800 West Horsetooth Road
Fort Collins, Colorado 80526
Re: Rossborough 3rd anda4Filings
Dear Mr. Strauss:
Earlier this year I wrote a letter regarding the need to complete the storm
drainage improvements within the Rossborough developments. In this letter
dated April 24, 1989 there were several items noted which need to be
cmPleted or the City would withhold all permits until such time as the
required work was finished. Consequently, Drexel/Burrell Engineering
contacted the City Storm Drainage Department on an occasional basis to
inquire about the status of the drainage in Rossborough. It is our
understanding that they were acting on behalf of Tri-Trend. However, as of
this date the necessary work has not been coupleted nor has the City
received any communication from the Engineer or your firm as to what the
plans are for addressing the storm drainage concerns.
It is my belief that the City has tried to work with your firm in resolving
the storm drainage issue and has allowed over three tines the allotted 43
permits for the 3rd Filing as was stated in the Development Agreement for
the 3n9 and 4th Filings. As you may recall, all of the storm drainage
irprovements east of Dunbar were to be co npleted prior to the release of
the 43xd permit, and all improvements were to be completed in the
Rossborough developments prior to the release of the 151st permit in the
3rd and 4th Filings. As of this date my records indicate 121 permits have
been issued for these filings, which is 30 permits shy of the allowable 151
for those improvements on the west side of Dunbar. Unfortunately, the east
side of Dunbar has basically been built without completing the improvements
as required, forcing us to demand the corpletion of the storm drainage
improvements in order to protect the health and welfare of those living on
the east side of Dunbar.
ovu �drune avenue • t-.u. box 06U • Fart Collins, CO 80522-0580 • (303) 221.6605
Jeff Strauss
Page Two
Please be informed that as of December 10, 1989 the City will not issue any
additional permits within the Rossborough developments until such time as
the east side improvements are completed and/or some arrangements for their
completion are agreed upon by the Storm Drainage Department. Additionally,
I strongly suggest that the remaining improvements be
the develo coacent throughout
development. Without the needed iimprovementsaadjacent
ed to the
irrigation ditch, it is my opinion that your firm and the City are assuming
some liabilities that neither of us want should a flooding storm occur.
I realize you may feel the City is being harsh, but the storm drainage
system for the Rossborough developments have been in a half completed state
for several years and probably will not function as intended if a storm
should occur. It is our desire that this system be completed and certified
that it is properly constructed as designed.
Sincerely,
David Stringer
Chief Construction Inspector
cc: Roca Albers
Bob Smith
:r► V40
Drexel Barrell
/T\
Engineers/Surveyors April 19, 1990
Incorporated
Boulder, City of Fort Collins Engineer Department
Colorado springs 300 LaPorte Avenue
P.O. Box 580
4840 Pearl East Circle Fort Collins, CO 80522-0580
Suite 114 Attn: Rodney Albers
Boulder, Colorado 80301
RE: Rossborough 4th Filing Drainage Amendment
303 442 4338
Dear Rodney:
This letter is in reference to grade changes in Kent
Court and Kent Way and the effect on the currently
approved drainage design prepared by James Stewart &
Associates and approved by the City of Fort Collins.
The only changes to the existing design were slight
changes in the road grade of both roads. Kent Way road
grade increased from .48% to .64%. Kent Court road grade
increased from 2.45% to 2.64% from Sta. 3+50 to the end
of the cul-de-sac. All storm inlets, manholes, pipe
grades, size and locations remained the same as in
the previously approved design.
The increase in road grade results in an insignificant
increase in the time of concentration and does not
materially change the storm water run-off or capacities.
If you have any questions and or comments concerning this
matter, please do not hesitate to contact me.
Respectfully,
Greg Hogan
GH/scc
E-3992
(0590C.GH)
Drexel Barrell
/T\
Engineers/Surveyors October 5, 1990
Incorporated
Boulder, City of Fort Collins
Colorado Springs Development Services, Engineering Department
P.O. Box 580
4840 Pearl Fast Circle Fort Collins, CO 80522-0580
Suite 114 Attn: Mr. Steve Biegler
Boulder, Colorado 80301
303 442 4338 RE: Rossborough Forth Filing
Dear Steve:
Regarding your letter of September 26, 1990, to Tri-
Trend, Incorporated. From your letter it is my
understanding that the City has performed the necessary
testing of the installation and construction of the water
mains, sanitary sewer mains, storm sewer lines and
facilities, street pavements, street lights and street
signs.
That these tests have met or exceed the City's
requirements and the construction warranty period of one
year begins the date of your letter, September 26, 1990
and final acceptance, pending repairs, is September 26,
1991. The streets included are Enfield Court, Lots 86
thru 93, Kent Court, Lots 25 thru 42 and Kent Way, Lots
77 thru 80.
If this is not the intent of your letter, please advise.
biipcerely,
?�Cli/iut_
James T. Stewart
JTS/scc
cc: Tri-Trend
Schmidt Earth Builders
(086OC.JTS)