Loading...
HomeMy WebLinkAboutHARMONY TECHNOLOGY PARK SEPTEMBER 2000 - Filed CS-COMMENT SHEETS - 2008-06-03PROJECT COMMENT SHEET Current Plannine DATE: March 1, 2000 TO: Trans Planning PROJECT: #12-97C Harmony Technology Park — Amended ODP — Type II (LUC) All comments must be received by Ron Fuchs no later than the staff review meeting: March 29, 2000 Note- Please identify your redlines for future reference Project: Harmony Technology Park -ODP Department: Transportation Planning Kathleen Reavis, phone (970)224-6140 or email: kreai°is'dci.fort-collins.co.us Transportation Impact Study/ODP 1. TIS needs to address pedestrian and bicycle LOS requirements pertaining to the planned school/park site on CR36 (south side of roadway, across from Cinquefoil intersection) as well as the planned community park site on CR9 just south of future Rock Creek Drive connection. The school/park site on CR36 needs to include analysis of street xing options, including a grade separated underpass. 2. TIS and ODP need to address connectivity to the future multi -use trail planned along CR7 between Harmony Road and CR36. 3. TIS needs to address Eric Bracke's requirements for analysis of the Harmony/Cambridge intersection, showing options with a future signalized intersection and without (as a'/4 intersection). Needs to show Cinquefoil as a RIRO option vs. the'/4. Final determination of type of access allowed at the intersections of Harmony/Cambridge and Harmony/Cinquefoil intersections will be determined jointly by the City and CDOT through the update to the Harmony Road Access Control Plan. A draft of the plan recommendations will be available in mid -April and I copy will be sent to Matt Delich. 4. TIS and ODP need to include extension of Harmony Technology Parkway south to intersect with future Rock Creek Drive extension and needs to show Rock Creek Drive intersections aligning (as one 4-legged intersection) at CR9 instead of the off -set. Name the east/west collector as "Rock Creek Drive". Signature CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _Plat _Site _Drainage Report Other _Utility _Redline Utility _Landscape City of Fort Collins From: Eric Bracke To: Bob Blanchard, Ron Fuchs Date: 3/7/00 11:08 AM Subject: Harmony Tech CDP I have had an opportunity to review the Harmony Tech Park CDP TIS and offer the following comments 1. The TIS assumes that Cambridge will be a signalized intersection. This is not a fair assumption. When the City agreed to signalize Technology Parkway, Cambridge was used as the lever. The City is now in a position to "justify' the need for a signal at Cambridge. 2. The analysis for the justification will require a redistribution of trips to the other signalize intersections. It may also require a reevaluation of land use distributions/types. 3. The analysis should be in a format that CDOT is used to such as an access control plan format. 4. AM and PM PASSER or Synchro runs must be provided (with and without Cambridge) 5. Cinquefoil/Harmony is shown as a 314 intersection. The Harmony Road access contol plan has it as an approved d/ro. A wb left turn addition to the intersection is not supported at this time. 6. Since Technology Parkway is a public collector, I have the expectation that it will continue southward to make the connection to the east -west collector. Kind Regards, Eric L. Bracke, P.E. Traffic Engineer City of Fort Collins email:ebracke@ci.fort-collins.co.us CC: Dave Stringer, FCI:INET:mdelich@frii.com, Kathie... PROJECT COMMENT SHEET Current Plannine DATE: March I, 2000 TO: Engineering Pavement PROJECT: #12-97C Harmony Technology Park —Amended ODP — Type II (LUC) All comments must be received by Ron Fuchs no later than the staff review meeting: March 29, 2000 Note- Please identify your redlines for future reference /V 0 com~/_t7L signature CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _Plat _Site _Drainage Report _Other _Utility _Redline Utility _Landscape PROJECT COMMENT SHEET MAR �000 Current Plannine FFiafv�,i 4'=; DATE: March 1, 2000 TO: Transfort PROJECT: # 12-97C Harmony Technology Park —Amended ODP — Type II (LUC) All comments must be received by Ron Fuchs no later than the staff review meeting: March 29, 2000 Note- Please identify your redlines for future reference CHECK HET y0U WISH TO RECEIVE COPIES OF REVISIONS _Plat S/ite Drainage Report Other _Utility _Redline Utility j,Landscape SHEET DATE: March 1, 2000 DEPT: ENGINEERING PROJECT: #12-97C Harmony Technology Park —Amended ODP— Type H (LUC) PLANNER: Ron Fuchs ENGINEER: Tim Blandford All comments must be received by: March 29, 2000 ❑ No Problems 0 Problems or Concerns (see below or attached) Comments: • The proposed east/ west collector street should be labeled as Rock Creek Drive (or whatever the street is called for the Harvest Park development) and should align with the point of access on the west side of CR 9. • Please add the access points as described on the redlined ODP. • Technology Parkway needs to be shown as a collector street that ties into the ease/west collector street — Rock Creek. • Please label all arrows, which are shown on the perimeter of the property, as "future street connections". • Please add the notes indicated on the ODP. • Please add a note that states "The pedestrian circulation routes is not be shown to preclude a street through the development". • Currently, Kathleen Reavis, Transportation Planning Dept., is working with a team to update the access plan for Harmony Road (State Hwy 68), which should be completed in April. This plan effects the Willowbrook ODP and the Harmony Technology Park ODP in that it is reviewing access options for Cambridge Avenue, Cinquefoil Street, and County Road 7. At this point in time, the City cannot support a signalized intersection at Cambridge Drive and a % access at Cinquefoil Lane. • CDOT is preparing design options to Harmony Road (State Hwy 68), which may effect grades at the Cinquefoil Street Intersection. As I understand it, the redesign and construction of these improvements may raise or lower that intersection. • Eric Bracke, City Traffic Engineer and Kathleen Reavis have concerns about the Traffic Impact Study. These concerns relate to the Harmony Road (State Hwy 68) access plan. Their concerns need to be addressed in the traffic study prior to considering any construction improvements. • Please address the specific comments and concerns redlined on the ODP. • Please show the street network through Parcel B. • Please include pedestrian corridors on the ODP and label as s h. Date: April 3, 2000 Signature: PLEASE SEND COPIES OF MARKED REVISIONS ❑ Plat ❑ Site ❑ Utility ❑ Landscape ❑ Drainage Report 0 ODP 0 NO COMMENTS -SUBMIT MYLARS PROJECT COMMENT SHEET Current Plannine DATE: March 1, 2000 TO: Street Oversizing PROJECT: #12-97C Harmony Technology Park —Amended ODP — Type II (LUC) All comments must be received by Ron Fuchs no later than the staff review meeting: March 29, 2000 Note- Please identify your redlines for future reference HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _Plat _Site _Drainage Report _Other _Utility _Redline Utility _Landscape w. City of Fort Collins PROJECT SHEET DATE: June 21, 2000 DEPT: ENGINEERING PROJECT: #12-97 Harmony Technology Park — Amended ODP — Type II (LUC) PLANNER: Ron Fuchs ENGINEER: Tim Blandford All comments must be received by: July 12 2000 ❑ No Problems 2 Problems or Concerns (see below or attached) Comments: ALTERNATIVE COMPLIANCE PLAN • The Engineering Department cannot support the proposed access configuration along Rock Creek Drive and Cambridge Drive. Public access points need to be provided at 660 foot intervals. • Refer to the Alternative Compliance Plan for more specific comments. AMENDED ODP • Please modify note number 1 on the Cover Sheet. • Please modify the proposed access points as shown on sheet number 2. • See ODP for additional comments and concerns. Date:,uly 18, 2000 Signature: PLEASE SEND COPIES OF MARKED REVISIONS ❑ Plat ❑ Site ❑ Utility ❑ Landscape ❑ Drainage Report Q ODP 0 NO COMMENTS -SUBMIT MYLARS No Comment © Problems or Concerns (see below or attached) **PLEASE IDENTIFY YOUR REDLINES FOR FUTURE REFERENCE** A'-t-- r e%a Oe- cro ,oa, f s w c— <!- 48 Date:• S' LZ • pb Si¢nsh�re c= ��r��ta,yyt;;��,, sx aim Mt —Odff— %W REVISION COMMENT SHEET DATE: August 9, 2000 DEPT: ENGINEERING PROJECT: #12-97C Harmony Technology Park — ODP — Type 11 (LUC) PLANNER: Ron Fuchs ENGINEER: Tim Blandford All comments must be received by: August 30, 2000 ❑ No Problems 0 Problems or Concerns (see below or attached) Comments: • Please modify note #1. • Please show the proposed pedestrian/bicycle circulation routes as shown on the plans. • Please resolve the conflict between this plan and the Hewlett Packard pilot project. • Please show the proposed transportation access point as indicated on the plans. ALTERNATIVE COMPLIANCE PLAN: • Please add the transportation access points where indicated. Date: September 1 2000 Signature: PLEASE SEND COPIES OF MARKED REVISIONS ❑ Plat ❑ Site ❑ Utility ❑ Landscape ❑ Drainage Report 0 NO COMMENTS -SUBMIT MYLARS 21 ODP