HomeMy WebLinkAboutMAPLE HILL REPLAT - Filed CS-COMMENT SHEETS - 2008-04-28L-)
Selected Issues Report
City of Port Coll
Date:
4/16/2008
MAPLE HILL 1ST REPLAT - TYPE I (LUC) AND FINAL PLAN
SELECTION CRITERIA: Status = All
ISSUES:
Department: Engineering Issue Contact: Dave Stringer
Topic: General
Number:3 Created:1/30/2004 Resolved
[1/30/04] Ready for hearing. See redline blue lines need to show corner cut in right-of-way
of alley as depicted on detail 7-12F.
Number:4 Created:1/30/2004 Resolved
[1/30/04] Need to provide more detail with Final Compliance Plans. See red line blue lines,
show existing utilities as existing and/or make reference to what plans they are to be
constructed with.
Number:5 Created:1/30/2004 Resolved
[1130/04] Provide cross section of alley type being proposed for construction.
Number:13 Created:3/29/2004 Pending
13/29/041 I'm confused. Why two sets of plans, one for alley work which are revisions to
original approved plans and then another set for drainage storm water. Prefer to have all
sheets as revisions to approved plans. No additional comments
Department: Transportation Planning Issue Contact: Tom Reiff
Topic: General
Number:8 Created:2/11/2004 Unresolved
12/11/04] No comments
Page 1
q .
Selected Issues Report
City of hurt Collfnn
Date:
4/16/2008
MAPLE HILL AMENDED FIRST REPLAT - TYPE I (LUC) AND FINAL
PLAN
SELECTION CRITERIA: Status = All
ISSUES:
Department: Engineering Issue Contact: Katie Moore
Topic: General
Number:16 Created:7/21/2004 Resolved
[7/21/04] 1 received one legal description for a temporary turnaround easement. Please
provide legals for both.
Easements are only needed where the ROW is insufficient in width - the easement should
not overlap the ROW.
Number:17 Created:7/21/2004 Resolved
[7/21/04] Minor amendment comments, FYI:
-Show temporary turnarounds for phase one and two.
-1 can't get the numbers to work for the changes in single-family and duplex lots. Please
clarify.
-Will block 23, the west half, be duplexes or single family?
-Larger fonts are needed for the lot labels - the existing font is too small.
Number:20
Created:
712812004
Pending
[9/221041
[7/28/04]
Please see redlines for any additional comments.
Topic: Plat
Number:14 Created:7/21/2004
Resolved
[7121/041
Who will own and maintain Tract A?
Number:15
Created:7/21/2004
Resolved
[7/21/04]
Add signature line for Gillespie Farm Development Co. per pg.
2 of the plat.
Number:26
Created:9/22/2004
Pending
[9/22/04]
Please label the driveway easements as private.
Topic: Utility plans
Number:3 Created:7/21/2004 Pending
[9/221041 Some of the original sheets showing bubbled out areas still refer to 32A and B;
please revise.
17/21/04] 32A and B - the sheet numbers need to reflect one of the original sheets being
revised, and 32 is not being revised. Please pick from the several sheet numbers which are
applicable.
Page 1
Number:4 Created: 7/2112004 Resolved
[7/21/041 sheet 32A and B - the new utility layout example has the driveway edges very
close together. The minimum separation of driveways on residential local streets is 12 feet.
Another option would be to use shared driveways and dedicate easements for them. Please
provide a dimension for the minimum distance from trees to services.
Number:5 Created:7/21/2004 Resolved
17/21/041 80A - Repeat - make these revisions on the ORIGINAL sheet.
Max grade break = 0.4%. Please revise.
Number:6 Created:7/21/2004 Resolved
[91221041
[7121/04] Baker lateral sheet 4 of 5 - What should this sheet really be numbered? How
does it fit within the utility plan set?
Please provide an easement for this lateral; it should be an access, maintenance and
irrigation easement. We'll need to include language in the amended DA regarding the
operation and maintenance of the gate/lateral.
Number:7 Created:7/21/2004 Resolved
[7/21/04] Sheets 24 and 25 - Bubble out revised areas and note changes on revision
blocks. Show original signatures.
Number:8 Created:7/2112004 Pending
[9/22/04] Please add in the barricades for the sidewalks.
[7/21/041 Sheets 24, 25: don't barricade off the turnarounds; barricade the ends of the
sidewalks.
Number:9 Created:7/21/2004 Resolved
[7/21/04] Sheet 25a: increase scale of text so it can be read/scanned.
Number:10 Created:7/21/2004 Resolved
[7121/041 25b: add note to apply to the City to vacate the temporary turnaround easements
from phase 1.
Number:11 Created:7/21/2004 Resolved
[7121/041 25c: add note to apply to the City to vacate the temporary turnaround easements
from phase 2.
Number:12 Created:7/2112004 Resolved
[7/21/041 On all original sheets: show original signatures, bubble and number revisions,
and note changes on revision blocks.
Number:13 Created:7/21/2004 Resolved
[7/21/04] Please organize all utility plan sheets and staple together in one set.
Page 2