Loading...
HomeMy WebLinkAboutINTERCHANGE BUSINESS PARK - Filed CS-COMMENT SHEETS - 2008-04-22COUNTY REF1 COMMENT S City of Fort Collins Current Planning COMMENTS TO: Keith Schuett BY: May 29, 1997 TYPE OF MEETING: Concept Technical Review PROJECT: Interchange Business Park PUD FROM: City of Fort Collins Engineering Department THRU: City of Fort Collins Planning Department PLANNER: Leanne Harter City comments must be received in Current Planning Department by: Thursday, May 22,1997 ❑ No Problems L�1 Problems or Concerns (see below or attached) 1. The internal streets need to be developed in accordance with the Urban Area Road standards or current City Standards. Commercial/ Industrial streets under both criteria have a 44 foot flowline to flowline dimension with a 62 foot Row in the Urban Area Standards and a 66 foot Row under City Criteria. 2. Improvements to the Frontage Rd and SH # 14 should be done along the frontage of the property. In addition improvements should be made off site as needed to mitigate traffic. 3. SH # 14 is considered a minor arterial along this property. A minor arterial requires a half Row of 42 feet and a 15 foot utility easement behind this. 4. Is the gas station proposed in the floodplain? 5. Recommend that joint access be provided/utilized between the commercial and sites and Mulberry Inn site. 6. Any access points off of the frontage Rd and Sh # 14 need CDOT approval and state highway access permits. 7. Are acceleration/ deceleration lanes needed for the access points? State high ay access permits for the new access points will need to be obt 'wed from CDOT. Date: 5/?T2 Signature: za COUNTY REFERRA COUNTY REFERRAL WhImin"I COMMENT SHEET City of Fort Collins Current Planning COMMENTS TO: Keith Schuett BY: August 25, 1997 TYPE OF MEETING: Urban Growth Area Review Board PROJECT: Interchange Business Park PUD FROM: City of Fort Collins Engineering Department THRU: City of Fort Collins Planning Department PLANNER: Leanne Harter City comments must be received in Current Planning Department by: ***Monday, August 25,1997**** ❑ No Problems E /Problems or Concerns (see below or attached) Date: / 7 Signaturek-1� COUNTY REFERRAL Ift COMMENT SHEET City of Fort Collins Current Planning COMMENTS TO: Keith Schuett BY: August 25, 1997 t TYPE OF MEETING: Urban Growth Area Review Board PROJECT: Interchange Business Park PUD FROM: City of Fort Collins Transportation Department THRU: City of Fort Collins Planning Department PLANNER: Leanne Harter City comments m-= be received in Current Planning Department by: ***Monday, August 25,1997**** ❑�/No Problems Lf Problems or Concerns (see below or attached) �e1icJle �,��5 unknowr)? SA-aAF cNou« l i k` +) v�ew 7 L s4-"y 'I - �� a rt- s-�-udy 5h100A 0.ddrt57r l-X,s-i-1. Qrobl�ms' I n � a r c.oL Date: g ZZ Signawr;* City of Fort Collins Current Planning COUNTY 'ERRAL COMMENT SHEET COMMENTS TO: Sean Wheeler FROM:Engineering TYPE OF MEETING: Urban Growth Area Review Board PROJECT: Interchange Business Park P.U.D. THRU: City of Fort Collins Planning Department PLANNER: Bob Blanchard City comments must be received in Current Planning Department by: April 2,1999 11 No Problems Q- Problems or Concerns (see below or attached) -z4-?-1 Date: �`--s--� City of Fort Collins 6 a u_ Y L O a H o► 2 m d CM c 0 s L N H COUNTY REFERRAL City of Fort Collins COMMENT SHEET Current Planning COMMENTS TO: Sean Wheeler FROM:Engineering TYPE OF MEETING: Board of County Commissioners PROJECT: Interchange Business Park FP THRU: City of Fort Collins Planning Department PLANNER: Cameron Gloss City comments must be received in Current Planning Department by: September 14, 2000 ❑ No Problems B'� Problems or Concerns (see below or attached) 6--24c�— 7 Date: y — %,�p — cn, i I�il c���l,b l-fig.—.1_� �.„... ✓O� 1—„� G:!/a ��L�O City of Fort Collins City of Fort Collins COMMENT SHEET Current Planning COMMENTS TO: Matt Lafferty FROM: Engineering TYPE OF MEETING: Staff Review PROJECT: Interchange Business L4-6 AP THRU: City of Fort Collins Planning Department PLANNER: Bib p rr, c �o Ii Co 1 � City comments must be received in Current Planning Department by: August 15, 2001 XNo Problems Problems or Concerns (see below or attached) , � ,: Signature:--�^�-�—`� Date: City of Fort Collins Current Planning COUNTY REFERRAL COMMENT SHEET COMMENTS TO: Matt Lafferty FROM: Engineering TYPE OF MEETING: Site Plan Review PROJECT: Rec Center @ Interchange Bus SP THRU: City of Fort Collins Planning Department PLANNER: Bob Barkeen City comments must be received in the Current Planning Department by: August 20, 2003 No Problems Ej�Problems or Concerns (see below or attached) Rec Center @interchange BP SP 8/26/03 1. Is there to be sidewalk on Denrose Court? None is shown on the plans. Sidewalk should be provided. 2. The driveways should align or meet separation requirements of the Larimer County Urban Area Street Standards. Are there any driveways across from the western driveway? The other side of the street is not shown in any of the plans? 3. The site doesn't meet traffic volume requirements for the use of high volume driveways. Standard driveway cuts should be used. 4. The sidewalk along Mulberry should connect to the adjacent parcels not just loop on site. 5. In accordance with the Larimer County Urban Area Street Standards drainage is not suppose to go out the driveways. All three of the driveways are shown to carry flows from the parking lot out the driveway. 6. Was additional row and easements dedicated for Mulberry Street? If not it should be dedicated at this time. 7. Frontage improvements along Mulberry are not shown on these plans. This property is responsible for there frontage improvements. Are these planed at some time? Did this property put up money for the future construction of these if they are not planned now. If they haven't they should. 8. Work with CDOT if an update access permit is needed for the street and frontage road intersection. 9. Use details from Larimer County Urban Street Standards. Date: 3 Signature• ��(/lc..�/ Cify of Fort Colllna i Selected Issues Report C:itt of Fort Collins Date: 4/3/2008 INTERCHANGE BUSINESS PARK 1ST ANNEXATION & ZONING - TYPE II SELECTION CRITERIA: Status = All ISSUES: Department: Engineering Issue Contact: Sheri Langenberger Topic: General Number:2 Created:9/6/2005 Pending [9/6105] No comments Number:3 Created:9/7/2005 Pending [9/7/05] from Technical Services: Boundary and legal close Department: Transportation Planning Issue Contact: Kurt Ravenschlag Topic: General Number:4 Created:9/7/2005 Pending [9/7105] No comments Department: Zoning Issue Contact: Jenny Nuckols Topic: ZONING Number:1 Created:9/1/2005 Pending [9/1/05] Any signage on the property that does not conform to the City sign code will need to be brought into compliance no later than 5 year after the date of annexation Page 1