HomeMy WebLinkAboutREDTAIL - Filed DCP-DEV. CONSTRUCTION PERMIT - 2008-03-19Transportation Services
Engineering Department
DEVELOPMENT CONSTRUCTION PERMIT
Permit Number: 06-26 Issuance Date:
Project Name:
Project A.K.A.:
Project Location: North West comer of Cameron Drive and College Avenue
Permittee: David Stolte
City and developer contacts: See attached Exhibit "A" for names and phone numbers of all
contact persons for this project.
Fees: Permit Application Fee (paid at the time of application) $ PAID
Construction Inspection Fee (paid prior to issuance of this permit) $ 15.554.55
Total $ 15,554.55
Development Bond or other approved security:
Amount of security deposited with the City to guarantee the completion of all public
improvements to be constructed as shown on the approved plans for the development.
$ 652,736.21
Form of security deposited with the City: LOC
PERFORMANCE REQUIREMENTS OF THIS PERMIT:
1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design
drawings and specifications the certification of all materials testing by an Engineer. The Permittee
shall have an Engineer prepare revised design drawings and secure City approval for all revisions to
the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required
by the City in the Development Agreement, that the improvements are constructed in conformance
with the approved Utility Plans and the standards and specifications of the City. The Permittee shall
provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance of the
constructed public improvements. (All references above to the terms "Project Engineer" and
"Engineer" shall mean a Professional Engineer licensed in Colorado.)
2. All contractors who perform work on this project must be bonded and licensed in conformance
with City requirements.
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6605 • FAX (970) 221-6378
www.fcgov.com
)i�i�1€� E 9ilaF[ rail[EE pia! g1R�ls �'�-j9i g �ieii ,1e'�o�zF �q t t sl, °; �;
€F ,t11€E aea [E sad€F
_ _
T rall Jj
a `s
$'11-1
, !
d niuuFl lux ,ivi wLmrSll
Nd ZP4S 6 900Z/OZ/9'Bmp gO'l0'S el!S leuld EE0-00190-LO-SO Pesmea190-OZ-EOleoueildwoo leuidlsBulme,pl€llelpea) LseM NewO plssod EEO-001000ZG'J
1^
DEVELOPMENT CONSTRUCTION PERMIT
APPLICATION
(2/16/99)
For City use only: Application Number: Application Date:
Permit application fee: $3=M-24V
INSTRUCTIONS:
1. Complete this form (some questions may not apply to you) and attach all necessary documents and
submit to the Development Engineering Section of the City.
2. If you have any questions contact the Development Engineer at 221-750.
3. Submit the Application and pay the Application Fee at the fee at the Engineering counter at 281No.
College Avenue.
PROJECT INFORMATION:
Project Name (as approved by the City):
L
Project A.R.A. (Marketing name if different from Project Name):
(41�r�L `L) v p ryvtw Krr
Project Location:
: CA-1vNE42nt'� t)P 1
Property Owner(At the time of this permit issuance):
Individual Name: _ Too Qr2Qvrj
Company Name : I p fa U tj irtN-,�. r121W
Address: :339 N t i -J'F K pKan+ V F0F"
Phone number(s):
Office: 9 O - Z2ln iX70
Cellphone:
Fax number: - 3:D - 2 7:� _ S 125�
Email:
Applicant/Project Manager (The primary contact person for all matters regarding this project, and the
Person responsible for all matters referencing "the Developer" in the Development Agreement for this
project):
Individual Name: DA"q 1 ii Srt'Dl--tiea_
Company Name : OO H N O" S-h2 t ir-t-t r, t.t
Address: 2 C a y L f0 t U J2Q 1 t,3T Q 0 1 T A �Fr at--" 1� S S05ZS
Phone number(s).
Office: C) �JU - la C1
Cellphone:
Fax number: aK- EO - Or 3
Email: Da-_ro F DO t4 r-t C 0 tJS�vCa 1 O N
Development Construction Permit, Page 2/6
3. Construction time restrictions:
4. The applicant understands that additional permits maybe required for this development project
and the applicant shall secure those permits directly from the issuing departments.
5. This permit, along with a complete set of all approved plans and documents for this project
(utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic
study, drainage report, plat easements and any other official documents), shall be kept on the
development site available for use by City staff doing inspections.
6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or
Section 2.6.3(K) of the Land Use Code, whichever is applicable):
a. If construction has not begun within sixty (60) days from the date of issuance of this
permit, this permit shall expire and the applicant will forfeit the permit fee paid for this
permit, whereupon the applicant must re -apply for a new permit.
b. In addition, this permit shall expire one year from the date of issuance. The applicant
may apply for an extension by reapplication at least two weeks prior to the expiration date.
Such application shall contain information sufficient to justify the granting of the extension.
An extension may be granted for up to six months.
7. Building permits and certificates of occupancy will only be issued when all conditions contained
in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29-
678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the
Development Agreement does not specify times for completion of public improvements, or if there is
no Development Agreement, then the improvement requirements specified in Section 24-95 of the
City Code shall apply, which provides that construction of all improvements shall be required prior
to the time of issuance of the first building permit.
8. Acceptance by the City of the public improvements shall be after (1) final inspection has been
conducted by the City; (2) punch list items from the final inspection are completed and accepted by
the City; and (3) required certifications from the licensed professional engineer that improvements
are completed to City standards, specifications and approved Utility Plans; and the "as -constructed"
plans have been received and accepted by the City.
9. The warranty on street improvements is for five (5) years from the date of acceptance by the City
of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional
Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use
Code, as applicable.
10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any
Development Construction Permit, Page 3/6
planned construction on this project. All required perimeter silt fencing and other erosion/sediment
control best management practices (BMP's) that can be installed prior to construction must be in
place and inspected by the City Erosion Control Inspector before any land disturbing activity begins.
11. No work (including grading) shall be started in State Highway right-of-way until a permit is
issued by the Colorado Department of Transportation to allow such work to begin.
12. Other conditions:
1. The Developer shall construct a concrete sidewalk from the western property boundary to tie into
the existing Mason Street Trail prior to the issuance of the first building permit in Phase 1
2 The Developer shall provide the City with a final soils report and information regarding the
method and plan for construction of the roadways crossing the ponds at both Cameron and Conejos
Said information must be submitted for review and approval by the City Engineering Department
prior to the start of construction of said roads These reports must be completed by a Colorado
licensed engineer and in accordance with the Larimer County Urban Area Street Standards
Permittee's acknowledgment signature:
By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of
the owners of the property (including all owners having legal or equitable interest in the real property, as
defined in Section 1-2 of the City Code; and including common areas legally connected to or associated
with the property which is the subject of this application) without whose consent and authority the
requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City
officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such
property to perform work required of the applicant if the applicant were to fail to perform the required
work. I also acknowledge that I have read this permit document with all its requirements and
conditions, and I agree to all of the terms and conditions so stated in this permit.
Applicant/Project Manager' s Signature: =eQty- Date: 11
Approval for issuance:
City Engineer Approval:
Date:
(Permit Issuance Date)
Development Construction Permit, Page 4/6
EXHIBIT "A"
DEVELOPMENT PROJECT CONTACT PERSONS
Project Name: Redtail
Project A.KA.: NA
City Staff Contact Persons:
Development Engineer:
Susan Joy, 281 N. College Ave., Fort Collins, CO 80521
Office 970-221-6605 Fax 970-221-6378
Email: sjov@legov.com
Construction Inspector:
Rhonda Henson, 281 N. College Ave., Fort Collins, CO 80521
Office 970-221-6605 Cell 970-217-4089 Fax 970-221-6378
Email: rhensonCgJc ov com
Current Planner:
Steve Olt, 281 N. College Ave., Fort Collins, CO 80521
Office 970-221-6750 Fax 970-416-2020
Email: soltnfcgov.com
Water Utilities Engineer:
Erosion Control Inspector: Bob Zakely, 700 Wood Street, Fort Collins, CO 80521
Office 970-224-6063 Fax 970-221-6619
Email: bzakely@fcyov.com
Natural Resources:
Doug Moore, 281 N. College Ave., Fort Collins, CO 80521
Office 970-221-6750 Fax 970-416-2020
Email: dmooreCwticgov.com
Traffic Operations:
Street Closures: Syl Mireles, 626 Linden Street, Fort Collins, CO 80521
Office 970-221-6815 Fax 970-6282
Email: smireles a fcgov com
Development Construction Permit, Page 5/6
Transportation Planning:
Dave Averill, 215 N. Mason, Fort Collins, CO 80521
Office 970-416-2643 Fax 221-6239
Email: daverill a?fcgov.cotn
Forestry:
Ralph Zentz, 215 N. Mason, Fort Collins, CO 80521
Office 970-224-6302 Fax 970-221-6586
Email: rzentz cr fc ov com
Light and Power:
Monica Moore, 700 Wood Street, Fort Collins, CO 80521
Office 970-224-6150 Fax 970-221-6619
Email: mmooreCa?fc ov.com
Developer's Contact Persons:
Project Manager:
David Stolte, Dohn Construction, Inc.
2642 Midpoint Drive, Unit A, Fort Collins, CO 80525
Office 970-490-1855 Fax 970-490-6093
Email: dstolte@dohnconstruction.com
Permittee:
Jon Prouty, Lagunitas Companies
3944 JFK Parkway, Fort Collins, Co 80525
Office 970-226-5000 Fax 970-226-5125
Email: lagunitas@fiii.com
Developer:
Jon Prouty, Lagunitas Companies
3944 JFK Parkway, Fort Collins, Co 80525
Office 970-226-5000 Fax 970-226-5125
Email: lagunitas@frii.com
Owner(s):
Jon Prouty, Lagunitas Companies
3944 JFK Parkway, Fort Collins, Co 80525
Office 970-226-5000 Fax 970-226-5125
Email: lagunitas@frii.com
Development Construction Permit, Page 6/6
Architect/Planner:
Patricia Kroetch, Northstar Design, Inc.
700 Automation Drive, Unit 1, Windsor, CO 80550
Office 970-686-6939 Fax: 970-686-1188
Project Engineer:
Patricia Kroetch, Northstar Design, Inc.
700 Automation Drive, Unit 1, Windsor, CO 80550
Office 970-686-6939 Fax: 970-686-1188
General Contractor:
David Stolte, Dohn Construction, Inc.
2642 Midpoint Drive, Unit A, Fort Collins, CO 80525
Office 970-490-1855 Fax 970-490-6093
Email: dstolte@dohnconstruction.com
o00o000o 0000000000
O O O O O WN000
00000
L° O
O�
O O O
1666CI OO
ci
s m °j 000000WVN
� 64A69 6%
N00000N
OMn
NOM�p
nNR6Pr
fA Yi fA fA V N
NON&9
O
WN
z
0
l
(A
H fy
N M N
fA 43 44
O
F
U
J
U
Z
CL
Oy W
,Nm
f Z LL
'u'
F-
0
F
00000000
�r-r-nu?'°oo
op 000000o0
NNnp000000
OOoo4]�!]
"
:;
z
.�
z z Q -
OOOGM f�)t+j (+j
fA fA 69 fA fH diO O
OOOOOC)ON�uj
fA 60 <6%N O r
�0��
to u4 u4
�i
UWmW
»»
MfH�fn v4 v4 to
N b04604
0
z
LU
Z LL a m
W
>
LLJ
a'
cOV, n 0 00 O M O
000000 0000
000000000o
n pp O N OO
K
�""
H
^� yO�°�MM�
MM
00NO6 O C5000
ea fnU)f»er sv v>vi
co,np,°mp0
N0ON
a
O
C4C �°�
e�vr
o�rn.-nf»v
rmO MN if1
Qy
C(3
MN�
O
F
J
��bN9 bn2�
Q-a4w
a
LL
W ? U
W
W
=
?Ovoi.000c^p.o
000000000o
oov0000000
noorncoo�
W
3
}
m
qN.
Mon�e4»vrn
V4 LO (° OC4
oo n0000000
NN 61l fA b4 fR fA Yi 1A
mo�co0Q
N;
�N 61
�NOf M
ou,aw� n
in
»
LU
o0
N~ _0
Z �
U
L � 0 0.
,DOLL a�
z
_UUOVQU
W
W
O N N O O O r
N N 0 0 0 0 0 0 0 0
'�OtOrO V
O
W
'
�0
NM
O n
F
m
NNN
(LI
m W
F
z
j W U
J
J
oLLJ
3
'ZOjO�
z
�(Ka.
iQ
0
1 a
Z
z
U
fqq
LL LL 0 w>->1 UU
JJ
IL: LL LL0000000
(/j } L� LL iy
}>;WJUU9
ao
Z m
W
W
JQaQQ
W W W
0
O
U LL
ZO
m
�U
Q
U
:3 W
J
O w
IL
I�
3
zg
a =
v
zz
Q W
w 05
J O C°
2 0
U 0
m ; — m
y U�
W
mz
u c 30
2
'_� h
QLL
0
ex
E
IL
�
nmmU3
U
cr
U
���
2 d
cOvm o
°C GXXCC-C
VJ
rm d
ha-
W>
Co
>Wm
ov
HO
�Lrn"�'°a�ao�
wC�acip°
acc�
az
Z O
s
d
o
i
np
a�O
F-j
00
N
s
I I x=
1 a ml
O i O n a U
O
inIo o �
n
o
Id
E
o
o
"
w
o E
e'j
f
O
-
a N co
0''
S£
I
m
Z
2 0
N
> o
O C
m
n
w
6 m
W ICI
UI
2 Ki
Vi �iin
F
0
W
III i m
r � a
uz°
E
FT
11
M in in t2
i�
a
o�
II
ice♦
U
11
m'
u
A
w
a
i
u
e
CI
p
a
F U
a
ml
E
8
n
13F n
'I
I
I
U Z
?
2
I S =
L
Q
N
i
Ia
w
5
of
a�
n
py
y
K
o
H
s
6.
m
M N
I
O i
a
N LL
LN_
N
1
_