HomeMy WebLinkAboutCENTENNIAL HIGH SCHOOL EXPANSION 330 EAST LAUREL STREET - Filed CS-COMMENT SHEETS - 2008-03-03Da+e:Time:
--- Loca+ion:
- Descri p �-
+ion:
--------- -
Applicanf: 67c."e= _ ChEe I_-
--- `>' AID - �3LG✓� ------
u-n LiTi-1 i9L A-t-j S
_ �1►2E�-natita�t, 2ocmPs ��.c_;� -1�-r �+,•a`�.-rz.t'�"�rr��iS
_ - a
Lj-n L-tT—j CA VbE �--bi" Ft�✓L
sJ
—
�G1145; w-Lx-r 4;�t )(_A,(
GZ�-kr1�-r V2lUL 1�LIG4�i��-�ZNL-- i-.l�-.:d�4�• — -
Topic: Variance Request
Number: 34 Created: 4/29/2003
A variance request must be submitted in accordance with section 1.9.4 of the Larimer County Urban Area Street
Standards if there is parking proposed within the 50' minimum parking setback from a local street. The first parking
spot will have to be eliminated as it is within two feet of the sidewalk and it presents a safety hazard as well. The
variance request must be received and approved prior to going to going to hearing.
Page 2
August 11, 2003
FCO22701
Mr. Ted Shepard
Senior Planner - Current Planning Division
City of Fort Collins
281 N. College Ave.
Fort Collins, CO 80524
BE Y ON D E N G IN E E R ING
RE: Response to City of Fort Collins Comments dated April 29, May 5 and May 7, 2003
PSD — Centennial High School Expansion and Remodel
Dear Mr. Shepard:
This letter is in response to the comments received from the City of Fort Collins. Specific responses are in
the order of each comment sheet and reference the note number where applicable.
Water/Wastewater Comments
29. Site plan and Landscape plan have the same information.
30. Noted.
31. The existing water service to the site is adequate to service the proposed expansion per the
mechanical engineering consultant for the project. Per the CFC Municipal Code, Chpt. 26-94, the
school expansion meets the criteria for allowing a single water service for the additional building
structure to be serviced from the existing water service. The Utility plans have been revised to reflect
a wet tap being installed from the 6" fire service line connection within Mathews Avenue.
32. Noted. Poudre School District will coordinate with the City regarding the Right -of -Way vacation
and easement: dedication documents.
Stormwater Utility Comments
Topic: Drainage
41. Please confer with Glen Schlueter and our meeting notes from our meetings on June 0 and 13s',
2002. Our calculation regarding water quality was reviewed and acceptable at this meeting.
42. The major water quality feature for this site is the use of grass swales in addition to 100-yr. water
surface ponding and release rate.
Topic: Floodplain
39. Noted. The Activities Building has a finish floor elevation of 4987.83 compared to an existing
ground elevation of 4986.00. The present CFC flood plain limits do not impact the site. The
proposed estimated flood plain as been annotated as being "Shallow flooding of 12" or less above
existing ground."
NOLTE ASSOCIATES, INC.
1901 SHARP POINT DRIVE. SUITE A
FORT COLLINS, CO E0525
970. 221.2100 TEL 970. 221.2415 FAX
N'WW. NOLT E. COM
N9FCO227\D.o.me is\L. ers\Respc4-20030811.doe
Mr. Ted Shepard
August 11, 2003
Page 2
40. Noted.
Topic: Erosion/Sediment Control
Noted.
Noted and added to the Utility Plans.
Noted and the erosion control plan calculations have been included in the Final Drainage Report.
Engineering Comments
Topic: General
3. Engineering did receive the entire submittal package. A drainage report and soils report were
submitted along with civil Utility Improvement Plans, Landscape Plan and Site Plan. A Traffic
Impact Study was not required per the direction of Mr. Eric Bracke, CFC Traffic Engineer.
Checklist E-4- is included in this submittal.
36. Poudre School District will coordinate with the City regarding the Right -of -Way vacation and
easement dedication documents.
Topic: Utility Plans
33. Noted. Updated details have been incorporated into the Utility Plans.
35. Redline comments have been addressed and are incorporated into the Utility Plans.
Topic: variance Request
34. We will prepare and submit a variance request letter for the Poudre School District for the existing
parking condition and minimum set back requirement.
Thank you for your review and approval of these plans and responses. If you need further clarification on
any of the above responses, please call me (419-1316) at your convenience.
Sincerely,
Nolte As-T , Inc.
Thomas Ochwat, P.E.
Associate Engineer
N:\FCO227,D.enk\Letters\Resp cfc-20030811.doe
NOLTE ASSOCIATES.. INC.
Project Comments Sheet
S
City of Fort Collins elected Departments
Department: Engineering
Date: September 2, 2003
Project:
POUDRE SCHOOL DISTRICT, CENTENNIAL SCHOOL DISTRICT
EXPANSION AND REMODEL
All comments must be received by Ted Shepard in Current Planning, no later than
the staff review meeting:
August 27, 2003
Note - Please identify your redlines for future reference
Issue Contact: Susan Joy
Topic: Easements
Number: 53 Created: 9/2/2003
The 30' utility easement in lieu of the alley must be described as two separate 5' utility easements. The portion being
vacated will automatically revert to a utility easement. Also, the ROW and utility dedication documents were not
submitted in the correct format. Please redo and resubmit. See attached.
Topic: General
Number: 36 Created: 4/30/2003
Must provide the ROW vacation legals electronically and a letter from the PSD requesting the vacation prior to going to
public hearing.
8/22/3: Repeat comment.
Topic: Landscape Plan
Number: 50 Created: 8/22/2003
Correct overlapped labelingto meet scanability requirements in Appendix E6. See comment #43 under variance
requests. .
Topic: Site Plan
Number: 49 Created: 8/22/2003
Move overlapped labeling to meet scanability requirements in Appendix E6. See comment #43 under variance
requests.
Number: 51 Created: 8/22/2003
Continue the sidewalk out to the Alley so that people coming from the parking lot don't have to walk through the grass
to get there.
Dar
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat _ Site / Drainage Report Other
Utility _X Redline Utility —I Landscape
Page I
Topic: Utility Plans
Number: 33 Created: 4/29/2003
Update all the old details to the current LCUASS details. Please provide details 701, 706, 707, 1601, 1602, and 1606.
They are available for download at the Larimer County website. The sidewalk culvert must be designed in accordance
with details D10-D13. Please select the appropriate detail, incorporate it into the design, and add the detail to the detail
sheet.
8/22/3: Repeat comment. Please provide detail 1606. Please label the concrete spillway detail as "on -site".
Number: 44 Created: 8/22/2003
See comment #43 under "Variance Requests"
Number: 45 Created: 8/22/2003
Cover Sheet - Date must toe the month submitted. In this case "August". Next time, September or....
Number: 46 Created: 8/22/2003
Sheet 2 - Note 14 of the Grading and Erosion Control Notes: Contact Bob Zakely. Also, correct the misspelling, see
redlines.
Number: 47 Created: 8/22/2003
Sheet 4 - Dimension all sidewalks and parking stalls. See comment #43. Also, the lineweights for existing and
proposed are too similar. Please adjust these so that the plans are more clear.
Number: 48 Created: 8/22/2003
Sheet 5 & 7 - Correct the sidewalk chase label to include detail D10 and sheet 9. See redlines.
Topic: Variance Request
Number: 34 Created: 4/29/2003
A variance request must be submitted in accordance with section 1.9.4 of the Larimer County Urban Area Street
Standards if there is parking proposed within the 40' minimum parking setback from a local street. The first parking
spot will have to be eliminated as it is within two feet of the sidewalk and it presents a safety hazard as well. The
variance request must be received and approved prior to going to hearing.
8/22/3: The variance request must be restated and resubmitted. The minimum parking setback is 40', not 20' as
currently stated in the request. The justification for reducing the parking setback must be addressed from a safety
perspective, not the fact that parking is limited at the site. See section 1.9.4 for further instruction. The City is
ameniable to granting the variance provided that the first stall is removed being that the first existing stall is too close to
the sidewalk and the street, and is on City ROW as well.
Number: 43 Created: 8/22/2003
It appears that the new parking spaces in the alley are only 14' deep. City standards require a 19' or 17' with a 2'
overhang. Please see detail 19-7 for other requirements. If the applicant chooses to go with the current configuration,
a variance request must be submitted in accordance with 1.9.4 of LCUASS. OR, contact Peter Barnes with Zoning
(221-6760) and find out if you can make these long term or compact car parking spaces.
Page 2
Project Comments Sheet
Selected Departments
a�¢soxrs.,aen.enu���L,���
Department: Engineering
Date: September 23, 2003
Project:
POUDRE SCHOOL DISTRICT, CENTENNIAL SCHOOL DISTRICT
EXPANSION AND REMODEL
All comments must: be received by Ted Shepard in Current Planning, no later than
the staff review meeting:
September 24, 2003
Note - Please identify your redlines for future reference
Issue Contact: Susan Joy
Topic: Easements
Number: 53 Created: 9/2/2003
The 30' utility easement in lieu of the alley must be described as two separate 5' utility easements. The portion being
vacated will automatically revert to a utility easement. Also, the ROW and utility dedication documents were not
submitted in the correct format. Please redo and resubmit. See attached.
9/24/3: Repeat comment. No easements were received with this round of review.
Topic: General
Number: 36 Created: 4/30/2003
Must provide the ROW vacation legals electronically and a letter from the PSD requesting the vacation prior to going to
public hearing.
8/22/3: Repeat comment.
9/24/3: Repeat comment.
Topic: Site Plan
Number: 51 Created: 8/22/2003
Continue the sidewalk out to the Alley so that people coming from the parking lot don't have to walk through the grass
to get there.
9/24/3: Thank you for continuing the sidewalk as requested, however, please taper the sidewalk as reclined as that is
how people will walk in that area.
Topic: Variance Request
Number: 34 Created: 4/29/2003
A variance request must be submitted in accordance with section 1.9.4 of the Latimer County Urban Area Street
Standards ibthere is parking propcised within the 40' minimum parking setback from a local street. The first parking
Signature
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_ Plat _ Site Drainage Report Other
Utility —� Redline Utility 1' Landscape
Page I
PROJECT
I COMMENT SHEET "ft
City of Fort Collins
CurrentPlannine
DATE: September 20, 2002 TO: Engineering
PROJECT: #39-02 Poudre School District, Centennial High School
Expansion and Remodel — Site Plan Advisory Review
-- Type II (LUC)
All comments must be received by Ted Shepard no later than the staff
review meeting:
October 16, 2002
Note - PLEASE identify your redlines for future reference
ASS 6 6or h. 'C"t"ebE "PotT
due SgA"'F- 06449- � T.1. S.
Name (please print)
CI IECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site _Drainage Report _Other.
Utility _Redline Utility _Landscape
City of Fort Collins
Project Comments Sheet
itofFort Collins Selected Departments
Department: Engineering
Date: October 15, 2002
Project:
POUDRE SCHOOL DISTRICT, CENTENNIAL SCHOOL DISTRICT
EXPANSION AND REMODEL
All comments must be received by TED SHEPARD in Current Planning no later than
the staff review meeting:
October 16, 2002
Note - Please identify your redlines for future reference
Issue Contact: Susan Joy
Topic: General
3
This is an incomplete submittal. All public improvements must be designed in accordance with LCUASS. Please read
Chapter 2 and 3 of LCUASS for submittal and design requirements. Please complete and submit the checklist in
appendix E-4. Submit a TIS, soils report, and drainage report. See redlines. This review is general in nature only, A
more detailed review will be given when a more detailed design is submitted.
4
Comments given at the Conceptual Review (April 1, 2002) still stand. They are as follows:
Traffic Impact Study may be required. Contact Eric Bracke.
Directional ramps required at intersections.
See detail 7-12F for alley design. No high volume drive allowed off Mathews or Peterson. Could submit a variance
request in accordance with section 1.9.2 for the delivery drive.
Parking setback of 50' from local streets.
Applicant proposed to vacate the alley ROW bisecting the property and dedicating a utility easement for the existing
utilities. All ROW vacations must go through City Council.
Any existing damaged curb/clutter/sidewalk must be replaced.
Underground any existing overhead utilities.
Contact Rick Richter i for possible alley improvements.
All improvements to LCUASS. Possible ROW and utility easement dedications.
t r7 Z
Date
CHECKZ tiERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat _ (_ Site / Drainage Report / Other_
Utility �c Redline Utility Landscape
Page 1
5
How was the existing alley ROW vacated? Or was it?
6
Coordinate the various plan sets so that they present the same information. The utility plans do not match the site or
landscape plan.
Page 2
April 9, 2003
rc02270i
Mr. Ted Shepard
Senior Planner - Current Planning Division
City of Fort Collins
281 N. College Ave.
Fort Collins, CO 80524
RE: Response to City of Fort Collins Comments dated October 16, 2002
PSD - Centennial High School Expansion and Remodel
Dear Mr. Shepard:
This letter is in response to the comments received from the City of Fort Collins. Specific responses are in the
order of each comment sheet and reference the note number where applicable.
Water/Wastewater Comments
17. The alley will be vacated and a 30-foot wide easement will be dedicated.
18. Permanent structures have been removed from within the proposed 30-foot wide utility easement.
19. The utility plan labeling has been completed.
20. Noted
Stormwater Utility Comments
Topic: Floodplain
16. This comment is further addressed in the Final Drainage Report.
24. Noted. Please refer to the drainage report.
Topic: Drainage
15. Noted.
25. Noted. This information has been included on the Drainage Plan.
26. Noted. Contours have been extended.
27. Noted.
Topic: Erosion/Sediment Control
28. Noted. Erosion control features have been included on the grading plan.
N:AFCO227ADocument.,VLetters\Rc,,-efc-20030409. doc
Mr. Ted Shepard
April 9, 2003
Page 2
Engineering Comments
Topic. General
Engineering did receive the entire submittal package. A drainage report and soils report were
submitted along with civil Utility Improvement Plans, Landscape Plan and Site Plan. A Traffic
Impact Study was not required per the direction of Mr. Eric Bracke, CFC Traffic Engineer.
4. Directional ramps on the comers of site have been recently constructed as part of the Laurel
Street pavement improvements.
The service entrance driveway on Mathews Street has been revised to reflect the City detail 729A,
"Standard Driveway Approach Types 1& 2".
Parking setback of 50 feet will require a variance since parking on the site has been an issue with the
neighborhood. and the Planning and Zoning Commission.
The Poudre School District will process the Right -of -Way vacation. A 30-foot wide utility easement
will be dedicated.
Noted. All damaged curb and gutter will be replaced per City standards.
Overhead utilities will be placed underground and are noted on the Utility Plan.
The Poudre School District will process the Right -of -Way vacation. A 30-foot wide utility easement
will be dedicated.
6. The civil Utility Improvement Plans, Landscape Plan and Site Plan have been updated to match.
Thank you for your review and approval of these plans and responses. If you need further clarification on any
of the above responses, please call me (419-1316) at your convenience.
Sincerely,
Nolte Associates, Inc.
Thomas Ochwat, P.E.
Project Manager
N:AFCO227,Documents,Letters\Resp-efe-20030409-doc
� Project Comments Sheet
Selected Departments
Citt of Fort Collins
Department: Engineering
Date: May 7, 2003
Project:
POUDRE SCHOOL DISTRICT, CENTENNIAL SCHOOL DISTRICT
EXPANSION AND REMODEL
All comments must be received by Ted Shepard in Current Planning, no later than
the staff review meeting:
October 16, 2002
Note - Please identify your redlines for future reference
Issue Contact: Susan Joy
Topic: General
Number: 3 Created: 10/14/2002
This is an incomplete submittal. Alf public improvements must be designed in accordance with LCUASS. Please read
Chapter 2 and 3 of LCUASS for submittal and design requirements. Please complete and submit the checklist in
appendix E-4. Submit a TIS, soils report, and drainage report. See redlines. This review is general in nature only. A
more detailed review will be given when a more detailed design is submitted.
4/22/3: Engineering did notreceive a drainage report, soils report, or Checklist E4 with either the first or second
submittal as stated in the response letter. Nolte Engineering did deliver a Soils Report as requested on 4/25/3. To
date, the drainage report and checklist are still outstanding. Please submit with the next submittal. Please complete
and submit the checklist with your next submittal. Any items that are not included in the plan sets will become an
outstanding comment with the next round. A checklist is attached for your convenience. The TIS was waived per Eric
Bracke.
Number: 36 Created: 4/30/2003
Must provide the ROW vacation legals electronically and a letter from the PSD requesting the vacation prior to going to
public hearing
Topic: Utility Plans
Number: 33 Created: 41 29/20 3
Update all the old details to the current LCUASS details. Please provide details 7.0T, 77066!71W, 1Be2, and 1606.
They are available for dowriload at the Larimer County website. The sidewalk culvert must be designed in acArdanc2
with details D10-D13. Please select the appropriate detail, incorporate it into the design, and add the detail to the detail
sheet.
Number: 35 Created: 4/29/2003
See redlines for additional comments.
Dad
CHECK HERE IF IfOU WISH TO.RECEIVE COPIES OF REVISIONS
Plat _ Site I Drainage Report Other F
Utility _ V' Redline Utility Landscape �_
�—
Page 1
Topic: Variance Request
Number: 34 Created: 4/29/2003
A variance request must be submitted in accordance with section 1.9.4 of the Larimer County Urban Area Street
Standards if there is parking proposed within the 50' minimum parking setback from a local street. The first parking
spot will have to be eliminated as it is within two feet of the sidewalk and it presents a safety hazard as well. The
variance request must be received and approved prior to going to going to hearing.
Page 2
Project Comments Sheet
Selected Departments
Department: Engineering
Date: May 7, 2003
Project:
POUDRE SCHOOL DISTRICT, CENTENNIAL SCHOOL DISTRICT
EXPANSION AND REMODEL
All comments must Ibe received by Ted Shepard in Current Planning, no later than
the staff review meeting:
October 16, 2002
Note - Please identify your redlines for future reference
Issue Contact: Susan Joy
Topic: General
Number: 3 Created: 10/14/2002
This is an incomplete submittal. All public improvements must be designed in accordance with LCUASS. Please read
Chapter 2 and 3 of LCUASS for submittal and design requirements. Please complete and submit the checklist in
appendix E-4. Submit a TIS, soils report, and drainage report. See redlines. This review is general in nature only. A
more detailed review will be given when a more detailed design is submitted.
4/22/3: Engineering did not receive a drainage report, soils report, or Checklist E4 with either the first or second
submittal as stated in the response letter. Nolte Engineering did deliver a Soils Report as requested on 4/25/3. To
date, the drainage report and checklist are still outstanding. Please submit with the next submittal. Please complete
and submit the checklist with your next submittal. Any items that are not included in the plan sets will become an
outstanding comment with the next round. A checklist is attached for your convenience. The TIS was waived per Eric
Bracke.
Number: 36 Created: 4/30/2003
Must provide the ROW vacation legals electronically and a letter from the PSD requesting the vacation prior to going to
public hearing.
Topic: Utility Plans
Number: 33 Created: 4/29/2003
Update all the old details to the current LCUASS details. Please provide details 701, 706, 707, 1601, 1602, and 1606.
They are available for download at the Larimer County website. The sidewalk culvert must be designed in accordance
with details D10-D13. Please select the appropriate detail, incorporate it into the design, and add the detail to the detail
sheet.
Number: 35 Created: 4/29/2003
See redlines for additional comments.
Signature
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_ Plat _ Site Drainage Report L Other
7
Utility _�, Redline Utility Landscape
Page 1 j'le°t0-nl::.�_.