HomeMy WebLinkAboutFOX POINTE PLAZA - Filed CS-COMMENT SHEETS - 2008-02-276;z Selected Issues Report
Citvof tort Cnllins
Date:
2/6/2008
FOX POINTE PLAZA PDP - TYPE II AND FINAL PLANS
SELECTION CRITERIA: Department = Engineering; Status = All
ISSUES:
Department: Engineering Issue Contact: Randy Maizland
Topic: Cover Sheet
Number:5 Created:6128/2006 Resolved
[6/28/06] Provide month and year under title, correct spelling/grammar in title. Label Vicinity
Map, Vicinity Map should be at a larger scale to show location with respect to larger City
arterial streets adjacent.
Number:6 Created:6/28/2006 Resolved
[6/28/06] Bench mark data and basis of bearings shall be shown on the cover sheet.
Number:7 Created:6/28/2006 Resolved
[6128/06] Revise the Index and City signature block per the redline comments. Provide a
reference to the Geotechnical Engineer and report submitted. Provide standard engineers
statement attached to redlines on cover sheet.
Number:8 Created:6/28/2006 Resolved
[6/28/06] No standard General Notes sheet was provided with this submittal. Please include
the general notes (Sheet 2) with your next submittal for review.
Topic: General
Number:93 Created:11/27/2006 Pending
[11/27/061 Please add the Plat to the Utility Plan set and add it to the sheet index.
Number:94 Created:11/27/2006 Pending
[11/27/06] Minor corrections needed on General Notes, see redlines for clarification.
Number:95 Created:11/27/2006 Pending
[11127/06] Please show and label the drainage easement on the Overall Utility Plan sheet
for the proposed storm drain connection to the existing Post Office inlet structure. Please
reference the reception number on the plans.
Number:96 Created:11/27/2006 Pending
[11/27/06] Please show and label the proposed 20 foot wide emergency access easement
on the Overall Utility Plan sheet.
Number:97 Created: 11127/2006 Pending
[11/27/06] Please clearly label the new 8 foot wide attached sidewalk being proposed on
the Overall Utility Plan sheet. Please also show the proposed new HC ramp at the
intersection.
Page 1
i
FINAL PLAN
c t� of Ii.� is COMMENT SHEET
Current Planning
DATE: November 8, 2006
TO: Technical Services
PROJECT PLANNER: Steve Olt
#16-06A FOX POINTE PLAZA PDP — FINAL PLANS
Please return all comments to the project planner no later than the staff
review meeting:
November 29, 2006
Note -.Please identify your redlines for future reference
(�/�%�/�tlo2 �d/2✓Ltrc�'IUN� 7i7 Sr ta- � ��N;�Sc,�P�r �tsa�✓ - �✓c�eoGv�
❑ No Problems
QJ Problems or Concerns (see below, attached, or DIMS)
r
O j (�c� ORAI �v4czc 4"7 TNcr 6mccac_7?/v(_y Acc&:c-j C—Afcr•
Ater NaT- Loc.4Ti4 /3G Ls
L..iV W 1.
Du /3c c=.
me (please
/U CBO !4 o /) / T to 1, •4<- EIS e,-/n 6,, T /17 L w.a f le_'OZ 14 (!c
L r iv6s S /� ��� 2p wac tc JFk T
CK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_Site _Drainage Report _Other
_Redline Utility _Landscape
2 7 00&
c C
1
PROJECT
COMMENT SHEET
Current Planning
DATE: June 15, 2006
TO: Technical Services
PROJECT PLANNER: Steve Olt
#16-06 Fox Pointe Plaza PDP —
RECCIV7")
JUN 2 6 2006
This is a revised site plan. The original site plan submitted was not the
correct version. Please update your comments in DMS if necessary.
Please return all comments to the project planner no later than the staff
review meeting:
July 5, 2006
Note --Please identify your redlines for future reference
❑ No Problems
Problems or Concerns (see below, attached, or DMS)
L I.v
P
Name (please print)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_Plat _Site _Drainage Report _Other
_Utility _Redline Utility _Landscape
E
Current Planning
DATE: June 15, 2006
TO: Technical Services
PROJECT
COMMENT SHEET
PROJECT PLANNER: Steve Olt
*16-06 Fox Pointe Plaza PDP — Type I 2'k
Please return all comments to the project planner no later the staff
review meeting:
July 59 2006
Note - Please idendfv your redlines for futrry
Lor-s /Pd referenrp
�. z3Ce'ml aAJ TFlr C«fiuJ.lc.¢ d
❑ No Problems
Problems or Concems (see below, attached, or DIMS)
1, �uzrnrc'7At2y LEGAL LrLoSE'. J` 'c %%ea -"N
Z, 3f+5r5 �F .BEA .�rTy <�H..�rrlrv/' �yt=5 4✓07 r77t1, r :dE /'ur '; ✓
3, i��, �.4)45 JFk i3L�i1zrU4J4(_K ���Q;c.�ra0 ,P v
i�• lrll1�S iS A 1�r cqr dF Pete7too, cr^
4 e''�+J i S Mo.:,.. � S 7-A 7'i TFI to . 1V
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
—Plat Site
——Drawage Report _Other
Utility —Redline Utility —Landscape
L�.rvu uat uuut.
REVISION
COMMENT SHEET
Current Planning
DATE: August 2, 2006 TO: Technical Services
PROJECT PLANNER: Steve Olt Q
# 16-06 FOX POINTE PLAZA PDP - TYPE II
SECOND ROUND OF REVIEW
Please return all comments to the project planner no later than the staff
review meeting:
August 16, 2006
Note - Please identify vour redlines for future reference
21-'No Problems
❑ Problems or Concerns (see below, attached, or DMS)
Name
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_Plat _Site _Drainage Report _Other_
_Utility _Redline Utility _Landscape
Current Planning
REVISION
COMMENT SHEET
DATE: August 2, 2006 TO: Engineering
PROJECT PLANNER: Steve Olt
# 16-06 FOX POINTE PLAZA PDP - TYPE II
SECOND ROUND OF REVIEW
Please return all comments to the project planner no later than the staff
review meeting:
August 16, 2006
Note -
❑ No Problems
KProblems or Concerns (see below, attached, or DMS)
Name (please
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
\`Plat Site —Drainage Report _Other
Utility Redline Utility _Landscape e P
Number:98 Created:11/27/2006 Pending
[11/27/06] On the Grading Plan, provide a flat space of at least 2 feet wide behind the
sidewalk so that pedestrians have a safety buffer between the sidewalk and the slope. Show
this with contour lines on the Grading Plan or provide adequate cross sesctions showing the
flat space.
Number:99 Created:11127/2006 Pending
[11/27/06] See redlines for comments related to scanning / drafting issues.
Number:100 Created:11/27/2006 Pending
[11/27/06] Please use LCUASS standard details for ROW improvements. If details need to
be modified, please indicate this on the detail as a modified LCUASS standard. All LCUASS
standards are available in electronic file format on the Larimer County Website. See redlines
for clarification.
Number:101 Created:11/27/2006 Pending
[11/27/06] Please adjust the Boardwalk Drive access elevations to adequately show how
drainage will be conveyed. OK to move the grade breaks closer to the street. Provide local
depression at the proposed inlet.
Number:102 Created:11127/2006 Pending
[11/27/06] Please check with Traffic Engineering for standard lane striping requirements as
shown on the right turn detail on sheet 9.
Number:103 Created:11/27/2006 Pending
[11127/061 Please add LCUASS standard interim detail 1607a provide in hard copy and by
email to the detail sheets.
Topic: General Comments
Number:34 Created:6/28/2006 Pending
[11/27/06] A development agreement will be required for this development prior to
development construction permit issuance. Please provide a completed DA info sheet
provided with the last round of review.
[8/8/06] No development agreement information sheet submitted. Please provide completed
information sheet with next submittal.
[6/28/06] Please complete the attached Development Agreement Information Sheet with
your next submittal. A Draft Development Agreement will be prepared with your next round
of review.
Number:35 Created:6/28/2006 Pending
[11/27/06] As discussed in our meeting on November 22nd, please move all sheets
lawbeled FOR REFERENCE ONLY to the back of the plan set. Revise the sheet index as
needed.
Please remove the Site Plan Layout sheets from the Utility Plan set. The Grading Plan is
sufficient for contours and elevations for this plan set.
Topic: General Engineering
Number:76 Created:8/8/2006 Resolved
[8/8106] Site Plan Layout sheets are not required but may be included in the Utility Plan set.
Please label sheets FOR REFERENCE ONLY. No signature blocks.
Page 2
Number:77 Created:8/8/2006 Resolved
[8/8/06] Please provide a telephone number for the owner/developer on the cover sheet.
Number:78 Created:8/8/2006 Pending
[11/27/06] please provide a City signature block to sheet 13, line and curve data tables.
[8/8/06] Provide a City signature block on sheet 2, General Notes. Rvise the font type for
scanning purposes.
Number:79 Created:8/8/2006 Resolved
[818/06] Show all new proposed utility connections with bold line type on the Overall Utility
Plan sheet.
Number:80 Created:8/8/2006 Resolved
[8/8/06] Please provide details for the riprap drainage swale near the entrance on
Boardwalk. How will this drainage swale outlet to the parking lot ?
Number:81 Created:8/8/2006 Resolved
[818/061 Minimum standard gutter flow line grade is 0.5%. A variance request must be
submitted by the engineer if this minimum slope cannot be achieved on Boardwalk.
Number:82 Created:8/812006 Resolved
[8/8/06] Call out the curb standard for the pork chop median on Boardwalk and provide a
detail.
Number:83 Created:8/8/2006 Pending
[11/27/06] Please use standard LCUASS ramp details rather than referencing them.
[8/8/06] Please provide handicap access ramp standard details.
Topic: General Notes
Number:9 Created:6/28/2006 Resolved
[6/28106] No City General Notes were provided with this plan set submittal. Please include
with your next round of review.
Topic: Grading & Drainage Plan
Number:22 Created:6/28/2006 Resolved
[6/28/06] Show and label the limits of grading including within the R.O.W. and on Post
Office site.
Number:23 Created:6/28/2006 Resolved
[6/28/06] All proposed retaining walls need to be shown on the Grading Plan. Any walls
over 30 inches in height must be labeled — Under Separate Permit By Building Department.
Please provide adequate number of wall elevations, top and bottom. Show drainage behind
the walls.
Number:24 Created:6/28/2006 Pending
[11/27/06] Drainage easement is outside the project plat boundary. Please provide a
recorded drainage easement from the post office for the storm drain connection.
[8/8/06] Proposed drainage easement for connection to existing Post Office curb inlet is
being shown on the Grading Plan. This drainage easement needs to be dedicated on the
Plat as well.
Page 3
[6/28/06] Proposed connection to the existing 5 foot Type R curb inlet on the Post Office
site will need a drainage easement dedication. Please show this drainage easement on the
plat.
Number:25 Created:6/28/2006 Resolved
[6/28/06] Street grading and drainage for the right turn lane on Boardwalk will not be
approved as shown. All drainage shall be conveyed to the curb & gutter at a 2 percent cross
slope to match the existing road section. No outfall gutter or concrete pan shall be used to
convey the street drainage east past the access. Street drainage will need to directed to an
inlet near the access. See redline comments. No street drainage shall be directed into the
access of the site. A high point elevation must be shown at the ingress/egress on
Boardwalk.
Number:26 Created:6/28/2006 Resolved
[6/28/061 Please show the water and sanitary sewer service connections on the Grading
Plan for reference.
Number:27 Created:6/28/2006 Resolved
[6128/061 Show all attached sidewalk as 8 feet wide. Transition from 8 to 6 feet wide on
JFK.
Topic: Plat
Number:18 Created:6/28/2006 Resolved
[6/28106] Please make sure all text fits within the border on the cover sheet.
Number:19 Created:6128/2006 Resolved
[6/28/06] Dedication of R.O.W. along Boardwalk should extend to back of sidewalk. Unless
utilities object, no additional utility easement will be required behind the new R.O.W.. Please
show dimension of new R.O.W. from centerline on Boardwalk.
Number:20 Created:6/28/2006 Resolved
[6/28/06] A reciprocal, shared access easement will be needed on the Post Office property.
Please dedicate this easement on the plat.
Number:21 Created:6/28/2006 Resolved
[8/8/06] Need a temporary construction easement and letter of intent from the Post Office
for all off -site work being proposed.
[6/28/061 A temporary construction easement, by separate document, will need to be
provided by the Post Office prior to permit issuance. Please provide a copy of the recorded
document for reference.
Topic: Rt Turn Lane Plan
Number:28 Created:6128/2006 Resolved
[6/28/06] Show and label limits of new proposed R.O.W.
Number:29 Created:6/28/2006 Resolved
[6/28/06] Show new 8 foot wide attached sidewalk along Boardwalk.
Number:30 Created:612812006 Resolved
[6/28/06] The proposed street drainage and concrete pan flow line shown will not be
approved. All street drainage from Boardwalk shall be conveyed to the gutter and a drain
Page 4
[6/28/06] Proposed connection to the existing 5 foot Type R curb inlet on
the Post Office site will need a drainage easement dedication. Please show
this drainage easement on the plat.
Topic: Plat
Number: 21 Created: 6/ 28 / 2006
[8/8/06] Need a temporary construction easement and letter of intent from
the Post Office for all off -site work being proposed.
[6/28/06] A temporary construction easement, by separate document, will
need to be provided by the Post Office prior to permit issuance. Please
provide a copy of the recorded document for reference.
Topic: Rt Turn Lane Plan
Number: 33 Created: 6/ 28 / 2006
[8/8/06] Add the street cut standard note to the plan sheet. Note provided
on redlines.
[6/28/06] Add the City standard street cut note, attached, to the plan
sheet.
Topic: Technical Services
Number: 69 Created: 7/6/2006
[8/ 16/06] Same comment. See redlines.
[7/6/06] The Landscape Plan and Site Plan are not acceptable for scanning
purposes. Please see redlines for scanning quality related comments.
Department: PFA Issue Contact: Carie Dann
Topic: Fire
Number: 63 Created: 7 / 6/ 2006
[8/ 16/06]
[7/6/06] FDC: The Fire Department Connection for the office/retail
building sprinkler system shall be mounted in a location approved by PFA,
to ensure fire apparatus have adequate access to the FDC.
Department: Stormwater-Water-Wastewater Issue
Contact: Roger Buffington
Topic: Landscape Plan
Number: 87 Created: 8/ 11/2006
[8/ 11/06] Show water/sewer service lines on landscape plan and maintain
required separation distances for trees and shrubs.
Department: Stormwater-Water-Wastewater Issue
Contact: Wes Lamarque
Topic: Stormwater
Number: 75 Created: 7 / 7 / 2006
[8/ 15/06] Repeat Comment.
Page 4
inlet installed near the access. See redline comments. Provide flow line elevations and new
typical cross section. Provide a detail for the inlet.
Number:31 Created:6/28/2006 Resolved
[6/28/061 The right out egress "pork chop" should be skewed more to deter anyone from
trying to make a left turn onto Boardwalk, per the City Traffic operations engineer.
Number:32 Created:6/28/2006 Resolved
[6/28/06] ADA ramps across the pork chop should line up better with the corner ramps.
Show more street design elevations (flow line, top of curb etc...) on the plan.
Number:33 Created:6/28/2006 Pending
[11/27/06] Please show and label the approximate limits of street cut on the Overall Utility
Plan sheet and add the standard street cut note to the sheet.
[8/8/06] Add the street cut standard note to the plan sheet. Note provided on redlines.
[6/28/06] Add the City standard street cut note, attached, to the plan sheet.
Topic: Site Plan
Number:10 Created:6/2812006 Resolved
[8/8/06]
[6/28/061 Standard parking stall size is 9 x 19 feet. Please dimension all drive isles.
Number:11 Created:6/28/2006 Resolved
[6/28/06] Due to the addition of the right turn lane and relocation of the sidewalk, a right-of-
way dedication will be required along Boardwalk such that all of the sidewalk is within right-
of-way. Unless the utility providers object, all utilities along Boardwalk will then also be within
right-of-way, and no 8 foot utility easement will be needed behind the R.O.W.
Number:12 Created:6/28/2006 Resolved
[6/28/06] Label proposed R.O.W. on the Site Plan and provide dimension from centerline of
Boardwalk.
Number:13 Created:6/28/2006 Resolved
[6/28/06] All intersections and drive approaches must meet A.D.A. access requirements.
Show ramps where needed.
Number:14 Created:6/28/2006 Resolved
[6/28/06] All attached sidewalk shall conform to current standard width of 8 feet. Show new
8 foot wide sidewalk transition from JFK and along Boardwalk.
Number:15 Created:6/28/2006 Resolved
[6/28/061 Show any proposed retaining walls on the site plan labeled with wall height.
Number:16 Created:6/28/2006 Resolved
[6/28/061 ADA access ramps across the pork chop in the right turn lane access should line
up as straight as possible. You may need to cut though the pork chop to meet minimum
ADA slope requirements instead of ramping up and down over it.
Number: 17
[818/061
Created:6/28/2006 Resolved
Page 5
[6/28/06] Please use a bold line type for the proposed utility connections and the north
arrow.
Topic: Technical Services
Number:69 Created:7/612006 Resolved
[8/16/06] Same comment. See redlines.
[7/6/06] The Landscape Plan and Site Plan are not acceptable for scanning purposes.
Please see redlines for scanning quality related comments.
Number:70 Created:7/6/2006 Resolved
[7/6/06] Boundary and legal close. Please correct small typo in the legal description.
Number:71 Created:7/6/2006 Resolved
[7/6/06] The Basis of Bearings statement does not match the Plat.
Number:72 Created:7/6/2006 Resolved
[7/6/06] Please provide documentation showing how JFK and Boardwalk were dedicated.
Number:73 Created:7/6/2006 Resolved
[7/6/06] This is a re -plat of a portion of Observatory Heights. Please show and state this.
Number:74 Created:7/6/2006 Resolved
[7/6/06] Show additional ROW dedication along Boardwalk to back of proposed sidewalk
along entire frontage. This ROW dedication will cover and replace the existing utility
easement. No additional utility easement behind the ROW will be required. See utility plans
for clarification.
Page 6
z`41 Iik
Selected Issues Report
CiYrof Fort Collins;
2/6/2008
Date:
FOX POINTE PLAZA PDP - TYPE II AND FINAL PLANS
SELECTION CRITERIA: Department = Transportation Planning; Status = All
ISSUES:
Department: Transportation Planning Issue Contact: David Averill
Topic: General
Number:61 Created:7/5/2006 Unresolved
[7/5/06] No issues or comments.
Page 1
MENNING SUBDIVISION
2ND Round PDP Comments
10/4/06
Although no public improvements will be required with this land subdivision, the
applicant will be required to enter into a development agreement with the City to
contractually obligate the applicant or any future property owners to construct
public improvements on Juniper with any new development submittals and
construct or escrow money for public improvements on LaPorte. Public
improvements or escrowed money for future construction will be based on current
street standards at the time of development.
2. Please remove the sidewalks and sidewalk notes being shown on Juniper and
LaPorte. Sidewalks are typically not shown on a Plat.
3. Some of the text is still to small for scanning purposes. See redlines for
clarification.
4. Please add a north arrow to the Vicinity Map and show the location of Juniper and
Columbine on the map.
Transportation Development Review has no objections to a hearing being
scheduled for this PDP. All comments may be addressed at the final compliance
stage.