HomeMy WebLinkAboutFORT COLLINS SUPPORTIVE HOUSING - Filed DCP-DEV. CONSTRUCTION PERMIT - 2008-02-21Services
Engineering Department
DEVELOPMENT CONSTRUCTION PERMIT
Permit Number: 07 - 3 Issuance Date. j
Project Name: Fort Collins SuLmo—ti_e
Project Location: south side of Hgrratonti Roud east of College Avenue
Permittee: Heath Construction
City and developer contacts: See attached Exhibit "A" for names and phone numbers of all
contact persons f or this project.
Fees. Permit Application Fee (paid at the time of application) $ 0.00
Construction inspection Fee (paid prior to issuance of this permit) $
Total 0.00*
Development Bond or other approved security:
Amount of security deposited with the City to guarantee the completion cf all public
improvements to he constructed as shown on the approved plans for the development.
0.00*
Form of security deposited with the City: N/A
rSecurity and fees under this DCP are waived as the project was granter! 100% affordable
housing desig,,wion.
PERFORMANCE REQUIREMENTS OF THIS PERMIT:
1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design
drawings and specifications the certification of all materials testing by an Engineer. The Permittee
shall have an Engineer prepare revised design drawings and secure City approval for alf revisions to
the Utility Plans and related documents. The Permittee shail have an Engineer represent, as required
by the City in the Development Agreement, that the improvements are constructed in conformance
with the approved Utility Plans and the standards and specifications of the City. The Permittee shall
prmide "as -constructed" plans prepared by an Engineer prior to the City's acceptance of the
constructed public improvements. (All references above to the terms "Project Engineer" and
"Engineer" shall mean a Professional Engineer licensed in Colorado.)
2. All contractors who perform work on this project must be bonded and licensed in conformance
with City requirements.
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6605 FAX (970) 221-6378
www.fcgov.com
Development Construction Permit, Page 2/5
3. Construction time restrictions:
4. The applicant understands that additional permits maybe required for this development project
and the applicant shall secure those permits directly from the issuing departments.
5. This permit, along with a complete set of all approved plans and documents for this project
(utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic
study, drainage report, plat easements and any other official documents), shall be kept on the
development site available for use by City staff doing inspections.
6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or
Section 2.6.3(K) of the Land Use Code, whichever is applicable):
a. If construction has not begun within sixty (60) days from the date of issuance of this
permit, this permit shall expire and the applicant will forfeit the permit fee paid for this
permit, whereupon the applicant must re -apply for a new permit.
b. In addition, this permit shall expire one year from the date of issuance. The applicant
may apply for an extension by reapplication at least two weeks prior to the expiration date.
Such application shall contain information sufficient to justify the granting of the extension.
An extension may be granted for up to six months.
7. Building permits and certificates of occupancy will only be issued when all conditions contained
in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29-
678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the
Development Agreement does not specify times for completion of public improvements, or if there is
no Development Agreement, then the improvement requirements specified in Section 24-95 of the
City Code shall apply, which provides that construction of all improvements shall be required prior
to the time of issuance of the first building permit.
8. Acceptance by the City of the public improvements shall be after (1) final inspection has been
conducted by the City; (2) punch list items from the final inspection are completed and accepted by
the City; and (3) required certifications from the licensed professional engineer that improvements
are completed to City standards, specifications and approved Utility Plans; and the "as -constructed"
plans have been received and accepted by the City.
9. The warranty on street improvements is for five (5) years from the date of acceptance by the City
of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional
Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use
Code, as applicable.
10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any
planned construction on this project. All required perimeter silt fencing and other erosion/sediment
control best management practices (BMP's) that can be installed prior to construction must be in
Development Construction Permit, Page 3/5
place and inspected by the City Erosion Control Inspector before any land disturbing activity begins.
11. No work (including grading and construction access) shall be started in State Highway right-of-
way until a permit is issued by the Colorado Department of Transportation to allow such work to
begin.
12. Other conditions: 1) Truncated dome warning detection shall be installed on the
driveway access ramp along Harmon Road see attached details). 2 A revised design for the offsite
sidewalk shall be implemented to avoid impacting the existing billboard
Permittee's acknowledgment signature:
By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of
the owners of the property (including all owners having legal or equitable interest in the real property, as
defined in Section 1-2 of the City Code; and including common areas legally connected to or associated
with the property which is the subject of this application) without whose consent and authority the
requested action could not lawfully be accomplished. Pursuant to said authority, 1 hereby permit City
officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such
property to perform work required of the applicant if the applicant were to fail to perform the required
work. I also acknowledge that I have read this permit document with all its requirements and
conditions, and I agree to all of the terms and conditions state 1 this permit.
e
Applicant/Project Manager' s
Approval for issuance:
Date: 43/0-7
Fa. City Engineer Approva a— Date: /O 1,91e,7
(Permit Issuance Date)
FORT COLLINS
ONLY
E
e
� U U
N 6
x
m
N
UULL
Cl
c
E
a
-
G1
c-
y d o
O C
6]J v 1
N (d t0
+.,.nG
Varies
_
N G EN
E
I W; :a` G I
J 1
M
CC v�nm m 2ti NSa�.
�
m o
U-3
ta_ �
U
c $ c
d A H
c `o c
a � E
o c E
E a w
E
_ a
75
n
E
5
m
h
o a E A o a 12
\
E E o 2r
se
\
E
v w w= o
C L U 7 nSz N O N
cc:
En d s
O C dG GJ \\\ \\\
m ;5 a 3 H rn E- 5 N 6 0 $. U
4 ..
N
Vari s
N
m
E
N
LL
U
=
m`
c
m
U
m ¢i
n
o ¢
m C
e
C C/i
LL
J
an
ca
a
E
m
�H
n
G a J 1
m E2
E
C
n
a.ownlr ¢
m
aC
Q Varies
0rp
lj
-
,dd
aAD pue qi no
1 1y o
y
U
m
_
C)
Boa
CD ¢
TRUNCATED DOME WARNING FOR ACCESS RAMPS
LARIMER COUNTY CONSTRUCTION 7REVISION NO: DRAWING
URBAN AREA DRAWINGS
STREET STANDARDS DATE: 04/01/07 1607
0
Z
m
C
0
as
0c
20
°LLa:..
O
N��
�
a
m
J
_
W
D Y
CD
W
CL W
r
m3
N
mD
}
Oq
IH
Q
73
N
M
M
M
ME
N
_E
23
N
N
0
U
< W
=
O
0
O
L
a
O
_
=
e
U
O
z
LF
a
ti
E
H
O
c
0
f%1
u
G)
E
N
N
� N
Eoa
E C U C
U �``" E�o
mm
z a) a) ooa
m O a C
W° Ems
at c°E
B ro n�
N . D m E
°
c a) a) °
a==aa))O4)
a) nDZjr
.0 7 C C
w 3�C)a0—
co<bc<-0
z r N c) V iq co
STANDARD DRIVEWAY APPROACH (HIGH VOLUME DRIVE TYPES III & IV
LARIMER COUNTY CONSTRUCTION REVISION NO: 2 DRAWING
URBAN AREA DRAWINGS
STREET STANDARDS DATE: 04/O1/07 707
Development Construction Permit, Page 4/5
EXHIBIT "A"
DEVELOPMENT PROJECT CONTACT PERSONS
Project Name: Fort Collins Supportive Housing
City Staff Contact Persons:
Development Engineer:
Construction Inspector:
Marc Virata / City of Fort Collins Engineering
281 N. College Avenue / Fort Collins, CO 80524
970 221-6605
Tracy Dyer / City of Fort Collins Engineering
281 N. College Avenue / Fort Collins, CO 80524
970 221-6605 (Chief Inspector starting 7/30)
Current Planner: Ted Shepard / City of Fort Collins Current Planning
281 N. College Avenue / Fort Collins, CO 80524
970 221-6750
Sanitary Sewer Engineer: N/A (FCLWD/SFCSD)
Erosion Control Inspector: D.A. Black / City of Fort Collins, 700 Wood
Street, Fort Collins, CO 80521
970 221-6700
Natural Resources: Dana Leavitt / City of Fort Collins, 281 North
College Avenue, Fort Collins, CO 80522
970 224-6143
Traffic Operations: Ward Stanford / City of Fort Collins, 625 Linden
Street, Fort Collins, CO 80524
970 221-6820
Street closures: Syl Mireles / City of Fort Collins, 625 Linden
Street, Fort Collins, CO 80524
970 221-6815
Forestry: Tim Buchanan / City of Fort Collins, 281 North
College Avenue, Fort Collins, CO 80522
Light and Power: Doug Martine / City of Fort Collins, 700 Wood
Street, Fort Collins, CO 80521
970 224-6152
Developer' Contact Persons:
Owner/Developer:
Project Engineer:
Development Construction Permit, Page 515
Dan Billmark
Fort Collins Supportive Housing, Inc.
2550 University Ave, West Suite 330N
St. Paul, MN 55114
651 645-7271
651 645-0541 (fax)
dbillmark@accessiblespace.org
Brian Clerico
S.A. Miro
3500 JFK Parkway, Suite 310
Fort Collins, CO 80525
970 266-1900
970 266-0276 (fax)
General Contractor: Randy DeMario / Joey Hardy / Doran Geise
Heath Construction
P.O. Drawer H
Fort Collins, CO 80522
970 221-4195
970 221-2907 (fax)
Planner: Michael D. Knisely
Distyle Design, P.C.
620 Mendelssohn Ave N Ste. 116
Golden Valley, MN 55427
763 591-0996
763 591-0964 (cell)
mknisely@distyledesign.com
DEVELOPMENT CONSTRUCTION PERMIT
APPLICATION
(1 /16/06)
For City use only: Application Number: Application Date:
Permit application fee: $ 400.00
INSTRUCTIONS:
1. Complete this form (some questions may not apply to you) and attach all necessary documents and
submit to the Development Engineering Section of the City.
2. If you have any questions contact the Development Engineer, , at 221-6605.
3. Submit the Application and pay the Application Fee at the fee at the Engineering counter at 281 N.
College Avenue.
PROJECT INFORMATION:
Project Name (as approved by the City):
Fort Collins Supportive
Project A.K.A. (Marketing name if different from Project Name):
Project Location: Fort Collins, Colorado
Property Owner(At the time of this permit issuance):
Individual Name: Dan Billmark
Company Name: Fart Cntlinc Snppnrfivr Hnncing Inv
Address: 2550 University Ave West Suite 330N St Paul Minnesota 55114
Phone number(s):
Office: 651-645-7271
Cellphone:
Fax number: 651-645-0541
Email: dbillmark@accessiblespace.org
Applicant/Project Manager (The primary contact person for all matters regarding this project, and the
person responsible for all matters referencing "the Developer" in the Development Agreement for this
project):
Individual Name: Dan Billmark
Company Name : Arrracihle C}carry Inv
Address: 2550 University Ave W Ste 330N. St Paul, Minnesota 55114
Phone number(s):
Office: 651-645-7271
Cellphone:
Fax number: 651-645-0541
Email: dbillmark@accessiblespace.org