July 18, 2003
Mr. Joe Simpson
Alpine Dental
P.O. Box 412
Fort Collins, CO 80522
RE: Comfort Dental P.D.P. - Sidewalk
Dear Joe:
rvices
The purpose of this letter is to clarify the obligation to construct a public sidewalk along
the south side of Harmony Road between the east property line of the Comfort Dental
P.D.P. (Current Planning Project File #19-02) and Hogan Drive. This sidewalk would
adjoin property owned by the Poudre Fire Authority and be considered a public sidewalk.
This sidewalk would be 360 feet in length and seven feet in width and is considered to be
an important pedestrian connection to serve the development of the Comfort Dental
P.D.P.
The cost of constructing this walk will be borne by the City of Fort Collins Street
Oversizing Program and Poudre Fire Authority. The cost sharing arrangement is that
.Poudre Fire Authority will contribute $4,500 for the "local share" of the sidewalk and the
Street Oversizing Program will pay for the "oversized share" so that the walk meets the
standard for a major arterial street. It is the City's desire to have the sidewalk constructed
by the time the Alpine Dental Clinic receives a Certificate of Occupancy.
If you have any further questions regarding the design, cost or construction of this
sidewalk, please contact me at 221-6750.
Sin:
Ted Shepard
Chief Planner
Cc: Dave Stringer, Development Review Supervisor
Matt Baker, Street Oversizing Coordinator
Bob Poncelow, Battalion Chief
281 Not th College Avenue • PO. Box 380 • Fort Collins, CO 80522-1580 • (970) 221-6750 • FAX (970) 416-2020
NEXTMEDIA OUTDOOR, INC.
left D
06T. it .266-7
September 28, 2007
RE: Deed of Dedication for Easement
City of Fort Collins
Planning and Zoning
C/o Mr. Peter Barnes, Zoning Administrator and Mr. Ted Shepard, Planner
P.O. Box 580
Fort Collins, CO 80522-0580
To whom it may concern
I am writing this letter to inform you that NextMedia Outdoor, Inc. recently purchased property along
Harmony Road east of South College Avenue (Lot 2, Replat of Part of Tract B, Fairway Estates Third
Filing) on 8/27/07 formerly belonging to Joseph M. and Ingrid Y. Simpson.
At the time of purchase we had an existing lease agreement in place for our sign located on the
northeast comer of this property. Since purchasing this property we have become aware of a Deed of
Dedication for Easement granted to the City of Fort Collins by the former owners Joseph M. and Ingrid
Y. Simpson. This easement appears to occupy ground underneath our sign. This particular deed was
executed on 7/11/07 prior to purchase of the property. In order for this deed to be valid per our lease,
notification or cancellation would have been required. Further at the time of purchase the seller (Joseph
M. and Ingrid Y. Simpson) warranted that there were no formal executed agreements or encumbrances
jeopardizing the existence of our sign.
In closing, we are amicable to working with all parties to clear up this matter. Please note we are open
to allowing the sidewalk for the betterment of the city as long as it does not interfere with our sign.
yours,
Jamie Rideoutt
Real Estate Manager
NextMedia Outdoor, Inc.
2649 East Mulberry St., Unit A20• Fort Collinsr C060524•Phone; 970.493-44111 Fax;970493-4595•w .nextmediagroupom
4L X/ a'2-
_OCT_10-2007 WED 03:19 PM Heath Construction FAX N0, 970 221 2907 P. 01
N
Heath
construction
FACSIMILE COVER SHEET
msrr�viftk-a
Toe_....._..
Pew
Proms Doran Gelse
Pegees 2
Phone Dales 10-W-07
Ref Cost Esdmate for Harmony Road CC. File
Widening within the Fort Collins Supportive
Housing parcel
❑ Urgent ❑ For R"ow ❑ Please Comment 13 Please Reply 0 Pw" Recycle
Dan,
As requested, here is the detailed cost estimate for adding the third lane to Harmony within the
lot for Fort Collins Supportive Housing.
As discussed yesterday in the conference call the sidewalk costs were as follows:
Simpson $5,000
Poudre Fire Property $8,300
Hach Co MC9l90 • r.O.DreWH • 141 aocgoans Dr. 4 Pon Collins, CO 80522 • ORm070,221.4195 • rant970.221,2907 • w .hwheonslmoslon.00m
_OCT-10-2007 WED 03:19 PM Heath Construction FAX H0, 970 221 2907 P. 02
(. t[/ ��
N 1%0%7z
Heath
construction
Pon Collin supportive Housing
Ft. Collins, CO
Project Cost estimate
Projected Costs for Harmony Road Widening
Spec Description Quanury unit
1062 Surveying 1 LS
02010 Harmony Read Traffic Control
02201 Site Demolition
Demo Trees
Saw -out Asphalt
Demo Curb & Gutter
Demo concrete Ditch
Demo Asphalt
Haul Debris
02530 Sits Concrete
Curb 8 Gutter
Sidewalks
02270 Erosion control
02200 Storm bralnage
24' RCP
02201 Earthwork
Ovailot Grading
Over Excavation
Sack811
Prop Asphalt
Prep Curb & Gutter
2910
irrigation
2031
Landscaping
02513
Asphalt Paving
02513
Paving Stripping
TOTALS
1 LS
10.OchD7
Owner Fart Collins Suppomve Housing
Arch' Distyie Design P,C.
Unit price Total
$1,630.00 $1.530.00
$1,68D.00 $1,680.00
1
EA
$25.00
$25A0
190
LF
$0.75
$142.60
190
LF
$1.00
$190.00
560
SF
$0.30
$168.00
380
SF
$0.30
$114.00
20
CY
$5.50
$130.00
120
LF
$11.65
$1,32alio
8F
$4.46
$0.00
1
LS
$1,294.00
$1.204.00
79
LF
$35.00
$2,730.00
2,756
SF
$0.25
$68B.78
204
CY
$5.60
$1.122.00
204
CY
$8.50
$1,734.00
2,75E
SF
$0.10
$275.50
190
LF
$1.25
$237,50
1
LS
$1.800.00
$1,800.00
1
LS
$1,20D,00
$1,200.00
306
9Y
S24.99
$7.046.94
1
LS
$195.00
$196.00
0
$24,301.19
z11, 301.,q
5-iO 6C.f0 NavMaJ,:1
�r 3Cz CC) PrA
(O r�00. ti t� NEer nev r.q �5.ar
Heath Construction . P.O.Oraw H • 141 Racquette Dr.. Fort CoMns. CO 80522 . Ofilcni 970.211.419E . Pax: 970.221,2907 . www.heathsanitruetlomcem
Services
Engineering Department
City of Fort Collins
MENNEN
October 12, 2007
Dan Billmark
2550 University Avenue
Suite 330N
St. Paul, Minnesota 55114
RE: Funds in -lieu of construction
Dear Dan:
The City has had the opportunity to review projected construction costs required to paid in -lieu of
construction pertaining to future Harmony Road widening and construction of sidewalk east of your
project as provided by your contractor Heath Construction (attached for your reference). Please be
advised that the City has approved of the estimates indicated in the attachment with the added cost of
$10,000 for the acquisition of an easement along the NextMedia property. These costs are broken down
below:
• $24.301.19 for Harmony Road widening abutting the project
+ $5,000.00 for sidewalk along the NextMedia property
• $10,000.00 for the City's costs to acquire an access easement for the installation of the sidewalk
along NextMedia property
The total of the above referenced costs is $39,301.19. Please note that upon the City's receipt of
$39,301.19 the sidewalk offsite your property is no longer required to be constructed by the first
certificate of occupancy.
Should you obtain the access easement along the NextMedia property and construct the sidewalk along
said property, a refund in the amount of $15,000.00 will also be issued to you. This dollar amount is only
required to serve as a fund available to the City in the event that the City assumes the sidewalk
construction (and easement acquisition) responsibility along the NextMedia property as a result of you
being unable to complete these items prior to the first certificate of occupancy on your site.
Let me know of any thoughts or concerns regarding this
Sincerely.
Marc Tr Virata
Civil Engineer
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6605 • FAX (970) 221-6378
www.fcgov.com
Interoffice Memorandum
Date: 1/4/08
To: Christie White, Financial Coordinator
From: Marc Virata, Development Review Engineer
Cc: project file
RE: Payment in -lieu of construction for Fort Collins Supportive Housing Subdivision
Attached are two checks in the amount of $24,301.19 and $15,000.00 which pertain to the Fort Collins
Supportive Housing Subdivision project and are intended to satisfy obligations of the development for
certain public improvements. The check in the amount of $24,301.19 is intended to satisfy the developer's
obligation towards certain Harmony Road improvements abutting the site, which is further explained in
paragraph II.D.3 of the development agreement for the project. The check in the amount of $15,000 is
intended to satisfy the developer's obligation towards certain sidewalk improvements along Harmony Road
east of the site which is further explained in paragraphs II.D.4-5 of the development agreement. These
specific portions of the development agreement are attached for reference.
It is conceivable that the funds provided may be returned to the developer if certain improvements are
constructed by the developer; however it is also as likely that the City or a third party would construct these
certain improvements and then be reimbursed by these funds.
Given the unique nature of this, let me know if I need to provide additional documentation, information, or
any other questions or concerns you might have.
OCT-10-2007 WED 03:19 FM Heath Construction FAX N0, 970 221 2907 F. 02
M��/Polo
Heath
construction
Fort Collins Supportive Housing
FL Collins, CO
Project Cost estimate
Projected Costs for Harmony Road Widening
Spec Description Ciuenuty
1062 Surveying 1
02010 Harmony Road Traffic Control
02201 Site Demolition
Demo Trees
Saw -cut Asphalt
Demo Curb & Gutter
Demo Concrete Ditch
Demo Asphalt
Haul Debris
02530 Bit@ Concrete
Curb 8 Gutter
Sidewalks
02270 erosion Control
02200 Storm Drainage
24' RCP
02201 earthwork
Ovadet Grading
over Fxcavatk+n
BeekfAl
Prep Asphalt
Prop Curb 6 Gutter
2810
Irrigation
2231
Landscaping
02513
A80011 Paving
02513
Paving Stripping
TOTALS
Unit
LS
1 LS
10.Oct-07
Owner: Fort Collins Supportive Housing
ArcR Dlatyls Design P.C.
Unit Price Total
$1,530.00 $1,530.00
$1,680.00 $1,680,00
1
EA
$25.00
$25.00
LF
$0.75
$142.50
190
$1.00
$190.00
190
LF
50.30
$188.00
550
SF
$0.30
$114.00
3S0
SF
$6.50
$130.00
20
CY
120 LF $11.65 $1,398.00
SF $4.46 $Ooo
t LS $1,294.00 $1.294.00
78
LF
$35.00
$2,730.00
2,755
SF
$0.25
$668.76
204
CY
$5.50
$1,122.00
204
CY
$8.50
$1,734.00
2,755
9F
$0.10
$275.50
$1.25
$237.50
ISO
LF
1
LS
$1,800.00
$1,800.00
1
LS
51,200.00
$1,200.00
3o5
SY
$24.99
$7,646.94
1
LS
$196.00
$195.00
0
$24,301.19
Z`1,301.1y
5,060.eo x/14rMv7'I
l0/COO,06 hE.rnenr.v 65..r
cf'7 9 C39, 3D1.1°J woo
Hasth Conttructlon • P.O. DrnwerH • 1411taequette Dr.. Port ColHns,CO80522 • Officer 970.221,4195 . 11=070.22L.2907 • www.hrathceasiractMe-com
Communitv Services
Advance Planning Department
MEMORANDUM
DATE: March 1, 2007
TO: Priority Processing Distribution List
FROM: Maurice Head, Affordable Housing Planner f
RE: Priority Processing and Waiver of Development Review Fees for
Accessible Space - Fort Collins Colorado Supportive Housing Development
Accessible Space is proposing to build a 23-unit apartment located at Harmony Road and
Hogan Drive. The project provides "independent living" opportunities for very low income
individuals with physical disabilities and will be 100% affordable.
Therefore, the project qualifies for Priority Processing and a 100% waiver of the City's
Development Review Fees. Please implement Priority Processing procedures for this
project.
If you have any questions, please call me at 221-6342. Thank you.
281 North College Avenue PO box 580 . Fort Collins, CO 50522-0580 • 970-221-6376
Fax 970-224-6ll1 • TDD 970-524-6002 • email: aplanninQ(«-fc-,ov.com
From: Gary Diede
To: Bob Poncelow; Cam McNair; Matt Baker
Date: 4/18/03 11:27AM
Subject: Harmony sidewalk
John Mulligan and Bob Poncelow have agreed to pay $4,500 for PFA's local share of the 7'
sidewalk along the south side of Harmony Road from Hogan to 360' west. This will relieve the
Dentist development from these offsite sidewalk improvements because Street Oversizing will pay
the oversized sidewalk in this 360'. 1 have left a message for Mr. Gallenste!n.
Cam, please have Engineering staff get with Bob Poncelow for the PFA account for these funds
and work with him on the easements or rights -of -way issues for the sidewalk.
Happy Day to you all!!
gary
CC: Dave Stringer; Gregory Byrne; John Mulligan; Ron Phillips; Sheri Wamhoff; Ted
Shepard
May 25, 2007
City of Fort Collins -Transportation Department
215 North Mason Street
Fort Collins, CO 80521
Re: Variance Request -Right Turn Lane Length for Fort Collins Supportive Housing
Denver Project
ncelns
This is a written request for variance on the required length of right turn lane off of Harmony
Road onto the Fort Collins Supportive Housing Project.
Summ,r Couniv
Standard to be Varied:
Per LCUASS (Larimer County Urban Area Street Standards) Chapter 8, Section 8.2.6
and Figure 8-5, the design right -turn lane length is 435 ft, including a 200 ft bay taper, for
a highway design speed of 50 mph.
Civil Enn_ineerirg
Proposed Alternate Design:
St°'corral E),gigee,mg We are requesting approval of the standard's distance of 435 ft to be 420 ft for the right -
Retail ArchitecWre turn lane design length including the 200 ft bay taper.
Comparing to Standard:
Our proposed right -turn lane length of 420 ft is slightly shorter than the standard length
of 435 ft by 15 ft.
Justification for the Variance:
The Standards right -turn lane length of 435 ft is based on approaches to stop sign
controlled and signaled intersections, allowing appropriate vehicle storage and
deceleration lengths. The proposed right -turn lane into the Fort Collins Supportive
Housing development is mid block, does not occur at a stop sign controlled or signaled
intersection and vehicles will be able to enter the site without completely stopping.
Additionally, Delich Associates, the traffic engineer for this Project, noted that while the
435 foot right -turn length would be standard for the 50 mph design speed for this
location, at the actual posted speed of 45 mph, the 420 foot right -turn length would only
require a 375 foot length. Delich Associates concluded that the current design of a 420 ft
right -turn lane will function efficiently and will not be detrimental to the public health,
welfare, and safety. The 420 foot length design also will not cause additional
maintenance costs.
We look forward to your response and approval of this proposed variance for the Fort Collins
Supportive Housing.
Sincerely
Gregory Aeeks, P.E.
Vdobs\06085 FC Supportive Housing\03 Outgoing\2007, 05-25 Final Plan Submittal to Distyle\Right T'um Lane Variance
RequesLdoc
S. A. MIRC, INC. 4582 South Ulster Street Suite 1501 Denver, Colorado 80237 Ww samiro.com Tel 303-741-3737 FAX 303 694-3134
DA
❑ 1 S T Y L E
D E 6 ! G N
June 27. 2097
Mr. and Mrs. Joe and Ingrid Simpson
P.O. Box 412
Fort. Collins, Colorado 80522
Subject: Fort. Collins Supportive Housing
Dear Mr. and Mrs. Simpson:
We are the architect for the Fort Collins Supportive Housing project to be constructed west of your site. In the
site development review process, the city of Fort Collins brought to our attention the sign on your property that
wilt be in conflict with the proposed walkway to be built out to Hogan. After looking at the sign, the city has
determined it is not an allowed sign and they have asked us to notify you that the sign is to be removed and that
it cannot be moved to another location. If you have any questions or concerns in the matter please contact Mr.
Peter Barnes. Zoning Administrator or Mr. Ted Shepard, Planner at (970)221-6750.
Sincerely.
DISTYLE DESIGN, P.C.
Michael D. Knisety
Principal
Copies To: Accessible Space, Inc.— Dan Billmark
Realtec — Larry Stroud
City of Fort Collins — Ted Shepard, Peter Barnes
620 MendeWsohn Ave. N, Suite 116
Gotd.n Valley, Minnesota 55427
[763] 591A996 ; 17631591.0964 f
July 12, 2007
WIN City of Fort Collins -Transportation Department
215 North Mason Street
Fort Collins, CO 80521
Re: Variance Request -Right Turn Lane Length for Fort Collins Supportive Housing
Denver Project
Fart Collins This is a written request for variance on the required length of right turn lane off of Harmony
Road onto the Fort Collins Supportive Housing Project.
SNpnut County
Standard to be Varied:
Per LCUASS (Latimer County Urban Area Street Standards) Chapter 8, Section 8.2.6
and Figure 8-5, the design right -turn lane length is 435 ft, including a 200 ft bay taper, for
a highway design speed of 50 mph.
Civil Engineering
Proposed Alternate Design:
Structural engineering We are requesting approval of the standard's distance of 435 ft to be 420 ft for the right -
Retail Architecture turn lane design length including the 200 ft bay taper.
Comparing to Standard:
Our proposed right -turn lane length of 420 ft is slightly shorter than the standard length
of 435 ft by 15 ft.
Justification for the Variance:
The Standards right -turn lane length of 435 ft is based on approaches to stop sign
controlled and signaled intersections, allowing appropriate vehicle storage and
deceleration lengths. The proposed right -turn lane into the Fort Collins Supportive
Housing development is mid block, does not occur at a stop sign controlled or signaled
intersection and vehicles will be able to enter the site without completely stopping.
Additionally, Delich Associates, the traffic engineer for this Project, noted that while the
435 foot right -turn length would be standard for the 50 mph design speed for this
location, at the actual posted speed of 45 mph, the right -turn length would only require a
375 foot length. Delich Associates concluded that the current design of a 420 ft right -
turn lane will function efficiently and will not be detrimental to the public health, welfare,
and safety. The 420 foot length design also will not cause additional maintenance costs.
We look forward to your response and approval of this proposed variance for the Fort Collins
Supportive Housing.
SincerVeeks,
regE.
N:Vobs\06085 FC Supportive Housing\03 Outgoing\2007, 07-13 Final Plan Submittal 2 to CityVRight Turn Cane Variance
Request.doc
S. A. MIRO, INC. 4582 South Ulster Street Suite 1501 Denver, Colorado 80237 w vsamiro.conr Tel 303-741-3737 FAX 303-694-3134
Page 1 1
From: "Simpson, Joseph M Ctr 90 MDOS/SGODD" <Joseph. Simpson. Ctr@warren.af. mil>
To: "Marc Virata" <mvirata@fcgov.com>
Date: 9/28/2007 11:32:14 AM
Subject: RE: Harmony Road Property
Marc - Thank you for your quick reply. I will contact our attorney.
Joe Simpson
-----Original Message -----
From: Marc Virata [mailto:mvirata@fcgov.comj
Sent: Friday, September 28, 2007 11:03 AM
To: cotoothdoc@aol.com; Peter Barnes; Simpson, Joseph M Ctr 90
MDOS/SGODD
Cc: Ted Shepard
Subject: RE: Harmony Road Property
Joe,
The easement in question had not been filed at the County while you
owned the property. The City isn't in a position to declare the
easement "void and non -binding", I believe an attorney would need to
formulate an opinion on this. Hope this helps.
Marc P. Virata, P.E.
Civil Engineer II
City of Fort Collins - Engineering Department
Phone: (970) 221-6605
Fax: (970) 221-6378
mvirata@fcgov.com
>>> Peter Barnes 9/28/2007 9:41 AM >>>
Joe, I'm copying this reply to Marc Virata of the Engineering
Department. I believe he would be the appropriate staff person to
provide you with some documentation and he's also familiar with all the
details.
Peter.
>>> "Simpson, Joseph M Ctr 90 MDOS/SGODD"
<Joseph. Simpson. Ctr@warren.af.miI> 09/28/2007 9:32 AM >>>
Good Morning Peter:
It was nice meeting you yesterday! Ingrid has spoken highly of you for
some time and it was nice to put a face with the reputation.
I got to thinking after I left your office, that it would be good for us
in the future if we had a letter that stated that the Easement had never
been filed (or what ever it is called?) while we owned the property.
Therefore, as you told me, the Easement is void and non -binding on the
purchaser since the property has been sold. Or in your words, "It's a
restart'.
Please email it to the above address; a copy to cotoothdoc@aol.com; and
a hard copy to - since sometimes I can't down load properly
Page 2
Joe Simpson
305 West Magnolia St # 161
Ft Collins, CO 80521
I am sorry to be a pest on this, but I am just tying to cover the bases.
I appreciate your help in this matter.
THANK YOU IN ADVANCE!!
Joe Simpson