Loading...
HomeMy WebLinkAboutFORT COLLINS SUPPORTIVE HOUSING - Filed GC-GENERAL CORRESPONDENCE - 2008-02-21Comm ty Planning and Environmental Current Planning Citv of Fort Collins July 18, 2003 Mr. Joe Simpson Alpine Dental P.O. Box 412 Fort Collins, CO 80522 RE: Comfort Dental P.D.P. - Sidewalk Dear Joe: rvices The purpose of this letter is to clarify the obligation to construct a public sidewalk along the south side of Harmony Road between the east property line of the Comfort Dental P.D.P. (Current Planning Project File #19-02) and Hogan Drive. This sidewalk would adjoin property owned by the Poudre Fire Authority and be considered a public sidewalk. This sidewalk would be 360 feet in length and seven feet in width and is considered to be an important pedestrian connection to serve the development of the Comfort Dental P.D.P. The cost of constructing this walk will be borne by the City of Fort Collins Street Oversizing Program and Poudre Fire Authority. The cost sharing arrangement is that .Poudre Fire Authority will contribute $4,500 for the "local share" of the sidewalk and the Street Oversizing Program will pay for the "oversized share" so that the walk meets the standard for a major arterial street. It is the City's desire to have the sidewalk constructed by the time the Alpine Dental Clinic receives a Certificate of Occupancy. If you have any further questions regarding the design, cost or construction of this sidewalk, please contact me at 221-6750. Sin: Ted Shepard Chief Planner Cc: Dave Stringer, Development Review Supervisor Matt Baker, Street Oversizing Coordinator Bob Poncelow, Battalion Chief 281 Not th College Avenue • PO. Box 380 • Fort Collins, CO 80522-1580 • (970) 221-6750 • FAX (970) 416-2020 NEXTMEDIA OUTDOOR, INC. left D 06T. it .266-7 September 28, 2007 RE: Deed of Dedication for Easement City of Fort Collins Planning and Zoning C/o Mr. Peter Barnes, Zoning Administrator and Mr. Ted Shepard, Planner P.O. Box 580 Fort Collins, CO 80522-0580 To whom it may concern I am writing this letter to inform you that NextMedia Outdoor, Inc. recently purchased property along Harmony Road east of South College Avenue (Lot 2, Replat of Part of Tract B, Fairway Estates Third Filing) on 8/27/07 formerly belonging to Joseph M. and Ingrid Y. Simpson. At the time of purchase we had an existing lease agreement in place for our sign located on the northeast comer of this property. Since purchasing this property we have become aware of a Deed of Dedication for Easement granted to the City of Fort Collins by the former owners Joseph M. and Ingrid Y. Simpson. This easement appears to occupy ground underneath our sign. This particular deed was executed on 7/11/07 prior to purchase of the property. In order for this deed to be valid per our lease, notification or cancellation would have been required. Further at the time of purchase the seller (Joseph M. and Ingrid Y. Simpson) warranted that there were no formal executed agreements or encumbrances jeopardizing the existence of our sign. In closing, we are amicable to working with all parties to clear up this matter. Please note we are open to allowing the sidewalk for the betterment of the city as long as it does not interfere with our sign. yours, Jamie Rideoutt Real Estate Manager NextMedia Outdoor, Inc. 2649 East Mulberry St., Unit A20• Fort Collinsr C060524•Phone; 970.493-44111 Fax;970493-4595•w .nextmediagroupom 4L X/ a'2- _OCT_10-2007 WED 03:19 PM Heath Construction FAX N0, 970 221 2907 P. 01 N Heath construction FACSIMILE COVER SHEET msrr�viftk-a Toe_....._.. Pew Proms Doran Gelse Pegees 2 Phone Dales 10-W-07 Ref Cost Esdmate for Harmony Road CC. File Widening within the Fort Collins Supportive Housing parcel ❑ Urgent ❑ For R"ow ❑ Please Comment 13 Please Reply 0 Pw" Recycle Dan, As requested, here is the detailed cost estimate for adding the third lane to Harmony within the lot for Fort Collins Supportive Housing. As discussed yesterday in the conference call the sidewalk costs were as follows: Simpson $5,000 Poudre Fire Property $8,300 Hach Co MC9l90 • r.O.DreWH • 141 aocgoans Dr. 4 Pon Collins, CO 80522 • ORm070,221.4195 • rant970.221,2907 • w .hwheonslmoslon.00m _OCT-10-2007 WED 03:19 PM Heath Construction FAX H0, 970 221 2907 P. 02 (. t[/ �� N 1%0%7z Heath construction Pon Collin supportive Housing Ft. Collins, CO Project Cost estimate Projected Costs for Harmony Road Widening Spec Description Quanury unit 1062 Surveying 1 LS 02010 Harmony Read Traffic Control 02201 Site Demolition Demo Trees Saw -out Asphalt Demo Curb & Gutter Demo concrete Ditch Demo Asphalt Haul Debris 02530 Sits Concrete Curb 8 Gutter Sidewalks 02270 Erosion control 02200 Storm bralnage 24' RCP 02201 Earthwork Ovailot Grading Over Excavation Sack811 Prop Asphalt Prep Curb & Gutter 2910 irrigation 2031 Landscaping 02513 Asphalt Paving 02513 Paving Stripping TOTALS 1 LS 10.OchD7 Owner Fart Collins Suppomve Housing Arch' Distyie Design P,C. Unit price Total $1,630.00 $1.530.00 $1,68D.00 $1,680.00 1 EA $25.00 $25A0 190 LF $0.75 $142.60 190 LF $1.00 $190.00 560 SF $0.30 $168.00 380 SF $0.30 $114.00 20 CY $5.50 $130.00 120 LF $11.65 $1,32alio 8F $4.46 $0.00 1 LS $1,294.00 $1.204.00 79 LF $35.00 $2,730.00 2,756 SF $0.25 $68B.78 204 CY $5.60 $1.122.00 204 CY $8.50 $1,734.00 2,75E SF $0.10 $275.50 190 LF $1.25 $237,50 1 LS $1.800.00 $1,800.00 1 LS $1,20D,00 $1,200.00 306 9Y S24.99 $7.046.94 1 LS $195.00 $196.00 0 $24,301.19 z11, 301.,q 5-iO 6C.f0 NavMaJ,:1 �r 3Cz CC) PrA (O r�00. ti t� NEer nev r.q �5.ar Heath Construction . P.O.Oraw H • 141 Racquette Dr.. Fort CoMns. CO 80522 . Ofilcni 970.211.419E . Pax: 970.221,2907 . www.heathsanitruetlomcem Services Engineering Department City of Fort Collins MENNEN October 12, 2007 Dan Billmark 2550 University Avenue Suite 330N St. Paul, Minnesota 55114 RE: Funds in -lieu of construction Dear Dan: The City has had the opportunity to review projected construction costs required to paid in -lieu of construction pertaining to future Harmony Road widening and construction of sidewalk east of your project as provided by your contractor Heath Construction (attached for your reference). Please be advised that the City has approved of the estimates indicated in the attachment with the added cost of $10,000 for the acquisition of an easement along the NextMedia property. These costs are broken down below: • $24.301.19 for Harmony Road widening abutting the project + $5,000.00 for sidewalk along the NextMedia property • $10,000.00 for the City's costs to acquire an access easement for the installation of the sidewalk along NextMedia property The total of the above referenced costs is $39,301.19. Please note that upon the City's receipt of $39,301.19 the sidewalk offsite your property is no longer required to be constructed by the first certificate of occupancy. Should you obtain the access easement along the NextMedia property and construct the sidewalk along said property, a refund in the amount of $15,000.00 will also be issued to you. This dollar amount is only required to serve as a fund available to the City in the event that the City assumes the sidewalk construction (and easement acquisition) responsibility along the NextMedia property as a result of you being unable to complete these items prior to the first certificate of occupancy on your site. Let me know of any thoughts or concerns regarding this Sincerely. Marc Tr Virata Civil Engineer 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6605 • FAX (970) 221-6378 www.fcgov.com Interoffice Memorandum Date: 1/4/08 To: Christie White, Financial Coordinator From: Marc Virata, Development Review Engineer Cc: project file RE: Payment in -lieu of construction for Fort Collins Supportive Housing Subdivision Attached are two checks in the amount of $24,301.19 and $15,000.00 which pertain to the Fort Collins Supportive Housing Subdivision project and are intended to satisfy obligations of the development for certain public improvements. The check in the amount of $24,301.19 is intended to satisfy the developer's obligation towards certain Harmony Road improvements abutting the site, which is further explained in paragraph II.D.3 of the development agreement for the project. The check in the amount of $15,000 is intended to satisfy the developer's obligation towards certain sidewalk improvements along Harmony Road east of the site which is further explained in paragraphs II.D.4-5 of the development agreement. These specific portions of the development agreement are attached for reference. It is conceivable that the funds provided may be returned to the developer if certain improvements are constructed by the developer; however it is also as likely that the City or a third party would construct these certain improvements and then be reimbursed by these funds. Given the unique nature of this, let me know if I need to provide additional documentation, information, or any other questions or concerns you might have. OCT-10-2007 WED 03:19 FM Heath Construction FAX N0, 970 221 2907 F. 02 M��/Polo Heath construction Fort Collins Supportive Housing FL Collins, CO Project Cost estimate Projected Costs for Harmony Road Widening Spec Description Ciuenuty 1062 Surveying 1 02010 Harmony Road Traffic Control 02201 Site Demolition Demo Trees Saw -cut Asphalt Demo Curb & Gutter Demo Concrete Ditch Demo Asphalt Haul Debris 02530 Bit@ Concrete Curb 8 Gutter Sidewalks 02270 erosion Control 02200 Storm Drainage 24' RCP 02201 earthwork Ovadet Grading over Fxcavatk+n BeekfAl Prep Asphalt Prop Curb 6 Gutter 2810 Irrigation 2231 Landscaping 02513 A80011 Paving 02513 Paving Stripping TOTALS Unit LS 1 LS 10.Oct-07 Owner: Fort Collins Supportive Housing ArcR Dlatyls Design P.C. Unit Price Total $1,530.00 $1,530.00 $1,680.00 $1,680,00 1 EA $25.00 $25.00 LF $0.75 $142.50 190 $1.00 $190.00 190 LF 50.30 $188.00 550 SF $0.30 $114.00 3S0 SF $6.50 $130.00 20 CY 120 LF $11.65 $1,398.00 SF $4.46 $Ooo t LS $1,294.00 $1.294.00 78 LF $35.00 $2,730.00 2,755 SF $0.25 $668.76 204 CY $5.50 $1,122.00 204 CY $8.50 $1,734.00 2,755 9F $0.10 $275.50 $1.25 $237.50 ISO LF 1 LS $1,800.00 $1,800.00 1 LS 51,200.00 $1,200.00 3o5 SY $24.99 $7,646.94 1 LS $196.00 $195.00 0 $24,301.19 Z`1,301.1y 5,060.eo x/14rMv7'I l0/COO,06 hE.rnenr.v 65..r cf'7 9 C39, 3D1.1°J woo Hasth Conttructlon • P.O. DrnwerH • 1411taequette Dr.. Port ColHns,CO80522 • Officer 970.221,4195 . 11=070.22L.2907 • www.hrathceasiractMe-com Communitv Services Advance Planning Department MEMORANDUM DATE: March 1, 2007 TO: Priority Processing Distribution List FROM: Maurice Head, Affordable Housing Planner f RE: Priority Processing and Waiver of Development Review Fees for Accessible Space - Fort Collins Colorado Supportive Housing Development Accessible Space is proposing to build a 23-unit apartment located at Harmony Road and Hogan Drive. The project provides "independent living" opportunities for very low income individuals with physical disabilities and will be 100% affordable. Therefore, the project qualifies for Priority Processing and a 100% waiver of the City's Development Review Fees. Please implement Priority Processing procedures for this project. If you have any questions, please call me at 221-6342. Thank you. 281 North College Avenue PO box 580 . Fort Collins, CO 50522-0580 • 970-221-6376 Fax 970-224-6ll1 • TDD 970-524-6002 • email: aplanninQ(«-fc-,ov.com From: Gary Diede To: Bob Poncelow; Cam McNair; Matt Baker Date: 4/18/03 11:27AM Subject: Harmony sidewalk John Mulligan and Bob Poncelow have agreed to pay $4,500 for PFA's local share of the 7' sidewalk along the south side of Harmony Road from Hogan to 360' west. This will relieve the Dentist development from these offsite sidewalk improvements because Street Oversizing will pay the oversized sidewalk in this 360'. 1 have left a message for Mr. Gallenste!n. Cam, please have Engineering staff get with Bob Poncelow for the PFA account for these funds and work with him on the easements or rights -of -way issues for the sidewalk. Happy Day to you all!! gary CC: Dave Stringer; Gregory Byrne; John Mulligan; Ron Phillips; Sheri Wamhoff; Ted Shepard May 25, 2007 City of Fort Collins -Transportation Department 215 North Mason Street Fort Collins, CO 80521 Re: Variance Request -Right Turn Lane Length for Fort Collins Supportive Housing Denver Project ncelns This is a written request for variance on the required length of right turn lane off of Harmony Road onto the Fort Collins Supportive Housing Project. Summ,r Couniv Standard to be Varied: Per LCUASS (Larimer County Urban Area Street Standards) Chapter 8, Section 8.2.6 and Figure 8-5, the design right -turn lane length is 435 ft, including a 200 ft bay taper, for a highway design speed of 50 mph. Civil Enn_ineerirg Proposed Alternate Design: St°'corral E),gigee,mg We are requesting approval of the standard's distance of 435 ft to be 420 ft for the right - Retail ArchitecWre turn lane design length including the 200 ft bay taper. Comparing to Standard: Our proposed right -turn lane length of 420 ft is slightly shorter than the standard length of 435 ft by 15 ft. Justification for the Variance: The Standards right -turn lane length of 435 ft is based on approaches to stop sign controlled and signaled intersections, allowing appropriate vehicle storage and deceleration lengths. The proposed right -turn lane into the Fort Collins Supportive Housing development is mid block, does not occur at a stop sign controlled or signaled intersection and vehicles will be able to enter the site without completely stopping. Additionally, Delich Associates, the traffic engineer for this Project, noted that while the 435 foot right -turn length would be standard for the 50 mph design speed for this location, at the actual posted speed of 45 mph, the 420 foot right -turn length would only require a 375 foot length. Delich Associates concluded that the current design of a 420 ft right -turn lane will function efficiently and will not be detrimental to the public health, welfare, and safety. The 420 foot length design also will not cause additional maintenance costs. We look forward to your response and approval of this proposed variance for the Fort Collins Supportive Housing. Sincerely Gregory Aeeks, P.E. Vdobs\06085 FC Supportive Housing\03 Outgoing\2007, 05-25 Final Plan Submittal to Distyle\Right T'um Lane Variance RequesLdoc S. A. MIRC, INC. 4582 South Ulster Street Suite 1501 Denver, Colorado 80237 Ww samiro.com Tel 303-741-3737 FAX 303 694-3134 DA ❑ 1 S T Y L E D E 6 ! G N June 27. 2097 Mr. and Mrs. Joe and Ingrid Simpson P.O. Box 412 Fort. Collins, Colorado 80522 Subject: Fort. Collins Supportive Housing Dear Mr. and Mrs. Simpson: We are the architect for the Fort Collins Supportive Housing project to be constructed west of your site. In the site development review process, the city of Fort Collins brought to our attention the sign on your property that wilt be in conflict with the proposed walkway to be built out to Hogan. After looking at the sign, the city has determined it is not an allowed sign and they have asked us to notify you that the sign is to be removed and that it cannot be moved to another location. If you have any questions or concerns in the matter please contact Mr. Peter Barnes. Zoning Administrator or Mr. Ted Shepard, Planner at (970)221-6750. Sincerely. DISTYLE DESIGN, P.C. Michael D. Knisety Principal Copies To: Accessible Space, Inc.— Dan Billmark Realtec — Larry Stroud City of Fort Collins — Ted Shepard, Peter Barnes 620 MendeWsohn Ave. N, Suite 116 Gotd.n Valley, Minnesota 55427 [763] 591A996 ; 17631591.0964 f July 12, 2007 WIN City of Fort Collins -Transportation Department 215 North Mason Street Fort Collins, CO 80521 Re: Variance Request -Right Turn Lane Length for Fort Collins Supportive Housing Denver Project Fart Collins This is a written request for variance on the required length of right turn lane off of Harmony Road onto the Fort Collins Supportive Housing Project. SNpnut County Standard to be Varied: Per LCUASS (Latimer County Urban Area Street Standards) Chapter 8, Section 8.2.6 and Figure 8-5, the design right -turn lane length is 435 ft, including a 200 ft bay taper, for a highway design speed of 50 mph. Civil Engineering Proposed Alternate Design: Structural engineering We are requesting approval of the standard's distance of 435 ft to be 420 ft for the right - Retail Architecture turn lane design length including the 200 ft bay taper. Comparing to Standard: Our proposed right -turn lane length of 420 ft is slightly shorter than the standard length of 435 ft by 15 ft. Justification for the Variance: The Standards right -turn lane length of 435 ft is based on approaches to stop sign controlled and signaled intersections, allowing appropriate vehicle storage and deceleration lengths. The proposed right -turn lane into the Fort Collins Supportive Housing development is mid block, does not occur at a stop sign controlled or signaled intersection and vehicles will be able to enter the site without completely stopping. Additionally, Delich Associates, the traffic engineer for this Project, noted that while the 435 foot right -turn length would be standard for the 50 mph design speed for this location, at the actual posted speed of 45 mph, the right -turn length would only require a 375 foot length. Delich Associates concluded that the current design of a 420 ft right - turn lane will function efficiently and will not be detrimental to the public health, welfare, and safety. The 420 foot length design also will not cause additional maintenance costs. We look forward to your response and approval of this proposed variance for the Fort Collins Supportive Housing. SincerVeeks, regE. N:Vobs\06085 FC Supportive Housing\03 Outgoing\2007, 07-13 Final Plan Submittal 2 to CityVRight Turn Cane Variance Request.doc S. A. MIRO, INC. 4582 South Ulster Street Suite 1501 Denver, Colorado 80237 w vsamiro.conr Tel 303-741-3737 FAX 303-694-3134 Page 1 1 From: "Simpson, Joseph M Ctr 90 MDOS/SGODD" <Joseph. Simpson. Ctr@warren.af. mil> To: "Marc Virata" <mvirata@fcgov.com> Date: 9/28/2007 11:32:14 AM Subject: RE: Harmony Road Property Marc - Thank you for your quick reply. I will contact our attorney. Joe Simpson -----Original Message ----- From: Marc Virata [mailto:mvirata@fcgov.comj Sent: Friday, September 28, 2007 11:03 AM To: cotoothdoc@aol.com; Peter Barnes; Simpson, Joseph M Ctr 90 MDOS/SGODD Cc: Ted Shepard Subject: RE: Harmony Road Property Joe, The easement in question had not been filed at the County while you owned the property. The City isn't in a position to declare the easement "void and non -binding", I believe an attorney would need to formulate an opinion on this. Hope this helps. Marc P. Virata, P.E. Civil Engineer II City of Fort Collins - Engineering Department Phone: (970) 221-6605 Fax: (970) 221-6378 mvirata@fcgov.com >>> Peter Barnes 9/28/2007 9:41 AM >>> Joe, I'm copying this reply to Marc Virata of the Engineering Department. I believe he would be the appropriate staff person to provide you with some documentation and he's also familiar with all the details. Peter. >>> "Simpson, Joseph M Ctr 90 MDOS/SGODD" <Joseph. Simpson. Ctr@warren.af.miI> 09/28/2007 9:32 AM >>> Good Morning Peter: It was nice meeting you yesterday! Ingrid has spoken highly of you for some time and it was nice to put a face with the reputation. I got to thinking after I left your office, that it would be good for us in the future if we had a letter that stated that the Easement had never been filed (or what ever it is called?) while we owned the property. Therefore, as you told me, the Easement is void and non -binding on the purchaser since the property has been sold. Or in your words, "It's a restart'. Please email it to the above address; a copy to cotoothdoc@aol.com; and a hard copy to - since sometimes I can't down load properly Page 2 Joe Simpson 305 West Magnolia St # 161 Ft Collins, CO 80521 I am sorry to be a pest on this, but I am just tying to cover the bases. I appreciate your help in this matter. THANK YOU IN ADVANCE!! Joe Simpson