Loading...
HomeMy WebLinkAboutRIVERSIDE FIRST AND SIXTH - Filed DCP-DEV. CONSTRUCTION PERMIT - 2007-11-29DEVELOPMENT CONSTRUCTION PERMIT Permit Number: 04-20 Issuance Date: 7 IS Project Name: Fort Collins Coloradoan Project A.K.A.: Project Location: 1300 Riverside Avenue Fort Collins CO 80524 Permittee: Dorothy Bland City and developer contacts: See attached Exhibit "A" for names and phone numbers of all contact persons for this project. Fees: Permit Application Fee (paid at the time of application) $ PAID Construction Inspection Fee (paid prior to issuance of this permit) $ 1,817.45 Total $ 1,817.45 Development Bond or other approved security: Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. $ 33,985.55 Form of security deposited with the City: Bond PERFORMANCE REQUIREMENTS OF THIS PERMIT: 1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design drawings and specifications the certification of all materials testing by an Engineer. The Permittee shall have an Engineer prepare revised design drawings and secure City approval for all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required by the City in the Development Agreement, that the improvements are constructed in conformance with the approved Utility Plans and the standards and specifications of the City. The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance of the constructed public improvements. (All references above to the terms "Project Engineer" and "Engineer" shall mean a Professional Engineer licensed in Colorado.) 2. All contractors who perform work on this project must be bonded and licensed in conformance with City requirements. DATED this 9th day of July , 2004 DEVELOPER: SURETY: Fort Collin Coloradoan, A Division of Multimedia Holds cg�p Printed Name Travelers Casualty and Surety Company of America Pri ted Name By: s Attomey-in-Fact (attach Pc&verof Attorney) Debra Deming o.:,I'ry FOF,; T COLLINS DEVELOPMENT CONSTRUCTION PERMIT ENG.INEERINi:, APPLICATION JFF'Afi TMENT '.21 1lGf,'TH C (2/16/99) OLLEr,E h707 1-n60 use only: Application Number: AtY1J}_ application Date: 'I Q7 ,17-14-04 41 Permit application fee: $ 300.00 ?U3:2102 �,00.00 TCTIONS: N`'4'w4 = I. Complete this form (some questions may not apply to you) and attach all necessary documents and TLTAL 700.00 submit to the Development Engineering Section of the City. Clint% 300.90 2. If you have any questions contact the Development Engineer 3. Submit the Application and a the Application Fee at the fee at the En ineering counter 281 N. CHANGE O.00 PP pay PP College Avenue. ,LERKN1 .3111 12.08 .CT INFORMATION: rroleCL Name (as approved by the City): Fort Collins Coloradoan PDP Project AXA. (Marketing name if different from Project Name): New Office Building for the Fort Collins Coloradoan Newspaper Project Location: 1300 Riverside Avenue Property Owner (At the time of this permit issuance): Individual Name: Dorothy Bland, President POF_ ,ice 1T Company Name: Fort Collins Coloradoan, a division of Multimedia Holdings Corp. Address: 1212 Riverside Ave. Fort Collins, CO 80524 Phone number(s): Office: 970-224-7790 Cellphone: Fax number: 970-224-7798 > Email: DBLAND@ftcollin.gannett.com Applicant/Project Manager (The primary contact person for all matters regarding this project, and the d person responsible for all matters referencing "the Developer" in the Development Agreement for this project): Individual Name: Jerry Quinn, Production Director Company Name: Fort Collins Coloradoan Address: 1212 Riverside Ave. Fort Collins, CO 80524 Phone number(s): Office: 970-224-7761 Cellphone: 970-218-4925 Fax number: 970-224-7864 Email: jerryquinn@coloradoan.com Permittee (Person who is to sign the Development Construction Permit): Individual Name: See Owner Company Name : Address: Phone number(s): Office: Cellphone: Fax number: Email: Project Engineer (A Colorado licensed professional engineer who is the civil engineer, the person, responsible for the design of this project, responsible for certification that improvements are constructed in accordance with approved plans, responsible for making revisions to plans with City approval and for providing as -constructed plans): Individual Name: Uger Curtiss Company Name: Northam Engineering c q t Address: 420 South Howes_ ite 202 Phone number(s): Office: 221-4158 Cellphone: 690-0928 Fax number: 221-4159 Email: bud(a),northemen ineering com Professional License Number 27362 Architect/Planner (The person responsible for the site design of this project) Individual Name: George Brelig. AIA Principal Company Name: RR+n Arrhitertg t Address: 315 E. Mountain Ave. Suite 100 Fort Collins CO 80524 Phone number(s): Office: 970-484-0117 Cellphone: Fax number: 970-484-0264 Email: gbrelig@rbbarchitects.com Developer (The party or parties referenced in the Development Agreement who are responsible for the Developer's obligations contained in the Agreement —add additional names below): Individual Name: See Owner Company Name: Address: Phone number(s): Office: Cellphone: Fax number: Email: General Contractor (The contractor in overall charge of the public infrastructure construction): Individual Name Company Name Address: 2642 Midpoint Drive Unit A Phone number(s): Office: 970-490-1855 Cellphone: Fax number: 970-490-6093 Email: dstolte@dohnconstruction.com If you have no General Contractor, list all other contractors below. Grading contractor: Individual Name: Company Name: Address: Phone number(s): Office: Cellphone: Fax number: Email: Utility contractor: Individual Name: Company Name: Address: Phone number(s): Office: Cellphone: Fax number: Email: Concrete contractor for flat work: Individual Name: Company Name: _ Address: Phone number(s): Office: _ Cellphone: _ Fax number: Email: Concrete contractor for structures: Individual Name: Company Name : Address: Phone number(s): Office: _ Cellphone: Fax number: Email: Paving contractor: Individual Name: _ Company Name: — Address: Phone number(s): Office: _ Cellphone: Fax number: Email: Landscape contractor: Individual Name: Company Name: Address: Phone number(s): Office: _ Cellphone: _ Fax number: Email: Other contractors and parties involved in the project: SUBMIT THE FOLLOWING ITEMS (Required for all projects): • 81/2"xI I" copy of the Site Plan • Proposed Project Schedule • Project quantities and cost estimate for all of the public improvements to be constructed. In addition, include all private improvements that are required to be inspected by the City Construction Inspectors. This information must be submitted in the format shown on the attached form titled "Project Quantities and Cost Estimate Sheet." ADDITIONAL SUBMITTALS (Required if checked): ❑ Traffic control plan(s) for the project ❑ Proposed haul routes shown on a City map ❑ Shop drawings ❑ Other CONSTRUCTION COORDINATION MEETING: A construction coordination meeting to discuss plans and special requirements for your project, is required for all development projects. The people required to attend the meeting are the Project Manager, Project Engineer, Developer, Architect/Land Planner and General Contractor (if no General Contractor, representatives for each of the contractors expected to work on this project) People to Attend: List the peoples names and titles for those who will attend the pre - construction meeting: Name Title ESTIMATED COST OF INFRASTRUCTURE IMPROVEMENTS: Provide the estimated value of all public infrastructure improvements that will be constructed and accepted by the City to own and maintain. In addition provide the value of all private infrastructure improvements that the City will inspect and require certification for. The estimate shall be in the same format as the attached sheet titled "Project Quantities and Cost Estimate Sheet." Public infrastructure, estimated cost: Private infrastructure, estimated cost: $ 0 I certify that the information on this permit application along with the required additional submittals are true and correct to the best of my knowledge, and that in filing this application I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required-Avork. Applicant Signature' Date: I., W W a ►4 i uj � I U Q LL o fr ❑ t` a ❑ ¢a z Q LLO aQ a a ® OOB9b Wtloj Development Construction Permit, Page 2/5 3. Construction time restrictions: 4. The applicant understands that additional permits maybe required for this development project and the applicant shall secure those permits directly from the issuing departments. 5. This permit, along with a complete set of all approved plans and documents for this project (utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic study, drainage report, plat easements and any other official documents), shall be kept on the development site available for use by City staff doing inspections. 6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable): a. If construction has not begun within sixty (60) days from the date of issuance of this permit, this permit shall expire and the applicant will forfeit the permit fee paid for this permit, whereupon the applicant must re -apply for a new permit. b. In addition, this permit shall expire one year from the date of issuance. The applicant may apply for an extension by reapplication at least two weeks prior to the expiration date. Such application shall contain information sufficient to justify the granting of the extension. An extension may be granted for up to six months. 7. Building permits and certificates of occupancy will only be issued when all conditions contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29- 678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the Development Agreement does not specify times for completion ofpublic improvements, or if there is no Development Agreement, then the improvement requirements specified in Section 24-95 of the City Code shall apply, which provides that construction of all improvements shall be required prior to the time of issuance of the first building permit. 8. Acceptance by the City of the public improvements shall be after (1) final inspection has been conducted by the City; (2) punch list items from the final inspection are completed and accepted by the City; and (3) required certifications from the licensed professional engineer that improvements are completed to City standards, specifications and approved Utility Plans; and the "as -constructed" plans have been received and accepted by the City. 9. The warranty on street improvements is for five (5) years from the date of acceptance by the City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use Code, as applicable. 10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any Development Construction Permit, Page 3/5 planned construction on this project. All required perimeter silt fencing and other erosion/sediment control best management practices (BMP's) that can be installed prior to construction must be in place and inspected by the City Erosion Control Inspector before any land disturbing activity begins. 11. No work (including grading) shall be started in State Highway right-of-way until a permit is issued by the Colorado Department of Transportation to allow such work to begin. 12. Other conditions: &A— ci� hr-UD a46AT,�F_Wq�r WLYE T 6f- eE6E-.vim A AC, .A,PP-ca/E-b ekl -n+E C 11- 1 of f-7.. t l-i,JS fQ!CYO TiJ T4-F- V:J;- )A4C£ FAQ-TiFICATe OF tYC i)PAr4CJ Permittee's acknowledgment signature: By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. I also acknowledge that I have read this permit document with all its requirements and conditions, and I agree to all of the terms and conditions so stated in this permit. Applicant/Project Manager' s Signature: D e: Approvalfor issuance. City Engineer Approval: � Date: (PkAit Idsuance Date) Development Construction Permit, Page 415 EXHIBIT "A" DEVELOPMENT PROJECT CONTACT PERSONS Project Name: Fort Collins Coloradoan City Staff Contact Persons: Development Engineer: Susan Joy 970-221-6605 Construction Inspector: Dan Peterson 970-222-8780 Current Planner: Ted Shepard 970-221-6750 Water Utilities Engineer: Jeff Hill 970-221-6674 Erosion Control Inspector: Bob Zakely 970-224-6063 Natural Resources: Doug Moore 224-6143 Traffic Operations: Eric Bracke 970-224-6062 Street closures: Syl Mireles 970-221-6815 Transportation Planning: Tom Reiff 970-416-2040 Forestry: Tim Buchanan 970-221-6361 Light and Power: Doug Martine 970-224-6152 Developer, Contact Persons: Project Manager: Jerry Quinn, Production Director, Fort Collins Coloradoan 1212 Riverside Avenue, Fort Collins, CO 80524 970-224-7761 office 970-218-4925 cell Developer: Dorothy Bland, Vice President of Multimedia Holdings Corp., Of which the Fort Collins Coloradoan is a division 1212 Riverside Avenue, Fort Collins, CO 80524 970-224-7790 Architect/Planner: George Brelig, RB&B Architects Inc. 315 E. Mountain Avenue, Suite 100, Fort Collins, CO 80524 970-484-0117 Development Construction Permit, Page 515 Project Engineer: Roger Curtiss, Northern Engineering Services, Inc. 420 South Howes, Suite 202 Fort Collins, CO 970-221-4158 office 970-690-0928 cell General Contractor: David Stolte, Project Manager Dohn Construction, Inc. 2642 Midpoint Drive, Unit A Fort Collins, CO 970-490-1855 office O O N O) N T W j U � Z _____ ____ ------- ____ n T 3 t U rn c � c ------------- 2 m � LL j N O ^ N Q m E U ryd $ _ _ d d 0 Z---• ---- ---- - - -- - - 0 a- 0 0 O ---- ---- ----- ---- s N m v ¢ 0 T >` ® N a` d a � � v O N c C - U N ------------ C 0 N d > Q 42 0 n U t O U T O C C N p) U C o ; d d u o c o ? of t E d 0 - >d Em m m c y L^ w n = > > > > v E E u Q1 LL U' 3 O ry t �f j O O O O F E f E ¢ O 010 C, C) 0 0 oM 9 Wk ta 6A bog Ci 64 Ci IF M I w Z) 0 .j R OW w z w LL. 0 t Z onwo U, W a. 0 F. w gul L W W IL M w IL > CL LU w n 61i 6% L 64 M, Ix a. p gL O V) 0 uj w M. !mpT' > w w 19 Z 0 Z uj x w �- 4 C) 0 00 0 0rm 000000 Ci . C) C; Ci C) 0 0 p C; ig, 0 UJ boil I- w W U) Ul LU > 1 MINIM 31, w U) 0. UJ �- 0 Nil$ LL. o 0 LL. 3000 31 ig IN Nial 11'', 0 co 0 LU w UJ z RI ZRIE M1,10i a W w >- z uj ISM I I FM 11 z LU fl,[1100 ILI, U ffll� Ni-4i 1,�,m w 0 Idlili:1 --- si g z S; 0 z 0 UL gw- LIJ a LL W 0 to T x U. L� -j L) . . . LL U. LL >- LL LL LL >- >: a) z '30 E5 LL 0 �- Z 0) .j 0 u L) W 91 c .3 9L IL W IK 4 z aw (D 0. t2 z 0: z 2 65 X. (n X. -0 W O -J W z w Z3 C Co CL aU OMM a. C E 4) 3: E 0) IL -j w En cc d) V ID v 'I v U) C t! ;u w 0 W 0 CCUD�cr M o JL - 0) a) 1: � (u - cm 8 t.- =u w D C LL 0 ui a -j L 0 M > CCU M -@ (D P U) M > U _(D 0 W j 0 z z:( / /)} •d'm /,,| 00 HM /()(} `!fl,•!� : EE ! ± / !� c° ©; / d / /«)/ §]ƒ§A \§;[ \0 () \ !;; \ � ) $ \ © R , r/--, A� DEVELOPMENT BOND Bond No. 104297068 KNOW ALL MEN BY THESE PRESENTS: that we Fort Collin Coloradoan, A division of Multimedia Holdings Corp. as Principal, hereinafter referred to as the "Developer" and Travelers Casualty and Surety Company of America a corporation organized under the laws of the State of Connecticut , as Surety, hereinafter referred to as "Surety", are held and firmly bound unto the CITY OF FORT COLLINS, COLORADO, a municipal corporation, hereinafter referred to as the "City", in the sum of Thirty -Three Thousand Nine Hundred Eighty -Five and ------- 33 100 Dollars ($ 33,985.33 ), to be_paid to the City, for which payment well and truly to be made, we bind ourselves, our heirs, executors and administrators, successors and assigns, firmly by these presents. WHEREAS, the Developer has submitted to the City for its approval of the following development project: Fort Collins New office Complex and WHEREAS, the City has approved said development project and the Developer and the City have executed a Development Agreement dated July 14, 2004 pertaining to the development project (the "Development Agreement") a copy of which is by reference made a part hereof; and WHEREAS, the City Code requires that the Developer post a bond equal to the total cost to construct the Developer's portion of the public infrastructure (which, upon completion and acceptance by the City shall become the property of the City), which for the above -described development project shall be Thirty -Three Thousand Nine Hundred Eighty -Five and "'u Dollars ($ 33, 985.33 ), with such Surety to be upon condition that the bond remain in full force and effect until such time as the City releases such bond, which release shall occur upon (1) issuance to the Developer of a notice of final acceptance stating that all of the public infrastructure improvements have been completed in accordance with the approved .plans for said development project and the specifications and standards of the City; and (2) delivery to the City by the Developer of a bond, cash or other securing deposit in a form acceptable to the City to guarantee that the Developer shall maintain and repair all of said public infrastructure improvements in accordance with the City Code. NOW, THEREFORE, the condition of this obligation is such that if the Developer shall truly and faithfully perform to the satisfaction of the City its obligations in constructing, maintaining and repairing the public infrastructure constructed in connection with the aforesaid development project in accordance with the City Code (including the Land Use Code and Transitional Land Use Regulations, as applicable), and the Development Agreement, then this obligation shall be void; otherwise to remain in full force and effect. COPY