HomeMy WebLinkAboutSIDEHILL THREE - Filed DCP-DEV. CONSTRUCTION PERMIT - 2007-11-27Transportation Development Review Fee Date Received/ Paid
�i --
Or9_d
City of Fort Collins Total Amount Paid Project Name: s;lc�//F�;.,G r.�i�,�,
Project Location. IP 4Wet r� & 7t ��e��"" �
nrl�0 Date:
Type of Submittal
Please indicate the type of application submitted by checking the box
preceding the appropriate request(s).
Fee snucture amount due
❑ Overall Development Plan (ODP) $500 each _
Final Development Plan (FDP)
This fee includes 2 rounds of review $1000 each
7
❑ Additional round of review $ 500 each
❑ Annexation $20 x _ acres = + $250 = _
I Minor Amendment $250 each _
❑ Major Amendment $2,500 each _
Re -zone $200 each
C Modification to Land Use Code $200 each _
❑ Wireless Telecommunication Equipment (WTE) $65 each
Road Projects _ acres (of roadway) X S250= _
❑ Vacation of Easement(s) * *" # of vacations _ X $400 = _
D Vacation of Right(s)-of-Way *,• # of vacations_ X.$800=
Ll Dedication of Easement(s) and/or Right(s)-of Way ***
# of dedications _ X $250 = _
*** This fee does not include the cost of filing fees. Filing fees shall be
determined at the time of final document submittal and will be required prior
to filing.
❑ Project Development Plan (PDP) or Basic Development Review Project
requiring Transportation Services Review and/or utility plan review. This fee
includes 3 rounds of review.
Detached Single Family $160 per unit
_#of units X$160= _
Multifamily or other residential units $115per unit
_#of units X$115= _
Commercial, Industrial, Retail, and/or Non residential
building square footage $0.25 per square foot
_sq IfX$0.25= _
Size of the development (area being platted or if not being
platted size of parcel accompanying all development
improvements) $250 per acre _ acres X $ 250 =
Project fee $2,000 each
Total of above amounts
If this fee amount exceeds $30,000 then the fee amount shall be adjusted with
the following formula:
$30,000 + V. (the amount over 30,000
The maximum fee for any residential ONLY project shall be $500 per
residential unit. This check should be used to verify the fee amount (does not
apply to mixed -use developments). PDP fee shall be the lesser of this amount
or the above calculated amount.
# of residential units X $500 =
Reduction for affordable housing — a copy of the Ciry letter certifying/
authorizing the affordable housing shall be provided with this application.
Amount of reduction to be applied
Total owed for PDP $
Land Use Information:
Total number of single family detached units:
Total number of multifamily/other residential units: _
Total number of certified affordable dwelling units (a copy
of the letter/ authorization is required):
Non residential buitding square footage: sq ft
Gross Acreage: acres
General Information:
Owners Name(s):
Street address:
City/State/Zip:
Telephone: Fax:
Applicants/ Consultants Firm Name:
Contact:
Street address:
City/State,'Zip:
Telephone: Fax:
Certification:
By signing this permit I acknowledge that I am acting
with the knowledge, consent, and authority of the
owners of the property (including all owners having
legal or equitable interest in the real property, as
defined in Section 1-2 of the City Code; and
including common areas legally connected to or
associated with the property which is the subject of
this application) without whose consent and authority
the requested action could not lawfully be
accomplished. Pursuant to said authority, I hereby
permit City officials to enter upon the property for
Purposes of inspection.
Name (please print): O.-_
Signature: G
Telephone: ZV'9 —%'P'JF�
cc: Christie White, Engineering 6 —(2--v
Development Review E gineering
m
d
b
Transportation Development Review Fee Date Received/ Paid
Project Name: Sidehill Filing 3 Total Amount Paid
Project Location: _Block 1, Sideh-- Ftltng 2 'NE corner of Timberline & Katandin Date: 3/13/07
Type of Submittal
Please indicate the type of application submitted by checking the box
preceding the appropriate requests).
C Overall Development Plan (ODP) Fee srructure amount due
5500 each _
❑ Final Development Plan (FDP)
This fee includes 2 rounds of review $1000 each _
❑ Additional round of review $ 500 each
❑ Annexation $20 x_acres =_+S250 = _
❑ Minor Amendment $250 each _
❑ Major Amendment $2,500 each _
❑ Re -zone $200 each _
❑ Modification to Land Use Code $200 each _
❑ Wireless Telecommunication Equipment (WTE) $65 each _
❑ Road Projects _ acres (of roadway) X $250 = _
❑ Vacation of Easement(s) ••' # of vacations _ X $400 = _
❑ Vacation of Right(s).of--Way '•" # of vacations _ X $800 = _
❑ Dedication of Easement(s) and/or Right(s)-of-Way •••
# of dedications _ X S250 = _
""• This fee does not include the cost of filing fees. Filing fees shall be
determined at the time of final document submittal and will be required prior
to filing.
X Project Development Plan (PDP) or Basic Development Review Project
requiring Transportation Services Review and/or utility plan review. This fee
includes 3 rounds of review.
Detached Single Family $160 per unit
_0 new_ # of units X $160 = 0
Multifamily or other residential units $115 per unit
_0_ # of units X $115 = 0
Commercial, Industrial, Retail, and/or Non residential
building square footage $0.25 per square foot
_0_sq It X $0.25 =
Size of the development (area being platted or if not being
planed size of parcel accompanying all development
improvements) $250 per acre _2.65_ acres X $ 250 = $662.50
Project fee $2,000 each
Total of above amounts $2,662.50
If this fee amount exceeds $30,000 then the fee amount shall be adjusted with
the following formula:
$30,000 + /, (the amount over 30,000
The maximum fee for any residential ONLY project shall be $500 per
residential unit. This check should be used to verify the fee amount (does not
apply to mixed -use developments). PDP fee shall be the lesser of this amount
or the above calculated amount.
_19_ # of residential units X $500 = _$9,500
Reduction for affordable housing — a copy of the City letter certifying/
authorizing the affordable housing shall be provided with this application.
Amount of reduction to be applied
Total owed for PDP $2,662.50
Land Use Information:
Total number of single family detached units: 19 (no change)
Total number of multifamily/other residential units:
Total number of certified affordable dwelling units (a copy
of the letter/ authorization is required): _0_
Non residential building square footage: _N/A_ sq ft
Gross Acreage: _2.65 acres
General Information:
Owners Name(s): _Postle Development Company
Street address: _2919 Valmont Rd, Suite 209
City/State/Zip: _Boulder, CO 80301
Telephone:_303-443-9644 Fax:
Applicants/ Consultants Firm Name:
_JR Engineering
Contact: _Mike Malvey.
Street address: _2620 E Prospect Rd, Suite 190
City/State/ Zip: _Fort Collins, CO 80525
Telephone:_970-491-9888_ Fax:_970-491-9984
Certification:
By signing this permit I acknowledge that I am acting
with the knowledge, consent, and authority of the
owners of the property (including all owners having
legal or equitable interest in the real property, as
defined in Section 1-2 of the City Code; and
including common areas legally connected to or
associated with the property which is the subject of
this application) without whose consent and authority
the requested action could not lawfully be
accomplished. Pursuant to said authority, I hereby
Permit City officials to enter upon the property for
purposes of inspection.
Name (ple t): l ��
Signature:
Telephone: 4 43 -104
cc: Christie White, Engineering
Development Review Engineering ✓�
Transportation Development Review
Fee Date Received/ PaidlJc'7
�_•.�.rt,�,,
Total Amount Paid T A-7 e -7
Citvof Fort Collins Project Name: t ij {"h
PAIN
wwnffiw� Project Location:
Date:
Type of Submittal
C' 7 01 C S C!
Please indicate the type of application submitted by checking the box
Land Use Information:
preceding the appropriate request(s).
Total number of single family detached units: �.
Fee structure amount due
❑ Overall Development Plan (ODP) $500 each
Total number of multifamily/other residential units: (4—.
_
❑ Final Development Plan (FDP)
Total number of certified affordable dwelling units (a copy
This fee includes 2 rounds of review $]000 each
of the letter/ authorization is required): '(
❑ Additional round of review $ 500 each
Nonresidential building square f iotage:4 , , sq R
Annexation $20 x acres _ + $250
_= =
Gross Acreage: bti acres
_
❑ Minor Amendment $250 each
General Information:
�( Major Amendment $2,500 each c4 �_
Owners Name(s):
C1 Re -zone $200 each
Street address: /6-11^- ca,4,21 s „'.ae, 500
_
❑ Modification to Land Use Code $200 each
❑ Wireless Telecommunication Equipment (WTE) $65 each
_
❑ Road Projects _ acres (of roadway) X $250 = _
City/State/Zip: t f t I P d Q K r C
G Vacation of Easement(s) "• # of vacations _ X $400 =
❑ Vacation of Right(s)-of-Way«•• #ofvacations _X$800=
Telephone:(/e3)�E�,Fax:(YL'3� �d-r3.7 :J
❑ Dedication of Easement(s) and/or Right(s)-of--Way `•*
# of dedications _ X $250 =
Applicants/ Consultants Firm Name:
«•` This fee does not include the cost of filing fees. Filing fees shall be
determined at the time of final document submittal and will be required prior
r
Contact:
to filing.
Street address:
❑ Project Development Plan (PDP) or Basic Development Review Project
requiring Transportation Services Review and/or utility plan review. This fee
includes 3 rounds of review.
Detached Single Family $160 per unit
units XS160=
pp
City/State/ Zip: r d i
_#of
Multifamily or other residential units $115 per unit
_ # ofunits X S115 =
Telephone: Er'76) q-&-8454 Fax:N 76)y-'I2 A 459
Commercial, Industrial, Retail, and/or Non residential
Certification:
building square footage $0.25 per square foot
_sq ft X $0.25 =
By signing this permit I acknowledge that I am acting
—
Size of the development (area being platted or if not being
with the knowledge, consent, and authority of the
platted size of parcel accompanying all development
owners of the property (including all owners having
improvements) $250 per acre acres X $ 250 =
legal or equitable interest in the real roe as
P P rtY,
—
Project fee $2,000 each uma
defined in Section 1-2 of the City Code; and
including common areas legally connected to or
Total of above amounts
associated with the property which is the subject of
If this fee amount exceeds $30,000 then the fee amount shall be adjusted with
this application) without whose consent and authority
the following formula:
the requested action could not lawfully be
$30,000 + /, (the amount over 30,000 ) =
accomplished. Pursuant to said authority, I hereby
permit City officials to enter upon the property for
The maximum fee for any residential ONLY project shall be $500 per
purposes of inspection.
residential unit. This check should be used to verify the fee amount (does not
apply to mixed -use developments). PDP fee shall be the lesser of this amount
Name (please
or the above calculated amount.
Signature:
— # of residential units X $500 =
Telephone:
Reduction for affordable housing- a copy of the City letter certifying/
authorizing the affordable housing shall be provided with this application.
Amount of reduction to be applied
cc: CIVistie White, Engineering
VA'evelopment Review Engineering
Total owed for PDP $