Loading...
HomeMy WebLinkAboutHARMONY SCHOOL SHOPS SIXTH - Filed DCP-DEV. CONSTRUCTION PERMIT - 2007-11-26Transportation Services Engineering Department DEVELOPMENT CONSTRUCTION PERMIT Permit Number: O 'i - 2 3 Issuance Date: -sa z S D _7 Project Name: _ Harmon School Shops 6`h Filing Project Location: _ north side of Harmony Road east of Timberline Road _ Permittee: WILLI P( v1 S (20ki;GTEu n C1#xA r nk:P ,P _ City and developer contacts: See attached Exhibit "A" for names and phone numbers of all contact persons for this project. Fees: Permit Application Fee (paid at the time of application) $_ 400.00 Construction Inspection Fee (paid prior to issuance of this permit) $I �a_ Total $ 9,081.00 Development Bond or other approved security: Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. $272�338.95 Form of security deposited with the City: letter of credit PERFORMANCE REQUIREMENTS OF THIS PERMIT: 1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design drawings and specifications the certification of all materials testing by an Engineer. The Permittee shall have an Engineer prepare revised design drawings and secure City approval for all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required by the City in the Development Agreement, that the improvements are constructed in conformance with the approved Utility Plans and the standards and specifications of the City. The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance of the constructed public improvements. (All references above to the terms "Project Engireer" and "Engineer" sliall mean a Professional Engineer Iicensed in Colorado.) 2. All contractors who perform work on this project must be bonded and licensed in conformance with City requirements. 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6605 • FAX (970) 221-6378 www.fcgov.com Development Construction Permit, Page 2/5 3. Construction time restrictions: N/A 4. The applicant understands that additional permits maybe required for this development project and the applicant shall secure those permits directly from the issuing departments. 5. This permit, along with a complete set of all approved plans and documents for this project (utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic study, drainage report, plat easements and any other official documents), shall be kept on the development site available for use by City staff doing inspections. 6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable): a. If construction has not begun within sixty (60) days from the date of issuance of this permit, this permit shall expire and the applicant will forfeit the permit fee paid for this permit, whereupon the applicant must re -apply for a new permit. b. In addition, this permit shall expire one year from the date of issuance. The applicant may apply for an extension by reapplication at least two weeks prior to the expiration date. Such application shall contain information sufficient to justify the granting of the extension. An extension may be granted for up to six months. 7. Building permits and certificates of occupancy will only be issued when all conditions contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29- 678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the Development Agreement does not specify times for completion of public improvements, or if there is no Development Agreement, then the improvement requirements specified in Section 24-95 of the City Code shall apply, which provides that construction of all improvements shall be required prior to the time of issuance of the first building permit. 8. Acceptance by the City of the public improvements shall be after (1) final inspection has been conducted by the City; (2) punch list items from the final inspection are completed and accepted by the City; and (3) required certifications from the licensed professional engineer that improvements are completed to City standards, specifications and approved Utility Plans; and the "as -constructed" plans have been received and accepted by the City. 9. The warranty on street improvements is for five (5) years from the date of acceptance by the City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use Code, as applicable. 10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any planned construction on this project. All required perimeter silt fencing and other erosion/sediment control best management practices (BMP's) that can be installed prior to construction must be in Development Construction Permit, Page 3/5 place and inspected by the City Erosion Control Inspector before any land disturbing activity begins. 11. No work (including grading and construction access) shall be started in State Highway right-of- way until a permit is issued by the Colorado Department of Transportation to allow such work to begin. 12. Other conditions: Permittee's acknowledgment signature: By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. I also acknowledge that I have read this permit document with all its requirements and conditions, and I agree to all of the terms and conditions so stated in this permit. -V Applicant/Project Manager's Signature: q Date: 048/n`7 Approvalforissuance: Fd City Engineer Appro Date: (Permit Issuance Date) Development Construction Permit, Page 415 EXHIBIT "A" DEVELOPMENT PROJECT CONTACT PERSONS Project Name: City Staff Contact Persons: Development Engineer: Construction Inspector: Harmony School Shops 4`h Filing Marc Virata / City of Fort Collins Engineering 281 N. College Avenue / Fort Collins, CO 80524 970 221-6605 Dan Peterson / City of Fort Collins Engineering 281 N. College Avenue / Fort Collins, CO 80524 970 221-6605 Current Planner: Ted Shepard / City of Fort Collins Current Planning 281 N. College Avenue / Fort Collins, CO 80524 970 221-6750 Sanitary Sewer Engineer: Roger Buffington /City of Fort Collins Utilities 700 Wood Street / Fort Collins, CO 80521 970 221-6854 Erosion Control Inspector: D.A. Black / City of Fort Collins, 700 Wood Street, Fort Collins, CO 80521 970 221-6700 Natural Resources: Dana Leavitt / City of Fort Collins, 281 North College Avenue, Fort Collins, CO 80522 970 224-6143 Traffic Operations: Eric Bracke / City of Fort Collins, 625 Linden Street, Fort Collins, CO 80524 970 224-6062 Street closures: Syl Mireles / City of Fort Collins, 625 Linden Street, Fort Collins, CO 80524 970 221-6815 Transportation Planning: Dave Averill / City of Fort Collins, 215 N Mason Street, Fort Collins, CO 80524 970 416-2643 Development Construction Permit, Page 515 Forestry: Tim Buchanan / City of Fort Collins, 281 North College Avenue, Fort Collins, CO 80522 Light and Power: Alan Rutz / City of Fort Collins, 700 Wood Street, Fort Collins, CO 80521 970 224-6153 Developer' Contact Persons: Owner/Developer: Project Engineer: Permittee/Applicant Project Manager/Contractor: John Mountjoy CFM Realty 209 S. 19`h St., Suite 500 Omaha, NE 68102 402 932-2000 402 932-2780 (fax) 402 968-7918 (cell) imountiovkcfinrealLy.com Joe Sparone JR Engineering 2620 E. Prospect Road, Ste 190 Fort Collins, CO 80525 970 491-9888 970 491-9984 (fax) jsparone@jrengineering.com Wendall Williams / Chris Haggard Willams Construction Company 965 S. Kipling Parkway Lakewood, CO 80226 303 989-9009 303 989-0909 (fax) 720 320-5750 (Wendall) (cell) 720 320-5755 (Chris) (cell) wendall a,wniscon st. com chris@wmsconst.com Planner: Michael Chalona Land Images 1136 E. Stuart Street, Suite 2040 Fort Collins, CO 80525 970 472-8954 970 472-8955 (fax) Michael@landimagesinc.com DEVELOPMENT CONSTRUCTION PERMIT APPLICATION (2/16/99) For City use only: Application Number: Application Permit application fee: S 400.00 INSTRUCTIONS: l . Complete this form (some questions may not apply to you) and attach all necessary documents and submit to the Development Engineering Section of the City. 2. If you have any questions contact the Development Engineer at 221-6750. 3. Submit the Application and pay the Application Fee at the fee at the Engineering counter at 281 No. College Avenue. PROJECT INFORMATION: Project Name (as approved by the City): NAP-mriDN,( ScAooL SNoPs Project A.K.A. (Marketing name if different from Project Name): 5MA +R2UE1 Ec_ 5 Project Location: Z 22 rt+ l=. 1}AP—talon! `/ Rb Property Owner(At the time Individual Name: _ Company Name: — Address: 20 Phone number(s): Office: '!D2 - cl 3Z. Z0o0 Cellphone: Fax number: !qo'Z- J3Z- 2.780 Email: J rm-w rdoy CZ Ca;ntRrAt7^(•G0M l 0'Z. Applicant/Project Manager (The primary contact person for all matters regarding this project, and the person responsible for all matters referencing "the Developer" in the Development Agreement for this project): Individual Name: t"Lgli c,- Li t LLA A M S Company Name: WOE tAnMi Cct4Sr2V(MOM COR.p, Address: J 6+ G S. K4 Qu N: (, PAe.A WA Phone number(s): Office: 303. 989 -yao9 Cellphone: Fax number: 303- ' - D Email: kJLiNVPtLL t..Jt21S CAtjss (0A4 "PROJECT QUANTITIES AND COST ESTIMATE SHEET"yjQvlq,�.Ltj� dU-�PS ALL PUBLIC AND APPLICABLE MEASURE QUANTITY CONSTRUCTION ATE IMPROVEMENTS) (PROVIDED BY THE COST PER UNIT PROJECT ENGINEER) OF MEASURE FEE PER UNIT I INSPECTION (PROVIDED FEE BY THE CITY) APPROVED BY THE CITY) Storm Sewer Reinforced Concrete Pipe 18' L.F. 49 $2&30 $1,386.70 $0.70 $70.00 21' 58 $33.80 $1,960.40 $1.70 $70.00 24' 357 ' $3&55 $13,048.35 $2.70 $763.90 30, 525 $56.20 $29,505.00 $3.70 $1,642.50 36, 69 $75.00 $5,175.00 54.70 $70.00 Trench 29x45 L.F. 167. $112.00 $18,704.00 $0.70 $116.90 Trench 3453 L.F. 48- $142.80 $6,854.40 $0.70 $70.00 Concrete Headwall C.Y. 0 $0.00 $0.00 $3.50 $0.00 Water Quality Outlet Structure C.Y. 1 i $5,638.00 $5,638.00 $3.50 $75.00 All Inlet Types EACH 8- $2,204.00 $17,632.00 $103.00 $824.00 Manhole EACH 5 ' $2,527.00 $12,635.00 $103.00 $515.00 FES EACH 3- $1,305.00 $3,915.00 $0.00 Rip Rap Tons 58 $61.00 $3,538.00 $0.00 Sanitary Sewer 3j7 [ ,zoo � Sanitary Sewer Main 8" L.F. -25 A" $18.40 $&R001 & $0.70 $2W1R& Water Main 8" L.F. 848 $26.40 $22,387.20 $0.70 5593.60 Trench included L.F. �jy� 0415 AM $0.00 $0.00 $0.70 $593.60 W"er/Sewer Service Line Stub EACH 6 $1,400.00 $8,400.00 $70.00 5420.00 Fire Hydrant EACH 0 $0.00 $0.00 570.00 $0.00 Manhole EACH 2' $1,622.00 53,244.00 $103.00 $206.00 Valves EACH 0 $0.00 $0.00 $70.00 $0.00 Meter Pit (1") EACH 0 $0.00 $0.00 $35.00 $0.00 Fitting ( Bend, Tee, Cross) EACH 0 $0.00 $0.00 $35.00 $0.00 Water Main Connection EACH 0 $0.00 $0.00 $35.00 $0.00 Water Trench L.F. 1,128 $0.00 $0.00 $0.70 $789.60 Water/Sewer Service Line S 1.5" EACH * Z $3,653.00 $74v"3-@& i306 $70.00 $S69.88 Water/Sewer Service Line S 2' EACH 2 $4,292.00 $8,584.00 $70.00 $140.00 Fire Hydrant EACH .0-4 $9,982.00 $29,946.00 $70.00 $27019& Other Hydrant EACH $2,634.00 $0.00 $0.00 Valves 6" & Box EACH 4 ' $675.00 $2,700.00 $70.00 $280.00 Valves 8" & Box EACH 2' $1,003.00 $2,006.00 $70.00 $140.00 Meter Pit (1") EACH 0 $0.00 $0.00 $35.00 $0.00 Fitting ( Bend, Tee, Cross) lump sum EACH 4 4 $6,464.00 $6,464.00 $35.00 ease& Water Main Connection EACH 2 $1,400.00 $2,800.00 $35.00 $70.00 B" Dip L.F. 630 - $35.40 $22,302.00 $0.00 6" Dip L.F. 109 546.80 $5,101.20 $0.00 �t work, curb & gutter, ig patch, traffic control lump sum 47 S.V. 1 $16,817.00 $16,817.00 $0.00 rt System ing L.S. 0 $0.00 SO.00 $0.00 ment S.Y. 0 $0.00 $0.00 $0.45 $0.00 &Gutter L.F. 0 $0.00 $0.00 $1.00 $0.00 ;hed Sidewalk L.F. 0 .,yyyy 0 $0.00 z- zEr4 $0.00 ?2 y0'L $1.00 �(?�`� $0.00 strian Ramps L.F. B SO.00 6B9Q $F.B6 $990 1 S.Y. 0 S $0.00 '/ 7 $"0 Z11 - $9.4a• 103.w $&.20 ;pan S.Y. ..W ) �y $0.00 y5 $0.00)&1it, , $0,4r�to i.,- $G,60 95 9)eg /D TOTaaVIPUB oINFRAs u RE�CO znz PRIVATE IMPROVEMENTS REQUIRING CITY INSPECTIONS WILL NEED TO BE INCLUDED. HOWEVER PRIVATE IMPROVEMENTS WILL NOT BE INCLUDED 4 THE TOTAL INFRASTRUCTURE COST FOR BONDING. "PROJECT QUANTITIES AND COST ESTIMATE SHEET' A I a I C I o I a I F c " (PROJECT NAME AS EXISTS ON THE DEVELOPMENT PERMIT) 3 3 DESCRIPTION UNITS OF JESTIMATED 1INFRASTRUCTURE TOTAL INSPECTION TOTAL (LIST ALL PUBLIC AND APPLICABLE MEASURE QUANTITY CONSTRUCTION ESTIMATED FEE PER UNIT INSPECTION e 'PRIVATE IMPROVEMENTS) (PROVIDED BY THE COST PER UNIT INFRASTRUCTURE (PROVIDED FEE s PROJECT £NGINEER)JOF MEASURE COST BY THE CITY (COST ESTMATE APPROVED BY THE 7 CITY) a Storm Sewer Reinforced Concrete Pipe 18" L.F. 49 $28,30 $1,386.70 $0.70 $70.00 e m 21" 58 $33.80 $1,960.40 $1,70 mA $7000 n 24" 357 $36.55 $13,048.35 $2.702"1$7G3�JD ,z 30" 525 $56.20 $29,505,00 $3.70 $164250 13 36" 69 $75.00 $5,175.00 $4.70 $70.00 ,. Trench 29x45 L.F. 167 $112.00 $18,704.00 $0.70 $116.90 15 Trench 34x53 L.F. 48 $142.80 $6.854.40 $0,70 $70.D0 ,s Concrete Headwall C.Y. 0 $0.00 $0.00 $3,50 $0.00 v Water Quality Outlet Structure -15011. -1- $5,638.00 $5,638.00 $3.50 $7&9& ,3 All Inlet Types EACH 8 $2,204.00 $17.632.00 $103,00 $824,00 19 Manhole EACH 5 $2,527.00 $12,635.00 $103,00 $515.00 m FES EACH 3 $1,305.00 $3,915A0 $0.00 a Rip Rap Tons 58 $61.00 $3,538,00 $0,00 n z3 Sanitary Sewer Sanitary Sewer Main L.F. a 193 0.00 >L$O�r U--' 0 $0.70 $0 00 a zs Water -Maim .8"` .16f. "994- $26,40 $8,817.60 I�, ��Y $0.70 $233.80 x TieOch inaluded L-F-- y,� ,t--1 $0,00 $0.00 $0.70 $233.80 n Water/Sewer Service Line Stub - EACH 6 $1,400.00 $8.400.00 �y. $70.00 $420.00 za Fire Hydrant - EACH B im 1 $0.00 $0.00 $g9,OB7 Io° $0.00 zs Manhole EACH 1 $1,622.00 $3,244.00 $103.00 $206.0 m Valves EACH 000 $0,00 $0,00 $70.00 $0.00 v Meter Pit (1") EACH 0 $0.00 $0.00 $35.00 $0,00 3: Fitting ( Bend, Tee, Cross ) EACH 0 $0.00 $0.00 $35.00 $0.00 33 Water Main Connection EACH Z' 0 $0.00 $0,00 $35.00 $ODO- 31 35 Water 36 Trench L.F. -044^ ( zf $0,00 $0.00 $0.70 $569.80 37 Water/Sewer Service Line S 1.5" EACH p. 4" $3,653.00 $7,306.00 $70,00 $140.00 3e Water/Sewer Service Line S 2' EACH e 5 $4,292,00 $8,584.00 $70.00 $140.00 39 Fire Hydrant EACH a :r $9,982.00 $19,964.00 $70.00 $140.00 w Other Hydrant EACH ! $2,634.00 $5,268.00 $0.00 ., Valves 6" & Box EACH ! y $675.00 $4,050,00 $70.00 $420.00 .3 Valves 8" & Box EACH 111 $1,003.00 $1,003.00 $70,00 $70.00 43 Meter Pit (1") EACH 0 $0.00 $0.00 $35.00 S0.00 u Fitting ( Bond, Tee, Cross) lump sum EACH 046 $6,464.00 $6,464.00 $35.00 $35.00 as Water Main Connection EACH • L $0.00 $0,00 $35.00 $0.00 w S" Dip L.F. b.t8.yo� $35.40 $22,974.60 S&00 a 6" Dip L.F. a& 161 $46.80 $7,722.00 �y 'Y $0.00 Street work, curb & gutter, Ls paving patch, traffic control lump sum 47 S.Y. 1 $16,817.00 $16,817.00 $0.00 w so Street System Grading L.S. 0 $0.00 $0.00 $0.00 m sz Pavement S.V. 0 $0,00 $0,00 $0.45 $0.00 53 Curb &Gutter L.F. 0 $0.00 $0.00 $1.Do $0.00 s. Detached Sidewalk L.F. ❑ $0.00 $0.00 $1,00 $0.00 ss Pedestrian Ramps L.F. 0 $0.00 $0,00 $1,00 $0.00 s. Apron S.V. 0 $0.00 $0.00 $0.45 $0.00 n Crosspan S.Y. 0 $0,00 $0,00 $0.45 $0 00 50 33 IT VINSPECT QF= :. $6,825,701` eo e, 1 e3 T �. 160&0 ai uz 03 PRIVATE IMPROVEMENTS REQUIRING CITY INSPECTIONS WILL NEED TO BE INCLUDED. HOWEVER PRIVATE IMPROVEMENTS WILL NOT BE INCLUDED ss IN THE TOTAL INFRASTRUCTURE COST FOR BONDING. bo K 3W22 ➢rf OW E" .