HomeMy WebLinkAboutHARMONY SCHOOL SHOPS SIXTH - Filed DCP-DEV. CONSTRUCTION PERMIT - 2007-11-26Transportation Services
Engineering Department
DEVELOPMENT CONSTRUCTION PERMIT
Permit Number: O 'i - 2 3 Issuance Date: -sa z S D _7
Project Name: _ Harmon School Shops 6`h Filing
Project Location: _ north side of Harmony Road east of Timberline Road _
Permittee: WILLI P( v1 S (20ki;GTEu n C1#xA r nk:P ,P _
City and developer contacts: See attached Exhibit "A" for names and phone numbers of all
contact persons for this project.
Fees: Permit Application Fee (paid at the time of application) $_ 400.00
Construction Inspection Fee (paid prior to issuance of this permit) $I �a_
Total $ 9,081.00
Development Bond or other approved security:
Amount of security deposited with the City to guarantee the completion of all public
improvements to be constructed as shown on the approved plans for the development.
$272�338.95
Form of security deposited with the City: letter of credit
PERFORMANCE REQUIREMENTS OF THIS PERMIT:
1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design
drawings and specifications the certification of all materials testing by an Engineer. The Permittee
shall have an Engineer prepare revised design drawings and secure City approval for all revisions to
the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required
by the City in the Development Agreement, that the improvements are constructed in conformance
with the approved Utility Plans and the standards and specifications of the City. The Permittee shall
provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance of the
constructed public improvements. (All references above to the terms "Project Engireer" and
"Engineer" sliall mean a Professional Engineer Iicensed in Colorado.)
2. All contractors who perform work on this project must be bonded and licensed in conformance
with City requirements.
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6605 • FAX (970) 221-6378
www.fcgov.com
Development Construction Permit, Page 2/5
3. Construction time restrictions: N/A
4. The applicant understands that additional permits maybe required for this development project
and the applicant shall secure those permits directly from the issuing departments.
5. This permit, along with a complete set of all approved plans and documents for this project
(utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic
study, drainage report, plat easements and any other official documents), shall be kept on the
development site available for use by City staff doing inspections.
6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or
Section 2.6.3(K) of the Land Use Code, whichever is applicable):
a. If construction has not begun within sixty (60) days from the date of issuance of this
permit, this permit shall expire and the applicant will forfeit the permit fee paid for this
permit, whereupon the applicant must re -apply for a new permit.
b. In addition, this permit shall expire one year from the date of issuance. The applicant
may apply for an extension by reapplication at least two weeks prior to the expiration date.
Such application shall contain information sufficient to justify the granting of the extension.
An extension may be granted for up to six months.
7. Building permits and certificates of occupancy will only be issued when all conditions contained
in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29-
678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the
Development Agreement does not specify times for completion of public improvements, or if there is
no Development Agreement, then the improvement requirements specified in Section 24-95 of the
City Code shall apply, which provides that construction of all improvements shall be required prior
to the time of issuance of the first building permit.
8. Acceptance by the City of the public improvements shall be after (1) final inspection has been
conducted by the City; (2) punch list items from the final inspection are completed and accepted by
the City; and (3) required certifications from the licensed professional engineer that improvements
are completed to City standards, specifications and approved Utility Plans; and the "as -constructed"
plans have been received and accepted by the City.
9. The warranty on street improvements is for five (5) years from the date of acceptance by the City
of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional
Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use
Code, as applicable.
10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any
planned construction on this project. All required perimeter silt fencing and other erosion/sediment
control best management practices (BMP's) that can be installed prior to construction must be in
Development Construction Permit, Page 3/5
place and inspected by the City Erosion Control Inspector before any land disturbing activity begins.
11. No work (including grading and construction access) shall be started in State Highway right-of-
way until a permit is issued by the Colorado Department of Transportation to allow such work to
begin.
12. Other conditions:
Permittee's acknowledgment signature:
By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of
the owners of the property (including all owners having legal or equitable interest in the real property, as
defined in Section 1-2 of the City Code; and including common areas legally connected to or associated
with the property which is the subject of this application) without whose consent and authority the
requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City
officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such
property to perform work required of the applicant if the applicant were to fail to perform the required
work. I also acknowledge that I have read this permit document with all its requirements and
conditions, and I agree to all of the terms and conditions so stated in this permit.
-V Applicant/Project Manager's Signature: q Date: 048/n`7
Approvalforissuance:
Fd City Engineer Appro Date:
(Permit Issuance Date)
Development Construction Permit, Page 415
EXHIBIT "A"
DEVELOPMENT PROJECT CONTACT PERSONS
Project Name:
City Staff Contact Persons:
Development Engineer:
Construction Inspector:
Harmony School Shops 4`h Filing
Marc Virata / City of Fort Collins Engineering
281 N. College Avenue / Fort Collins, CO 80524
970 221-6605
Dan Peterson / City of Fort Collins Engineering
281 N. College Avenue / Fort Collins, CO 80524
970 221-6605
Current Planner: Ted Shepard / City of Fort Collins Current Planning
281 N. College Avenue / Fort Collins, CO 80524
970 221-6750
Sanitary Sewer Engineer: Roger Buffington /City of Fort Collins Utilities
700 Wood Street / Fort Collins, CO 80521
970 221-6854
Erosion Control Inspector: D.A. Black / City of Fort Collins, 700 Wood
Street, Fort Collins, CO 80521
970 221-6700
Natural Resources: Dana Leavitt / City of Fort Collins, 281 North
College Avenue, Fort Collins, CO 80522
970 224-6143
Traffic Operations: Eric Bracke / City of Fort Collins, 625 Linden
Street, Fort Collins, CO 80524
970 224-6062
Street closures: Syl Mireles / City of Fort Collins, 625 Linden
Street, Fort Collins, CO 80524
970 221-6815
Transportation Planning: Dave Averill / City of Fort Collins, 215 N
Mason Street, Fort Collins, CO 80524
970 416-2643
Development Construction Permit, Page 515
Forestry: Tim Buchanan / City of Fort Collins, 281 North
College Avenue, Fort Collins, CO 80522
Light and Power: Alan Rutz / City of Fort Collins, 700 Wood
Street, Fort Collins, CO 80521
970 224-6153
Developer' Contact Persons:
Owner/Developer:
Project Engineer:
Permittee/Applicant
Project Manager/Contractor:
John Mountjoy
CFM Realty
209 S. 19`h St., Suite 500
Omaha, NE 68102
402 932-2000
402 932-2780 (fax)
402 968-7918 (cell)
imountiovkcfinrealLy.com
Joe Sparone
JR Engineering
2620 E. Prospect Road, Ste 190
Fort Collins, CO 80525
970 491-9888
970 491-9984 (fax)
jsparone@jrengineering.com
Wendall Williams / Chris Haggard
Willams Construction Company
965 S. Kipling Parkway
Lakewood, CO 80226
303 989-9009
303 989-0909 (fax)
720 320-5750 (Wendall) (cell)
720 320-5755 (Chris) (cell)
wendall a,wniscon st. com
chris@wmsconst.com
Planner: Michael Chalona
Land Images
1136 E. Stuart Street, Suite 2040
Fort Collins, CO 80525
970 472-8954
970 472-8955 (fax)
Michael@landimagesinc.com
DEVELOPMENT CONSTRUCTION PERMIT
APPLICATION
(2/16/99)
For City use only: Application Number: Application
Permit application fee: S 400.00
INSTRUCTIONS:
l . Complete this form (some questions may not apply to you) and attach all necessary documents and
submit to the Development Engineering Section of the City.
2. If you have any questions contact the Development Engineer at 221-6750.
3. Submit the Application and pay the Application Fee at the fee at the Engineering counter at 281 No.
College Avenue.
PROJECT INFORMATION:
Project Name (as approved by the City):
NAP-mriDN,( ScAooL SNoPs
Project A.K.A. (Marketing name if different from Project Name):
5MA +R2UE1 Ec_ 5
Project Location: Z 22 rt+ l=. 1}AP—talon! `/ Rb
Property Owner(At the time
Individual Name: _
Company Name: —
Address: 20
Phone number(s):
Office: '!D2 - cl 3Z. Z0o0
Cellphone:
Fax number: !qo'Z- J3Z- 2.780
Email: J rm-w rdoy CZ Ca;ntRrAt7^(•G0M
l 0'Z.
Applicant/Project Manager (The primary contact person for all matters regarding this project, and the
person responsible for all matters referencing "the Developer" in the Development Agreement for this
project):
Individual Name: t"Lgli c,- Li t LLA A M S
Company Name: WOE tAnMi Cct4Sr2V(MOM COR.p,
Address: J 6+ G S. K4 Qu N: (, PAe.A WA
Phone number(s):
Office: 303. 989 -yao9
Cellphone:
Fax number: 303- ' - D
Email: kJLiNVPtLL t..Jt21S CAtjss (0A4
"PROJECT QUANTITIES AND COST ESTIMATE SHEET"yjQvlq,�.Ltj� dU-�PS
ALL PUBLIC AND APPLICABLE MEASURE QUANTITY CONSTRUCTION
ATE IMPROVEMENTS) (PROVIDED BY THE COST PER UNIT
PROJECT ENGINEER) OF MEASURE
FEE PER UNIT I INSPECTION
(PROVIDED FEE
BY THE CITY)
APPROVED BY THE
CITY)
Storm Sewer
Reinforced Concrete Pipe
18'
L.F.
49
$2&30
$1,386.70
$0.70
$70.00
21'
58
$33.80
$1,960.40
$1.70
$70.00
24'
357 '
$3&55
$13,048.35
$2.70
$763.90
30,
525
$56.20
$29,505.00
$3.70
$1,642.50
36,
69
$75.00
$5,175.00
54.70
$70.00
Trench
29x45
L.F.
167.
$112.00
$18,704.00
$0.70
$116.90
Trench
3453
L.F.
48-
$142.80
$6,854.40
$0.70
$70.00
Concrete Headwall
C.Y.
0
$0.00
$0.00
$3.50
$0.00
Water Quality Outlet Structure
C.Y.
1 i
$5,638.00
$5,638.00
$3.50
$75.00
All Inlet Types
EACH
8-
$2,204.00
$17,632.00
$103.00
$824.00
Manhole
EACH
5 '
$2,527.00
$12,635.00
$103.00
$515.00
FES
EACH
3-
$1,305.00
$3,915.00
$0.00
Rip Rap
Tons
58
$61.00
$3,538.00
$0.00
Sanitary Sewer
3j7
[ ,zoo
�
Sanitary Sewer Main
8"
L.F.
-25 A"
$18.40
$&R001 &
$0.70
$2W1R&
Water Main
8"
L.F.
848
$26.40
$22,387.20
$0.70
5593.60
Trench
included
L.F.
�jy� 0415 AM
$0.00
$0.00
$0.70
$593.60
W"er/Sewer Service Line Stub
EACH
6
$1,400.00
$8,400.00
$70.00
5420.00
Fire Hydrant
EACH
0
$0.00
$0.00
570.00
$0.00
Manhole
EACH
2'
$1,622.00
53,244.00
$103.00
$206.00
Valves
EACH
0
$0.00
$0.00
$70.00
$0.00
Meter Pit (1")
EACH
0
$0.00
$0.00
$35.00
$0.00
Fitting ( Bend, Tee, Cross)
EACH
0
$0.00
$0.00
$35.00
$0.00
Water Main Connection
EACH
0
$0.00
$0.00
$35.00
$0.00
Water
Trench
L.F.
1,128
$0.00
$0.00
$0.70
$789.60
Water/Sewer Service Line S
1.5"
EACH
* Z
$3,653.00
$74v"3-@& i306
$70.00
$S69.88
Water/Sewer Service Line S
2'
EACH
2
$4,292.00
$8,584.00
$70.00
$140.00
Fire Hydrant
EACH
.0-4
$9,982.00
$29,946.00
$70.00
$27019&
Other Hydrant
EACH
$2,634.00
$0.00
$0.00
Valves
6" & Box
EACH
4 '
$675.00
$2,700.00
$70.00
$280.00
Valves
8" & Box
EACH
2'
$1,003.00
$2,006.00
$70.00
$140.00
Meter Pit (1")
EACH
0
$0.00
$0.00
$35.00
$0.00
Fitting ( Bend, Tee, Cross)
lump sum
EACH
4 4
$6,464.00
$6,464.00
$35.00
ease&
Water Main Connection
EACH
2
$1,400.00
$2,800.00
$35.00
$70.00
B" Dip
L.F.
630 -
$35.40
$22,302.00
$0.00
6" Dip
L.F.
109
546.80
$5,101.20
$0.00
�t work, curb & gutter,
ig patch, traffic control lump sum 47 S.V. 1 $16,817.00 $16,817.00 $0.00
rt System
ing
L.S.
0
$0.00
SO.00
$0.00
ment
S.Y.
0
$0.00
$0.00
$0.45
$0.00
&Gutter
L.F.
0
$0.00
$0.00
$1.00
$0.00
;hed Sidewalk
L.F.
0 .,yyyy
0
$0.00 z-
zEr4
$0.00 ?2
y0'L
$1.00
�(?�`�
$0.00
strian Ramps
L.F.
B
SO.00
6B9Q
$F.B6
$990
1
S.Y.
0 S
$0.00 '/ 7
$"0 Z11 -
$9.4a• 103.w
$&.20
;pan
S.Y.
..W )
�y
$0.00 y5
$0.00)&1it, ,
$0,4r�to i.,-
$G,60
95 9)eg /D
TOTaaVIPUB oINFRAs u RE�CO znz
PRIVATE IMPROVEMENTS REQUIRING CITY INSPECTIONS WILL NEED TO BE INCLUDED. HOWEVER PRIVATE IMPROVEMENTS WILL NOT BE INCLUDED
4 THE TOTAL INFRASTRUCTURE COST FOR BONDING.
"PROJECT QUANTITIES AND COST ESTIMATE SHEET'
A I a
I C I
o I
a
I F
c
"
(PROJECT NAME AS EXISTS ON THE DEVELOPMENT
PERMIT)
3
3
DESCRIPTION
UNITS OF
JESTIMATED
1INFRASTRUCTURE
TOTAL
INSPECTION
TOTAL
(LIST ALL PUBLIC AND APPLICABLE
MEASURE
QUANTITY
CONSTRUCTION
ESTIMATED
FEE PER UNIT
INSPECTION
e
'PRIVATE IMPROVEMENTS)
(PROVIDED
BY THE
COST PER UNIT
INFRASTRUCTURE
(PROVIDED
FEE
s
PROJECT £NGINEER)JOF
MEASURE
COST
BY THE CITY
(COST ESTMATE
APPROVED BY THE
7
CITY)
a
Storm Sewer
Reinforced Concrete Pipe 18"
L.F.
49
$28,30
$1,386.70
$0.70
$70.00
e
m
21"
58
$33.80
$1,960.40
$1,70
mA $7000
n
24"
357
$36.55
$13,048.35
$2.702"1$7G3�JD
,z
30"
525
$56.20
$29,505,00
$3.70
$164250
13
36"
69
$75.00
$5,175.00
$4.70
$70.00
,.
Trench 29x45
L.F.
167
$112.00
$18,704.00
$0.70
$116.90
15
Trench 34x53
L.F.
48
$142.80
$6.854.40
$0,70
$70.D0
,s
Concrete Headwall
C.Y.
0
$0.00
$0.00
$3,50
$0.00
v
Water Quality Outlet Structure
-15011.
-1-
$5,638.00
$5,638.00
$3.50
$7&9&
,3
All Inlet Types
EACH
8
$2,204.00
$17.632.00
$103,00
$824,00
19
Manhole
EACH
5
$2,527.00
$12,635.00
$103,00
$515.00
m
FES
EACH
3
$1,305.00
$3,915A0
$0.00
a
Rip Rap
Tons
58
$61.00
$3,538,00
$0,00
n
z3
Sanitary Sewer
Sanitary Sewer Main
L.F.
a 193
0.00
>L$O�r U--' 0 $0.70
$0 00
a
zs
Water -Maim .8"`
.16f.
"994-
$26,40
$8,817.60
I�, ��Y $0.70
$233.80
x
TieOch inaluded
L-F--
y,� ,t--1
$0,00
$0.00
$0.70
$233.80
n
Water/Sewer Service Line Stub -
EACH
6
$1,400.00
$8.400.00
�y. $70.00
$420.00
za
Fire Hydrant -
EACH
B im 1 $0.00
$0.00
$g9,OB7
Io° $0.00
zs
Manhole
EACH
1
$1,622.00
$3,244.00
$103.00
$206.0
m
Valves
EACH
000
$0,00
$0,00
$70.00
$0.00
v
Meter Pit (1")
EACH
0
$0.00
$0.00
$35.00
$0,00
3:
Fitting ( Bend, Tee, Cross )
EACH
0
$0.00
$0.00
$35.00
$0.00
33
Water Main Connection
EACH
Z' 0
$0.00
$0,00
$35.00
$ODO-
31
35
Water
36
Trench
L.F.
-044^ ( zf
$0,00
$0.00
$0.70
$569.80
37
Water/Sewer Service Line S 1.5"
EACH
p. 4"
$3,653.00
$7,306.00
$70,00
$140.00
3e
Water/Sewer Service Line S 2'
EACH
e 5
$4,292,00
$8,584.00
$70.00
$140.00
39
Fire Hydrant
EACH
a :r
$9,982.00
$19,964.00
$70.00
$140.00
w
Other Hydrant
EACH
!
$2,634.00
$5,268.00
$0.00
.,
Valves 6" & Box
EACH
! y
$675.00
$4,050,00
$70.00
$420.00
.3
Valves 8" & Box
EACH
111
$1,003.00
$1,003.00
$70,00
$70.00
43
Meter Pit (1")
EACH
0
$0.00
$0.00
$35.00
S0.00
u
Fitting ( Bond, Tee, Cross) lump sum
EACH
046
$6,464.00
$6,464.00
$35.00
$35.00
as
Water Main Connection
EACH
• L
$0.00
$0,00
$35.00
$0.00
w
S" Dip
L.F.
b.t8.yo� $35.40
$22,974.60
S&00
a
6" Dip
L.F.
a& 161
$46.80
$7,722.00
�y 'Y
$0.00
Street work, curb & gutter,
Ls
paving patch, traffic control lump sum
47 S.Y.
1
$16,817.00
$16,817.00
$0.00
w
so
Street System
Grading
L.S.
0
$0.00
$0.00
$0.00
m
sz
Pavement
S.V.
0
$0,00
$0,00
$0.45
$0.00
53
Curb &Gutter
L.F.
0
$0.00
$0.00
$1.Do
$0.00
s.
Detached Sidewalk
L.F.
❑
$0.00
$0.00
$1,00
$0.00
ss
Pedestrian Ramps
L.F.
0
$0.00
$0,00
$1,00
$0.00
s.
Apron
S.V.
0
$0.00
$0.00
$0.45
$0.00
n
Crosspan
S.Y.
0
$0,00
$0,00
$0.45
$0 00
50
33
IT
VINSPECT QF= :.
$6,825,701`
eo
e,
1
e3
T
�. 160&0 ai
uz
03
PRIVATE IMPROVEMENTS REQUIRING CITY INSPECTIONS WILL
NEED TO BE INCLUDED. HOWEVER PRIVATE IMPROVEMENTS WILL
NOT BE INCLUDED
ss
IN THE TOTAL INFRASTRUCTURE COST FOR BONDING.
bo
K
3W22
➢rf
OW
E" .