HomeMy WebLinkAboutMENNING - Filed CS-COMMENT SHEETS - 2007-11-20Im-
PROJECT
COMMENT SHEET
DATE: August 23, 2006
TO: Engineering Pavement
PROJECT PLANNER: Anne Aspen
#25-06 Menning Subdivision Replat — Type I
Please return all comments to the project planner no later than the staff
review meeting:
September 13, 2006
Note - Please identify Your redlines for future reference
,E] No Problems
❑ Problems or Concerns (see below, attached, or DMS)
- q Sq - 0('-99
Name (please print)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_Plat _Site _Drainage Report _Other
_Utility _Redline Utility _Landscape
6
City of F� C°�
k
Project Comments Sheet
4�a�lSelected Departments
City of Fort Collins
Department: Engineering
Date: September 8, 2006
Project: MENNING SUBDIVISION PDP -TYPE I
All comments must be received by Anne Aspen in Current Planning, no later than
the staff review meeting:
September 13, 2006
Note - Please identify your redlines for future reference
Issue Contact: Randy Maizland
Topic: General
Number: 4 Created: 9/8/2006
[9/8/06] This is a land subdivision only. No specific development is being entitled through
this process. There will not be any public improvement requirements associated with this
land subdivision however, a development agreement between the City and land owner(s) is
required which will specify any public improvement obligations which will be required at the
time of any future development on either of the new parcels. Please complete and return the
Development Agreement Information Sheet provided with your next submittal. A draft
development agreement will be prepared for the applicant to review prior to final approval of
the subdivision plat.
Number: 5 Created: 9/8/2006
[9/8/06] Future street improvements on LaPorte and Juniper will mainly consist of the
design and construction of new sidewalks. The sidewalks will need to be constructed to
meet the current standards at the time of development per the Larimer County Urban Area
Street Standards. LaPorte is currently classified as a minor collector on the City Master
Street plan and Juniper is a local residential.
Topic: Plat
Number: 6 Created: 9/8/2006
[9/8/06] Please use a different vicinity map on the Plat. A one line street map is preferred
showing the project site location with respect to major arterials. You may show the subject
parcel boundary but no other parcel lines should be shown on the map.
Number: 7 Created: 9/8/2006
[9/8106] The title and legal description heading should be located at the top and center of
the sheet in large bold font.
Signature
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other_
Utility Redline Utility Landscape
Page 1
Number: 8 Created: 9/8/2006
[9/8/06] The current right-of-way on LaPorte is 60 feet. An additional 8 feet of ROW
dedication is needed to meet LCUASS collector street standards.
Number: 9 Created: 9/8/2006
[9/8/06] The current right-of-way on Juniper is 50 feet. An additional 0.5 feet of ROW
dedication is needed to me LCUASS local residential standards.
Number: 10 Created: 9/8/2006
[9/8/06] A 9 foot wide utility easement dedication is required behind the new ROW on both
LaPorte and Juniper.
Number: 11 Created: 9/8/2006
[9/8/06] Please add or revise specific plat language per the redline comments. Standard
language has been attached to the redlines.
Number: 12 Created: 9/8/2006
[9/8/06] See redlines for other minor drafting and sheet layout comments.
Topic: Site Plan
Number: 13 Created: 9/8/2006
[9/8/06] Please show all proposed utility connections to the future residence on Lot 2 on the
Site Plan. This will help determine if any additional easements may need to be dedicated on
the plat. This information will also help the utility providers with their review.
Number: 14 Created: 9/8/2006
[9/8/06] Please show and label the new right-of-way and utility easement dedications on the
Site Plan for reference.
Page 2
FINAL PLAN
�+• COMMENT SHEET
Citcof Port Collins
Current Planning
DATE: December 12, 2006
TO: Engineering
PROJECT PLANNER: Anne Aspen
#25-06A MENNING SUBDIVISION PDP — FINAL PLANS
Please return all comments to the project planner no later than the staff
review meeting:
December 27, 2006
Note - Please identify Your redlines for future reference
No Problems
Problems or Concerns (see below, attached, or DMS)
Name (please print)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_Plat _Site _Drainage Report _Other
_Utility _Redline Utility _Landscape
FINAL PLAN
COMMENT SHEET
Citvof Fort Collins
Current Planning
DATE: December 12, 2006
TO: Technical Services
PROJECT PLANNER: Anne Aspen
#25-06A MENNING SUBDIVISION PDP — FINAL PLANS
Please return all comments to the project planner no later than the staff
review meeting:
December 27, 2006
Note -.Please identify your redlines for future reference
o Problems
❑ Problems or Concerns (see below, attached, or DMS)
6 L�f "��F Y(- l� l� r 4' 0� /" i�
Name�nt)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_Plat _Site _Drainage Report _Other 6a
_Utility _Redline Utility _Landscape Gt9 of Port Collins
FINAL PLAN
(Irma. COMMENT SHEET
Cilvoi Port Collins
Current Planning;
DATE: December 12, 2006
TO: Engineering Pavement
PROJECT PLANNER: Anne Aspen
#25-06A MENNING SUBDIVISION PDP — FINAL PLANS
Please return all comments to the project planner no later than the staff
review meeting:
December 27, 2006
Note -Please identify your redlines for future reference
}� No Problems
T❑ Problems or Concerns (see below, attached, or DMS)
0
Name (please print)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_Plat _Site _Drainage Report _Other
_Utility _Redline Utility _Landscape
6a
City of Fort Collins