Loading...
HomeMy WebLinkAboutMENNING - Filed CS-COMMENT SHEETS - 2007-11-20Im- PROJECT COMMENT SHEET DATE: August 23, 2006 TO: Engineering Pavement PROJECT PLANNER: Anne Aspen #25-06 Menning Subdivision Replat — Type I Please return all comments to the project planner no later than the staff review meeting: September 13, 2006 Note - Please identify Your redlines for future reference ,E] No Problems ❑ Problems or Concerns (see below, attached, or DMS) - q Sq - 0('-99 Name (please print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _Plat _Site _Drainage Report _Other _Utility _Redline Utility _Landscape 6 City of F� C°� k Project Comments Sheet 4�a�lSelected Departments City of Fort Collins Department: Engineering Date: September 8, 2006 Project: MENNING SUBDIVISION PDP -TYPE I All comments must be received by Anne Aspen in Current Planning, no later than the staff review meeting: September 13, 2006 Note - Please identify your redlines for future reference Issue Contact: Randy Maizland Topic: General Number: 4 Created: 9/8/2006 [9/8/06] This is a land subdivision only. No specific development is being entitled through this process. There will not be any public improvement requirements associated with this land subdivision however, a development agreement between the City and land owner(s) is required which will specify any public improvement obligations which will be required at the time of any future development on either of the new parcels. Please complete and return the Development Agreement Information Sheet provided with your next submittal. A draft development agreement will be prepared for the applicant to review prior to final approval of the subdivision plat. Number: 5 Created: 9/8/2006 [9/8/06] Future street improvements on LaPorte and Juniper will mainly consist of the design and construction of new sidewalks. The sidewalks will need to be constructed to meet the current standards at the time of development per the Larimer County Urban Area Street Standards. LaPorte is currently classified as a minor collector on the City Master Street plan and Juniper is a local residential. Topic: Plat Number: 6 Created: 9/8/2006 [9/8/06] Please use a different vicinity map on the Plat. A one line street map is preferred showing the project site location with respect to major arterials. You may show the subject parcel boundary but no other parcel lines should be shown on the map. Number: 7 Created: 9/8/2006 [9/8106] The title and legal description heading should be located at the top and center of the sheet in large bold font. Signature Date CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site Drainage Report Other_ Utility Redline Utility Landscape Page 1 Number: 8 Created: 9/8/2006 [9/8/06] The current right-of-way on LaPorte is 60 feet. An additional 8 feet of ROW dedication is needed to meet LCUASS collector street standards. Number: 9 Created: 9/8/2006 [9/8/06] The current right-of-way on Juniper is 50 feet. An additional 0.5 feet of ROW dedication is needed to me LCUASS local residential standards. Number: 10 Created: 9/8/2006 [9/8/06] A 9 foot wide utility easement dedication is required behind the new ROW on both LaPorte and Juniper. Number: 11 Created: 9/8/2006 [9/8/06] Please add or revise specific plat language per the redline comments. Standard language has been attached to the redlines. Number: 12 Created: 9/8/2006 [9/8/06] See redlines for other minor drafting and sheet layout comments. Topic: Site Plan Number: 13 Created: 9/8/2006 [9/8/06] Please show all proposed utility connections to the future residence on Lot 2 on the Site Plan. This will help determine if any additional easements may need to be dedicated on the plat. This information will also help the utility providers with their review. Number: 14 Created: 9/8/2006 [9/8/06] Please show and label the new right-of-way and utility easement dedications on the Site Plan for reference. Page 2 FINAL PLAN �+• COMMENT SHEET Citcof Port Collins Current Planning DATE: December 12, 2006 TO: Engineering PROJECT PLANNER: Anne Aspen #25-06A MENNING SUBDIVISION PDP — FINAL PLANS Please return all comments to the project planner no later than the staff review meeting: December 27, 2006 Note - Please identify Your redlines for future reference No Problems Problems or Concerns (see below, attached, or DMS) Name (please print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _Plat _Site _Drainage Report _Other _Utility _Redline Utility _Landscape FINAL PLAN COMMENT SHEET Citvof Fort Collins Current Planning DATE: December 12, 2006 TO: Technical Services PROJECT PLANNER: Anne Aspen #25-06A MENNING SUBDIVISION PDP — FINAL PLANS Please return all comments to the project planner no later than the staff review meeting: December 27, 2006 Note -.Please identify your redlines for future reference o Problems ❑ Problems or Concerns (see below, attached, or DMS) 6 L�f "��F Y(- l� l� r 4' 0� /" i� Name�nt) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _Plat _Site _Drainage Report _Other 6a _Utility _Redline Utility _Landscape Gt9 of Port Collins FINAL PLAN (Irma. COMMENT SHEET Cilvoi Port Collins Current Planning; DATE: December 12, 2006 TO: Engineering Pavement PROJECT PLANNER: Anne Aspen #25-06A MENNING SUBDIVISION PDP — FINAL PLANS Please return all comments to the project planner no later than the staff review meeting: December 27, 2006 Note -Please identify your redlines for future reference }� No Problems T❑ Problems or Concerns (see below, attached, or DMS) 0 Name (please print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _Plat _Site _Drainage Report _Other _Utility _Redline Utility _Landscape 6a City of Fort Collins