HomeMy WebLinkAboutSOUTH TIMBERLINE ROAD WIDENING PROSPECT TO DRAKE - Filed BC-BRIDGES & CULVERTS - 2007-02-12SUMMARY OF QUANTITIES ONTRACT CONTRACT UNIT BRIDGE TOTAL ITEM NO. ITEM DESCRIPTION 202 REMOVAL OF PORTIONS OF PRESENT STRUCTURE LS 1 1 (y 206 SHORING LS 1 1 206 STRUCTURE EXCAVATION CY 1167 1167 j� 206 STRUCTURE BACKFILL (CLASS 1) CY 782 782 C" � 403 HOT BITUMINOUS PAVEMENT TON 65 65 502 STEEL PILING (HP12X53) LF 630 630 502 PILE TIP EA 36 36 515 WATERPROOFING (MEMBRANE) SY 597 597 601 CONCRETE CLASS B (BRIDGE) CY 279 279 601 CONCRETE CLASS D (BRIDGE) CY 504 504 601 STRUCTURAL CONCRETE COATING SF 1899 1899 602 REINFORCING STEEL (EPDXY COATED) LB 129,222 129,222 606 BRIDGE RAIL TYPE 4 (SPECIAL) LF 167 167 609 CURB TYPE 4 (6" BARRIER) (SECTION 8) LF 184 184 609 8" BARRIER CURB LF 92 92 610 MEDIAN COVER MATERIAL (PATTERNED CONCRETE) SF 276 276 BRIDGE COLORS • LOCATION COLOR APPLICATION ABUTMENT, PIER & WINGWALLS FED COLOR 36495 (GREY) * CDOT CLASS 5 FINISH BRIDGE RAIL CONCRETE FED COLOR 36495 (GREY) * STRUCTURAL CONCRETE COATING BRIDGE RAIL STEEL GREY GALVANIZED SUBMIT COLOR SAMPLE PANELS FOR APPROVAL PRIOR TO CONSTRUCTION * COLOR TO BE SELECTED BY CITY OF FORT COLLINS PRIOR TC 100% SUBMITTAL STRUCTURE DESCRIPTION 91' -117t" LONG x 73' -5" WIDE (AVE.) WIDENING IN -KIND OF CAST -IN -PLACE EXISTING 89' -7V/4" LONG x 52' -0" WIDE CON SLAB SUPERSTRUCTURE ON REINFORCED CONCRETE ABUTMENTS PIERS SUPPORTED BY PILE FOUNDATIONS OVER SPRING CREEK. 1� 1 2/� 1 1 1 ' -6" Loris and Associates, Inc. n� p.` 2585 Trail Ridge Drive East ® LIMITS OF STRUCTURAL BACKFILL GENERAL NOTES: A. ALL WORK SHALL BE IN ACCORDANCE WITH THE COLORADO DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION, 1999 EDITION, AND PROJECT SPECIAL PROVISIONS; THE LATEST M&S STANDARDS; CITY OF FT. COLLINS STANDARDS; AND THE PROJECT CONTRACT BID DOCUMENTS. B. EXCEPT AS SHOWN IN THE PLANS, STRUCTURE EXCAVATION AND BACKFILL SHALL BE IN ACCORDANCE WITH M-206-1 EXCEPT THAT TEMPORARY SHORING MAY BE REQUIRED FOR EXCAVATION ADJACENT TO THE EXISTING ROADWAY, TEMPORARY EXCAVATION SUPPORT SHALL BE PAID FOR BY ITEM 206 SHORING. C. A CLASS 5 FINISH WILL BE REQUIRED ON EXPOSED CONCRETE SURFACES EXCEPT FLOORS, DECK UNDERSIDE, AND SURFACES TO BE COVERED WITH EARTH UNLESS OTHERWISE SHOWN. THE COLOR SHALL BE AS SHOWN ON THE BRIDGE COLORS TABLE AND IS TO BE SELECTED FROM TEST PANELS PROVIDED BY THE CONTRACTOR. D. ALL STRUCTURAL STEEL NOT OTHERWISE NOTED SHALL BE PAINTED IN ACCORDANCE WITH SECTION 509 OF THE STANDARD SPECIFICATIONS. THE COLOR SHALL BE AS SHOWN ON THE BRIDGE COLORS TABLE. E. GRADE 60 REINFORCING STEEL IS REQUIRED. F. ALL REINFORCING STEEL SHALL BE EPDXY COATED UNLESS OTHERWISE NOTED. G. QN DENOTES NON COATED REINFORCING STEEL. H. ALL EXPOSED CONCRETE EDGES SHALL HAVE A 3/4" CHAMFER, UNLESS DESIGNATED OTHERWISE ON THE PLANS. I. ALL CONSTRUCTION JOINTS SHALL BE THOROUGHLY CLEANED BEFORE FRESH CONCRETE IS POURED. J. ALL CONSTRUCTION JOINTS NOT SHOWN ON THE PLANS SHALL BE APPROVED BY THE ENGINEER. K. ALL WATERSTOP MATERIALS SHALL BE INCLUDED IN THE WORK AND WILL NOT BE PAID FOR SEPARATELY. L DEWATERING WILL NOT BE PAID FOR SEPARATELY, BUT SHALL BE INCLUDED IN THE WORK. M. ALL FIELD WELDS AND DAMAGED PAINT SURFACES SHALL BE CLEANED AND PAINTED PER SECTION 509.29. N. FOUNDATION DESIGN OF THE BRIDGE AND WINGWALLS IS BASED ON "GEOTECHNICAL INVESTIGATION, TIMBERLINE ROAD WIDENING, TIMBERLINE ROAD BETWEEN DRAKE ROAD AND PROSPECT ROAD, FORT COLLINS, COLORADO", BY CTL/THOMPSON, INC., DATED DECEMBER 1, 2004 (CTL/THOMPSON REPORT #FC03289) DESIGN DATA: AASHTO, SECOND EDITION LRFD WITH CURRENT INTERIMS DESIGN METHOD: LOAD AND RESISTANCE FACTOR DESIGN LIVE LOAD: HL-93 (DESIGN TRUCK OR TANDEM, AND DESIGN LANE LOAD) DEAD LOAD: ASSUMES 36 LBS. PER SO. FT. FOR BRIDGE DECK OVERLAY REINFORCED CONCRETE: CLASS B CONCRETE: f'c = 3,000 psi CLASS D CONCRETE: f'c = 4,500 psi REINFORCING STEEL: fy = 60,000 psi UTILITY NOTIFICATION CENTER OF COLORADO 1-800-922-1987 OR 287-0595 IN E DENVER CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTIU11ES 1' 6" - II II ® LIMITS OF STRUCTURAL EXCAVATION Lafayette, Colorado 80026 STRUCTURE EXCAVATION & BACKFILL DETAIL N.T.S. 303 444 2073 I REVISIONS: DATE.: CITY OF FORT COLLINS, COLORADO ENGINEERING DIVISION 0. THE FOLLOWING TABLE GIVES THE MINIMUM LAP SPLICE LENGTH FOR EPDXY COATED REINFORCING BARS PLACED IN ACCORDANCE WITH SUBSECTION 602.06. THESE SPLICE LENGTHS SHALL BE INCREASED BY 25% FOR BARS SPACED AT LESS THAN 6" ON CENTER. BAR SIZE #4 #5 #6 #7 #8 #9 #10 #11 SPLICE LENGTH FOR CLASS B CONCRETE it -3" 1 ' -6" 2' -0" 2' -8" 4' -6" 5' -8" 7' -3" 8' -11" SPLICE LENGTH FOR CLASS D CONCRETE 1' -3" 1' -6" 1' -10" 2' -2' 3'-8" 4' -8' 5'- 11' 7' -3" P. WHEN THE CONTRACTOR ELECTS TO SUBSTITUTE EPDXY COATED REINFORCEMENT FOR BLACK REINFORCING BARS, THE MINIMUM LAP SPLICE SHALL BE AS DESCRIBED ABOVE. THE FOLLOWING TABLE GIVES THE MINIMUM LAP SPLICE LENGTH FOR BLACK REINFORCING BARS PLACED IN ACCORDANCE WITH SUBSECTION 602.06, THESE SPLICE LENGTHS SHALL BE INCREASED BY 25% FOR BARS SPACED AT LESS THAN 6" ON CENTER. BAR SIZE #4 #5 #6 #7 #8 #9 #10 #11 SPLICE LENGTH FOR CLASS B CONCRETE 1' -0" 1' -4" 1' -8" 2' -3" 3'-Ow 3' -10" 4' -10" 5' -11" SPLICE LENGTH FOR CLASS D CONCRETE 1' -0" 1' -4" 1' -7" 1' -10' 2' -5" 3' -1" 3' -11" 4' -10" Q. THE ABOVE SPLICE LENGTHS SHALL BE INCREASED BY 20 PERCENT FOR 3 BAR BUNDLES AND 33 PERCENT FOR 4 BAR BUNDLES. R. STAGGER SPLICES ONE SPLICE LENGTH WHEN POSSIBLE T. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE STABILITY OF THE STRUCTURE DURING CONSTRUCTION. U. STATIONS, ELEVATIONS, AND DIMENSIONS CONTAINED IN THESE PLANS ARE CALCULATED FROM A RECENT FIELD SURVEY. THE CONTRACTOR SHALL VERIFY ALL DEPENDENT DIMENSIONS IN THE FIELD BEFORE ORDERING OR FABRICATING ANY MATERIAL. V. THE INFORMATION SHOWN ON THESE PLANS CONCERNING THE TYPE AND LOCATION OF UNDERGROUND UTILITIES IS NOT GUARANTEED TO BE ACCURATE OR ALL INCLUSIVE. THE CONTRACTOR IS RESPONSIBLE FOR MAKING HIS OWN DETERMINATION AS TO THE TYPE AND LOCATION OF UNDERGROUND UTILITIES AS MAY BE NECESSARY TO AVOID DAMAGE THERETO. THE CONTRACTOR SHALL CONTACT THE UTILITY NOTIFICATION CENTER OF COLORADO AT 1-800-922-1987 AT LEAST 2 DAYS (NOT INCLUDING THE DAY OF NOTIFICATION) PRIOR TO ANY EXCAVATION OR OTHER EARTHWORK. W. STRUCTURAL STEEL TUBES SHALL BE ASTM A-500. PLATES SHALL BE ASTM A-36. X. EXISTING BRIDGE PLANS ARE AVAILABLE FROM THE CITY OF FORT COLLINS. THE CONTRACTOR SHOULD FAMILIARIZE HIMSELF WITH THESE PLANS PRIOR TO CONSTRUCTION. SECTION OR DETAIL IDENTIFICATION CROSS REFERENCE DRAWING NUMBER BLANK, REFERENCE IS TO SAME INDEX OF BRIDGE SUBSET SHEETS SHEET TITLE NO 40 GENERAL NOTES & ESTIMATED QUANTITIES 41 GENERAL LAYOUT 42 ENGINEERING GEOLOGY 43 PILING LAYOUT & DECK ELEVATIONS 44 - 45 ABUTMENT DETAILS (2 SHEETS) 46 WINGWALL DETAILS 47 PIER DETAILS 48 SUPERSTRUCTURE DETAILS 49 BRIDGE RAIL DETAILS ,DESIGNED BY: DRAWN BY: Y APPROVED BY: MKS I MKS PJL SCALE: DATE: CHECKED BY: DATE: AS SHOWN I 4-6-05 TDB I 4-6-05 CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL APPROVED _ ! �D ITY INFER DATE CHECKED BY: Kd I WAATTER&& WASTTEEWATER UTILITY DATE CHECKED BY: *I iA dt� 6-/i-07 STORMWATER UTILITY DATE CHECKED BY: N14. PARKS & RECREATION DATE CHECKED BY: Au— _ _— TRAFFIC ENGINEER DATE CHECKED BY: DATE PREPARED UNDER THE DIRECT SUPERVISION OF BRIDGE & ROADWAY ABBREVIATIONS O - AT\AT EACH i = DIMENSION TO EXISTING OBJECT MIN - MINIMUM E = SURVEY LINE ABC - AGGREGATE BASE COURSE EF - EACH FACE MK - MARK SCJ - SAW CUT JOINT ABUT - ABUTMENT EL\ELEV - ELEVATION NF - NEAR FACE SHT = SHEET ALT - ALTERNATE EDP - EDGE OF PAVEMENT NIS - NOT TO SCALE SIM = SIMILAR ARCH - ARCHITECTURAL EOTW - EDGE OF TRAVELED WAY OC - ON CENTER SPA = SPACING\SPACES BF = BACK FACE EST - ESTIMATED OF - OUTSIDE FACE SPEC - SPECIFICATIONS BM = BEAM EW - EACH WAY OH - OVERHEAD SO - SQUARE BOF - BOTTOM OF FOOTING EQUIP = EQUIPMENT OPNG - OPENING STA - STATION BOW - BOTTOM OF WALL EXIST = EXISTING OPP = OPPOSITE STD - STANDARD BRG - BEARING EXP - EXPANSION R = PLATE SYM = SYMMETRICAL BIM = BOTTOM FF - FAR FACE PC - POINT OF CURVATURE T & B = TOP & BOTTOM f = CENTERLINE FTG = FOOTING PEJF - PREFORMED EXPANSION JOINT FILLER TAN = TANGENT (CIP) - COMPLETE IN PLACE] GAVL = GALVANIZED PGL = PROFILE GRADE LINE TH = TEST HOLE CJ = L JOINT GEOTECH - GEOTECHNK;AL PI - POINT OF INTERSECTION TOC = TOP OF CONCRETE CUR - CLEAR\CLEARANCE GRD BM - GRADE BEAM PK - KNOWN POINT TOF - TOP OF FOOTING CONST JNT - CONSTRUCTION JOINT HORIZ - HORIZONTAL PP = POWER POLE TOW - TOP OF WALL COL - COLUMN HCL - HORIZONTAL CONTROL LINE PROD = PROJECTION TYP - TYPICAL CONC - CONCRETE IF - INSIDE FACE PROP = PROPOSED UNO - UNLESS NOTED OTHERWISE CONT - CONTINUOUS INV EL - INVERT ELEVATION PT - POINT OF TANGENCY VERT - VERTICAL CP - CONTROL POINT LP - LIGHT POLE QTY - QUANTITY VC = VERTICAL CURVE f = DIAMETER MAS = MASONRY R\RAD - RADIUS VPC - VERTICAL POINT OF CURVATURE DIET = DETAIL MATL - MATERIAL REINF - REINFORCING VPI = VERTICAL POINT OF INTERSECTION DIAG - DIAGONAL MAX - MAXIMUM REF - REFERENCE VPT - VERTICAL POINT OF TANGENCY DWG - DRAWING MB - MAIL BOX REQD - REQUIRED WL - WORKING LINE DWLS - DOWELS MFR - MANUFACTURER ROW = RIGHT OF WAY WP - WORKING POINT C.274 € ABUT. 00 i'-4�" 44' -A M # 11 CONT., 2 TOP, 2 BOTTOM CCI I R44 Co I 10' -0" 6. FOR DIMENSION & 6" DETAILS OF WALK, 06x 0 1'-0" CURB & RAILING, MIN 1'-O" EMBED INTO DECK SEE SHEET BRIDGE RAIL DETAILS #6 x 4'-6" 0 1' -0" MIN 1' -O" EMBED INTO DECK 0.02 FT FT d q [V 7-1 (4b - 111 CONT. Loris and Associates, Inc. n K 2585 Trail Ridge Drive East Lafayette, Colorado 80026 303.444.2073 z U � o I o 00 ' -11 I%" f PIER # 2 -74» TERMINATE LONGITUDINAL BARS AT EDGE OF DECK AS SHOWN X, E CURB TYPE 4 (6" \ BARRIER) (SECTION B) (TYP), SEE DETAIL C � ABUT. # 3 #4 X 1 0 1 ' —6" SEE SUPERSTRUCTURE SECTION R 44"0 x 12" ® 6'-O" O.C. DEFORMED REINFORCING BARS AT 6 FOOT SPACING, SEE DETAIL C Cl- o x o I O M I x #11 CONT. 2 TOP, 2 BOTTOM A DECK PLAN 48 a 4 o s ORIGINAL SCALE: %t" = 1'-0" 46' -0" #4 X 0 1'-6" #6 CONT. & #11 X 17'-0" 0 1'-0" #11 x 34'-0" 0 1 '-0" T — #5 0 1 '-on =e 4 d #11 0 1' -O" CONT. #11 X 32'-6" 0 1'-0" CITY OF FORT COLLINS, COLORADO ENGINEERING DIVISION ad 6" 11/4 r- �.__.._. 3 x 12" 6" 6" 2" PAVEMENT 3/4"o x 12" DEFORMED BARS 1 0 HOLES 6» _..__ (6 FT. SPACING) BRIDGE DECK 5' CURB TRANSITION, -0 MATCH 2% DECK SLOPE TYP 3/4» 0 x 12" DEFORMED REINFORCING BARS AT 6 FOOT SPACING. BARS TO BE GROUTED IN 1 '/2 0 HOLES IN DECK. GROUT TO CONSIST OF 2 PARTS CLEAN SAND AND 1 PART CEMENT. o COST OF INSTALLATION IS TO BE INCLUDED IN THE PRICE BID FOR CURB. #5 X 3'-0" LONG EPDXY DOWEL, 1' -0" (MIN) INTO EXISTING BRIDGE 0 1'-0" N 0.02 FT/FT d q o ° 1 R MEDIAN COVER MATERIAL (PATTERNED CONCRETE), SEE CIVIL PLANS FOR COLOR & PATTERN 10" CONCRETE BETWEEN SIDEWALK AND ROADWAY CURB, FORM SWALE TO DRAIN AWAY FROM SIDEWALK AND OFF BRIDGE, TO BE INCLUDED IN 6"�'j ��, ITEM 601 - CONCRETE CLASS D (BRIDGE) 8" CENTER OF COLORADO 1-800-922-1987 METRO OR 287-0595 I D CALL 2-BUSINESS DAYS IN ADVANCE IEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND PREPARED UNDER THE DIRECT SUPERVISION OF FL 48-3/4 nT x 14" PGL& HCL j DEFORMED BARS CITY OF FORT COLLINS, COLORADO ROAD SURFACE UTILITY PLAN APPROVAL M �- 1t/2 >a HOLES APPROVED: /s \ N w EXISTING BRIDGE DECK 6 (6 FT. SPACING) CITY ENGINE DATE ^'S L CHECKED BY. WATER &WASTEWATER UTILITY DATE CHECKED BY:!� '�eS 3/4" o x 14" DEFORMED REINFORCING BARS AT 6 FOOT SPACING, STORMWATER UTILITY DATE "tl BARS TO BE GROUTED IN 1 1/2 e HOLES IN DECK. CHECKED BY: �"09 GROUT TO CONSIST OF 2 PARTS CLEAN SAND AND 1 PART CEMENT. PARKS & RECREATION DATE COST OF INSTALLATION IS TO BE INCLUDED IN THE PRICE BID FOR CURB. CHECKED BY: GI —' TRAFFIC ENNEER DATE D 8" BARRIER CURB DETAIL CHECKED BY: DATE 48 N.T.S. SEE GENERAL LAYOUT FOR 8" BARRIER CURB LOCATION -0" I i MEDIAN COVER MATERIAL (PATTERNED CONCRETE), SEE CIVIL PLANS FOR COLOR & PATTERN .-- CURB TYPE 2 (6" BARRIER) (SECTION B) (TYP), SEE DETAIL C ,-- PGL & HCL 0.02 FT/FT q 15 ® 1'-0" VARIES (SEE PLAN) B SUPERSTRUCTURSECTION 48 2 1 0 2 �pml I ORIGINAL SCALE: 1 ' -0" ---------- _ DESIGNED BY: DRAWN BY: APPROVED BY: MKS I MKS I PJL SCALE: DATE: CHECKED BY: DATE: City of Fort collift.0 . AS SHOWN ( 4-6-05 TDB I 4-6-05 A III /I � III ilWsry'-.-.ann=-'utSYrw.Y+n.y-.w,'�+++..orYWYM-.+.'...•_A •-... _._ .- _ _ - a 2' BITUMINOUS PAVEMENT WATERPROOFING MEMBRANE a d d TOTAL DEAD LOAD DEFLECTIONS SPAN PTS. 0.0 10.2 10.4 10.6 0.8 1.0 A (IN.) a 1 '�/l6 1 '/16 1 1/4 I16 0 SYMMETRICAL ABOUT 'i PIER "e ALL CONCRETE SHOWN IS CLASS D #5 X 3'-0" LONG EPDXY DOWEL, 1'-O" (MIM) INTO THE EXISTING BRIDGE * EXISTING BRIDGE a I LOSURE POUR (4) - #11 CONT. 2'-0" * DOWELS, DRILLING AND EPDXY GROUTING ARE INCLUDED IN THE WORK AND WILL NOT BE PAID FOR SEPARATELY. TIMBERLINE ROAD WIDENING - INTERIM SHEET 48 SUPERSTRUCTURE DETAILS OF 94 -1 27 4 (V V LIMITS OF STRUCTURAL CONCRETE COATING a U tPIER — o0 EW JT. MAT' L '-on . 9' -0" Q Ilo 1" -TS 4 2x0.25 W/%"OXO'-2" WELDED STUD WITH HEX NUTS & WASHERS 234" 23'4" --riP4— "0x8" HS BOLTS, HEX NUTS t& L CK WASHERS (GALV.) TYP. t r\ R N ri 6-#5 CONT TYP 2" 204 SEE SUPERSTRUCTURE DETAILS FOR REINFORCING #4 CONT 01'-6" 0"4x F-1 0 1'-6" a R iJ io I M M I 1 %" R N l SEE c \ SUPERSTRUCTURE DETAILS FOR O • o • O • O • REINFORCING 1 0 1 ORIGINAL SCALE: 8'/i " 1" 6'h" 1" 4'4" PI HOLES R T- R M R R M 1/4 M I 1 14 "0 X0, -90 /•/1�IT1'1f11 IT •T ANC /�" wr ur ucun #6 x 4' -6" ® 1 ' -0"- CONST. JOINT TS 4x2xO.25 ELLEVATIO 2 1 0 2 1 _ ORIGINAL SCALE: 1/2" WALK DIMENSIONS SAME AS SECTION A, EXCEPT AS NOTED a / -It" EXPANSION JOINT MAT' L ri v� 6` 6`11 m 6x 1 A 1' -0" r-� B BRID AIL ELEVATION 49 11 ',� oo 1 ORIGINAL SCALE:: EAR 6"1 6" EXP, JT. MAT'L 0 ABUT 0 1'-0" N.F. i 0 V -0" F.F. NOTES: POSTS SHALL BE PERPENDICULAR TO THE GRADE OF THE DECK. GALVANIZE ALL STEEL AFTER FABRICATION ALL EXPOSED CORNERS SHALL BE GROUND SMOOTH HIGH STRENGTH RODS (ASTM-A449) THREADED BOTH ENDS WITH 2 HEX NUTS AND WASHERS (ALL GALV.) MAY BE SUBSTITUTED FOR HIGH STRENGTH RAILS SHALL BE CONTINUOUS OVER NOT LESS THAN 2 POSTS /4" WALL TUBE SLEEVE (SLIP FIT) s --� _____- ---------------' I 1 I 1 Loris and Associates, Inc. R BAR 2x 36 x , ' —, " f : 2585 Tian R" Dm Erg C POST ANCHORAGEDETAIL D 0L ONTRJOINT Dun E RAIL SPLICE A 14 "0 HOLES V/4 BENT OR (WELDED & GROUND SMOOTH) Lafayette, Colorado 81D026 49 1� �4 0 it 49 % 1/4 o '/t 49 ''� 1/4 ORIGINALTNL SSCA`: 2" = 1' -0" ORIGINAL SCALE: 2" = 1' -0" = ORIGINAL SCALE: 2" 1'-0' „ 303.444.2073 op REVISIONS: DATE: DESIGNED BY: +DRAWN BY: APPROVED BY: CITY OF FORT COLLINS, COLORADO MKS I MKS PJL SCALE: DATE: CHECKED BY: DATE: ENGINEERING DIVISION c►i3 °�i_= AS SHOWN 14-6-05 TDB ( 4-6-05 '/z '/a 0 '/� ORIGINAL SCALE: 2" = 1'-0" CURVED RAIL SECTION MAY BE FABRICATED FROM WELDED '116" PLATE AND GROUND SMOOTH TO THE DIMENSIONS OF TS 4x2x2. R=1' —0" 0 v END OF WINGWALL R1/a x2xO' —6 2-14"00" SLC H CITY OF FORT COLLINS, COLORADO U11UTY PLAN APPROVAL R R APPROVED- 7 ! 0 CITY ENGINEEI DATE CHECKED BY: baA WATER & WASTEWATER UTILITY DATE CHECKED BY: 6'/f-dr STORMWATER UTILITY DATE CHECKED BY: IV, '— PARKS & RECREATION DATE CHECKED BY: TRAFFIC ENGINEER DATE CHECKED BY: PREPARED UNDER THE DIRECT SUPERVISION OF TIMBERLINE ROAD WIDENING —INTERIM BRIDGE RAIL DETAILS SHEET 49 OF 94 C 1 2t 4 B/F ABUT /1 STA 60+50.7 REMOVE EXISTING SIDEWALK AND WINGWALL, TO BE INCLUDED IN ITEM 202 — REMOVAL OF PORTIONS OF PRESENT STRUCTURE. REMOVE EXISTING \\\ E PIER 12; \ V \\ STA 60+967i LLJ R \ \ \ \ /F ABUT J3 fA 61+42.72 --- ------------- --------- -- ----------------- — - — ----- - \ '\ \ \ \ oA BRIDGE — \ ""- 0 REMAIN \� y 4 10' CONCRETE 3ETWEEN SIDEWALK AND ROADWAY CURB FORM SWALE TO VARIES; 69' -0" MIN, 75' -8h" MAX (MEASURED AT i ABUT) -0" 9' -0" 32' -0" MEDIAN COVER MATERIAL (PATTERNED CONCRETE), SEE CIVIL PLANS FOR COLOR & w m PATTERN U x O�pc/I : O ddfw..)W o a = z Of � r m O T p v L .I t-n 0 C V r UOf � U 0.02 FT/FT REMOVE EXISTING WINGWALL, TO BE INCLUDED IN ITEM 202 — REMOVAL OF PORTIONS OF PRESENT STRUCTURE DRAIN AWAY FROM S IDEWALK AND OFF 8' BARRIER CURB, SEE CONSTRUCT NEW BRIDGE, TO BE INCLUDED IN ITEM 601SUPERSTRUCTURE DETAILS WINGWALL, SEE ABUTMENT — CONCRETE CLASS D (BRIDGE) Z & WINGWALL DETAILS PLAN 16 8 0 16 ORIGINAL SCALE: 1/6" = 1' -0" '-4v6" EL.4916.91* HP 12 X 53 PILES —�- (TYP) Loris and Associates, Inc. 2585 Trail Ridge Dive East Lafayette, Colorado 80026 303.444.2073 I_117A* '-77A," AAA-77A" I 1'—AIA,e" F— m EL.4917.02*CD m EL.4916.93* - (100 YR.) NOTES F 1. * = ELEVATION 0 PGL 2. ALL DIMENSIONS MEASURED ALONG HCL ELEVATIO 16 8 0 16 ORIGINAL SCALE: 1/16' = 1'-0' SEE CIVIL PLANS FOR PATH & RIPRAP DETAILS VARIES; 23' -0'/4" (MIN), 1 -0"t _ 5, MEASURED AT � ABUT. CURB TYPE 2 (6" BARRIER) (SECTION B) (TYP), SEE SUPERSTRUCTURE DETAILS `HCL & PGL 0.02 FT/FT TYPICAL SECTION 10 5 0 10 ORIGINAL SCALE: 1" = 10' u 0' TO 6' -11 Lil m U W : (A, -Hm' Wt o I CD U O CV .—Uw�U 0.02 FT FT CENTER OF COLORADO 1-800-922-1987 OR 287-0595 ' u° CALL 2-BUSINESS DAYS IN ADVANCE IEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND 3 10" CONCRETE BETWEEN o SIDEWALK AND ROADWAY CURB, FORM SWALE TO DRAIN AWAY FROM SIDEWALK AND OFF BRIDGE, TO BE INCLUDED IN ITEM 601 - CONCRETE CLASS D (BRIDGE), SAWCUT 2" OF EXISTING SIDEWALK EXISTING SIDEWALK AND `-EXISTING BRIDGE `- 8" BARRIER CURB, SEE RAIL TO BE REMOVED SUPERSTRUCTURE DETAILS HIGH POINT ELEV = 4917.02 HIGH POINT STA = 60+98.50 PVl STA = 60+98.50 PVI FI FV = 4Q 17 15 60+00 60+50 61+00 DESIGNED BY: DRAWN BY: 'APPROVED BY: MKS I MKS PJL SCALE: DATE: CHECKED BY: DATE: AS SHOWN 1 4-6-05 1 TDB I 4-6-05 PREPARED UNDER THE DIRECT SUPERVISION OF CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL APPROVED: -71/lDS CITY EMNEER DATE CHECKED BY: w�A. W�A//TTE/ER..,�& WASTEWA R UTILITY DATE CHECKED BY:..L�^�11�4 Iff"OS STORMWATER UTILITY DATE CHECKED BY: - N.A. -� PARKS & RECREATION DATE CHECKED BY: A,4- CHECKED TRAFFIC ENGINEER BY: DATE DATE PROFILE GRADE 0 ROADWAY CENTERLINE N.T.S. 61+50 62+00 INTERIM SHEET 41 OF 94 C-1 274 41111* It BRIG. ABUT. 1 N \ cl u STA 60+52.07 NOTES: 1. ALL PILES ARE HP12x53 2. ALL PILES ARE END BEARING 4. ALL PILES SHALL HAVE REINFORCED TIPS 5. E-_ _"r INDICATES BATTERED PILE, BATTER 1:4. 6. ESTIMATED PILE TIP ELEVATION IS 4885. 7. MAXIMUM PILE LOAD = 70 TONS. PIER 2 TIMBERLINE ROAD �o. t 61 00 CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL EIK. ABUT. 3 APPROVED 41 �,�/CITY ENGINE DATE \ CHECKED BY: ' ` ►� r WATER WASTEWATER UTILITY DATE CHECKED STORMWATER UTILITY DATE \ CHECKED BY: PARKS x. 1RECREATION DATE CHECKED BY. 1RAFFlC ENGINEER DATE \ CHECKED BY: DATE ..:_...,..__..,,_.<w-..._.._-..-.....v..,_,_....-... PREPARED UNDER THE DIRECT SUPERVISION OF cD -O Cp Lp ROADWAY HCL, SEE ROADWAY PLANS IF -t. - A PILING LAYOUT 43 �� F PIER 12 I \ LEFT EDGE OF DECK \ ORIGINAL SCALE: = 1 -D COMMERCIAL TIP MAY BE USED IN LIEU OF REINFORCED TIP. PAY LENGTH SHALL BE AS SHOWN R 4/4„ (2 REO' D EACH PILE) Loris and Associates, Inc. 4 PLATES FOR EACH PILE TIP TO BE PAID FOR 2585 Trail Ridge Drive East AS ONE UNIT IN ITEM 502 - REINFORCING TIP Lafayette, Colorado 80026 PILE (TIP REINFORCING) DETAIL l \ `BEGINNING OF SIDEWALK 0 I \ o M \ ABUT # 3 ABUT # 1 ' ` ENDMEDIAN \ � (LEFT)) t BRIDGE `\ i \ ARIGHT EDO OF BRIDGE (MIN) -I CITY OF FORT COLLINS, COLORADO ENGINEERING DIVISION RIGHT EDGE OF BRIDGE (MAX) DECK ELEVATIONS Left Edge of Deck PARALLEL TO HORIZONTAL CONTROL CL of Bridge BENT LINE STATION OFFSET ELEVATION BENT LINE BF Abut 1 60+33.1362 - 4 6 . C 0 0 0 4915.9032 BF Abut 1 CL Brg Al 60+34.4762 -46.0000 4915.9099 CL Brg Al F-1 60+38.9412 -46.0000 4915.9322 F-1 F-2 60+43.4062 -46.0000 4915.9545 F-2 F-3 60+47.8712 -46.0000 4915.9769 F-3 F-4 60+52.3362 -46.0000 4915.9984 F-4 F - 5 60+56.6012 -46.0000 4916.0181 F-5 F-6 60+61.2662 -46.0000 4916.0357 F-6 F-7 F-7 60+65.7312 -46.0000 4916.0513 F-8 F - 8 60+70.1962 -46.0000 4916.0649 F-9 F-9 60+74.6612 -46.0000 4916.0766 CL Pier 2 CL Pier 2 60+79.1262 -46.0000 4916.0862 F-1 F-1 60+83.5922 -46.0000 4916.0939 F 2 F-2 60+88.0582 -46.0000 4916.0995 F-3 F-3 60+92.5242 -46.0000 4916.1032 F-4 F-4 60+96.9902 -46.0000 4916.1049 F-5 F-5 61+01.4562 -46.0000 4916.1046 F-6 F-6 61+05.9222 -46.0000 4916.1022 P-7 F-7 61+10.3882 -46.0000 4916.0979 F-8 F-8 61+14.8542 -46.0000 4916.0916 P-9 F-9 61+19.3202 -46.0000 4916.0833 CL Brg A3 CL Brg A3 61+23.7862 -46.0000, 4916.0730 BF Abut 3 OF Abut 3 61+25.1162 -46.0000 4916.0696 CENTER OF COLORADO 1-800-922-1987 OR 287-0595 I DEMNvVEER° CALL 2-BUSINESS DAYS IN ADVANCE EFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND PARALLEL TO HORIZONTAL CONTROL STATION OFFSET ELEVATION 60+50.7300 0.0000 4916.9109 60+52.0700 0.0000 4916.9172 60+56.5350 0.0000 4916.9369 60+61.0000 0.0000 4916.9547 60+65.4650 0.0000 4916.9704 60+69.9300 0.0000 4916.9942 60+74.3950 0.0000 49115.9959 60+78.8600 0.0000 4917.0057 60+83.3250 0.0000 4917.0135 60+87.7900 0.0000 4917.0193 60+92.2550 0.0000 4917.0230 60+96.7200 0.0000 4917.0240 61+01.1860 0.0000 4917.0246 61+05.6520 0.0000 4917.0224 61+10.1180 0.0000 4917.0183 61+14.5840 0.0000 4917.0121 61+19.0500 0.0000 4917.0039 61+23.5160 0.0000 4916.9937 61+27.9920 0.0000 4916.9915 61+32.4490 0.0000 4916.9674 61+36.9140 0.0000 4916.9512 61+41.3800 0.0000 4916.9331 61+42.7100 0.0000 4916.9273 Beginning of Sidewalk PARALLEL TO HORIZONTAL CONTROL Right Edge of Deck (Min) PARALLEL TO HORIZONTAL CONTROL BENT LINE STATION OFFSET ELEVATION BENT LINE STATION OFFSET ELEVATION OF Abut 1 60+36.9609 -36.0000 4916.1223 BF Abut 1 60+59.5346 23.0200 4916.4897 CL Brg Al 60+38.3009 -36.0000 4916.1290 CL Brg Al 60+60.0746 23.0200 4916.4938 F-1 60+42.7659 -36.0000 4916.1513 F-1 60+65.3396 23.0200 4916.5096 F-2 60+47.2309 -36.0000 4916.1737 F-2 60+69.8046 23.0200 4916.5234 F-3 60+51.6959 -36.0000 4916.1955 F-3 60+74.2E96 23.0200 4916.5352 F-4 60+78.7346 23.0200 4916.5451 F - 4 60+56.1609 -36.0000 4916.2154 F-5 60+03.1996 23.0200 4916.5529 F-5 60+6C.6259 -36.0000 4916.2333 F-6 60+87.6646 23.0200 4916.5587 F-6 60+65.0909 -36.0000 4916.2492 F-7 60+92.1296 23.0200 4916.5626 F-7 60+69.5559 -3 6.0000 4916.2631 F-8 60+96.5946 23.0200 4916.5644 F-8 60+74.0209 -36.0000 4916.2750 F-9 61+01.0596 23.0200 4916.5643 F-9 60+78.4859 -36.0000 4916.2850 CL Pier 2 61+05.5246 23.0200 4916.5621 CL Pier 2 60+82.9509 -36.0000 9916.2929 F-1 61+09.9906 23.0200 4916.5580 F-1 60+87.4169 -36.0000 4916.2989 F-2 61+14.4566 23.0200 4916.5519 F-2 60+91.8829 -36.0000 4916.3028 F-3 61+19.9226 23.0200 4916.5437 F-3 60+96.3489 -3 6.0000 4916.3048 F-4 61+23.3886 23.0200 4916.5336 F - 4 61+00.6149 -36.0000 4916.3047 F-5 61+27.0546 23.0200 4916.5215 F - 5 61+05.2809 -36.0000 4916.3027 F-6 61+32.3206 23.0200 4916.5074 F-6 61+09.7469 -36.0000 4916.2987 F-7 61+36.7866 23.0200 4916.4913 F-7 61+14.2129 -36.0000 4916.2927 F-8 61+41.2526 23.0200 4916.4732 F-8 61+18.6789 -36.0000 4916.2846 F-9 61+45.7186 23.0200 4916.4531 F-9 61+23.1449 -36.0000 4916.2746 CL Brg A3 61+50.1846 23.0200 4916.4312 CL Brg A3 61+27.6109 -36.0000 4916.2626 BF Abut 3 61+51.5146 23.0200 4916.4245 BF Abut 3 61+28.9409 -36.0000 4916.2587 End of Median Lt. PARALLEL TO HORIZONTAL CONTROL Right Edge of Deck (Max) BENT LINE STATION OFFSET ELEVATION BENT LINE STATION OF Abut 1 60+49.2001 -4.0000 4916.8235 OF Abut 1 60+62.0971 CL Brg Al 60+50.5401 -4.0000 4916.8300 CL Brg Al 60+63.4371 F - 1 60+55.0051 -4.0000 4916.8504 F-1 60+67.9021 F-2 60+59.4731 -4.0000 4916.8686 F-2 60+72.3671 F - 3 60+63.9351 -4.0000 4916.8853 F-3 60+76.8321 F - 4 60+68.4001 -4.0000 4916.8997 F-4 60+91.2971 F - 5 60+72.8651 -4.0000 4916.9121 F-5 60+95.7621 F-6 60+90.2271 F-6 60+77.3301 -4.0000 4916.9226 F-7 60+94.6921 F - 7 60+81.7951 -4.0000 4916.9310 F-8 60+99.1571 F - 8 60+86.2601 -4.0000 4916.9375 61+0.1 F - 9 60+90.7251 -4.0000 4916.9420 CL r 2 Pier 61+08.097871 CL Pier 2 60+95.1901 -4.0000 4916.9445 F-1 61+12.5531 F - 1 60+99.6561 -4.0000 4916.9449 F-2 61+17.0191 F-2 61+04.1221 -4.0000 4916.9434 F-3 61+21.4851 F - 3 61+08.5881 -4.0000 4916.9399 F-4 61+25.9511 F - 4 61+13.0541 -4.0000 4916.9344 F-5 61+30.4171 F-5 61+17.5201 -4.0000 4916.9269 F-6 61+34.0031 F - 6 61+21.9861 -4.0000 4916.9174 F-7 61+39.3491 F - 7 61+26.4521 -4.0000 4916.9059 F-0 61+43.8151 F - 8 61+30.9181 -4.0000 4916.8925 F-9 61+48.2811 F-9 61+35_3841 -4.0000 4916.8770 CL Brg A3 61+52.7471 CL Brg A3 61+39.6501 -4.0000 4916.8595 OF Abut 3 61+54.0771 BF Abut 3 61+41.1801 -4.0000 4916.8539 PARALLEL TO HORIZONTAL CONTROL OFFSET ELEVATION 29.7200 4916.3643 29.7200 4916.3691 29.7200 4916.3839 29.7200 4916.3965 29.7200 4916.4071 29.7200 4916.4150 29.7200 4916.4225 29.7200 4916.4272 29.7200 4916.4299 29.7200 4916.4306 29.7200 4916.4293 29.7200 4916.4260 29.7200 4916.4207 29.7200 4916.4135 29.7200 4916.4042 29.7200 4916.3929 29.7200 4916.3797 29.7200 4916.3644 . 29.7200 4916.3472 29.7200 4916.3279 29.7200 4916.3067 29.7200 4916.2844 29.7200 4916.2777 NOTE: ELEVATIONS SHOWN ARE FINISHED GRADE. SUBTRACT 2" FOR TOP OF CONCRETE ELEVATIONS. r.._ _ . -�--___--- _ _ __ -- -_ter--- _�� ~�_ _. _ . �. _� ._.."v. -- - ..._ -_--�-�_ . _ �_ , _ ___ . __. __.___.._� _.... DESIG Y: DRAWN KAPPROVED BY: MKSMS TIMBERLINE ROAD - 50% INTERIM DESIGN SH43 City of Fbrt Coliine SCALE: AL :Silo\Nri (DATE_S_orJ CHECKED BY: DATE: PILING LAYOUT & DECK ELEVATIONS OFAS 94 -- w��wr���� _.-: �.. .,x-,�lwn-.o.•-:,...,,..�...._r..�.,.,�n.,,r,.e..--.• '��i���i III■ rl�l�wr ��w�rw�r���� w�, �,���i .-._ - -� q..,.- ....., n.....>_ _. ,,.. ... .. ..m..�..-, .. _, ..-e.�.w.w..w d,+..+w"�/ � .,.nF.-...s .,w:.�,--.. .,. a._»....,...-.�+pi+�/ �ls�'.r+�.�..--.._•:.,�-py..c�.�^.-.-..+..*Mser.nt,...- .., _.,... �..... _-�.+�.v.,,.,., ,. _.. .....,. ._ -,+ti.�`�-*.,,.,..,««..,..:._.....m+._,., -1 274 ae N 6.? U-1 iV 274 N t IRG. r " N = � I -I r 1 SW -EL 4916.20 NW -EL 4916.26 = 1 i 9 4� 2 1 0 ORIGINAL 6iw. 7e SCALE: fi" = 1'-0" SEE BRIDGE RAIL DETAILS RE -LOCATED GAS LINE #6 ® 1' -0 #4 ® 1 ' -0 #7 X '!�La 1' 32' #5 ® 10-00 — #4 ® 1 ' —O" ---\ r Loris and Associates, Inc, 2585 Trail Ridge Drive East Lafayette, Colorado 80026 303.444,2073 r 0 ABUT 1 EL 4905.50 ABUTP EL 4905.50 SEE BRIDGE RAIL DETAILS, FOR ADDITIONAL INFORMATION PROVIDE 6"0 BLOCKOUT FOR RE -LOCATED GAS LINE, SEE DETAIL E/46, LOCATION TO BE DETERMINED IN FIELD iTY CJ 3" #4 ® 1 r -0" 5 Y CLR TYP LINO U- "xllh" DEEP KEY O � _n" I .I 46..,/ 2 1 0 2 ORIGINAL SCALE: �,� " = 1'-0' (SEE PLAN) CONST. JOINT GAS LINE TO BE RE —LOCATED BY OTHERS, CONTRACTOR TO COORDINATE REMOVE EXISTING WINGWALL, TO BE INCLUDED IN ITEM 202 — REMOVAL OF PORTIONS OF .4----- PRESENT STRUCTURE LIMITS OF STRUCTURAL CONCRETE COATING PREPARED UNDER THE DIRECT SUPERVISION OF 6"0 HOLE, FILL VOID W/ EPDXY GROUT CENTER OF COLORADO 1-800-922-1987 OR 287-0595 I D mE R CALL 2-BUSINESS DAYS IN ADVANCE EFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND CITY OF FORT COLLINS, COLORADO U111/UTY PLAN APPROVAL APPROVED: x CITY ENGIN DATE CHECKED BY: MA _. WATER & WASTEWA'TER UTILITY DATE CHECKED dg� BY: - /''f-dD STORMWATER UTILITY DATE CHECKED BY: Ar. A. PARKS & RECREATION DATE CHECKED BY: 41 TRAFFIC ENGINEER DATE CHECKED BY: DATE (4)-#4 x 2'-0" LONG EACH FACE, ADJUST LENGTH AS NECESSARY DEPENDENT UPON GAS LINE VERTICAL LOCATION -LOCATED 4"OGAS LINE IW & SW SECTION THRU WINGWALL E TYPICAL BLOCKOUT DETAIL 2 1 0 2 %46 1 1� 0 1 ORIGINAL SCALE: 1'-0' ORIGINAL SCALE: 1" = 1 ' -0" TOP OF WINGWALL 3, EL=4913.06 TOP OF RAILING +3' -04'4" FIELD VERIFY TO MATCH EXISTING G -- EXISTING EDGE OF BRIDGE DECK t. 1,I" EXPANSION MATL, PROVIDE RAIL EXPANSION JOINT 1 s Sxt tj 4`t 1 1 4 \ \ 11 e �Y, ROVIDE 6"4�,, BLOCKOUT FO ` GAS LINE `SEE DETAIL E/44 D NE WINGWALL PLAN 46 2 1 0 2 ORIGINAL SCALE: i,� " = 1 ' -0" t W� W FLOW LINE %LL FOOTING -TOP OF WINGWALL EL=4912.54 (TOP OF RAILING +3' -04'4 ") � WINGWALL STEM N:1450073.62 E:3128894.47 _ DESIGNED BY: DRAIN BY: APPROVED BY: —INTERIM SHEET TIMBERLINE ROAD WIDENING CITY OF FORT COLLINS, COLORADO MKS I MKS PJL 46 ENGINEERING DIVISION SCALE: DATE: CHECKED BY: DATE: AS sHOM ( 4-6-05 MB ( 4-6-05 WINGWALL DETAILS �F 94 City of Wort Collin= w� - - .W.m�..c3,-=,....w,q/ ��!"w-,..,w°--�'»«"w+"'—'._—....:.........�..-.«..y.....,��,r,./ �++,,..... _..._._�..�.., ..�,,..-..._.�.�:�.,,,.„,..>, ,. ...-..,.�.—.--ate,-,.,.,_ ... .� _,.. ,, ,...w , .._.•-....e.. ;ar...,_.x...,.... ,....,..._.....:.... -_.-.. ..._,... .. _..,-:......,k :. .. ..�..✓ � �. C -1 274 r- N p'"•1 I V W (n uj !(NO NOTES: 1. BARRIER RETROFIT DESIGNED IN A AASHTO STANDARD SPECIFICATIONS, 1 INTERIMS. 2. ALL CONCRETE FOR WINGWALL MO SHALL BE COOT CLASS D. 3. BACKFILL TRENCH EXCAVATION WIT * Loris and Associates, Inc. 2585 Trail Ridge Drtve East Lafayette, Colorado 80026 303.444.2073 A TE: FIBER 0 DANCE WITH EDITION WITH - - - REMOVE PORTIONS Oi FLOWFILL EXISTING WINGWALL, TO BI INCLUDED IN ITEM 202 . REMOVAL OF PORTIONS 01 PRESENT STRUCTURI 3'-0* MIN EXISTING EDGE OF BRIDGE DECK EXPANSION MATL, PROVIDE RAIL EXPANSION JOINT PORTION OF EX BRIDGE RAIL AND WINGWALL TO BE REMOVED 20' 04x *!�❑ 0 12 V -e" #4 0 12" #6x —� ^ 0 12"-\ i%" EXP. JT. FI EX. FIBER OPTIC TO REMAI 3; 3'-2* MAX. MAINTAIN MII EDGE DISTANCE TO CONDUITS " < I 00 0 i #4 0 12"--' ' I I 20 I I • I - I I I • � PORTION OF EX I BRIDGE RAIL AND WINGWALL TO REMAIN I I I I I I I • I ORIGINAL SCALE: I1/i" = V -0" CITY OF FORT COLLINS, COLORADO ENGINEERING DIVISION 2'-0" WIDE TRENCH. ALIGN IMMEDIATELY ADJACENT TO FIBER OPTIC CONDUITS GUARDRAIL TRANSITION TYPE 3G 2 1 0 2 ORIGINAL SCALE: 1/2 " = 1 ' -0" SEE BRIDGE RAIL DETAILS EXCEPT AS NOTED cc #6x J 0 12" 12 #6x 12• 0 12" EX. FIBER OPTIC TO REMAIN V-GROOVE CHAMFER #4x ^= 0 12" 3'-8• DRILL & EPDXY GROUT #8x19" (12" EMBEDMENT) 0 12" C/C EX. GAS TO REMAIN PORTION OF EX BRIDGE RAIL AND WINGWALL TO BE REMOVED 7'-8• #4 0 12" #6x -�'r-- 0 12"- #4 0 12" 20• #4x �❑ 0 12" Ut51GNED BY: DRAWN BY: "APPROVED BY: TDB I TDB PJL SCALE: DATE: CHECKED BY: DATE: O-OF:r-cC4ollins ` AS SHOWN 08-29-06 PJL 18-29-06 DRAWIN6 OF RI�CORA =I PREPARED UNDER THE DIRECT SUPERVISION OF VARIES: 3' -1 "f MAX UIILIIY N011FICA11ON CENTER OF COLORADO 1-800-922-1987 OR 287-0595 I DENVVEER CALL 2-BUSINESS DAYS IN ADVANCE EFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL APPROVED: CITY ENGINEER DATE CHECKED BY: WATER & WASTEWATER UTILITY DATE CHECKED BY: STORMWATER UTILITY DATE CHECKED BY: PARKS & RECREATION DATE CHECKED BY: TRAFFIC ENGINEER DATE CHECKED BY: DATE > SEE BRIDGE RAIL DETAILS EXCEPT AS NOTED #6x 12• 0 12" a I I I •I 34" V-GROOVE I I 4'4" CHAMFER I I I I I I 'OR T ON OF EX BRIDGE-All RIDGE l RAIL AND WINGWALL TO REMAIN ORIGINAL SCALE: I,� " = 1 ' -0" #4x ^= 0 12" 3'-8- DRILL & EPDXY GROUT #809" (12" EMBEDMENT) 0 12" C/C EX. GAS TO REMAIN * =VARY DEPTH, WIDTH AND/OR LOCATION AS REQUIRED TO AVOID FIBER OPTIC LINES, BUT MAINTAIN THICKENED EDGE COUNTERBALANCE FORCE OF 5.0 SF AREA X 7 FT LEVER ARM. TIMBERLINE ROAD WIDENING - INTERIM N.E. WINGWALL MODIFICATION DETAILS 1EET 46A OF 94 274 -v C --1 274