HomeMy WebLinkAboutSILVERBERG PUD - Filed CS-COMMENT SHEETS - 2007-01-08r„ 0
PROJECT
COMMENT SHEET
City of Fort Collins
DATE: December 24, 1996 DEPT: Engineering
PROJECT: #12-92A Silverberg PUD - Preliminary
PLANNER: Mike Ludwig
sij vljrgoryWt eiimir abye received by: Monday, January 13, 1P 7
uary 16, 1996
1. Access to the frontage road will need to be provided with phase 2. Therefor for approval of
anything more than phase I a letter of intent is needed for that access point.
2. The access point onto the frontage road needs to be moved to the west. A median will need to
be provided to restrict the access to right -in right -out at phase 2. This needs to be shown how
this will work.
3. A right turn lane is needed at the Prospect Road access. Need to show how this fits in. Will
the slope area you have shown be adequate with the additional width?
4. Auxiliary lanes will be needed on the frontage road at the time the access is provided. Row
may be necessary to provide these and the design will be needed at final.
5. Permits will be needed from the state for the utility work in the frontage road and for the bore
under the highway. Need indication from the state that these will be granted to verify that this site
will have utility services.
6. The extent of off site improvements, including signal participation have not been determined
by the City yet and need to be looked into.
7. Prospect Road to the east of the overpass is considered a collector street on the master street
plan not an arterial as is indicated on the site plan. Additional width from the 50 foot flowline to
flowline section will be needed due to the necessity of a median to limit movements and still
provide for the left turn movements at the frontage road.
8. State Highway access permit will be needed for the frontage road access and possibly for the
prospect road access (depends on who's right-of-way it is).
Date: VI-q-1 q7 Signature
u
CHECK IF YOU WISH TO RECEIVE
COPIES OF REVISIONS
IQ PLAT
SITE
ANDSCAPE
UTILITY
u
,_ t v? REVISION
COMMENT SHEET
DATE: December 8, 1997 TO: Engineering
PROJECT: #12-92A Silverberg P.U.D. - (LDGS)
Preliminary
All comments must be received by Leanne Harter no later than the staff
review meeting:
Wednesday, *December 31,1997
FYI: This projects' revision comments are due on New Year's Eve day. Since,
the standing Development Review may be cancelled, it may then be necessary
to discuss this project at the Wednesday, January 7th meeting.
Silverburg PUD January 9, 1998
• As was indicated in a letter to Ayres and Assoc. dated January 27, 1997 an updated traffic
study is needed for this site. As has been indicated by CDOT access to Prospect Road
has not been agreed to and if allowed will be limited to right -in right -out. The traffic
study needs to look at these two alternatives and the site designed in that manner also.
• The traffic study should also address when the frontage road connection would need to be
made if it is not being proposed to be built with the first building.
• Until a traffic study is received the proposed improvements can not be evaluated to
determine if they are adequate.
• Additional improvements to the frontage road intersection will be needed. The additional
pavement needed may not fit within the existing row. If it doesn't additional row will
need to be acquired. Will need letters of intent for this prior to being scheduled for a
preliminary hearing.
• Need letters of intent for off site easements needed for services and for access prior to
being scheduled for preliminary hearing.
(Continued on next page)
Date: V-<- r�� 1�
/�.14k_L
CHECK HERE IF YOU WISE TO RECEIVE COPIES OF REVISIONS
X Plit Site — Damage Report Odff
x Udi u' Redline Utik LmdW —
Silverburg PUD (page 2 of 2) January 9, 1998
• Additional auxiliary lanes than those currently shown maybe needed on the frontage
roads.
• Extent of off site improvements, including signal participation have not been determined
yet.
• State highway access permits will be needed for the access point(s).
• See additional comments on the plans.
%r
V
REVISION
COMMENT SHEET
DATE: December 8, 1997 TO: Traffic. Ping
PROJECT: #12-92A Silverberg P.U.D. - (LDGS)
Preliminary
All comments must be received by Leanne Harter no later than the staff
review meeting:
Wednesday, *December 31,1997
FYI: This projects' revision comments are due on New Year's Eve day. Since,
the standing Development Review may be cancelled, it may then be necessary
to discuss this project at the Wednesday, January 7th meeting.
V L,, ZL, ,/ Lc
6�- ^ lt,:� Lit
Date: Signature:
CHECK HERE F YOU WISH M RECEIVE COPIES OF REVISIONS
Pld _ k _ Dta V Report _ Offer
_ Uh* — ReAme Utility _ Lads*
kA,(