Loading...
HomeMy WebLinkAboutSILVERBERG PUD - Filed CS-COMMENT SHEETS - 2007-01-08r„ 0 PROJECT COMMENT SHEET City of Fort Collins DATE: December 24, 1996 DEPT: Engineering PROJECT: #12-92A Silverberg PUD - Preliminary PLANNER: Mike Ludwig sij vljrgoryWt eiimir abye received by: Monday, January 13, 1P 7 uary 16, 1996 1. Access to the frontage road will need to be provided with phase 2. Therefor for approval of anything more than phase I a letter of intent is needed for that access point. 2. The access point onto the frontage road needs to be moved to the west. A median will need to be provided to restrict the access to right -in right -out at phase 2. This needs to be shown how this will work. 3. A right turn lane is needed at the Prospect Road access. Need to show how this fits in. Will the slope area you have shown be adequate with the additional width? 4. Auxiliary lanes will be needed on the frontage road at the time the access is provided. Row may be necessary to provide these and the design will be needed at final. 5. Permits will be needed from the state for the utility work in the frontage road and for the bore under the highway. Need indication from the state that these will be granted to verify that this site will have utility services. 6. The extent of off site improvements, including signal participation have not been determined by the City yet and need to be looked into. 7. Prospect Road to the east of the overpass is considered a collector street on the master street plan not an arterial as is indicated on the site plan. Additional width from the 50 foot flowline to flowline section will be needed due to the necessity of a median to limit movements and still provide for the left turn movements at the frontage road. 8. State Highway access permit will be needed for the frontage road access and possibly for the prospect road access (depends on who's right-of-way it is). Date: VI-q-1 q7 Signature u CHECK IF YOU WISH TO RECEIVE COPIES OF REVISIONS IQ PLAT SITE ANDSCAPE UTILITY u ,_ t v? REVISION COMMENT SHEET DATE: December 8, 1997 TO: Engineering PROJECT: #12-92A Silverberg P.U.D. - (LDGS) Preliminary All comments must be received by Leanne Harter no later than the staff review meeting: Wednesday, *December 31,1997 FYI: This projects' revision comments are due on New Year's Eve day. Since, the standing Development Review may be cancelled, it may then be necessary to discuss this project at the Wednesday, January 7th meeting. Silverburg PUD January 9, 1998 • As was indicated in a letter to Ayres and Assoc. dated January 27, 1997 an updated traffic study is needed for this site. As has been indicated by CDOT access to Prospect Road has not been agreed to and if allowed will be limited to right -in right -out. The traffic study needs to look at these two alternatives and the site designed in that manner also. • The traffic study should also address when the frontage road connection would need to be made if it is not being proposed to be built with the first building. • Until a traffic study is received the proposed improvements can not be evaluated to determine if they are adequate. • Additional improvements to the frontage road intersection will be needed. The additional pavement needed may not fit within the existing row. If it doesn't additional row will need to be acquired. Will need letters of intent for this prior to being scheduled for a preliminary hearing. • Need letters of intent for off site easements needed for services and for access prior to being scheduled for preliminary hearing. (Continued on next page) Date: V-<- r�� 1� /�.14k_L CHECK HERE IF YOU WISE TO RECEIVE COPIES OF REVISIONS X Plit Site — Damage Report Odff x Udi u' Redline Utik LmdW — Silverburg PUD (page 2 of 2) January 9, 1998 • Additional auxiliary lanes than those currently shown maybe needed on the frontage roads. • Extent of off site improvements, including signal participation have not been determined yet. • State highway access permits will be needed for the access point(s). • See additional comments on the plans. %r V REVISION COMMENT SHEET DATE: December 8, 1997 TO: Traffic. Ping PROJECT: #12-92A Silverberg P.U.D. - (LDGS) Preliminary All comments must be received by Leanne Harter no later than the staff review meeting: Wednesday, *December 31,1997 FYI: This projects' revision comments are due on New Year's Eve day. Since, the standing Development Review may be cancelled, it may then be necessary to discuss this project at the Wednesday, January 7th meeting. V L,, ZL, ,/ Lc 6�- ^ lt,:� Lit Date: Signature: CHECK HERE F YOU WISH M RECEIVE COPIES OF REVISIONS Pld _ k _ Dta V Report _ Offer _ Uh* — ReAme Utility _ Lads* kA,(