HomeMy WebLinkAboutRIVERSIDE THIRD - Filed CS-COMMENT SHEETS - 2007-01-08Project Comments Sheet
t(0-60110
Selected Departments
City of Fort Collins
Department: En
Date: March 28, 2005
Project: COLOR PRO REMODEL PDP, 1437 RIVERSIDE AVE, TYPE I
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
March 23, 2005
Note - Please identify your redlines for future reference
Issue Contact: Susan Joy
Topic: General
Number: 8 Created: 3/23/2005
[3/23/051 If no utility plans are required, then the driveway can be replaced to current
standards by pulling a street cut permit.
Number: 9 Created: 3/23/2005
scan.
[3/23/05] Please see Appendix E6 for scannability requirements. This plan set will not
Number: 11 Created: 3/23/2005
[3/23/05] Landscape and Site plans need to show the same information.
Number: 13 Created: 3/23/2005
[3/23/05] From Pavement Management: No comments.
Topic: Landscape plan
Number: 10 Created: 3/23/2005
[3/23/05] Need to show all utilities and easements (dimensioned and labeled).
Topic: Site Plan
Number: 12 Created: 3/23/2005
the CL of Riverside.
[3/23/05] Please dimension and label the existing row, parkway, and utility easement from
Number: 14[3/2Created: 3/23/2005
well. 05] From Technical Services: The hatch and shading on this drawing doesn't work
well. landscap areas don't show up and some areas too busy with hatch over hatch.
rare J
Date
UKECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat [ Site Drainage Report _ I Othe'2,L
Utility Redline Utility --I Landscape
Page I
PROJECT
COMMENT SHEET
Current Planning
DATE: March 2, 2005 TO: Trans. Planning
PROJECT: #10-05 Color Pro Remodel PDP, 1437 Riverside
Ave, Type I
All comments must be received by Steve Olt no later than the staff
review meeting:
March 23, 2005
Note -Please identifv your redlines for future reference
�No Problems
❑ Problems or Concerns (see below or attached)
Name (please print)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
<�Plat _site Drainage Report _Other
Utility 4wline Utility � Landscape
City of Fot C°o
�.T..
PROJECT
Citv of Fort Collins COMMENT SHEET
�Mrren I�larr�,:^ci
DATE: March 2, 2005 TO: Engineering Pavement
PROJECT: #10-05 Color Pro Remodel PDP, 1437 Riverside
Ave, Type I
All comments must be received by Steve Olt no later than the staff
review meeting:
March 23, 2005
Note -_Please identify your redlines for future reference
No Problems
❑ Problems or Concerns (see below or attached)
Name (please print) J '
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_Plat _Site _Drainage Report _Otheria
_Utility _Redline Utility _Landscape City of Fort Collins
iffilln
PROJECT
_.
City of Fort Collitts COMMENT SHEET
Current lannin
DATE: March 2, 2005 TO: Technical Services
PROJECT: #10-05 Color Pro Remodel PDP, 1437 Riverside
Ave, Type I
All comments must be received by Steve Olt no later than the staff
review meeting:
March 23, 2005
Note -
❑ No Problems
Problems or Concerns (see below or attached)
L„' 1
Name (please print)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat la
Site _Drainage Report _Other
_Utility _Redline Utility _Landscape
City of Fort Collins