HomeMy WebLinkAboutSPRING CANYON COMMUNITY PARK - Filed DCP-DEV. CONSTRUCTION PERMIT - 2006-12-29Transportation Services
Engineering Department
DEVELOPMENT CONSTRUCTION PERMIT
Permit Number: 06-11 Issuance Date: 04111106
Project Name: Spring Canyon Community Park
Project A.K.A.:
Project Location: 2626 West Horsetooth Road (west end of Horsetooth Rd.)
Permittee: Kathleen Benedict City of Fort Collins Parks & Recreation Proiect Manager
(970) 416-2260
City and developer contacts: See attached Exhibit "A" for names and phone numbers of all
contact persons for this project
Fees: Permit Application Fee (paid at the time of application) $ 400.00
Construction Inspection Fee (paid prior to issuance of this permit) $
Total $ 21,517.20
Development Bond or other approved security:
Amount of security deposited with the City to guarantee the completion of all public
improvements to be constructed as shown on the approved plans for the development.
$ 198,654.20
Form of security deposited with the City: City Proiect (N/A)
PERFORMANCE REQUIREMENTS OF THIS PERMIT:
1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design
drawings and specifications the certification of all materials testing by an Engineer. The Permittee
shall have an Engineer prepare revised design drawings and secure City approval for all revisions to
the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required
by the City in the Development Agreement, that the improvements are constructed in conformance
with the approved Utility Plans and the standards and specifications of the City. The Permittee shall
provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance of the
constructed public improvements. (All references above to the terms "Project Engineer" and
"Engineer" shall mean a Professional Engineer licensed in Colorado.)
2. All contractors who perform work on this project must be bonded and licensed in conformance
with City requirements.
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6605 • FAX (970) 221-6378
www.fcgov.com
Development Construction Permit, Page 2/6
3. Construction time restrictions:
4. The applicant understands that additional permits maybe required for this development project
and the applicant shall secure those permits directly from the issuing departments.
5. This permit, along with a complete set of all approved plans and documents for this project
(utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic
study, drainage report, plat easements and any other official documents), shall be kept on the
development site available for use by City staff doing inspections.
6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or
Section 2.6.3(K) of the Land Use Code, whichever is applicable):
a. If construction has not begun within sixty (60) days from the date of issuance of this
permit, this permit shall expire and the applicant will forfeit the permit fee paid for this
permit, whereupon the applicant must re -apply for a new permit.
b. In addition, this permit shall expire one year from the date of issuance. The applicant
may apply for an extension by reapplication at least two weeks prior to the expiration date.
Such application shall contain information sufficient to justify the granting of the extension.
An extension may be granted for up to six months.
7. Building permits and certificates of occupancy will only be issued when all conditions contained
in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29-
678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the
Development Agreement does not specify times for completion of public improvements, or if there is
no Development Agreement, then the improvement requirements specified in Section 24-95 of the
City Code shall apply, which provides that construction of all improvements shall be required prior
to the time of issuance of the first building permit.
8. Acceptance by the City of the public improvements shall be after (1) final inspection has been
conducted by the City; (2) punch list items from the final inspection are completed and accepted by
the City; and (3) required certifications from the licensed professional engineer that improvements
are completed to City standards, specifications and approved Utility Plans; and the "as -constructed"
plans have been received and accepted by the City.
9. The warranty on street improvements is for five (5) years from the date of acceptance by the City
of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional
Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use
Code, as applicable.
10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any
Development Construction Permit, Page 3/6
planned construction on this project. All required perimeter silt fencing and other erosion/sediment
control best management practices (BMP's) that can be installed prior to construction must be in
place and inspected by the City Erosion Control Inspector before any land disturbing activity begins.
11. No work (including grading) shall be started in State Highway right-of-way until a permit is
issued by the Colorado Department of Transportation to allow such work to begin.
12. Other conditions:
1. No building permit shall be issued until such time as the Spring Creek Farms North plat
has been filed.
2. The on -site emergency access easements to be dedicated by separate document shall be
signed by all appropriate parties no later than May 1, 2006. All transportation development review
fees and filing fees shall be paid prior to this date.
Permittee's acknowledgment signature:
By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of
the owners of the property (including all owners having legal or equitable interest in the real property, as
defined in Section 1-2 of the City Code; and including common areas legally connected to or associated
with the property which is the subject of this application) without whose consent and authority the
requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City
officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such
property to perform work required of the applicant if the applicant were to fail to perform the required
work. I also acknowledge that I have read this permit document with all its requirements and
conditions, and I agree to all of the terms and conditions so stated in this permit.
Applicant/Project Manager' s Signature: 6'4:6/ Date: i A o 6
.11
Approval for issuance:
City Engineer Approval: 77�i� G — -- Date: y << o rc
(Permit Issuance Date)
Development Construction Permit, Page 4/6
EXHIBIT "A"
DEVELOPMENT PROJECT CONTACT PERSONS
Name, address and numbers
Project Name: Spring Canyon Community Park
Project A.K.A.:
City Staff Contact Persons:
Development Engineer:
Construction Inspector:
Current Planner:
Dan DeLaughter
281 N. College Avenue, Fort Collins, CO 80524
(970) 221-6605
ddelaughter@fcgov.com
Rhonda Henson
281 N. College Avenue, Fort Collins, CO 80524
Cell: (970) 217-4089
Steve Olt
281 N. College Avenue, Fort Collins, CO 80524
(970) 221-6341
Water Utilities Engineer: Roger Buffington
700 Wood Street, Fort Collins, CO 80521
(970)221-6854
Erosion Control Inspector: Bob Zackley
700 Wood Street, Fort Collins, CO 80521
(970) 224-6063
Natural Resources: Doug Moore
281 N. College Avenue, Fort Collins, CO 80524
(970) 221-6143
Traffic Operations: Eric Bracke
626 Linden Street, Fort Collins, CO 80524
(970) 221-6630
Street Closures: Syl Mireles
626 Linden Street, Fort Collins, CO 80524
(970)221-6815
Development Construction Permit, Page 5/6
Transportation Planning: Kurt Ravenschlag
215 N. Mason Street, Fort Collins, CO 80524
(970) 416-2040
Forestry: Tim Buchanan
215 N. Mason Street, Fort Collins, CO 80524
(970) 221-6361
Light and Power: Alan Rutz
700 Wood Street, Fort Collins, CO 80521
(970) 224-6153
Developer' Contact Persons:
Project Manager: Kathleen Benedict, Project Manager
City of Fort Collins
P.O. Box 580, 215 North Mason Street,
Fort Collins, CO 80524
Office: (970) 416-2260
Cell: (970) 222-5795
Fax: (970) 221-6586
KBenedict@fcgov.com
Owner/Developer: Craig L. Foreman, Owner
City of Fort Collins Parks and Recreation
P.O. Box 580, 215 North Mason Street,
Fort Collins, CO 80254
Office: (970) 221-6618
Fax: (970) 221-6586
CForeman@fcgov.com
Architect/Planner: Russ Lee
BHA Design
4803 Immovation Drive, Ftort Collins, CO 80525
Office: (970) 223-7577
Fax: (970) 223-1827
www.bhadesign.com
Project Engineer: Eric Lessard
Ayres Associates
3665 JFK Parkway, Ftort Collins, CO 80525
Office: (970) 223-5556
Development Construction Permit, Page 6/6
Fax: (970) 223-5578
Iessardena,AyresAssociates.com
Professional Lisence # 37562
General Contractor: Rick Coulter
ECI Site Construction Management, Inc.
2526 East Highway 402, Loveland, CO 80537
(Mailing) P.O. Box 2135, Loveland, CO 80539
Office: (970) 669-6291
Cell: (970) 218-4203
Fax: (970) 669-6411
rick@ecisite.net
F
W
w
x
y
W
F
Q
H
W
N
O
U
C
Q
U)
w
H
Fz-
F
U
W
O
x
a
000000
�0000
0 0000000
1O 0000000
00000o
p
mvn��roi
O000Oo
ui000air
,�
Cl) 060 6, 0
NN�N 61' , O
OCDNr 00
��,
N M N6A
� 60
nj ' tR 60 fo to 69 V9
d,
N N M 6-T ,
d, d,
\ o
a
O
�
�, �, d,
w
Oo
yW
2LL
f„
O00000
nnLo0gq
0000000000
nnr000000o
L0000,n�n
v,000v,v
Z
O=WU
069a(6 vi MOC
OO O O OM 0 Lo LO Uj
f»wvi no 64 o n» M» CM) M<A
0', OO
to vi vi en 69 <»
f. m�i W
��
64
LU
wdIF
,w m
000000
000000
00000pp000$
00000 0 000
0000aDoo
w
00000o
Vi 69 CO 69 ID eo
CCOCGOCCOO
H'l 60! 69 fo 69 69 6% 64 fo 6o
O O N O M O O
6r:C600i0,n
co co co 69 to OD
OI 00 fD M .
' rM
w
67
r 0) Cj 1
69 , f»64
a
��
~W
o 0 0 0 0 0
000000
0000000000
0000000000
o O r 0 m0 lD
ovooNnuR
0000o00O.H640
69696o 490 dB
63 6966% 6.9
,�=
0NOAA�
w�yw
IL
O IL
O
V V
OMNO
"
C%l V M0� Mr 7M
`7y�
�-000 fD
w
r-L
M�
O
M
OOD co CO
wZ
romw
ui�1-
__-.....
ON
LL vMLLI
IL
W
Z' S 2 2 S S 2 S 2 S Z
i�/{� lL lLiiUU LL.IL LLQU QU QU QU QU QU QU y}� �LL}} }
L W J J U U� W J_l J W W LLI W W LL] W -� ViJ J J 0J lA F_
� � V
WW z
O
W
ppCL, CO)
Q y Fi Z
0Z W a y c H W
a 0) 000
LU
:3O
O
aCc
eO E
N
m c WN CU� 2NO� Z,2
OL —0 aQa
C� a d dC N m Um m m 0) m d m m m w MO) a Q
0a00a.<0 a
ff-
EXHIBIT A
SOUTHWEST COMMUNITY PARK
Cottonwood Glen
Neighborhood Park
1
Pineridge Natural Area
JJ � 'ing
1 Southwest Community Park
1
t _
1 Park Boundary
na 1
„ I/
Tefft Acres
rrr�—
Silver Oaks
I
Olander
ISchool
Horsetooth Rd. I
q OM
U__L1LJ11J1.