HomeMy WebLinkAboutNORTHSIDE AZTLAN COMMUNITY CENTER - Filed CS-COMMENT SHEETS - 2006-11-30PROJECT COMMENT SHEET Current Planning DATE: December 21, 2005 TO: Engineering PROJECT PLANNER: Anne Aspen #54-05 Northside Atzlan Community Center PDP — Type I Please return all comments to the project planner no later than the staff review meeting: January 11, 2006 Note --Please identify your redlines for future reference ❑ No Problems ❑ Problems or Concerns (see below or attached) Name (pleaseprint) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _Plat _Site _Drainage Report _Other _Utility _Redline Utility _Landscape Project Comments Sheet City of Fort160" Selected Departments Collins Date: April 25, 2006 Project: NORTHSIDE ATZLAN COMMUNITY CENTER PDP - TYPE I All comments must be received by Anne Aspen in Current Planning, no later than the staff review meeting: April 26, 2006 Note - Please identify your redlines for future reference Issue Contact: David Averill Topic: Overall Utility Plan Number: 84 Created: 4/25/2006 [4/25/06] The sidewalk on the northside of the building needs to be configured at 6' minimum since it is adjacent to head -in parking. I think we should perhaps talk about widening it beyond that if indeed there is no curb there (as indicated on sheet 5 of the Utility Plans). Seems to me that it will be easy for vehicles to park on this walking surface if we do not take some sort of action (curb, wheel stops, or something else?) to keep that from happening. Thanks. Signature Date Z �.ob CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site Drainage Report Other :tL­Utility Redline Utility k Landscape Page I 6 REVISION Citvof Fort Collins COMMENT SHEET Current Planning DATE: April 12, 2006 TO: Technical Services PROJECT PLANNER: Steve Olt /Ul V #54-05 Northside Aztlan Community Center PDP - Type I SECOND ROUND OF REVIEW Please return all comments to the project planner no later than the staff review meeting: April 26, 2006 Note --Please identify your redlines for future reference ❑ No Problems ❑ Problems or Concerns (see below or attached) 1+ r�Y®f`'r/ �5 .dc'C��S fd •Y'llir/�y�- T 3• /�/.{i '� /( uNE � s .- � Gu i� �e� t..( � = lccclL, rr �. f �s^;7� 1a' a i\. t:';'K(Dlea =0-- CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONSa _Plat _Site _Drainage Report _Other _Utility _Redline Utility _Landscape City of Fort Collins FINAL PLAN COMMENT SHEET City of Fort Collins Current Planning DATE: August 9, 2006 TO: Engineering PROJECT PLANNER: ANNE ASPEN #54-05/A NORTHSIDE AZTLAN COMMUNITY CENTER PDP-FINAL PLANS Please return all comments to the project planner no later than the staff review meeting: September 6, 2006 Note -.Please identify your redlines for future reference ❑ No Problems ❑ Problems or Concerns (see below, attached, or DMS) Name (please print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _Plat _Site _Drainage Report _Other _Utility _Redline Utility _Landscape FINAL PLAN COMMENT SHEET DATE: August 9, 2006 TO: Technical Services PROJECT PLANNER: ANNE ASPEN 0 '/ #54-05/A NORTHSIDE AZTLAN COMMUNITY CENTER PDP-FINAL PLANS Please return all comments to the project planner no later than the staff review meeting: September 6, 2006 Note %Please identify Your redlines for future reference F-] No Problems Problems or Concerns (see below, attached, or DMS) C-4i C 7 fly 7v TLY /'V 6 L/00*? &Y 7- - NL"/Vpi i N7 Name (please print) �HECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site —Drainage Report —Other —Utility —Redline Utility —Landscape city oP FINAL PLAN j COMMENT SHEET DATE: August 9, 2006 TO: Engineering Pavement PROJECT PLANNER: ANNE ASPEN #54-05/A NORTHSIDE AZTLAN COMMUNITY CENTER PDP-FINAL PLANS Please return all comments to the project planner no later than the staff review meeting: September 6, 2006 Note -.Please identify your redlines for future reference No Problems ❑ Problems or Concerns (see below, attached, or DMS) Name (please p 'ntrz ) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _Plat _Site _Drainage Report _Other _Utility _Redline Utility _Landscape CityCity of� Project Comments Sheet Selected Departments City of Fort Collins Department: Engineering Date: September 8, 2006 Project: NORTHSIDE AZTLAN COMMUNITY CENTER PDP - TYPE I & FINAL PLANS All comments must be received by Anne Aspen in Current Planning, no later than the staff review meeting: September 06, 2006 Note - Please identify your redlines for future reference Issue Contact: Marc Virata Topic: General Number: 58 Created: 1 /10/2006 [9/5/06] 1 will follow up on how this local street portion amount will be collected. [4/26/06] Carried over for reference. [1/10/06] With the Downtown River District Project looking into improving Willow Street and the project not designing Willow Street a dollar amount to satisfy the frontage improvement requirement along Willow Street will be required. Further work into arriving at the amount will need to be made. Number: 90 Created: 4/26/2006 [9/8/06] I'm not seeing this on first blush on the plans. Please ensure the site and construction drawings indicate this. [4/26/061 It should be noted that the sidewalk along Willow Street may possibly change with future Willow Street improvements. Number: 115 Created: 9/8/2006 [9/8/06] 1 wasn't present for the staff review discussion, which apparently was limited. I understand there may be concerns with the transformer location along Willow in relation to the ultimate buildout of Willow. Let me know of any coordination on my part that may be needed if the issue is outstanding. Topic: Plat Number: 103 [9/5/06] The plat notes Tract B as Daggett she seemsrto share myfA Created: 9/5/2006 land" in the tract table. In checking with Carrie whether "open land" implies something sirnilagtoo Date CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS X Plat _ Site Drainage Report Other Utility Redline Utility Landscape Page 1 "open space" whereupon the land perhaps cannot be "developed"? A solution would be to just eliminate the "open land" designation. Just an observation on my part rather than a comment or concern as there may be an unattended consequence in the label, but I'll defer to anyone else's opinion. Number: 116 Created: 9/8/2006 [918/06] Technical Services offered the following comments on the plat: 1. Boundary and legal close. 2. Please try to eliminate lines over text for scanning. 3. 100 year flood line and text not dark enough to show on prints and scans. 4. Vicinity Map -- show Old Town to South. Number: 117 Created: 9/8/2006 [9/8/06] There was a question raised at the staff review whether the railroad company needed to sign off on the plat. I'll defer to Carrie Daggett on this, as she would presumably be provind the attonney certification on the plat. Page 2 Northside Aztlan Response to 9-9-06 Civil Comments (to accompany mylars) North Star Design Roger Buffington's Comments 61 The redline notes have been added. 65 The approximate location of the 3" line has been shown. It is stated that it will need to be abandoned prior to building construction. 104 The valve has been moved. 107 All redlines were included in the mylars. Marc Virata's Comments 58 Noted. 90 Notes have been added to the grading plan that the Willow Street walk may move in the future. 115 The transformer has been moved. 103 Tract 6 has been changed to "Utility Alignment". 116 Plat by TEC 117 Steve Seefeld is working on this item. Basil Hamdan's Comments 105 Parks has been involved with the design and knows what we are planning for drainage and the maintainance requried. We have chosen to not install a pipe in the swales. With proper maintainance, they should work without a pipe drain. There is irrigation in the swales. The slope of the channel is now noted. 98 The shedule has been revised. 71 The Permit has been prepared and given to Steve Seefeld to submit. The LOMR is not yet approved. 114 A note has been added to fill in the sump portion of the inlet with grout. 108 The entire parking lot of the United Way is a drainage alignment. 106 There is not a low area downstream of the pipe. The channel by the United Way has some bellies that are going to be removed to elimiate puddles. Citvof Fort Cotlins +_urreni Planning PROJECT COMMENT SHEET DATE: December 21, 2005 TO: Engineering Pavement PROJECT PLANNER: Anne Aspen #54-05 Northside Atzlan Community Center PDP — Type I Please return all comments to the project planner no later than the staff review meeting: January 11, 2006 Note - Please identify your redlines for future reference X No Problems ❑ Problems or Concerns (see below or attached) Name (please print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _Plat _Site _Drainage Report _Other _Utility _Redline Utility _Landscape 6a City of Fort Collins PROJECT COMMENT SHEET Current Planning DATE: December 21, 2005 TO: Technical Services PROJECT PLANNER: Anne Aspen #54-05 Northside Atzlan Community Center PDP — Type I Please return all comments to the project planner no later than the staff review meeting: January 11, 2006 Note -.Please identify your redlines for future reference ❑ No Problems ❑ Problems or Concerns (see below or attached) Z, �/I�iTGt 7� lift � per 7 ,;//S 7>44'7` V , 4,11z c . I -- Name (please print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _Plat _Site _Drainage Report _OtherI& _Utility _Redline Utility Landscape City of Fofl Collins t Project Comments Sheet Selected Departments City of Fort Collins Date: January 17, 2006 Project: NORTHSIDE ATZLAN COMMUNITY CENTER PDP - TYPE I All comments must be received by Anne Aspen in Current Planning, no later than the staff review meetina: January 11 2006 Note - Please identify your redlines for future reference Issue Contact: Marc Virata Topic: Construction Plans Number: 55 Created: 1/10/2006 [1110/06] The preliminary removal plan should use different shading to delineate the areas being removed, the solid black should be avoided. Number: 56 Created: 1/10/2006 [1/10/06] The grading contours are difficult to discern existing and proposed contours. Can different line weight be used to Topic: General Number: 51 Created: 1/10/2006 [1110/061 There appears to be several outside entities that would need to provide a letter of intent for the work that is occurring on their easement/right-of-way and/or the vacating of the rights as shown on the plat. North Weld County, Xcel Energy, Colorado -Wyoming Gas Company, and United Way should provide letters of intent. Burlington Northern Railroad appears likely as grading may be occurring within their easement. Mountain States Telephone and Telegraph doesn't appear to be impacted and thus a letter of intent is likely not required. Number: 57 Created: 1/10/2006 [1/10/06] The construction drawings specify a Tract B south of the United Way building while the plat specifies this as Lot 4. Number: 58 Created: 1/10/2006 [1/10/06] With the Downtown River District Project looking into improving Willow Street and the project not designing Willow Street a dollar amount to satisfy the frontage improvement Signature Datef CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site Drainage Report Other Utility Redline Utility Landscape Page I requirement along Willow Street will be required. Further work into arriving at the amount will need to be made. Number: 67 Created: 1 /11 /2006 [1/11/061 Resolution regarding the variance request for taking drainage from Willow Street onto the driveway will be postponed and taken into consideration with the Willow Street design. The frontage escrow for improvement will likely need to also factor in a drainage structure to divert flows underneath the street sidewalk. Number: 68 Created: 1/1112006 (1/11/06] The variance request to not require a 9' utility easement along Willow Street is noted and I'll look to schedule a utility cooraination meeting to help potentially verify the probability of eliminating the easement. Number: 69 Created: 1 /11 /2006 [1/11/06] I'd ideally like to see easement/right-of-way boundaries on a sheet showing proposed grades, utilities, and other general disturbance in order to ascertain which outside entities are being impacted as it related to ID# 51, Topic: Plat Number: 52 Created: 1/10/2006 [1/10/06] The Certificate of Dedication statement should probably be modified as the City isn't looking to convey anything onto itself. Number: 54 Created: 1 /10/2006 [1 /10/061 There are several trails within the property (mostly Lot 2) that do not fall within an alignment/area. Wouldn't it be beneficial to provide for these on the plat? Number: 70 Created: 1/11/2006 [1/11/06] Technical Services has been requiring that lots on a plat all fit on one sheet. If this cannot be accomplished then a matchline needs to be provided. Page 2 Project Comments Sheet Selected Departments City of Fort Collins Department: Transportation Planning Date: January 10, 2006 Prqject: NORTHSIDE ATZLAN COMMUNITY CENTER PDP - TYPE I All comments must be received by Anne Aspen in Current Planning, no later than the staff review meeting: January 11, 2006 Note - Please identify your redlines for future reference Issue Contact: David Averill Topic: Landscape Plan Number: 48 Created: 1/10/2006 (1/10/061 Minor issues related to bicycle parking: There doesn't seem to be enough provided per LUC (see Current Planning's comment #22). In addition, I would strongly suggest that this project provide bicycle parking well BEYOND what the code requires since it is likely (due to the recreational nature of the use and proximity to the Poudre Trail) that many users of this facility will be arriving via bicycle. The location of bicycle parking is another issue. As currently shown, the proposed bicycle parking is encroached upon by a tree and does not satisfy the requirements of the LUC. In addition, it would make sense to provide bicycle parking at the main entrance to the building along Willow St., as well as somewhere in the vicinity of the basketball courts and/or skate park when they are complete. I believe that Current Planning Staff has some redlined plans outlining these considerations. Thanks. Number: 49 Created: 1/10/2006 [1/10/061 Please strike the "no -parking" note beneath the typical street section on the front sheet of the utilty planset. Willow will be a Collector, but it is TBD wether or not on -street parking will be provided. Number: 50 Created: 1/10/2006 [1/10/06] As a reminder, this project will be required to provide a fee in lieu of designing/building the ultimate frontage for Willow St. (TBD by the DTRD design project). Please coordinate with Engineering staff to arrive at an acceptable amount. Number: 53 Created: 1/10/2006 [1/10/06] To avoid future issues with trees and the new (TBD) streetscape, it is strongly suggest at any proposed landscaping (trees in particular) be installed outside of the yi1�.w�.n In 1 10 0 6 Signature Date CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS ek'Plat _A Site Drainage Report Other_ Utility Redline Utility Landscape Page l ROW or at a minimum at the back of ROW. It seems that it may be problematic to install tree grates, other street features, or sidewalk around mature trees in the future. For site planning/landscaping purposes it may be safest to make the assumption that there will be on -street parking provided, even though this is not yet "set in stone". If there are any issues with this course of action lets discuss them early. Thanks. Paec 2 Nr r: `Project Comments Sheet CSelected Departments ity of Fort Collins Date: April 28, 2006 Project: NORTHSIDE ATZLAN COMMUNITY CENTER PDP - TYPE I All comments must be received by Anne Aspen in Current Planning, no later than the staff review meeting: April 26, 2006 Note - Please identify your redlines for future reference Issue Contact: Marc Virata Topic: Constniction Plans Number: 88 Created: 4/26/2006 [4126/06] The patching along Willow Street needs to be at right angles to the flowline and should be shown encompassing the full width of Willow Street. Number: 89 Created: 4/26/2006 [4/26/06] Why is no curb being proposed for the sidewalk along the north side of the building? It appears that parking along the north side of the building will result in the pedestrian space for the sidewalk being compromised without the curb to provide a physical barrier for the vehicles. (Follow-up: In checking with Transportation Planning, the use of curb stops mentioned at staff review should be indicated on the plans and the sidewalk will still need to be widened to 6'.) Topic: General Number: 51 Created: 1/10/2006 (4/26/061 It appears at this point, letters of intent are needed from Xcel and North Weld County. [1/10/06] There appears to be several outside entities that would need to provide a letter of intent for the work that is occurring on their easement/right-of-way and/or the vacating of the rights as shown on the plat. North Weld County, Xcel Energy, Colorado -Wyoming Gas Company, and United Way should provide letters of intent. Burlington Northern Railroad appears likely as grading may be occurring within their easement. Mountain States Telephone and Telegraph doesn't appear to be impacted and thus a letter of intent is likely not required. Number: 58 Created: 1 /10/2006 [4/26/06] Carried over for ference / i Date VCKCK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Pla A' Site Drainage Report Other— ,)( Utility _ ' Redline Utility X Landscape Page I [1/10/06] With the Downtown River District Project looking into improving Willow Street and the project not designing Willow Street a dollar amount to satisfy the frontage improvement requirement along Willow Street will be required. Further work into arriving at the amount will need to be made. Number: 90 Created: 4/26/2006 [4/26/06] It should be noted that the sidewalk along Willow Street may possibly change with future Willow Street improvements. Topic: Plat Number: 87 Created: 4/26/2006 (4/26/06) Tracts A & B on sheet 2 of the plat have a note referring to Sheet 1. 1 don't seem to see any information on Sheet 1 pertinent to these references. Page 2