From: Erika Keeton
To: David Averill
Date: 11/3/2005 4:56:42 PM
Subject: Manhattan Townhomes
David, I have prepared a cost estimate for the Manhattan Townhomes connection to the Mason Trail for
$42.701.31, attached. I realize this is significantly more that what is being proposed by the developer.
There may be opportunities to reduce costs, however this is what I would recommend for budgeting
purposes.
This estimate includes
*Excavation - The trail cannot be dropped on top of the berm. The berm will need to be excavated to
accept the trail in order to maintain the top design elevation of the berm.
*Aggregate Base Course - base material for the trail
*Metal Sidewalk Culvert
*6" thick concrete trail with fibermesh
*Concrete Pumping
*Temporary asphalt sidewalk to connect trail to Manhattan until development is complete
*10% contingency -costs are based on an existing 2005 contract with Vogel Concrete. Prices may
increase between now and the time of construction.
There may also be an opportunity for the developer - or Ped Planning - to utilize the existing contract with
Mountain Constructors who will be installing the Mason Trail adjacent to this project. Let me know if you
have any questions. Thanks! Erika
Erika Keeton, P.E.
Civil Engineer III
City of Fort Collins Engineering Department
970.221.6605
ekeeton@fcgov.com
CC: Douglas E. Groves; Mark Laken; Mark Taylor; Mike Herzig; Susan Joy
Susan Joy - Manhattan Townhomes.As Page 1
2005 PEDESTRIAN .ACCESS PROGRAM ESTIMATE Job 4 05-
CITYOFFORT COLLINS -ENGINEERING Priorily(1-3) I
Address Manhattan Townhomes =
Notes. Sidewalk Connection to M... Trail St Maintenance 50/50
fi-
2n101
mx Rmt Grilling
$111.61
FIX
20 02
knered Excavation
564.15
CY
135.0
8,66023
211303
."(CI I, Cl 5 ABC. C I.P.)
$29,93
TON
21201
W
$2,41
SF
21202
enduapc Labor
S42.08
HR
31e 01,
near. Base Coune
S2Y.93
TON
65
1945.45
40150
tnporery Pasele,
S 133 64
TON
504.01
dbbing (M S.E. Black Wdl]
$25.fi
SFF
60201
poxy-CoatW ReinfercW Steel
so 83
L&5
fiW IU
Flecoustract Wet Dock - Catch Burin, R@R
S To15.]0
EA
Win 11
FAecwtslrvet let.Deck - Catch Basin- Additional Foot Opting
5 10692
LF
rat 12
Reconstruct Curb Inlet Dark-4'Openmg, R & R
I 1042?3
EA
00413
IRecmnmet Inlet Deck- Additional Feat Openin,
S 160.32
LF
61R. 14
,Tyµ 13-W.w/Frame, Grate &Ad utubk Curb Bwme -R&R
5 L44336
EA
file. 15
T W R later - Remove & Replace
3,1112DO
EA
61416
rabba Slewalk Culvert -R&R
1015,70
EA
fiO4.1T
eel Eidewalk Culwn-T Opening SIB"Plata-R&ft
5 1,443,36
EA
1
I44336
60918
'fdditimtal Square Foot, Slit"Platt
112.61
SF
8
94098
60g01
ow CancreuYPlNymne
3214
SF
60802 ,C acte- Sl.1ILTlatwOd(4.1
$321
SF
60903 StlewalkT I.Motk(0)
$364
SP
5403
19.666,92
LConcrete
fibs04 C..MC Apron S')
$4.28
SP
608 Tonerte Craepan is")
$4.29
Sle
hoe 08
i'ertleal Can, Guter,&4"Sidewalk
V26 23
LF
60909
Neural Curb, Gutt<i,&6"Sidewalk
28.8)
LF
news 1u
ertiral Cul6&Gumr-No Sidewalk
$18,18
LF
fiUA II
ollyaoad Curb@Cmtar w/9"8lcwalk
$19.24
LF
60tl. 12
ollyxard Curb &Goner wl 6"Sidewalk
S21.38
LP
611LIJ
ollywood or Dtivmver Curb&Gutter - No Sidewalk
SIs. I
LF
filttl.l4
- mmver Curb&Goner wl 4"8ldtvak
S24.59
LF
bag 15
ver Care &Outmr wl 6"Sidewalk
$26,73
LF
611816
B"x 12" Variable Ht Curb&Grant-No Sidewalk
518.18
LF
611812
edesrtian Access Ramp -Diner Curb
S Mat
IF
fibs 18
chstnan Amos Ramp - VeNeal Curb
S 28 84
LF
-
1.11919
Pedssnan Access Rapp - Hollywood Curb
S25,66
L.F.
r()A 20
PeduananAwas Ramp-Highleack Curb
S695
S.F.
608.21
7mnaal Dane parel
S 39.U9
S.F.
60822
Concrete Drive AWrmeb (6") - All Curb Typcs
$ 3.74
SF
fibX.2J
ancruse FBtwutk - I- Addido al Depth
$ 0 42
SF
Ent. 26
Ae s E.xistiog Flagsb. - 6" Bam Bedding
$6.95
SF
608.21
et New Flegsmtc-6"Base Balding
$It 97
SF
60128
, Extamg Flagstone -4" Concrete Base
$ 1.15
SF
fi0g29
tNue. Flags.tc-4"Cone. Base
$1659
SP
fiUX.111
Eanurg Fagnone-6" Concrete Base
S 12.83
SF
fiUX.11
t"Flagaurm-6"Cone. Base
S18,19
SF
a0N.3J
rime Tree Grate Border(F'.x 6"x 10')
$CLOD
LF
608.34
ibortnuh Rein(oramem(4')
$0,10
SF
910,45
fi0X.35
E.xposcl Aggmgam Cencrere (4"T <500 SF
S 2.22
SP
60H 36
xpoaW Aggregate C... (4'), 1500 SF
$6.15
SF
bet 37
bwable Fill
10,21
CY
60839
"Nue Reinforced Concrete Retawittg Wall
S m.96
SFF
60939
M Nm42einftced Concrete F.,(10-ffi,k)
$30,24
LF
60340
"Non-RciMereaxl Cmerene Structural Slab
$20.4I
SF
itional Cost- Concrete Pumping
S2.000.00
Day
100
2,000.00
adtfieunal Cast - Asphalt prudent,(C Tempors, Sidewalk)
5121.00
TON
300
3,630,00
10 a Contingency - seeding price increase, etc.
3,60100
'1c
-iG. i.-'1
42T01.31
CDOCl1ME-1l joKOCALS-lkTempsgwpnn6Manhatlan Tovmhomes.xls
Thursday, November 10, 2005 4:39 PM Lagunitas (970) 226-5125
p.01
FAX
To: Susan Joy
From: Jon Prouty
Date: November 10, 2005
Re: Manhattan - Connecting Sidewalk
We will construct the connecting path to the Mason Street Bike Trail in conjunction with
the development of our Manhattan project, which will be underway as soon as the
development agreement is completed and the mylars are recorded.
Best regards.
Jon
J P/ksr