HomeMy WebLinkAboutMAPLE HILL - Filed DCP-DEV. CONSTRUCTION PERMIT - 2006-11-16City of Fort Collins Transportation Services Engineering Department City of Fort Collins, Colorado DEVELOPMENT CONSTRUCTION PERMIT Permit Number: Ub — 19 Issuance Date: � Project Name: Maple Hill Phase 3) Project A.I;.A.: Project Location: Last of Turnber Lane and South of Pichards Lake koad (County Road 521 Permittee: Lany S. Buckendorf Maple Hill Investments. LLCM( 970 -7072 Cite and developer contacts: See attached Exhibit `A'Jor names and phone numb-rs of all contact persons for this project. Fees: Permit Application Fee ($40.00) $ paid Construction Inspection Fee (paid prior to issuance of this perrut) $ 42 327.95 Total ii 42,327.95 Development Bond or other approved securiy^ Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. $ 817.213.73 Form of security deposited with the City: tVX1D_ PERFORMANCE REQUIREMENTS OF THIS PERMIT: 1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design drawings and specifications the certification of all materials testing by an Engineer. The Permittee shall have an Engineer prepare revised design drawings and secure City approval for all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required by the City in the Development Agreement, that the improvements are constructed in conformance with the approved Utility Plans and the standards and specifications of the City. The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance of the constructed public improvements. (All references above to the terms "Project Engineer" and `'Engineer" shall mean a Professional Engineer licensed in Colorado.) 2. All contractors who perform work on this project must bc- bonded and licensed in conformance v.7th City requirements. 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6605 FAX (970) 221-6378 www.fcgov.com Curb, Gutter & Walks Quantity Unit Unit Price Total Vertical Curb 8 Gutter w/ Drive Cuts 2,290 LF $ Vertical Curb & Gutter Prep 10.44 $ 23,907.60 31" Rolled Curb & Gutter 2,290 LF $ 1.64 $ 3,755.60 31" Rolled Curb & Gutter Prep 6,153 LF $ 13.09 $ 80,542.77 4.5' Walk 6,153 LF $ 1.64 $ 10,090.92 4.5' Walk Prep 6,186 LF $ 14.10 $ 87,222.60 5' Walk 6,186 LF $ 1.64 $ 10,145.04 5' Walk Prep 2,590 LF $ 15.63 $ 40,481.70 10' Walk 2,590 LF $ 1.64 $ 4,247.60 10' Walk Prep 125 LF $ 31. $ 3,0. 20' Square Radii w/ 2 HC Ramps 125 LF $ 1.6644 $ 205.00 Square Radii H/C Ramp Prep 9 EA $ 2,111.80 $ 19,006.20 20' Round Radii w/ 2 HC Ramps 9 EA $ 246.62 $ 2,219.58 Round Radii H/C Ramp Prep 9 EA $ 1,444.00 $ 12,996.00 Midblock H/C Ramp 9 EA $ 246.62 $ 2,219.58 Midblock H/C Ramp Prep 3 EA $ 569.50 $ 1,708.50 27.5' x 8' Crosspan 3 EA $ 246.62 $ 739.86 27.5' x 6' Crosspan 3 EA $ 1,399.20 $ 4,197.60 Crosspan Prep 2 EA $ 1,049.40 $ 2,098.80 Driveway Cuts 2 EA $ 678.21 $ 1,356.42 Pans for Type R Inlets 38 EA $ 527.10 $ 20,029.80 T Valley Pan 30 LF $ 50.10 $ 1,503.00 T Valley Pan Prep 873 LF $ 24.13 $ 21,065.49 12' x 3' Metal Sidewalk Chase 873 1 LF $ 1.90 $ 1,658.70 EA $ 5,088.28 $ _SAS&28_ $ 360,395.39 . Paving Quantltv Unit Unit Price Total 5 HBP/7 ABC 10,910 SY $ 18.87 $ 205,871.70 6" HBP/ 8" ABC 6,571 SY $ 21.78 $ 143,116.38 Subgrade Prep 17,481 SY $ 1.54 $ Raise Manholes 14 EA $ 477.00 $ _26,920,74-- 8;678 00 -. Raise Valve Boxes 11 EA $ 291.50 S on AO Maple Hill Phase X- Subdivision - TOTAL General Sitework Erosion Control Dirt Work Sewer Main Water Main Storm Main Extra 42" Storm N End Curb, Gutter & Walks $ 467;Z32:48 $ 7,76"2 $ 674;,W.32-- $ 274A32.85 361 433.88 �$ $ 116,503.38 - $ 360,395.39 1 1 ' .1JJ. JL 3Y8� Crow Creek Construction, LLC Phase XSubdivision Page 3 of 3 71) Maple Hill Phase- Maple Hill Drive General Sitework Survey QuantityUnit Unit Price Total Material Testing 1 LS $ 11,549.76 $ 11,549.76 Waste Management 1 LS $ 9,247.44 $ 9,247.44 Street Signs 2 MO $ 530.00 $ 1,060.00 Type III Barricades 4 EA $ 381.60 $ 1,526.40 Striping 2 EA § 1,590.00 § 3,180.00 Dry Utility Conduit Allowance 1 LS $ 6,949.36 $ 6,949.36 1 LS $ 4.991.92 x d oo, ce Erosion Control Inlet Protection Vehicle Tracking Pad Quantity 6 1 Unit EA EA $ $ Unit Price 206.70 1,516.25 $ $ Total 1,240.20 1,516.25 $ 2,756.45 Sewer Main Quantity Unit Unit Price Total 12 SDR 35 Sewer Main 829 LF $ 41.12 $ 34,088.48 4' Diam. Manhole 3 EA $ 1,994.34 $ 5,983.02 4" Service off 12" Main 16 EA $ 1,046.57 $ 16,745.12 Sewer Testing 829 LF $ 2.70 $ 2,238.30 Crow Creek Construction, LLC Phase Maple Hill Drive Page 1 of 3 Water Water Main Quantity Unit Unit Price Total 6 Water Main LF $ 20.54 $ 821.60 6" Gate Valve 1 EA $ 700.13 $ 700.13 6"Foster Adaptor 1 EA $ 128.67 $ 128.67 8" Water Main 766 LF $ 25.26 $ 19,349.16 8" Gate Valve 3 EA $ 936.77 $ 2,810.31 8" Foster Adaptor 2 EA $ 274.98 $ 549.9E 8"x8" Tee 1 EA $ 416.35 $ 416.35 8"x6" Tee 1 EA $ 381.86 $ 381.86 8" Plug w/Temp FH 1 EA $ 3,680.27 $ 3,680.27 12" Water Main 276 LF $ 37.90 $ 10,460.40 12" Butterfly Valve 2 EA $ 1,312.92 $ 2,625.84 12" Foster Adaptor 2 EA $ 274.39 $ 548.78 12" Cross 1 EA $ 727.42 $ 727.42 12"x8" Reducer 1 EA $ 407.65 $ 407.65 Fire Hydrant off 8" Main 1 EA $ 3,642.67 $ 3,642.67 Fire Hydrant off 12" Main 1 EA $ 4,551.15 $ 4,551.15 3/4" Service off 8" Main 14 EA $ 1,160.87 $ 16,252.18 Meter Pit, Yoke & Dome 14 EA $ 467.68 $ 6,547.52 24" Steel Casing 20 LF $ 181.36 $ 3,627.20 16" Steel Casing 60 LF $ 161.43 $ 9,685.80 12" Lowering 1 EA $ 3,759.16 $ 3,759.16 8" Lowering 1 EA $ 2,314.98 $ 2,314.98 8" WL Deflection 2 EA $ 303.05 $ 606.10 Testing 1082 LF $ 0.28 $ 302.96 Storm Main Quantity Unit Unit Price Total 30 Class III RCP 309 LF $ 69.11 $ 21,354.99 19" x 30" Class III ERCP 85 LF $ 74.62 $ 6,342.70 24" x 38" Class III ERCP 66 LF $ 87.82 $ 5,796.12 29" x 45" Class III ERCP 63 LF $ 98.82 $ 6,225.66 34" x 53" Class III ERCP 330 LF $ 125.90 $ 41,547.00 43" x 68" Class III ERCP 52 LF $ 206.77 $ 10,752.04 5' Diam. Storm Manhole 1 EA $ 1,971.02 $ 1,971.02 6' Diam. Stone Manhole 3 EA $ 2,273.08 $ 6,819.24 T Diam. Stone Manhole 1 EA $ 2,846.85 $ 2,846.85 10' Type R Inlet 3 EA $ 3,604.00 $ 10,812.00 14' Type R Inlet 2 EA $ 5,167.50 $ 10,335.00 20' Type R Inlet 1 EA $ 7,791.00 $ 7,791.00 Type L Rip Rap 9 CY $ 80.98 $ 728.82 $ 133,322.44 Crow Creek Construction, LLC Phase Maple Hill Drive Page 2 of 3 Curb, Gutter & Walks Quantity Unit Unit Price Total Vertical Curb & Gutter w/ Drive Cuts 1,344 LF $ 10.44 $ 14,031.36 Vertical Curb & Gutter Prep 1,344 LF $ 1.64 $ 2,204.16 5' Walk 1,424 LF $ 15.64 $ 22,271.36 5' Walk Prep 1,424 LF $ 1.64 $ 2,335.36 20' Square Radii w/ 2 HC Ramps 2 EA $ 2,111.80 $ 4,223.60 Square Radii H/C Ramp Prep 2 EA $ 246.63 $ 493.26 20' Round Radii w/ 2 HC Ramps 6 EA $ 1,444.00 $ 8,664.00 Round Radii HIC Ramp Prep 6 EA $ 246.62 $ 1,479.72 Midblock HIC Ramp 2 EA $ 569.50 $ 1,139.00 Midblock HIC Ramp Prep 2 EA $ 246.63 $ 493.26 27.5' x 8' Crosspan 1 EA $ 1,399.20 $ 1,399.20 Crosspan Prep 1 EA $ 94.85 $ 94.85 Driveway Cuts 12 EA $ 527.10 $ 6,325.20 Pans for Type R Inlets 80 LF $ 50.10 $ 4,008.00 7' x 3' Metal Sidewalk Chase 1 EA $ 2,970.40 $ 2,970.40 7' x 2' Metal Sidewalk Chase 1 EA $ 2,127.70 $ 2,127.70 $ 74,260.43 Paving Quantity Unit Unit Price Total 6" HBP/ 8" ABC 4,500 SY $ 22.17 $ 99,765.00 Geo-Grid 1,818 SY $ 7.59 $ 13,798.62 Subgrade Prep 4,500 SY $ 1.54 $ 6,930.00 Raise Manholes 5 EA $ 477.00 $ 2,385.00 Raise Valve Boxes 8 EA $ 291.50 $ 2,332.00 $ 125,210.62 .,7 Maple Hill Phase(- Maple Hill Drive - TOTAL General Sitework $ 38,504.58 Erosion Control $ 2,756.45 Sewer Main $ 59,054.92 Water Main $ 94,898.12 Stone Main $ 133,322.44 Curb, Gutter & Walks $ 74,260.43 Paving $ 125,210.62 $ 528,007.56 Crow Creek Construction, LLC Phase Maple Hill Drive Page 3 of 3 City of Fort Collins Transportation Services Engineering Department City of Fort Collins, Colorado DEVELOPMENT CONSTRUCTION PERMIT Permit Number. 06-19 Issuance Date: 7/7/06 Project Name: Maple Hill (Phase 3 Phase 8 and a portion of Phase 4 Project A.K.A.: Project Location: East of Turnberry Lane and South of Richards Lake Road (Count Rgqd Permittee: Mark Foste�Journev Homes (970) 539-0136 City and developer contacts: See attached Exhibit `A' for names and phone numbers of ali contact persons for this project. Fees: Permit Application Fee ($400.00) $ paid Construction Inspection Fee for Phase 3($42,327.95) $ paid 7/7/06 Construction Inspection Fee for Phase 8 and portion of Phase 4 4.143.15 Development Bond or other approved security: Total S 4,143.15 For Phase 3 Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans i6r the development. $ 877,213_73 Form of security deposited with the City: Bond frcceived 7i7/06 For Phase 8 and a portion of Phase 4 Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans far the devc!oprncnt. ' L 181,580.00 f-.ec_eavcc�'W 23_4 Lva io eerKple. M OA6 ar_C�Aa� Form of security deposited with the City: �j�pi7 (r¢Ge�Ved IZ�ZCo Olo� PERFORMANCE REQUIREMENTS OF THIS PERMIT: 1. The Permittee shall be responsible to require their Project Engineer to incorporate into ail design drawings and specifications the certification of all materials testing by an Engineer. 'I'he Permittee shall have an Engineer prepare revised design drawings and secure City approval for all revisions to the Utility Plans and related documents. The Permittee shall havF an Engineer represent, as required by the City in the Development Agreement, that the improvements are constructed in conformance with the approved Utility Plans and the standards and specifications of the City. 'The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance of the constructed public improvements. (All references above to the terms "Project Engineer" and'Tngineer" shall mean a Professional Fngineer lio,nsed in. (Worado.) 2. All contractors who perform work on this project must Ile bonded and licensed in 281 North College Avenue • PO. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6605 • FAX (970) 221-6378 www.fcgov.com conformance with City requirements. 3. Construction time restrictions: N/A 4. The applicant understands that additional permits may be required for this development project and the applicant shall secure those permits directly from the issuing departments. 5. This permit, along with a complete set of all approved plans and documents for this project (utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic study, drainage report, plat easements and any other official documents), shall be kept on the development site available for use by City staff doing inspections. 6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable): a. If construction has not begun within sixty (60) days from the date of issuance of this permit, this permit shall expire and the applicant will forfeit the permit fee paid for this permit, whereupon the applicant must re -apply for a new permit. b. In addition, this permit shall expire one year from the date of issuance. The applicant may apply for an extension by reapplication at least two weeks prior to the expiration date. Such application shall contain information sufficient to justify the granting of the extension. An extension may be granted for up to six months. 7. Building permits and certificates of occupancy will only be issued when all conditions contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29-678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the Development Agreement does not specify times for completion of public improvements, or if there is no Development Agreement, then the improvement requirements specified in Section 24-95 of the City Code shall apply, which provides that construction of all improvements shall be required prior to the time of issuance of the first building permit . 8. Acceptance by the City of the public improvements shall be after (1) final inspection has been conducted by the City; (2) punch list items from the final inspection are completed and accepted by the City; (3) required certifications from the licensed professional engineer that improvements are completed to City standards, specifications and approved Utility Plans; and (4) the `as -constructed' plans have been received and accepted by the City. 9. The warranty on street improvements is for five (5) years from the date of acceptance by the City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use Code, as applicable. 10. The City Erosion Control Inspector must be notified at least twenty four (24) hours prior to any planned construction on this project. All required perimeter silt fencing and other erosion/sediment control best management practices (BMP's) that can be installed prior to construction must be in place and inspected by the City Erosion Control Inspector before any land disturbing activity begins. 11. No work (including grading) shall be started in State Highway right-of-way until a permit is issued by the Colorado Department of Transportation to allow such work to begin. 12. Other conditions: Permittee's acknowledgment signature: By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the a plicant were to fail to perform the required work. 1 also acknowledge that I have read this per i document with all its requirements and conditions, and I agree to all of the terms ands #d' o s so stated in this permit. Applicant/Project Manager's Signature: Approval for issuance: 12�oti -c�� r' City Engineer ApprovC Date: (Permit Issuance Date) EXHIBIT `A' DEVELOPMENT PROJECT CONTACT PERSONS Project Name: Maple Hill (Phase 3, Phase 8 and a portion of Phase 4) Name, address and numhem City Staff Contact Persons: Development Engineer: Construction Inspector: Sheri Wamhoff 281 N. College Avenue, Fort Collins, Co 80524 (970) 221-6750 x7140 281 N. College Avenue, Fort Collins, Co 80524 (970)221-6605 Cell (970) Current Planner: Ted Shepard 281 N. College Avenue, Fort Collins, Co 80524 (970) 221-6750 Water Utilities Engineer: Web Jones, ELCO (970)493-2044 Wastewater Engineer: Roger Buffington 700 Wood Street, Fort Collins, Co 80521 (970) 221-6681 Erosion Control Inspector: Bob Zackley 700 Wood Street, Fort Collins, Co 80521 (970)224-6063 Natural Resources: Doug Moore 281 N. College Avenue, Fort Collins, Co 80524 (970)221-6143 Traffic Operations: Eric Bracke 625 Ninth Street, Fort Collins, Co 80524 (970)224-6062 Street closures: Syl Mireles 625 Ninth Street, Fort Collins, Co 80524 (970)221-6815 Transportation Planning: Kathleen Reavis 215 N. Mason St., Fort Collins, Co 80524 (970)224-6140 Forestry: Tim Buchanan 215 N. Mason St., Fort Collins, Co 80524 (970)221-6361 Light and Power: Doug Martine 700 Wood Street, Fort Collins, Co 80521 (970) 221-6700 Developer's Contact Persons: Project Manager: Larry S. Buckendorf, Maple Hill Investments, LLC. 7251 W. 20°i Street #L-200, Greeley, Co 80634 (970)352-7072 Cell (970) 539-0131 Fax (970) 330-5357 larrvLa)iournevhomes com Developer: Larry S. Buckendorf, Maple Hill Investments, LLC. 7251 W. 20"' Street #L-200, Greeley, Co 80634 (970)352-7072 Cell (970) 539-0131 Fax (970)330-5357 la &Journevhomes.com Owner: Palmer Gillespie Jr., Nineteenth Green Partnership, LLP 6373 S. Grape Ct., Littleton, Co 80121 (303)796-7805 Project Engineer: Keith Sheaffer, P.E. TST, Inc. Consulting Engineers 748 Whalers Way, Bldg D, Fort Collins, Cc 80525 (970)226-0557 Fax (970)226-0204 ksheafferLi tstinc com Architect/Planner: VF Ripley Associates, Inc. 401 W. Mountain Ave, Fort Collins, Co 80521 (970)224-5828 Fax (970) 224-1662 Contractor: Ken Baty Crow Creek Construction, LLC 7251 W. 20'h Street #L-101, Greeley, Co 80634 (970)330-5070 Fax (970) 330-6044 000000 n r.0000 0000000000 Mm o00000o o 0 0 0 0 LO00000 O O O 0 M M N M O) M O O M O OO O O 69 O 69 69 69 Vj N V N CO O O O C07 69 fA <A 69 M aa0 69 'M 69 64 V VI' V 69 69 w 69 E9 69 Z O H U W aW zw LL H 000000 nnU')U)00 0000000000 nr�r�0000000 LOO O O LOU) > Z' ° F O O M co M M 6H 69 EA EAO O 666 O O M O 6 N 6 fA 6969 r n O r. M M M v000-It a rM ��� 7 W (.1 69 69 6% , W EA 69 69 609 m G W a0FZ W M > Ul LLam 000000 0 0 0 0 0 0 0000000000 0 0 0 0 0 0 o o o 0 0000000 �W 0 0 0 0 0 0 7 fA v) fA NvLvrn 0000000000 v) A 0000000 0 0 0 0 0 0 0 O abs o <A f» v> nN v ° = ui n N a0 0) N M O 64 — 6% 64 N� � w H 64 69 w = 0 0 0 0 0 0 000000 0 0 0 0 0 0 0 0 0 0 O O O O O O O O O O 0 0 0 0 0 0 0 O O O O O O O f- Z W F~ Q } 0 0 0 0 0 0 69 (A co 60 % 69 0 0 0 0 0 0 0 0 0 0 69 69 60 69 6) (A 69 69 % 69 0 0 0 0 0 0 0 to V3 69 60 69 69 64 U) � a. U.ya> OWO1L U O � Q U — 0 0 co N 003 - V M N O— 0 0 0 O o m m o O O O m W V V Cl) N L 0 0O 1 N O V 0 2 mW U LL } }UU LL LL LL UQUUUUUU 0))-LL LL U. J } j J U U W W J J J W W W W W W W J 0) J J J (n U) J m Q U IL ILf <Z ° w a 2 ; c aw U 0 a �_ Q) m rA .- J 0 °o U° O ma m - �p U He s 3E d� 0 a`+U a16i a «2 m m 0 - m d:oQ J F N a)ca c N N .ro c 3 ca cp N y 2 m a) 2 a) -° a) a °v � N rn C ro C7 co I- > r E°°° O c L N m (Li 2 t aNi o) ID c E -0 N M C .0 m inLrHU�ai 0 i4 - w m ca m m m m y� m d ca> :? - 0 ... �(n�H3iL�>miE� in(7LiUoa ° W O J U Z w m O Z J J 3 zZ w i W O m IL 2 W m Q ° W W Z J J 3 w z O 0m U Z a° yo Zm F M U LL Z y O LU W m� zm M N wa >m mLL Z RO >w 2 a~ 3. Construction time restrictions: N/A 4. The applicant understands that additional permits may be required for this development project and the applicant shall secure those permits directly from the issuing departments. 5. This permit, along with a complete set of all approved plans and documents for this project (utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic study, drainage report, plat easements and any other official documents), shall be kept on the development site available for use by City staff doing inspections. 6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable): a. If construction has not begun within sixty (60) days from the date of issuance of this permit, this permit shall expire and the applicant will forfeit the Permit fee paid for this permit, whereupon the applicant must re -apply for a new permit. b. In addition, this permit shall expire one year from the date of issuance. The applicant may apply for an extension by reapplication at least two weeks prior to the expiration date. Such application shall contain information sufficient to justify the granting of the extension. An extension may be granted for up to six months. 7. Building permits and certificates of occupancy will only be issued when all conditions contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29-678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the Development Agreement does not specify times for completion of public improvements, or if there is no Development Agreement, then the improvement requirements specified in Section 24-95 of the City Code shall apply, which provides that construction of all improvements shall be required prior to the time of issuance of the first building permit . 8. Acceptance by the City of the public improvements shall be after (1) final inspection has been conducted by the City; (2) punch list items from the final inspection are completed and accepted by the City; (3) required certifications from the licensed professional engineer that improvements are completed to City standards, specifications and approved Utility Plans; and (4) the `as -constructed' plans have been received and accepted by the City. 9. The warranty on street improvements is for five (5) years from the date of acceptance by the City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use Code, as applicable. Page 2 of 5 I ►�u��M■����r_��_rrl���_�rr��r�r�r__�_�r�rlrr���� r�' ON�� ������ ��■iY��l■r■I■�■1■�ii7YY:r■ ��1: II � I I � 11 § •+ 1 � 1 1 I I 5 •- I I I I g I I - 1 1 �' 1 I T I Lu 'sCD -- 1� R 11 I § 1' II 4 li 1 -- -- .- •� y' � 5 3 3 3' § 4 M LU . a 4 B 3 CO) Q 3 9 4 5 3 4 3 3 4 4 •§' .g y 8 6 8 5 5 5 g g 3 3 § S 5 3 § B .. . . . .. . . . . y Ke' Services Engineering Department Development Construction Permit, Page 1/4 City of Fort Collins DEVELOPMENT CONSTRUCTION PERMIT Permit Number: 04-09 Issuance Date: 9 O Project Name: Maple Hill Phases 1 10/2 i log{ a , �,O,c we(tc��ed +O VPr�y"aly')d.EIGf Ph ��e j Ft-ctse L �lII feouFrC Project Location: Northeast corner of Turnberry an County Club Roads t it ee Permittee: Brad Lenz — J2 Development/Management see, 0++ aC.��� -Qv,?t-0 City and developer contacts: See attached Exhibit A for names and phone numbers of all contact persons for this project. Fees: Permit Application Fee (paid at the time of application) $300.00-3-31-04 Erosion Control Fee $ Fee Paid Construction inspection fee $58,569.90� TOTAL $58,569.90 } b2 a p1Cd �v Development Bond or other approved security: VtC'- l> Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development.�tr V,2o5)gIF, 00 (V-evvt( sr)A,.Y Form of security deposited with the City: L 0, L +� 040o (0 PERFORMANCE REQUIREMENTS OF THIS PERMIT: 1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design drawings and specifications the certification of all materials testing by an Engineer. The Permittee shall have an Engineer prepare revised design drawings and secure City approval for all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required by the City in the Development Agreement, that the improvements are constructed in conformance with the approved Utility Plans and the standards and specifications of the City. The Permittee shall provide As -constructed plans prepared by an Engineer prior to the City's acceptance of the constructed public improvements. (All references above to the terms "Project Engineer and Engineer shall mein a Professional Engineer licensed in Colorado.) 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6605 • FAX (970) 221-6378 www.fcgov.com Development Construction Permit, Page 2/4 2. All contractors who perform work on this project must be bonded and licensed in conformance with City requirements. Construction time restrictions: Normal Work hours 4. The applicant understands that additional permits maybe required for this development project and the applicant shall secure those permits directly from the issuing departments. 5. This permit, along with a complete set of all approved plans and documents for this project (utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic study, drainage report, plat easements and any other official documents), shall be kept on the development site available for use by City staff doing inspections. 6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable): a. If construction has not begun within sixty (60) days from the date of issuance of this permit, this permit shall expire and the applicant will forfeit the Permit fee paid for this permit, whereupon the applicant must re -apply for a new permit. b. In addition, this permit shall expire one year from the date of issuance. The applicant may apply for an extension by reapplication at least two weeks prior to the expiration date. Such application shall contain information sufficient to justify the granting of the extension. An extension may be granted for up to six months. 7. Building permits and certificates of occupancy will only be issued when all conditions contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29-678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the Development Agreement does not specify times for completion of public improvements, or if there is no Development Agreement, then the improvement requirements specified in Section 24-95 of the City Code shall apply, which provides that construction of all improvements shall be required prior to the time of issuance of the first building permit. 8. Acceptance by the City of the public improvements shall be after (1) final inspection has been conducted by the City; (2) punch list items from the final inspection are completed and accepted by the City; and (3) required certifications from the licensed professional engineer that improvements are completed to City standards, specifications and approved Utility Plans; and the Aas-constructed@ plans have been received and accepted by the City. 9. The warranty on street improvements is for five (5) years from the date of acceptance Development Construction Permit, Page 3/4 by the City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use Code, as applicable. 10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any planned construction on this project. All required perimeter silt fencing and other erosion/sediment control best management practices (BMP=s) that can be installed prior to construction must be in place and inspected by the City Erosion Control Inspector before any land disturbing activity begins. 11. No work (including grading) when applicable, shall be started in State Highway right- of-way until a permit is issued by the Colorado Department of Transportation to allow such work to begin. 12. Other conditions: Construction Traffic including workers in company owned vehicles arriving and leaving thejob site shall use Mountain Vista Drive/County Road 9 and County Road 11 ( Turnberry). This route shall also be used as the haul route for construction equipment and materials 13. As courtesy, the permittee shall notify Mr. Joseph W. Bleicher at (970) 407-0531 prior to beginning construction on any portion of this development. Permittees acknowledgment signature: By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, 1 hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. I also acknowledge that I have read this permit document with all its requirements and conditions, and I agree to all of the terms and conditions so stated in this permit. Applicant/Project Managers Signature: t Date: 4-2-8- o Q- Approval for issuance: City Engineers Approval: Sign Development Construction Permit, Page 4/4 PAGE LEFT INTENTIONALLY BLANK Project Name: City Staff contacts: Development Engineer: Construction Inspector: Water utilities Engineer: Sanitary Sewer: EXHIBIT A Dave Stringer 281 N. College Ave. Fort Collins, Co. 80524 970 221- 6765 Lance Newlin 281 N. College 970 221-6605 970 222- 0854 ECLO Boxelder Erosion Control Inspector: Bob Zakley 700 Wood Street 970 221- 6063 Traffic Operations: Ward Stanford 625 Ninth Street 970 221 - 6615 Street Closures: Sly Mireles 625 Ninth Street 970 221- 6815 Transportation Planner: Tom Reiff 210 E. Olive 970 221- 6140 Forestry: Tim Buchanan 281 N. College 970 221- 6361 Light & Power: Doug Martine 700 Wood Street 970 224 — 6700 DEVELOPMENT CONSTRUCTION PERMIT APPLICATION (2/16/99) For City use only: Application Arumber:A0 � Application Date:_ Permit application fee: S 300.00 INSTRUCTIONS: 1. Complete this form (some questions may not apply to you) and attach all necessary documents and submit to the Development Engineering Section of the City. 2. If you have any questions contact the Development Engineer ma`s r at 221-6750. 3. Submit the Application and pay the Application Fee at the fee at the Engineering counter at 281 No. College Avenue. PROJECT INFORMATION: t� Project Name (as approved by the City): RESc pni 1 j ED FoR ?HA51isC- v H1I-L tv1 eN �Hns 1 d Z tU I510IJ Project A.KA. (Marketing name if different from Project Name): Project Location: Seurhena+ to{8ic C .-1V R o-1 i t d coo"+ Ra,,4 5 Property Owner(At the time of this permit issuance): Individual Name: M:I.. G r r Company Name: — M-pi. Hol Address: 9111. + a s U.—I C„ A a i 7 -A Phone number(s): Office: 1e4- 4z4 - 4 A 5 8 Cellphone: See _ 9 4 4 - 18 z-7 Fax number: Soy- 4zy - 491 Email: r.,;lay g +.y;Ae c � Applicant/Project Manager (The primary contact person for all matters regarding this project. and the person responsible for all matters referencing "the Developer" in the Development Agreement for this project): Individual Name: 3RAD LENm Company Name: J2 D av I pw..,&mt / wt 3,,z„-r Address: 1194 Dinne ! C:r.l Uw'+T Y CD Boo r Phone number(s): Office: 7zo- 84o - oii Cellphone: 3 o3 - 3 5 V- o 5 31 Fax number: 770 - 890 - 0 11 13 Email: b d. l n c.o 1 April 28. 2004 Horizon NA City of Fort Collins Engineering Department 281 N. College Ave. Fort Collins, Colorado 80524 Dear Sirs: LETTER OF CREDIT #040010 We hereby establish, at the request and for the account of Horsetooth Development, LLC, in your favor as beneficiary, our Irrevocable Letter of Credit No. 040010, in the amount of One Million Fifty -Five Thousand Five -Hundred Fifty -Eight and no/100 Dollars ($1,055,558,00) (as more fully described below), effective immediately and expiring at the close of banking business on April 30, 2005, at our office at 1899 Wynkoop Street, # 100, Denver, CO 80202. This Letter of Credit is intended for the funding required for the Maple Hill Subdivision Public Improvements Phase 1 Development Project ("Development Project") for the assurance of the completion of the construction and the maintenance and repair of the public infrastructure in connection with the aforesaid development project and its associated development agreement and development construction permit. Funds under this Letter of Credit are available to you for one or more drawings prior to the close of business on April 30, 2005, against sight drafts in an aggregate cumulative amount not to exceed $1,055,558.00, dated the date of presentment, drawn on our office referred to above, referring thereon to the number of this Letter of Credit and accompanied by your written certificate signed by you and acknowledged as therein provided in the form of Exhibit 1 hereto. Presentation of such draft and certificate shall be made at our office referred to above. Upon the earlier of (i) our honoring your draft(s) totaling $1,055,558.00 in the aggregate presented on or before this Letter of Credit expires pursuant to the terms herein or (ii) the surrender to us by you of this Letter of Credit for cancellation, this Letter of Credit shall automatically terminate. It is understood that the amount of this Letter of Credit may be reduced as public improvements are constructed and accepted by the City. As components of the infrastructure are satisfactorily completed in accordance with approved utility plans, the value of the completed components may be established from the Development Construction Permit worksheet for determining costs of infrastructure construction and inspection fees, whereupon the amount of this letter of credit may be reduced by the value of the completed component(s), upon execution of a "Request for Am to Letter of Credit" in the form attached hereto as Exhibit 2 . O C I899 Ntvnkoop Street dto0, Denve,, CoIoraao 80202 • 13031 297-0333 • r;x M3) 297-CSH • o mwbankhorizononl,n, toff This letter of credit shall be subject to the Uniform Commercial Code as in effect in the State of Colorado, and, to the extent not inconsistent with the terms of this Letter of Credit and the Uniform Commercial Code, the Uniform Customs and Practice for Documentary Credits, 1993 revision, ICC publication number 500. This Letter of Credit will be automatically extended without amendments for one year from the present, and each future, expiration date thereof, unless Issuer delivers written notice at least sixty (60) days prior to any such expiration date to the City of Fort Collins of its intent not to renew this Letter of Credit. Any such notice shall be in writing and shall be delivered with an acknowledged receipt, either in hand or by certified mail. Any amendments to this Letter of Credit shall be made in the form of Exhibit 2 hereto. The City may at any time request that the Bank amend this Letter of Credit by submitting to the Bank a fully executed certificate in the form of Exhibit 2. The Bank may thereafter promptly issue an amendment to the Letter of Credit corresponding to the change or changes requested in such certificate. This Letter of Credit is not transferable. This Letter of Credit sets forth in full our undertaking, and such undertaking shall not in anyway be modified, amended, amplified or limited by reference to any document, instrument or agreement referred to herein, except only the certificate and draft(s) referred to herein; and any such reference shall not be deemed to incorporate herein by reference any document, instrument or agreement except for such certificate and dra$(s). Sincerely, HORI NKS — ISSUER Bere S. Teas Branch President Issuing company name: Horsetooth Development, LLC Address: 9116 W. Bowles Ave, 415 Littleton, CO 80123 Phone Number: 303-979-9858 EXHIBIT 1 CERTIFICATE The City of Fort Collins hereby certifies as follows with respect to the certain Irrevocable Letter of Credit No. dated , established in favor of the City of Fort Collins, Colorado (the "Letter of Credit'): (a) He (She) is authorized to execute this Certificate of behalf of the City of Fort Collins; (b) The applicant/developer is in default under the terms of the development agreement and/or the development construction permit. (c) The sum of $ , which is the amount of the draft presented with this Certificate, is the amount currently due to the City of Fort Collins from (d) The amount of the accompanying draft together with all previous draws under the Letter of Credit do not exceed in the aggregate $ ; and (e) The Letter of Credit has not expired. IN WITNESS WHEREOF, the undersigned has executed this Certificate of behalf of the City of Fort Collins this day of , THE CITY OF FORT COLLINS, COLORADO A Municipal Corporation M. [Title] 10. The City Erosion Control Inspector must be notified at least twenty four (24) hours prior to any planned construction on this project. All required perimeter silt fencing and other erosion/sediment control best management practices (BMP's) that can be installed prior to construction must be in place and inspected by the City Erosion Control Inspector before any land disturbing activity begins. 11. No work (including grading) shall be started in State Highway right-of-way until a permit is issued by the Colorado Department of Transportation to allow such work to begin. 12. Other conditions: Permittee's acknowledgment signature: By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. I also acknowledge that I have read this permit document with all its requirements and conditions, and I agree to all of the terms and conditions so stated in this permit. Applicant/Project Manager's Approvalforissuance: 7—t--4xe City Engineer Approvak4�✓ Date: (Permit Issuance Date) Page 3 of 5 EXHIBIT 2 Request for Amendment or Release of Letter of Credit 4 The City of Fort Collins certifies that the person signing below is authorized to execute this Request for Amendment or Release of Letter of Credit on behalf of the City of Fort Collins, and further certifies with respect to the provisions contained in the Development Construction Permit dated , and/or the Development Agreement dated between the City of Fort Collins (Beneficiary) and (Developer), the following: [Check applicable boxes.] L The Letter of Credit is to be reduced to $ ❑ The expiration date of the Letter of Credit is revised to be C The 60-day automatic one year renewal provision contained in the Letter of Credit is no longer in effect. Release Original Letter of Credit upon receipt of separate replacement Maintenance Letter of Credit in the amount of (current value). ❑ Release Letter of Credit. In witness whereof, the undersigned has executed this certificate on behalf of the City of Fort Collins this day of CITY OF FORT COLLINS, COLORADO a Colorado municipal corporation (Name and Title) Sent I J2 Development/Management; r - 7208900118; Oct-21-04 5:47PM; Page 2/2 Transportation Services Engineering Department I OWTV44wer J2 Development / Management 1194 Diamond Circle Unit T Lafayette, CO 80026 Attn. Mr. Brad Lenz Dear Mr. Lenz, The purpose of this letter is to summarize our recent phone conversations concerning the release of the letter of credit for phase 2 of the Maple Hill sub division. The City of Fort Collins is willing to release the letter of credit # 040011 in the amount of S647,466.00 for phase 2 of the Maple Hill sub division with the conditions listed below. 1. The development Construction Permit issued for this development is for phases 1 & 2. This letter will serve as our agreement to drop phase 2 from the DCP. A new Development Construction Permit will need to be applied for prior to construction of phase 2 of this development. 2. The inspection fees for this development have been paid for both phases 1& 2. As per your request we will keep the inspection fees pending the start of phase 2, 3. Since the first application for a Development Construction Permit our fees for inspection have increased 10 to 15 %. When the new DCP application for phase 2 is turned in this increase will be applied to the fees for inspection for phase 2. Upon receipt of this letter you are agreeing to the terms listed above that reflect our phone conversations on 10-20-04. Please sign and return this letter to the City of Fort Collins Engineering Department. The letter of credit # 040011 will be released once we receive the signed copy. If you have any questions or concerns please feel free to contact me at 970-416-2011. Sincerely, Lance Newlin Chief Construction inspector City of Fort Collins ;tea �„a L� e� `2Ge ' OO r^ 5 • w5 - jZ to a ,ou 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-W5 • FAX (970) 221-6378 wwwfcgov.com e �h Horizon Banks,, April 28, 2004 LETTER OF CREDIT #040011 City of Fort Collins � Engineering Department Ccd- ro/2l1oy 281 N. College Ave. Fort Collins, Colorado 80524 See Ckfaeke d Dear Sirs: We hereby establish, at the request and for the account of Horsetooth Development, LLC, in your favor as beneficiary, our Irrevocable Letter of Credit No. 040011. in the amount of Six Hundred Forty -Seven Thousand Four Hundred Sixty -Six and no/100 Dollars ($647,466.00) (as more fully described below), effective immediately and expiring at the close of banking business on April 30, 2005, at our office at 1899 Wynkoop Street, # 100, Denver, CO 80202. This Letter of Credit is intended for the funding required for the Maple Hill Subdivision Public Improvements Phase 2 Development Project ("Development Project") for the assurance of the completion of the construction and the maintenance and repair of the public infrastructure in connection with the aforesaid development project and its associated development agreement and development construction permit. Funds under this Letter of Credit are available to you for one or more drawings prior to the close of business on April 30, 2005, against sight drafts in an aggregate cumulative amount not to exceed $647,466.00, dated the date of presentment, drawn on our office referred to above, referring thereon to the number of this Letter of Credit and accompanied by your written certificate signed by you and acknowledged as therein provided in the form of Exhibit 1 hereto. Presentation of such draft and certificate shall be made at our office referred to above. Upon the earlier of (i) our honoring ,your draft(s) totaling S647,466.00 in the aggregate presented on or before this Letter of Credit expires pursuant to the terms herein or (ii) the surrender to us by you of this Letter of Credit for cancellation, this Letter of Credit shall automatically terminate. It is understood that the amount of this Letter of Credit may be reduced as public improvements are constructed and accepted by the City. As components of the infrastructure are satisfactorily completed in accordance with approved utility plans, the value of the completed components may be established from the Development Construction Permit worksheet for determining costs of infrastructure constriction and inspection fees, whereupon the amount of this letter of credit may be reduced by the value of the completed component(s), upon execution of a "Request for Amendment to Letter of Credit' in the form attached hereto as Exhibit 2 . GpP 1899 Wyrkoop S.[reet knC. 6e,ver. Colorado 8C2C2 • (303j 297-0333 • fax 3C31 297-0555 • vmw 6a nkhonzonon line= This letter of credit shall be subject to the Uniform Commercial Code as in effect in the State of Colorado, and, to the extent not inconsistent with the terms of this Letter of Credit and the Uniform Commercial Code, the Uniform Customs and Practice for Documentary Credits, 1993 revision, ICC publication number 500. This Letter of Credit will be automatically extended without amendments for one year from the present, and each future, expiration date thereof, unless Issuer delivers written notice at least sixty (60) days prior to any such expiration date to the City of Fort Collins of its intent not to renew this Letter of Credit. Any such notice shall be in writing and shall be delivered with an acknowledged receipt, either in hand or by certified mail. Any amendments to this Letter of Credit shall be made in the form of Exhibit 2 hereto. The City may at any time request that the Bank amend this Letter of Credit by submitting to the Bank a fully executed certificate in the form of Exhibit 2. The Bank may thereafter promptly issue an amendment to the Letter of Credit corresponding to the change or changes requested in such certificate. This Letter of Credit is not transferable. This Letter of Credit sets forth in frill our undertaking, and such undertaking shall not in any way be modified, amended, amplified or limited by reference to any document, instrument or agreement referred to herein, except only the certificate and draft(s) referred to herein; and any such reference shall not be deemed to incorporate herein by reference any document, instrument or agreement except for such certificate and draft(s). Sincerely, HORIZON ANKS — ISSUER Bere S. Neas Branch President Issuing company name: Horsetooth Development, LLC Address: 9116 W. Bowles Ave. #15 Littleton, CO 80123 Phone Number: 303-979-9858 EXHIBIT 1 CERTIFICATE The City of Fort Collins hereby certifies as follows with respect to the certain Irrevocable Letter of Credit No. dated , established in favor of the City of Fort Collins, Colorado (the "Letter of Credit"): (a) He (She) is authorized to execute this Certificate of behalf of the City of Fort Collins; (b) The applicant/developer is in default under the terms of the development agreement and/or the development construction permit. (c) The sum of S , which is the amount of the draft presented with this Certificate, is the amount currently due to the City of Fort Collins from (d) The amount of the accompanying draft together with all previous draws under the Letter of Credit do not exceed in the aggregate $ ; and (e) The Letter of Credit has not expired. IN WITNESS WHEREOF, the undersigned has executed this Certificate ofbehalf of the City of Fort Collins this day of THE CITY OF FORT COLLINS, COLORADO A Municipal Corporation [Title] EXHIBIT 2 Request for Amendment or Release of Letter of Credit # The City of Fort Collins certifies that the person signing below is authorized to execute this Request for Amendment or Release of Letter of Credit on behalf of the City of Fort Collins, and further certifies with respect to the provisions contained in the Development Construction Permit dated , and/or the Development Agreement dated between the City of Fort Collins (Beneficiary) and (Developer), the following: [Check applicable boxes.] ❑ The Letter of Credit is to be reduced to $ _ The expiration date of the Letter of Credit is revised to be ❑ The 60-day automatic one year renewal provision contained in the Letter of Credit is no longer in effect. Release Original Letter of Credit upon receipt of separate replacement Maintenance Letter of Credit in the amount of (current value). ❑ Release Letter of Credit. In witness whereof, the undersigned has executed this certificate on behalf of the City of Fort Collins this day of Wo CITY OF FORT COLLINS, COLORADO a Colorado municipal corporation (Name and Title) Services Engineering Department City of Fort Collins, Colorado DEVELOPMENT CONSTRUCTION PERMIT Permit Number: 9�1 Issuance Date: _+/20 /0_4 Project Name: Maple Aill (Phase 4 and Phase Project A.K.A.: Project Location: East of Turnberry lane and South of Richards Lake Road (County Road 52L Permittee: ._ Mark FosterJourney homes )?07Q) 539-0136 - City and developer contacts: See attached Exhibit `A' for names and phone numbers of all contact person .v for this project. Fees: Permit Application Fee ($400.00 paid 7/12/07) $ paid Construction Inspection Fee for Phase 4 $ 27,178.50 Construction Inspection Fee for Phase 5 $ 35607.70 Development Bond or other approved security: Total S 62,786.20 For Phase 4 Antount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. $ �V_].Ol_OQ Form of security deposited with the City: �- TMZ OF CZE0IT *6LO F For Phase 5 Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. $ 1„106,375_00 Form of security deposited with the City: L.SrFM OF C.?_W LT *" 15(oq PERFORMANCE REQUIREMENTS OF THIS PERMIT: 1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design drawings and specifications the certification of all materials testing by an Engineer. The Permittee shall have an Engineer prepare revised design drawings and secure City approval for all revisions to the Utility Plans and related docranents. The Permittee shall have an Engineer represent; as required by the City in the Development Agreement, that the improvements are constructed in conformance with the approved Utility Plans and the standards and specifications of the City. The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance of the constructed public improvements. (All references above to the terms "Project Engineer" and "Engineer" shall mean a Professional Engineer licensed in Colorado) 2. All contractors who perform work on this project must be bonded and licensed in 2s1 North College Avenue • P.O. Box 580 • Fort Colhns, CO 80522-0580 • (970) 221-6605 -FAX (970) 221-6378 www.fcgov.com conformance with City requirements. 3. Construction time restrictions: N/ 4. The applicant understands that additional permits maybe required for this development project and the applicant shall secure those permits directly from the issuing departments. 5. This permit, along with a complete set of all approved plans and documents for this project (utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic study, drainage report, plat easements and any other official documents), shall be kept on the development site available for use by City staff doing inspections. 6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable): a. If construction has not begun within sixty (60) days from the date of issuance of this permit, this permit shall expire and the applicant will forfeit the Permit fee paid for this permit, whereupon the applicant must re -apply for a new permit. b. In addition, this permit shall expire one year from the date of issuance. The applicant may apply for an extension by reapplication at least two weeks prior to the expiration date. Such application shall contain information sufficient to justify the granting of the extension. An extension may be granted for up to six months. 7. Building permits and certificates of occupancy will only be issued when all conditions contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29-678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the Development Agreement does not specify times for completion of public improvements, or if there is no Development Agreement, then the improvement requirements specified in Section 24-95 of the City Code shall apply, which provides that construction of all improvements shall be required prior to the time of issuance of the first building permit . 8. Acceptance by the City of the public improvements shall be after (1) final inspection has been conducted by the City ; (2) punch list items from the final inspection are completed and accepted by the City; (3) required certifications from the licensed professional engineer that improvements are completed to City standards, specifications and approved Utility Plans; and (4) the `as -constructed' plans have been received and accepted by the City. 9. The warranty on street improvements is for five (5) years from the date of acceptance by the City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use Code, as applicable. 10. The City Erosion Control Inspector must be notified at least twenty four (24) hours prior to any planned construction on this project. All required perimeter silt fencing and other erosion/sediment control best management practices (BMP's) that can be installed prior to t construction must be in place and inspected by the City Erosion Control Inspector before any land disturbing activity begins. 11. No work (including grading) shall be started in State Highway right-of-way until a permit is issued by the Colorado Department of Transportation to allow such work to begin. 12. Other conditions: Permittee's acknowledgment signature: By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. I also acknowledge that I have read this permit document with all its requirements and conditions, and I agree to all of the terms and condioms so stated in this permit. Applicant/Project Manager's Sign 1 �^ �`- Approvalforissuance: City Engineer Appr val: ('�a-`. Date #0� Alf� U (Permit Issuance Date) EXHIBIT `A' DEVELOPMENT PROJECT CONTACT PERSONS Project Name: Maple Hill (Phase 4 and Phase 5) Name, address and numbers City Staff Contact Persons: Development Engineer: Sheri Langenberger 281 N. College Avenue, Fort Collins, Co 80524 (970) 221-6750 0140 Construction Inspector: Jeff Baldwin 281 N. College Avenue, Fort Collins, Co 80524 (970)221-6605 Cell (970) 218-2157 Current Planner: Ted Shepard 281 N. College Avenue, Fort Collins, Co 80524 (970) 221-6750 Water Utilities Engineer: Web Jones, ELCO (970)493-2044 Wastewater Engineer: Roger Buffington 700 Wood Street, Fort Collins, Co 80521 (970)221-6681 Erosion Control Inspector: D.A. Black 700 Wood Street, Fort Collins, Co 80521 (970) 224-606-T— (ears' Natural Resources: Dana Leavitt 281 N. College Avenue, Fort Collins, Co 80524 (970) 221-6143 Traffic Operations: Eric Bracke 625 Ninth Street, Fort Collins, Co 80524 (970) 224-6062 Street closures: Syl Mireles 625 Ninth Street, Fort Collins, Co 80524 (970)221-6815 Transportation Planning: Kathleen Reavis 215 N. Mason St., Fort Collins, Co 80524 (970)224-6140 � t/ EXHIBIT `A' DEVELOPMENT PROJECT CONTACT PERSONS Project Name: Maple Hill (Phase 3) Name, address and numbers City Staff Contact Persons: Development Engineer: Sheri Wamhoff 281 N. College Avenue, Fort Collins, Co 80524 (970)221-6750 0140 Construction Inspector: '3e4 n 281 N. College Avenue, Fort Collins, Co 80524 (970) 221-6605 Cell (970) Z 1 g Current Planner: Ted Shepard 281 N. College Avenue, Fort Collins, Co 80524 (970)221-6750 Water Utilities Engineer: Web Jones, ELCO (970)493-2044 Wastewater Engineer: Roger Buffington 700 Wood Street, Fort Collins, Co 80521 (970)221-6681 Erosion Control Inspector: Bob Zackley 700 Wood Street, Fort Collins, Co 80521 (970)224-6063 Natural Resources: Doug Moore 281 N. College Avenue, Fort Collins, Co 80524 (970) 221-6143 Traffic Operations: Eric Bracke 625 Ninth Street, Fort Collins, Co 80524 (970)224-6062 Street closures: Syl Mireles 625 Ninth Street, Fort Collins, Co 80524 (970)221-6815 Transportation Planning: Kathleen Reavis 215 N. Mason St., Fort Collins, Co 80524 (970)224-6140 Page 4 of 5 Forestry: Tim Buchanan 215 N. Mason St., Fort Collins, Co 80524 (970) 221-6361 Light and Power: Doug Martine 700 Wood Street, Fort Collins, Co 80521 (970)221-6700 Developer's Contact Persons: Project Manager: Mark Foster, Maple Hill Investments, LLC. 7251 W. 20'h Street #L-200, Greeley, Co 80634 (970)352-7072 Fax (970) 330-5357 mark@journeyhonies.com Developer/Owner: Larry S. Buckendorf, Maple Hill Investments, LLC. 7251 W. 20`' Street #L-200, Greeley, Co 80634 (970)352-7072 Fax (970) 330-5357 larry@j ourneyhomes. com Project Engineer: Keith Sheaffer, P.E. TST, Inc. Consulting Engineers 748 Whalers Way, Bldg D, Fort Collins, Co 80525 (970)226-0557 Fax (970) 226-0204 ksheaffer@tstine,coni Architect/Planner: VF Ripley Associates, hic. 401 W. Mountain Ave, Fort Collins, Co 80521 (970)224-5828 Fax (970) 224-1662 Contractor: Ken Baty Crow Creek Construction, LLC 7251 W. 20`h Street #L-101, Greeley, Co 80634 (970)330-5070 Fax (970) 330-6044 83M3S AdV11NYS ONV 3NI1831VM NVld `JNISVHd A111I1(1 lVld3b 4HIH1 711H 3ldVW ` F j S 1................::.:.:.:.........- ....... 1------------------------------- a k k k Y d I 1- YI z O ' z i O 0 1 I LO N _ M u rn Z96T f-I m m V) NN 6 6 0 N C6 rl: uj z L6 0 u U z Lij CL Uj U) 0 ui LL 0 a C) It z 0 m m m m m 6 C=i ci C=i — — — uj Fuip uj CO L) ui > F- z LU M 0 LU w LU M m — LU LL > ui o 0 0000 C' 666N666666 6N'Qo 0 0o n m 0 to (=v v Lo C6 N m 0 � act LU F- w LU W a� co C6 C4 coC6co w J < x ; V) w io LL 0 ui ui LU m 0 � 0 � 0 a Lr) C) > 3w w Z,� F- — U Z LU LU F- F- >. o W — U� � 0 � N � � — — � � 0 cli m — m w :):) 'i cli fA ct: MU) U) LLI Lu 0 F- LU U) CL < Lu > 0 L) I U) �- LU MZ2 F- U)m L) 0 LL. 0 0 U. Z L) L) 0 0 CL L) Z LU N O N C\l mwvNNmr-OMN 04 W CD 0 w w LU m v m O DOOM F- LLI Z V7 NONttj 0 w z z LU LU w 2 UJ LU 0--) ? u 0: P 0 03 w LU CL 2 z 0 M — 1 z 0 < IX 0 co F- z LU L) 2 CL LU i z r 2 u. LU 10 1 IL 1 0 W. w 0 :E 7 LL LL >- >- L) LL LL LL 0 0 0 >- LL LL LL >- >- U) c z iLLJ > Lu L) L) < W LLI -j -A < < < < < < . . . . . . . 0 uj 2 LL L) �- w LU Z M 0 L) z a D LU 0 L) CY w CL LU U) aU) < Z CO m LLJ R 0 LU z 2 4) s LU U) w L) > C 0 0 C) 2 U) uj LU V —0 j U) > LL 0 om z z a. o :1 0 0 E z CL a_ CL 2 4, M C) (D CL -do a r 4) 2, < L) LU T mu U) Lu n Y R < (D a) (D —0—-5 (D CO m a.m c LU 0 0 0) 7a 0 �. m 2 a) 0 43 c E 2 -z-- 0 0 0) M = w M 2 z d) LU LU Z5 a) 0 3: = C -fa "5 e Q) > 2 m cD cL 2 LTL > Ci5 EL L) 0 CL < 0 z F W W 2 N W Q F y W H O U 0 z Q W _F z 2 Q Q F U w O m IL 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 V V O O W m 0 0 CN 0 0 0 0 0 0 0 (AN f9 (A E9 ER Hi rsi T Q i m 0 n V M n di O fA f9 MfR 70 M MO W w z D i Oz U - 1w FLU m 0) 0LLI ?LL O z F 000000 nn�n u�oo 0000000000 nnn000000o (n000in(n o voovv -� z Zp1� 0 ai ai ai fA fA to fAo o 00000rio vi ui Sri fA fAW n n O n M M M N f9 .- fA f9 e9 o (yy���� 3 W U f LL p W yj fA y F Wd >N O; w LU ZwamLU _LL`" O C o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 0 0 0 0 0 L 2 a voodoo O N fA fA O O oo0 wio oo00 di ffl (D 00 fA (A f9 fA f9 to oed iri0000 M Vi Y [0 O7 eon v(a � C- N Mui Gp V N a 0maw '' "+! 3 W F Q W � � � � � 0l m C\l M�F»�ss !i Z {t� LL W O N O L-w?U > W 2 W H o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 0 0 0 0 o f""LLI �+ O W mZH WQV n 00 000 0006000000 MfA f9 fA f9 fR O M LLJ 0000 fH M��� ` 2 Ili �N p LU yyH� ;m V7 In fAH1Q J QZ C z O U),1'N2�. LLOOLLLIL z z U U O V Q U m LL'^. N N O O tt M mn N W a M W O O M 7 W LU W 0((0 Orn ~ w z N M O N (D (O p W 1- O W >w _ v w�wLU 3 a mz>O O 2 w(�)'aa UZ f ILz LL W O Vl� 22 xxxxxxx zm U J �y LLLL%>UU a LLLL LLUUUUUUU Q Q Q Q Q Q QWpW In i LL LL LL}} LL' LLJQ wwwwwww O 2 ULL H N U m m 7 LLJ p 0 Ci rn Iw L X az �� W pW ? y c y WW fA Q W _a LL U) 3 C J o co a M 4 JK m mvac 0 o -oU Ez mm aO c �-1 ~z Q NmanU c .-gye m narCL ?�U=aF U. c �d� wOW2 > cw0.� `cLO c w m20° m v rnca � E USu ycu way IL . E c c> c a 0 v o n a2 cLZ� LL �i"v« z—¢ DEVELOPMENT CONSTRUCTION PERMIT APPLICATION (1/16/06) For City use only: Application Number: Application Date: Permit application fee: $ 400.00 INSTRUCTIONS: 1. Complete this form (some questions may not apply to you) and attach all necessary documents and submit to the Development Engineering Section of the Cip. 2. If you have any questions contact the Development Engineer, , at 221-6605. 3. Submit the Application and pay the Application Fee at the fee at the Engineering counter at 281 N, Colleee Avenue. PROJECT INFORMATION: Project Name (as approved by the City): MAPLE HILL SUBDIVISION PHASE 6A Project A.K.A. (Marketing name if different from Project Name): Project Location: Maine Hill Drive / Bar Harbor Drive Fort Collins Property Owner(At the time of this permit issuance): Individual Name: Company Name: I-101Z I E 7-00 r q D EVE p M f eNT , L L r Address: 441to W, Sul« A ' 15, L+rl +, r6 3o1z,, Phone number(s): Office: 303- 971- 495R Cellphone: Fax number: -s o I - 9-75 - 9 91 t, Email: Applicant/Project Manager (The primary contact person for all matters regarding this project, and the person responsible for all matters referencing 'the Developer" in the Development Agreement for this project): Individual Name. '-; RAD LF- N Company Name: S o f ern r /t t 8 + Address: _ 1400 West- t22^a A� S,;4e 101 P Wegr- si.., cc) eon+ Phone number(s): Office: -r z-o - M - 0 113 Cellphone: 3o3- 3 %t. - c, 531 Fax number: -7zo- slo -oil 8 Email: I e nz_, to � ?- 44e4.etgpy. . + CPM Sent By: J2 Development/Management; 7208900118; Oct-18-04 11:34AM; Page 2 ✓2 DEVELOPMENT I MANAGEMENT 1194 Diamond Circle, Unit T, Lafayette, CO S0026 720-890-01 13 Fax: 720-890-01 1 S October 18, 20D4 City of Fort Collins Engineering Department Lance Newlin 281 North College Avenue Fort Collins, CO 80522-0580 Subject: Maple Hill Phase 1 Public Improvements Dear Lance: As you are aware, there were two original Letters of Credit in place with the City of Fort Collins covering the estimated cost of the public improvements for the Maple Hill Project Phases 1 and 2. L.O.C. #040010 was in the amount of $1,055,558.00 for Phase 1. L.O.C. #040011 is in the amount of $647-466.00 to cover the Phase 2 improvements This letter is making two requests regarding the Maple Hill Project and the relevant L.O.0 's mentioned above. 1) Reduction of Phase l L.O.C. #040010 to $205,918.00. This requested reduction is due to continuing work and completion of Phase 1 public improvements. The original LOC amount was reduced by $576,114 last month for work then completed and an additional $273,526 has been completed and inspected since that time. The remaining amount of $205,918 will cover the final phase 1 work yet to be finished which consists of approximately $60,000 of concrete work and $150,000 of street paving. Included with this letter is a spreadsheet which details the work completed to - date. 2) Release / Reduction of Phase 2 L.O.C. #040011 to $0.00. At the time of the issuance of the Development Construction Permit for this project. J2 Development was working with Dave Stringer on a revision to the project phasing plan. The estimate of public improvement costs and inspection fees for each phase was based on the new proposed phasing, which is what is current basis for actual construction and which is now being finalized with Katie Moore. At the time Dave's thought was to issue the DCP and collect LOC's and inspection fees for Phases 1 and 2 to ensure that there was adequate financial coverage since the phasing was at the time a unfinalized, "moving" boundary. J2 Development would like to now take down the Phase 2 Letter of Credit since the phasing is final and our construction schedule is such that we will not begin construction on Phase 2 until sometime in 2005. We fully understand that the DCP would no longer be in effect for Phase 2 and that we Sent By: J2 Development/Management; 7208900118; Oct-18-04 11:34AM; Page 3 will have to re-establish the LOC in the full phase 2 amount prior to continuing with any work outside of the Phase 1 area. A Request for Amendment or Release of Letter of Credit form is also included for each of the above requests which would need to be completed and signed by the appropriate City personnel. Please let me know if you have any question or require any additional information. Your assistance in completing these reductions in as quickly a manner as possible would be greatly appreciated. Sincerely, Brad Lenz Operations Manager 72 Development/Management Sent By: J2 Development/Management; 7208900118; Oct-18-04 11:34AM; Page 4/7 00 Z V v � W � 6 U _ W a g o R �o mo o m m O N m N m f0 m O O O `fin o$oe N m m x �:c mn �n vi n 6 of m °1 n� � .• .• r� c � m � r � in N a �- C < W F G got C o o ' '� m m ry �f N N ry m ry N Z r - O_ � a W C C O N�• b •• .. A� � N m n n g�� i m `a� � m m 9 mO • g e n i, •.. a .. m ry i2..p t L 4 N SS nSn `mnn'n �Tla$ngffi58v5'$RgsFe��'a� m FO Nc�o��IS IriPN„' �����Af �'piC r.i�CiY O . O1O %1 • • . • • =pm m y! O q m n ti � � e� n n m n rl Q� qQR Q gg QQ gg 0 Li 0o R'lmgiPv${$S$n�8 888588888888888 w�� i�rmiv �r 9in �m���g :nnom$'��roi�'m �'imman f N 8 » p 888 » p N ........ .... N N n N N N N N N N M 88f�8f�O8O11r8�n�8p8pff8��N8N8�8�pp8888 r s0 e-n .8ym8rp„$m88��88 fINVYNIOONrFa JI ��if{NT�w.TNN.YmQS� �nrvn mm�r+e •o� N Nw rvn n on m i% mNwm ««»»»»»p««» womnomrvsw�&=�nrvn.•�m���n��nn NNN»»n.....00.o • N m rvownn rvn.•io mimn"��'nroi��R n r �-'- C YQ mum m%1 •, mfl MW � � � � � N f) 4 T� mm amNtn fl O1 J a r e a um'& a w r e too 77 C 9 a. 0 ZQc s Y Y 0 C q UUm P o ZZFS'��-yy'cl 5'o `im.�3WWWWLLIea KKK R'Q L�pmUVKK 6'1'K CS f]. wx9kk YW E K? S O i O Zb'2R Wu' �yZ hR1m`y `w iF �iRimLLLL b' 6O i nino'm un`o w6bF•"'rouai ib�, �l=o3 F�FRfn,:u-{r°i�na:!`ii ��n�n�"m$m!'d '� Sent By: J2 Development/Management; 7208900118; Oct-18-04 11:35AM; Page 5/7 UZ 00 ^ 0 W � aw �w u 0 W H 6 0 z v:.5 r: ,. .f N ^ S',C gmc mbl` mC•0 • aNl� ly • • i i _< s' N... NrIN $n p � •n' li wNif v r. 0 V m w�NOnm m•smx.s�a�.a n�R^N owri �� fi mfmfOnOfv •ff1bA O LLC1 ,•ml GT emN� ..t'�ppN q pw v3�0 •n0 t�10 'per N nf1$ !lN wCl 0 am:S:.eSam N N N N N N N y N N a mooaoeem. m f P Y m a 000Nnaoo Q� Sage �� g8 a n35pevE��Y � VU� lS XZ ae •X �� O Q ;p U >zv.v .¢i �OinOU �ffge m m O f1 0 0 0 m Rm:ase�seo `s I.NI t'VN.mo�N" w m UOmaNOSrSa O v qW fi �i �01.j {V rQQV (Gp O O O O_ N' Y IUJ g g N O O 0100�00wi��000 N11 wNm.r sawn nRR��;n�^^ • ---------- RRom _ O N b ^ g�aS r _ NbNNNI}I1�W1YN N ^J N x• e 8X`p.'nY�t J y tun C �a .. .. z twdV`u o'�mm� 6 (h �i��3KLL1i liW06 Sent By: J2 Development/Management; 7208900118; Oct-18-04 11:35AM; Page 6/7 EXHIBIT 2 Request for Amendment or Release of Letter of Credit # 040010 The City of Fort Collins certifies that the person signing below is authorized to execute this Request for Amendment or Release of Letter of Credit on behalf of the City of Fort Collins.. and further certifies with respect to the provisions contained in the Development Construction Permit dated April 28, 2004 and,'or the Development Agreement dated August 19, 2003 between the City of Fort Collins (Beneficiary) and Vta Ie Hill Phase I _ (Developer), the following: [Check applicable boxes.) ® The Letter of Credit is to be reduced to $.205 918 . The expiration date of the Letter of Credit is re,.ised to be u The 60-day automatic one year renewal provision contained in the Letter of Credit is no longer in effect. ❑ Release Original Letter of Credit upon receipt of separate replacement Maintenance Letter of Credit in the amount of (current value). i Release Letter of Credit. In witness whereof, the undersigned has executed this certificate on behalf of the City of Fort Collins this day of CITY OF FORT COLLINS, COLORADO a Colorado municipal corporation By: (Name and Title) Forestry: Tim Buchanan 215 N. Mason St., Fort Collins, Co 80524 (970) 221-6361 Light and Power: Doug Martine 700 Wood Street, Fort Collins, Co 80521 (970) 221-6700 Developer's Contact Persons: Project Manager: Larry S. Buckendorf, Maple Hill Investments, LLC. 7251 W. 20`h Street #L-200, Greeley, Co 80634 (970)352-7072 Cell (970) 539-0131 Fax (970) 330-5357 larrygiournevhomes com Developer: Larry S. Buckendorf, Maple Hill Investments, LLC. 7251 W. 20`h Street #L-200, Greeley, Co 80634 (970)352-7072 Cell (970) 539-0131 Fax (970) 330-5357 lany@iourneyhomes.com Owner: Palmer Gillespie Jr., Nineteenth Green Partnership, LLP 6373 S. Grape Ct., Littleton, Co 80121 (303)796-7805 Project Engineer: Keith Sheaffer, P.E. TST, Inc. Consulting Engineers 748 Whalers Way, Bldg D, Fort Collins, Co 80525 (970)226-0557 Fax (970) 226-0204 ksheaffer@tstine.com Architect/Planner: VF Ripley Associates, Inc. 401 W. Mountain Ave, Fort Collins, Co 80521 (970)224-5828 Fax (970) 224-1662 Contractor: Ken Baty Crow Creek Construction, LLC 7251 W. 20`h Street #L-101, Greeley, Co 80634 (970)330-5070 Fax (970) 330-6044 Page 5 of 5 Sent By: J2 Development/Management; 7208900118; Oct-18.04 11:35AM; Page 7/7 EXHIBIT 2 Request for Amendment or Release of Letter of Credit # 040011 The City of Fort Collins certifies that the person signing below is authorized to execute this Request for Amendment or Release of Letter of Credit on behalf of the City of Fort Collins, and further certifies with respect to the provisions contained in the Development Construction Permit dated April 28, 2004 and/or the Development Agreement dated August 19, 2003 between the City of Fort Collins (Beneficiary) and Maple Hill Phase 2 (Developer), the following: [Check applicable boxes.] J The Letter of Credit is to be reduced to .1 The expiration date of the Letter of Credit is revised to be J The 60-day automatic one year renewal provision contained in the Letter of Credit is no longer in effect. 7 Release Original Letter of Credit upon receipt of separate replacement Maintenance Letter of Credit in the amount of (current value). Release Letter of Credit. In witness whereof, the undersigned has executed this certificate on behalf ofthe City of Fort Collins this day of M. CITY OF FORT COLLINS, COLORADO a Colorado municipal corporation (Name and Title) ■ilRULLLtC!LLLttLLL� `I LLLLLttC6 ICt[fLLLpLaLz[�tct[aR L999191Ls' LLBLLLtr ;€ LLLLLitL9 tLtLLLLLGar :r LLLLCLLL TLCCCCCLCG a < L:,al 91 ,.. S LG' I[LCLLLtL11 `:`s1Si d[[k it[S[[[[�1'1 U SLUM [CC[ �' as,Lu - ,. or '^'� I CCC[LCtC „' :i •( f mr , �L ttt: '�tt t!�� •_' ;LLL�csLe; l� : [C[[L[[tL[u ILtt[LLtC' ;� LtLGLLC� ILttLLILLLLF ILILt7 1 :IL[[CCCCC � I:� . ', 661�t46ti 6t66t666UK i6EtE6[[['EECI'16[EtLL[Ki V ��°iCttlittf�ti Lttt66ttt6 iIsluttttgg r F- W W 2 m F a F y W 1- O U O Z a 9) W_ H H Z a U W O m a C`d li) Z O H U W a W NW ? LL 0 0 cc 0 0 O O O O N0000 0hm o O O a a a a 0 0 0 0 0 o o N n aW 0OOh0(pOM(D 0 0 0 0 0 0 N N N (A M N fR O � -4 Q tp fA a�O M 664 � 0 0 0 0 0 0 ��'r"noo 0 0 0 0 0 0 0 o a o �i•�0000000 fA f9 fR fA fR fA f9 I� n O r M M M = W U a'❑ W _O _O (A (fl � ��69 fR 6969 2 W >IL v 0 i W a' } Wam LL ` M o 0 0 0 0 0 0 o 0 0 6 a o o o a o a o 0 0 0 w F 0 (n (a e» (» (» 0 0 0 6 0 0 0 0 0 CD 0 O H 0: � f ag~ LL. en O W ? U W 2 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o a o 0 0 0 0 0 0 0 0 0 0 0 0 Z W a m 0 0 0 0 0 0 0 0 0 0 Hi fA fA f9 E9 6% fR (H fA b9 (ny W aW > y H W F O Z 0 a U)0: 00LL0 U U U O a U N N O 1� � W w M M V (D N w N N Q N Oj F 0 }Z mW LA. LLJ 0 m H y 2 2 LL LL }} U U 2 S 2 2 2 2 S LL LL LL U U U U U U U Z W J J U U W W J J J Q Q Q Q Q Q Q n s W W W W W W W W W J m U J IL (n aZ Z <w c� 0 J m ma a9 J W Qa a U) v J 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0000000 f9 tR (A fA di (A (A W n N N a Q) n M Q N a) O (n } LL. LL LL } } J(oJ JJ (n(n J a \J W a 0- a LU w W 0 O LU Y ❑ J U z � m 0 L4 W W Z J y 3 4 Z Z O� w2 a❑ N Z 2 m F IK U U. O i- ZyQ C V 7W O Fg a W z Z w w CL 7 a ,P J Maple Hill Phase,- Subdivision Survey 121 LS $ 567.67 $ Material Testing 121 LS $ 395.97 $ Waste Management 6 MO $ 530.00 $ Street Signs 13 EA $ 381.60 $ Type III Barricades 2 EA $ 1,590.00 $ Striping 1 LS $ 9,111.76 $ Dry Utility Conduit Allowance 121 LS 3 7d0 Sa t 47,912.37 3,180.00 4,960.80 3,180.00 9,111.76 30,199.18 57,232.18 Erosion Control Quantity Unit Unit Price Total Silt Fence 2,145 LF $ 1.26 $ 2,702.70 Inlet Protection 2 EA $ 206.70 $ 413.40 Vehicle Tracking Pad 2 EA $ 1,610.66 $ 3,221.32 Concrete Washout Pit 1 EA $ 1,431.00 $ 1,431.00 $ 7,768.42 Dirt Work Quantity Unit Unit Price Total Mobilize Dirt Subcontractor 1 LS $ 9,010.00 $ 9,010.00 Cut to Fill 88,495 CY $ 1.75 $ 154,866.25 Haul Imported Material 66,403 CY $ 6.36 $ 422,323.08 Place & Compact Imported Material 66,403 CY $ 1.33 $ 88,315.99 $ 674,515.32 Sewer Main Quantity Unit Unit Price Total 8 SDR 35 Sewer Main 3,995 LF $ 29.80 $ 119,051.00 4' Diam. Manhole 12 EA $ 1,996.05 $ 23,962.60 4" Service off 8" Main (No Elder Valve) 130 EA $ 932.02 $ 121,162.60 Sewer Testing 3,995 LF $ 2.67 $ 10,666.65 Crow Creek Construction, LLC Phase Oubdivision Page 1 of 3 Water Main QuantityUnit Unit Price Total 6" Water Main 1,040 LF $ 20.59 $ 21,413.6o 6" Gate Valve 2 EA $ 647.71 $ 1,295.42 6" Foster Adaptor 2 EA $ 128.67 $ 257.34 8" Water Main 1,770 LF $ 25.19 $ 44,586.30 8" Gate Valve 3 EA $ 936.78 $ 2,810.34 8" Foster Adaptor 3 EA $ 183.31 $ 549.93 8"x8" Tee 1 EA $ 416.34 $ 416.34 8"x6" Tee 1 EA $ 381.87 $ 381.87 8" Plug w/Temp FH 1 EA $ 3,770.45 $ 3,770.45 12" Water Main 1,253 LF $ 37.92 $ 47,513.76 12" Butterfly Valve 1 EA $ 1,312.92 $ 1,312.92 12" Foster Adaptor 1 EA $ 274.38 $ 274.38 12" x 8" Tee 1 EA $ 641.16 $ 641.16 Fire Hydrant off 6" Main 2 EA $ 4,109.26 $ 8,218.50 Fire Hydrant off 8" Main 1 EA $ 3,908.32 $ 3,908.32 Fire Hydrant off 12" Main 2 EA $ 4,139.77 $ 8,279.54 3/4" Service off 6" Main 36 EA $ 1,150.30 $ 41,410.80 3/4" Service off 8" Main 49 EA $ 1,160.34 $ 56,856.66 3/4" Service off 12" Main 39 EA $ 1,265.11 $ 49,339.29 Meter Pit, Yoke & Dome 124 EA $ 467.68 $ 57,992.32 16" Steel Casing 20 LF $ 161.43 $ 3,228.60 8" WL Deflection 1 EA $ 606.07 $ 606.07 Flowfill for Tie In 25 CY $ 107.91 $ 2,697.75 Tie to Existing Stub in CR 52 1 EA $ 2,193.95 $ 2,193.95 Testing 4,063 LF $ 0.29 $ 1,178.27 $ 361,133.88 Storm Main Quantity Unit Unit Price Total 18 Class III RCP 30 LF $ - 42.02 $ 1,260.60 30" Class III RCP 524 LF $ 68.30 $ 35,789.20 5' Diam. Stone Manhole 2 EA $ 1,971.04 $ 3,942.08 14' Type R Inlet 2 EA $ 5.167.50 S 10 33 ^-n_ Extra 42" Storm N End Quantity Unit Unit Price Total 42 Class III RCP 864 LF $ 104.34 $ 90,149.76 42" Class III RCP FES 1 EA $ 1,517.35 $ 1,517.35 6' Dlam Drop MH 1 EA $ 13,092.91 $ 13,092.91 Area Inlet 1 EA $ 6,572.00 $ 6,572.00 Headwall 1 EA $ 3,392.00 $ 3,392.00 Type L Rip Rap 22 CY S RD_RR i 1 77a zc Crow Creek Construction, LLC Phase �Subdivision Page 2 of 3