Loading...
HomeMy WebLinkAboutMAPLE HILL SECOND REPLAT - Filed CS-COMMENT SHEETS - 2006-11-16PROJECT COMMENT SHEET City of Fort Collins Current PlanninLy REC. 0 '99NlU DATE: October 28, 2004 TO: Engineering Pavement PROJECT: #29-OOJ Maple Hill Recreational Center PDP - Type I (LUC) All comments must be received by Ted Shepard no later than the staff review meeting: November 24, 2004 Note - PLEASE identify your redlines for future reference k Name (please print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _Plat _Site _Drainage Report _Other _Utility _Redline Utility _Landscape 9.50 PROJECT COMMENT SHEET Citv of Fort Collins Current PlanninE DATE: October 28, 2004 TO: Transp. Ping PROJECT: 929-OOJ Maple Hill Recreational Center PDP - Type I (LUC) All comments must be received by Ted Shepard no later than the staff review meeting: November 24, 2004 Note - PLEASE identify your redlines for future reference lCL Name (please print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS I —Plat \'Site _Drainage Report _Other Utility Redline Utility Landscape PROJECT COMMENT SHEET Current Planning DATE: October 28, 2004 TO: Technical Services REM 'B9NOU PROJECT: #29-OOJ Maple Hill Recreational Center PDP - Type I (LUC) All comments must be received by Ted Shepard no later than the staff review meeting: November 24, 2004 jk Note - PLEAsE identlfv your redfi—nes for future reference /, Bo-u�✓v�QY LcasES. Name (please print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _Plat _Site _Drainage Report _Other _Utility _Redline Utility _Landscape 9:59 ' Project Comments Sheet Selected Departments City of Fort Collins Date: November 29, 2004 Project: MAPLE HILL RECREATION CENTER PDP - TYPE I All comments must be received by Ted Shepard in Current Planning, no later than the staff review meeting: November 24, 2004 Note - Please identify your redlines for future reference Issue Contact: Katie Moore Topic: Landscape plan Number: 7 Created: 11/16/2004 [11/16/04] It appears that shrubs and trees are too close to the sewer and water services. Please revise. Topic: Phasing Number: 28 Created: 11/29/2004 If the pool is planned to be built prior to phase 5, then re -phasing is needed so that all adjacent streets are built with this pool, and the DA will need to be amended as well. Topic: PI t Number: 1 Created: 11/16/2004 [11/16/041 P 4e provide a signature line for the City Clerk Number: 11 Created: 11/16/2004 [11/16/041 Tract A is labeled as future development, but is also dedicated in its entirety as a drainage easement, so any future development would necessitate vacating at least a portion of that easement. Was this the intention? Topic: Site Plan Number: 8 Created: 11/16/2004 [11/16/04] Why are 2 fences needed? There's one fence close to the pool and another on the property line, with no apparent way of getting to the area in between. Was this the intent? The fence on the property line should be moved a minimum of 2' from the back of the walk on Maple Hill Road. !! 2?10Y Date /J CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat v, Site Drainage Report Other -- Utility l/ Redline Utility >✓ Landscape Page 1 Number: 9 Created: 11/16/2004 [11/16/04] Please label the ROW widths on the site plan for Maple Hill and Bar Harbor. Topic: Utility Plans Number: 12 Created: 11/16/2004 [11/16/04] Please include the plat as (for reference only) and do not include it in the numbering of the sheets for the utility plan set. Number: 13 Created: 11/16/2004 [11/16104] There are 2 options for handling the utility plans. If you want the new sheets to form a separate new set of utility plans, that's ok, but the revised sheets need to be a part of the original plan set, and a note on the new plans added to refer to the original Maple Hill plans for more information. Or the new sheets could be added as new sheets to the original Maple Hill plans along with the revised sheets and no new separate plan set would be created. Number: 14 Created: 11/16/2004 [11116/04] Two benchmarks are required on the cover sheet. Number: 15 Created: 11/1612004 [11/16/04] Please review appendix E6 in LCUASS for scanability requirements and revise plans accordingly. Number: 16 Created: 11/16/2004 [11/16/04] The proposed mid -block ramp makes sense only if a handicapped parking stall is designated on -street. Please show signing/striping for the stall. Number: 17 Created: 11/1612004 [11/16/04] Grading is shown on City property. An easement might be required for this offsite grading. Please obtain a letter of intent from Craig Foremen of Parks prior to hearing. Once this is cleared up, then I'm ok with the project going to hearing. Number: 18 Created: 11/16/2004 [11/16/04] The ramp proposed is for mid -block use with 'attached' walks. Please use a standard directional ramp and include interim detail 1606 and enlarge interim detail 1607. Number: 19 Created: 11/16/2004 [11/16/04] See redlines and utility plan checklist for any additional comments. Number: 27 Created: 11/29/2004 Please revise phasing plans (again) to show the pool as Phase 8 to match the DA. Page 2 REVISION COMMENT SHEET DATE: December 3, 2004 TO: Engineering PROJECT: #29-OOJ Maple Hill Recreation Center, PDP — Type I (LUC) All comments must be received by Ted Shepard no later than the staff review meeting: December 15, 2004 No Comment ® Problems or Concerns (see below or attached) **PLEASE IDENTIFY YOUR REDLINES FOR FUTURE SCaffLot)p 14 L REFERENCE** • 5WON old wc'� S 16I'd A+ feMvC,y" (04 P of- (air atci� Name (please print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _Plat Site _Drainage Report _Other _Utility _Redline Utility _Landscape Date 9a City of Fort Collins Project Comments Sheet City of Fort Collins Selected Departments Department: Date: December 16, 2004 Project: MAPLE HILL RECREATION CENTER PDP - TYPE I All comments must be received by Ted Shepard in Current Planning, no later than the staff review meeting: December 15, 2004 Note - Please identify your redlines for future reference Issue Contact: Katie Moore Topic: Phasing Number: 29 Created: 12/16/2004 [12/16/041 Please show old revision bubbles on previously revised utility plan sheets. Topic: Utility Plans Number: 12 Created: 11/16/2004 [12/16/041 Didn't receive a revised plat or plat redlines. [11/16/04] Please include the plat as (for reference only) and do not include it in the numbering of the sheets for the utility plan set. Number: 15 [12116/04] See redlines. [11/16/041 Please review appendix E6 in plans accordingly. Created: 11/16/2004 LCUASS for scanability requirements and revise Number: 19 [12/16/04] Created: 11/16/2004 [11/16/041 See redlines and utility plan checklist for any additional comments. «. Ile. oy Date CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS ✓ Plat a Site Drainage Report Other Utility _ V Redline Utility Landscape Page 1 Selected Issues Report Cih, of Fori Collins 4/16/2008 Date: MAPLE HILL 2ND REPLAT - TYPE I (LUC) AND FINAL PLAN SELECTION CRITERIA: Status = All ISSUES: Department: Engineering Issue Contact: Dave Stringer Topic: Civil Plans Number:5 Created:1/30/2004 Resolved [1/30/041 Need to provide more detail on Final Compliance Plans. See Redlined Bluelines, show existing utilities as existing and/or make reference to what plans they are to be constructed with Topic: General Number:9 Created:3/29/2004 Pending [3/29/04] [3/29/04] I'm confused. Why two sets of plans, one for alley work which are revisions to original approved plans and then another set for drainage storm water. Prefer to have all sheets as revisions to approved plans. No additional comments Topic: Plat Number:4 Created:1/30/2004 Resolved [1/30/041 Ready for hearing. Need to show corner cut in right-of-way of alley as depicted on LCUASS detail 7-12F Department: Traffic Operations Issue Contact: Eric Bracke Topic: Traffic Number:I Created:1/22/2004 Unresolved [1/22/04] No problem from Traffic Engineering Department: Transportation Planning Topic: General Number: 7 [2111/041 No comments Issue Contact: Tom Reiff Created:2/11/2004 Unresolved Page 1