Loading...
HomeMy WebLinkAboutNEW BELGIUM BREWERY FOURTH BUCKINGHAM STREET IMPROVEMENTS - Filed CS-COMMENT SHEETS - 2006-11-16PROJECT COMMENT SHEET Current Planning DATE: August 10, 2005 TO: Trans. Planning PROJECT PLANNER: Ted Shepard #1-95F New Belgium Brewery, Packaging Hall PDP & Amended ODP — Type II Please return all comments to the project planner no later than the staff review meeting: August 31, 2005 Note -Please identify your redlines for future reference ❑ No Problems Problems or Concerns (see belo-w-)or attached) too � C"N4 ��f, �<� �SSdK—rYY.t� %]C."2L�✓l� ''Y' �Y/ti Name (please print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat -bite _Drainage Report _Otherft ytJtility S`Redline Utility Landscape City of Fort rt Co STAFF PROJECT REVIEW Cityof Fort Collins BHA DESIGN, INC. Date: 02/06/2006 LUKE OLDENBURG 4803 INNOVATION DR. FORT COLLINS. CO 80525 Staff has reviewed your submittal for NEW BELGIUM BREWERY, PACKAGING HALL & BUCKINGHAM ST PDP & AMENDED ODP - TYPE II, and we offer the following comments: ISSUES: Department: Engineering Issue Contact: Marc Virata Topic: Buckingham Street Plans Number: 41 Created: 9/13/2005 [1/30/06] The cover amount with the HERCP pipe is still not per standards however it is acknowledged that the amount will be acceptable given the constraints. [12121/05] The profile sheet for the Coy Ditch does not show a proposed grade line to see if this issue was resolved. [9/13/05] The amount of cover over the crossing in which the realigned ditch ties into is less than standard. That combined with the structure being corrugated metal raises a general concern. We would want to see the corrugated metal pipes removed and replaced with twin elliptical pipes (RCP?) to achieve better cover and provide a pipe type that is to standard. Number: 44 Created: 9/14/2005 [1/30/06) Carried over for reference. [9/14/05] At time of final plan, provide cross sections along Buckingham Street at 50' intervals. Number: 46 Created: 9/14/2005 [1130/06] Carried over, appears to be unresolved. [12/21/051 Appears to be unresolved. With the curb extensions, this information is needed [9/14/05] Provide flowline curve/line table data for verification. The inset parking narrowing appears fine bt I'd like to see the radii specified just to be sure. Number: 93 Created: 1/30/2006 [1130/061 Clarify the inlet types proposed along Buckingham Street as area inlets are specified where Type R appear to be intended. Number: 94 Created: 1/30/2006 [1/30/06] Please look at tweaking the curb extension design for the north side of Buckingham Street across from First Street such that the curb extension is brought further east (about 10-15 feet) to better address pedestrian crossings on the east side of the intersection. Number: 95 Created: 1/30/2006 [1/30/061 The street repair limits shown with the signing and striping plan shows that the patching limits will need to be expanded as the eastbound through lane does not match up with the patching limits. Please expand the patching limits. Number: 96 Created: 1/30/2006 Page 1 [1/30/061 Provide for at least one access ramp along the north side of Buckingham Street for each intersection with First, Second and Third Street. Only one access ramp is needed at T-intersections. Topic: General Number: 27 Created: 9/2/2005 [1/30/06] Carried over for reference as unresolved. [12/21/05] Appears to be unrevsolved. [9/2/05] A letter of intent is required from the Coy Ditch Company for the work proposed by the development. Number: 83 Created: 12/28/2005 [1/30/06] As it was brought up in staff reivew that the design is being further refined to possibly avoid any potential conflicts, the comment is being carried over for review at time of final. [12/28/05] The storm sewer manholes behind the curb along Buckingham Street appear to be partially in the Buckingham sidewalk; there needs to be a separation from the sidewalk as prescribed in Figure 16-1 of LCUASS. Number: 90 Created: 1/30/2006 (1/30/061 The creation of the temporary detention pond on the south side of Buckingham Street requires the responsibility of frontage improvements for Buckingham and First Street abutting the pond per 24-95 of the City Code. This item will need more discussion after hearing and as discussion continues with the Bohemian Foundation. Topic: Plat Number: 29 Created: 9/2/2005 [1/30/061 Carried over for reference as unresolved. The creation of an "irrigation easement" on the plat is problematic as the certificate of dedication has noted that easements shown are dedicated to the City and the Coy Ditch is mainly a private system. [12/21/051 Appears to be unresolved. The plat shows an irrigation easement while the certificate of dedication states easements are conveyed to the City and the irrigation line is not the City's. [9/2/05] The plat indicates an "irrigation easement" which appears to be dedicated with the plat. As the dedication statement dedicates all easements to the City, it appears this ditch easement should be indicated otherwise. More than likely, an easement will need to be dedicated to the Coy Ditch Co. by separate document, with the recording information provided on the plat. Number: 91 Created: 1/30/2006 [1130/061 For ease of specifying obligations onto the property set forth in a development agreement, we'd still prefer creation of a lot line to coincide with the limits of development line specified on the documents. Number: 92 Created: 1/30/2006 [1130/06] Technical Services provided the following comments: - Show Buckinghman right-of-way in the same manner as the 3rd Filing. - A monument is needed at intervals not to exceed 1400' - What is "(R1)"? - Bearing and distance information is missing at the First Street intersection. -An area is drawn but isn't indicated along Linden Street. Page 2 /-;-� FINAL PLAN � COMMENT SHEET City of Fort Collins Current Planning DATE: March 15, 2006 TO: Trans. Planning PROJECT PLANNER: Ted Shepard #1-95F/G New Belgium Brewery, Packaging Hall & Buckingham St PDP & Amended ODP & Final Plans — Type 11 Please return all comments to the project planner no later than the staff review meeting: April 12, 2006 Note -Please identify your redlines for future reference No Problems ❑ Problems or Concerns (see below or attached) Name (please print) CHECK HERE ��IF��YOU WISH TO RECEIVE COPIES OF REVISIONS _Plat mite _Drainage Report _Other _Utility _Redline Utility _Landscape