HomeMy WebLinkAboutHARMONY MARKET PUD ELEVENTH LOT 1 - Filed DCP-DEV. CONSTRUCTION PERMIT - 2006-09-20Transportation Services
Engineering Department
City of Fort Collins, Colorado
DEVELOPMENT CONSTRUCTION PERMIT
City of Fort Collins
Permit Number: Qtn-l3 Issuance Date:
Project Name: Lot 1 Harmony Market PUD, 1 la' Filing
Project A.K.A.: _ 921 Harmony Market
Project Location: Scanl_i of Haxrnoriti Road_v7yeen 13, a dwalk Drive and Lemma Avenue cin
t;h parking_lc_t).
Permittee: _David Veldrnan, Veidman Morgan L;�mmercial, Inc, 223-5555
City and developer contacts: See attached Exhibit "A "for names and phone numbers of all
contact persons for this project.
Fees: Permit Application Fee ($400.00) S paid
Construction Inspection Fee (paid prior to issuance of this permit) $__1_173.40
Total 5 1,173.40
Development Bond or other approved security:
Amount of security deposited with the City to guarantee the completion of all public
improvements to be constructed as shown on the approved plans for the development.
$ 36 570.00
Form of security deposited with the City:-CA1id4
PERFORMANCE REQUIREMENTS OF THIS PERMIT:
1. The Permittee shall be responsible to require their Project Engineer to incorporate into all
design drawings and specifications the certification of all materials testing by an Engineer. The
Permittee shall have an Engineer prepare revised design drawings and secure City approval for
all revisions to the Utility Pians and related documents. The Permittee shall have an Engineer
represent, as required by the City in the Development Agreement, that the improvements are
constructed in conformance with the approved Utility Plans and the standards and specifications
of the City. The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to
the City's acceptance of the constructed public improvements. (All references above to the terns
"Project Engineer" and "Engineer" shall mean a Professional Engineer licensed in Colorado.)
2. All contractors who perform work on this project must be bonded and licensed in
conformance with City requirements.
3. Construction time
1 of 5
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6605 • FAX (970) 221-6378
www.fcgov.com
e.woy
d.�..., ED
ti�w.m...:onu
4. The applicant understands that additional permits may be required for this development
project and the applicant shall secure those permits directly from the issuing departments.
5. This permit, along with a complete set of all approved plans and documents for this project
(utility plans, site plan, landscape plan, development agreement, soils report, pavement design,
traffic study, drainage report, plat easements and any other official documents), shall be kept on
the development site available for use by City staff doing inspections.
6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use
Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable):
a. If construction has not begun within sixty (60) days from the date of issuance of this
permit, this permit shall expire and the applicant will forfeit the permit fee paid for this
permit, whereupon the applicant must re -apply for a new permit.
b. In addition, this permit shall expire one year from the date of issuance. The applicant
may apply for an extension by reapplication at least two weeks prior to the expiration
date. Such application shall contain information sufficient to justify the granting of the
extension. An extension may be granted for up to six months.
7. Building permits and certificates of occupancy will only be issued when all conditions
contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or
Sections 29-678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable,
are met. If the Development Agreement does not specify times for completion of public
improvements, or if there is no Development Agreement, then the improvement requirements
specified in Section 24-95 of the City Code shall apply, which provides that construction of all
improvements shall be required prior to the time of issuance of the first building permit.
8. Acceptance by the City of the public improvements shall be after (1) final inspection has
been conducted by the City; (2) punch list items from the final inspection are completed and
accepted by the City; (3) required certifications from the licensed professional engineer that
improvements are completed to City standards, specifications and approved Utility Plans; and (4)
the "as -constructed" plans have been received and accepted by the City.
9. The warranty on street improvements is for five (5) years from the date of acceptance by the
City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the
Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of
the Land Use Code, as applicable.
10. The City Erosion Control Inspector must be notified at least twenty four (24) hours prior to
any planned construction on this project. All required perimeter silt fencing and other
erosion/sediment control best management practices (BMP's) that can be installed prior to
construction must be in place and inspected by the City Erosion Control Inspector before any
land disturbing activity begins.
2of5
11. No work (including grading) shall be started in State Highway right-of-way until a permit is
issued by the Colorado Department of Transportation to allow such work to begin.
12. Other conditions:
Permittee's acknowledgment signature:
By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of
the owners of the property (including all owners having legal or equitable interest in the real property, as
defined in Section 1-2 of the City Code; and including common areas legally connected to or associated
with the property which is the subject of this application) without whose consent and authority the
requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City
officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such
property to perform work required of the applicant if the applicant were to fail to perform the required
work. I also acknowledge that I have read this permit document with all its requirements and
conditions, and I agree to all of the terms and conditions -Stated in this permit.
Applicant/Project Manager's
Approvalforissuance:
City Engineer Approval:
3 of 5
(Permit Idsu*e Date)
EXHIBIT f°A"
DEVELOPMENT PROJECT CONTACT PERSONS
Project Name: Lot 1,Harmony Market PUD, 11s' Filing
Project A.K.A.: 921 Harmony Retail Market
Name, address and numbers
City Staff Contact Persons:
Development Engineer: Sheri Wamhoff
Construction Inspector:
281 N. College Avenue, Fort Collins, Co 80524
(970) 221-6750 0140
281 N. College Avenue, Fort Collins, Co 80524
(970)221-6605
Cell (970)
Current Planner: Anne Aspen
281 N. College Avenue, Fort Collins, Co 80524
(970) 221-6750
Water Utilities Engineer: Roger Buffington
700 Wood Street, Fort Collins, Co 80521
(970)221-6700
Erosion Control Inspector: Bob Zackley
700 Wood Street, Fort Collins, Co 80521
(970)224-6063
Natural Resources: Doug Moore
281 N. College Avenue, Fort Collins, Co 80524
(970)224-6143
Traffic Operations: Eric Bracke
625 Ninth Street, Fort Collins, Co 80524
(970)224-6062
Street closures: Syl Mireles
625 Ninth Street, Fort Collins, Co 80524
(970) 221-6815
Transportation Planning: Kathleen Reavis
210 E. Olive, Fort Collins, Co 80524
(970)224-6140
4of5
Forestry: Tim Buchanan
281 N. College, Fort Collins, Co 80524
(970)221-6361
Light and Power: Doug Martine
700 Wood Street, Fort Collins, Co 80521
(970)221-6700
Developer's Contact Persons:
Project Manager: David Veldman, Veldman Morgan Commercial, Inc.
760 Whalers Way, A-200, Fort Collins, Co 80525
(970) 223-5555
Cell (970) 567-8130
Fax (970) 225-1100
davena,veldmanmorgan.com
Developer: David Veldman, Veldman Morgan Commercial, Inc.
760 Whalers Way, A-200, Fort Collins, Co 80525
(970) 223-5555
Cell (970) 567-8130
Fax (970) 225-1100
dave(a),veldmanmorgan.com
Owner: David Veldman, Veldman Morgan Commercial, Inc.
760 Whalers Way, A-200, Fort Collins, Co 80525
(970)223-5555
Cell (970) 567-8130
Fax (970) 225-1100
Project Engineer: TST, 748 Whalers Way, Fort Collins, Co 80525
(970)226-0557
Fax (970) 226-0204
Architect: Luis Hinahosa, Vaught Fry Architects
401 West Mountain Ave, Suite 201, Fort Collins, Co 80521
(970)224-1191
Fax (970) 224-1662
General Contractor: Sean Windsor, Delta Construction
208 Racquette Drive, Fort Collins, Co 80524
(970) 498-8766
Cell (970) 567-2621
Fax (970) 498-8770
seanwna,deltaconstruction.com
5of5
0000 0 9
0 0 0 0
0000 0000o0 0
0000o�
0000ri M
{Qp�
o ���
C���0»� M'
`
F»�vieno
e»Inf»tn
0
- S
w
`
R w
V1 W
? LL
0 0 0 0 0 0
^ r 0 0 0 0 0 0 o
V 0 0 0, T
t
lrl�0 0 M M M M
O O O O O M O N N N
y>.n sArronMMM
O r 0 0
Z O H
v3 .»vi fnoo
of ea En f» f» .n
—
z
¢oW
e
W
wa>ph
pQ1nc,
LL
po��
Z O
!wam
r(
O r\
LL -�
000000
0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 F= 1`^
U
w
¢
00001l10
00000 CD O O
f»
0000000
.» e» Wa �.Y
7
f» va f» f» 6s
f» o v
0
E» 60
Z M
W S
G o u
8 0
J _
O
F
Q r
t Qy
o q
O
O
�f>
�ELL
sif?U
W
o m o o.o 0
0 0 0 0 0 0 0
u
i W H
Z
o 0 0 0 0 0
0000�0
O�tN N 00
M6a6-> fA fA
C4 be »���
t Y
to E9 E9 E9 64
¢
U 0
R H
tf>
6s
QNIL
W FM
.9
Z OOO...QU
nJ
0000000
0000� wNo
01,1„i,�
0� �t'i 7
2
W
W
W Z
H W
W
m�
G O U
Mz>¢
Fa0LL
7
w0a
O�
xxxssxx
LL l L 0 0 0 0 0 0 0
U) I LL <L Y 1
m N
LL lj . 0
J J U ¢ ¢
L L:
J J J ¢ ¢ ¢ ¢ ¢ ¢ ¢
w W W
J UJ J J J U7 U7
H a
U w W
W W W W
Z W
7 �
W
J
m
a
U
�
J
as n
�
g
�
n
Q Z
N U
41 N
C N
z E
]
Q W
>
v 0
pad
mU �_ a
m d c `.d
m 5 c
CwUl
a
x N T
UI U)
mz 0
at
=Cm
Q
�U >
Np
p
��to
Lw
ca
09 0
to
0
0 °1
M tz
Q.00(L
n M >
n m
0
w
0
J
U
z
w
m
0
0
Z
J
J_
3
N
z
w
2
w
O
IL
IL
2
w
">
I¢
a
W
W
3
O
x
0
W
0
m
J
U
Z
W
m
O
F
G
W
W
Z
J
J
3
N
z
O
U
w
CDC
H I
(
UI
01
Z1
Q �
d
W
S
N
z
z
w
w
>O
m
IL
2
w
Q
CL
a
APR-25-06 10:20 FROM- T-160 P.001/002 F-027
DOHN CONSTRUCTION, INC.
2642 Midpoint Drhm. Unit A Fort Collins, Coiomdo 80525 (970) 490.1866 Fax (970) 490-8093
FACSIMII.E TRANSMISSION
TO: �I&AN-vL
COMPANY: C'-' ty vc- r} CAI AS
FAX 27-1 - (0'57 �5
FROM: ` %b P'kcxz-
DATE H125t0l�
NO. OF PAGES (Including cover sheet): 'L.-
is 6C e"LL-' ✓:1 0�- Ott-- clv gcv
yfor any reason part of this transmission has faired, please phone (970)490-1855 or fax(970)490-6093
APR-25-05 10:20 FROtI-
�ERRARO
Developing A Common Future
DATE: April 25, 2006
TO: Dohn Construction
Attn: Brian Blake
FROM: Bill Nicholl
RE: 921 E. Hwm-iony
Pursuant to your request is the Following:
Sewer:
Connect to existing line
4" service
Water:
3/a" service complete
Tire Line:
Wet tap assembly
4" DIP and flange riser
Water Main:
Wet tap assembly
6" DIP
6" elbows (2 each)
6" valve
Testing
Joint restraints
T-160 P.002/002 F-027
1739 South County Road 13c /Loveland, CO 80537
office 970,669.1463 /fax 970.669.1964
$ 670,00
$ 1,450,00
$ 2,795.00
$ 2,310.00
$ 1,605.00
$ 2,950.00
$ 7,995,00
$ 365.00
$ 680.00
$ 730.00
$ 244.00
Wet tap assemblies include the saddle, tap valve, thrust block, City tap charges. 3/a" service is
complete with core stop, copper line, curb stop and box, meter pit and yoke (meter is supplied by
the City)
921 E Harmony Breakdown