Loading...
HomeMy WebLinkAboutHARMONY MARKET PUD ELEVENTH LOT 1 - Filed DCP-DEV. CONSTRUCTION PERMIT - 2006-09-20Transportation Services Engineering Department City of Fort Collins, Colorado DEVELOPMENT CONSTRUCTION PERMIT City of Fort Collins Permit Number: Qtn-l3 Issuance Date: Project Name: Lot 1 Harmony Market PUD, 1 la' Filing Project A.K.A.: _ 921 Harmony Market Project Location: Scanl_i of Haxrnoriti Road_v7yeen 13, a dwalk Drive and Lemma Avenue cin t;h parking_lc_t). Permittee: _David Veldrnan, Veidman Morgan L;�mmercial, Inc, 223-5555 City and developer contacts: See attached Exhibit "A "for names and phone numbers of all contact persons for this project. Fees: Permit Application Fee ($400.00) S paid Construction Inspection Fee (paid prior to issuance of this permit) $__1_173.40 Total 5 1,173.40 Development Bond or other approved security: Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. $ 36 570.00 Form of security deposited with the City:-CA1id4 PERFORMANCE REQUIREMENTS OF THIS PERMIT: 1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design drawings and specifications the certification of all materials testing by an Engineer. The Permittee shall have an Engineer prepare revised design drawings and secure City approval for all revisions to the Utility Pians and related documents. The Permittee shall have an Engineer represent, as required by the City in the Development Agreement, that the improvements are constructed in conformance with the approved Utility Plans and the standards and specifications of the City. The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance of the constructed public improvements. (All references above to the terns "Project Engineer" and "Engineer" shall mean a Professional Engineer licensed in Colorado.) 2. All contractors who perform work on this project must be bonded and licensed in conformance with City requirements. 3. Construction time 1 of 5 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6605 • FAX (970) 221-6378 www.fcgov.com e.woy d.�..., ED ti�w.m...:onu 4. The applicant understands that additional permits may be required for this development project and the applicant shall secure those permits directly from the issuing departments. 5. This permit, along with a complete set of all approved plans and documents for this project (utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic study, drainage report, plat easements and any other official documents), shall be kept on the development site available for use by City staff doing inspections. 6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable): a. If construction has not begun within sixty (60) days from the date of issuance of this permit, this permit shall expire and the applicant will forfeit the permit fee paid for this permit, whereupon the applicant must re -apply for a new permit. b. In addition, this permit shall expire one year from the date of issuance. The applicant may apply for an extension by reapplication at least two weeks prior to the expiration date. Such application shall contain information sufficient to justify the granting of the extension. An extension may be granted for up to six months. 7. Building permits and certificates of occupancy will only be issued when all conditions contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29-678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the Development Agreement does not specify times for completion of public improvements, or if there is no Development Agreement, then the improvement requirements specified in Section 24-95 of the City Code shall apply, which provides that construction of all improvements shall be required prior to the time of issuance of the first building permit. 8. Acceptance by the City of the public improvements shall be after (1) final inspection has been conducted by the City; (2) punch list items from the final inspection are completed and accepted by the City; (3) required certifications from the licensed professional engineer that improvements are completed to City standards, specifications and approved Utility Plans; and (4) the "as -constructed" plans have been received and accepted by the City. 9. The warranty on street improvements is for five (5) years from the date of acceptance by the City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use Code, as applicable. 10. The City Erosion Control Inspector must be notified at least twenty four (24) hours prior to any planned construction on this project. All required perimeter silt fencing and other erosion/sediment control best management practices (BMP's) that can be installed prior to construction must be in place and inspected by the City Erosion Control Inspector before any land disturbing activity begins. 2of5 11. No work (including grading) shall be started in State Highway right-of-way until a permit is issued by the Colorado Department of Transportation to allow such work to begin. 12. Other conditions: Permittee's acknowledgment signature: By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. I also acknowledge that I have read this permit document with all its requirements and conditions, and I agree to all of the terms and conditions -Stated in this permit. Applicant/Project Manager's Approvalforissuance: City Engineer Approval: 3 of 5 (Permit Idsu*e Date) EXHIBIT f°A" DEVELOPMENT PROJECT CONTACT PERSONS Project Name: Lot 1,Harmony Market PUD, 11s' Filing Project A.K.A.: 921 Harmony Retail Market Name, address and numbers City Staff Contact Persons: Development Engineer: Sheri Wamhoff Construction Inspector: 281 N. College Avenue, Fort Collins, Co 80524 (970) 221-6750 0140 281 N. College Avenue, Fort Collins, Co 80524 (970)221-6605 Cell (970) Current Planner: Anne Aspen 281 N. College Avenue, Fort Collins, Co 80524 (970) 221-6750 Water Utilities Engineer: Roger Buffington 700 Wood Street, Fort Collins, Co 80521 (970)221-6700 Erosion Control Inspector: Bob Zackley 700 Wood Street, Fort Collins, Co 80521 (970)224-6063 Natural Resources: Doug Moore 281 N. College Avenue, Fort Collins, Co 80524 (970)224-6143 Traffic Operations: Eric Bracke 625 Ninth Street, Fort Collins, Co 80524 (970)224-6062 Street closures: Syl Mireles 625 Ninth Street, Fort Collins, Co 80524 (970) 221-6815 Transportation Planning: Kathleen Reavis 210 E. Olive, Fort Collins, Co 80524 (970)224-6140 4of5 Forestry: Tim Buchanan 281 N. College, Fort Collins, Co 80524 (970)221-6361 Light and Power: Doug Martine 700 Wood Street, Fort Collins, Co 80521 (970)221-6700 Developer's Contact Persons: Project Manager: David Veldman, Veldman Morgan Commercial, Inc. 760 Whalers Way, A-200, Fort Collins, Co 80525 (970) 223-5555 Cell (970) 567-8130 Fax (970) 225-1100 davena,veldmanmorgan.com Developer: David Veldman, Veldman Morgan Commercial, Inc. 760 Whalers Way, A-200, Fort Collins, Co 80525 (970) 223-5555 Cell (970) 567-8130 Fax (970) 225-1100 dave(a),veldmanmorgan.com Owner: David Veldman, Veldman Morgan Commercial, Inc. 760 Whalers Way, A-200, Fort Collins, Co 80525 (970)223-5555 Cell (970) 567-8130 Fax (970) 225-1100 Project Engineer: TST, 748 Whalers Way, Fort Collins, Co 80525 (970)226-0557 Fax (970) 226-0204 Architect: Luis Hinahosa, Vaught Fry Architects 401 West Mountain Ave, Suite 201, Fort Collins, Co 80521 (970)224-1191 Fax (970) 224-1662 General Contractor: Sean Windsor, Delta Construction 208 Racquette Drive, Fort Collins, Co 80524 (970) 498-8766 Cell (970) 567-2621 Fax (970) 498-8770 seanwna,deltaconstruction.com 5of5 0000 0 9 0 0 0 0 0000 0000o0 0 0000o� 0000ri M {Qp� o ��� C���0»� M' ` F»�vieno e»Inf»tn 0 - S w ` R w V1 W ? LL 0 0 0 0 0 0 ^ r 0 0 0 0 0 0 o V 0 0 0, T t lrl�0 0 M M M M O O O O O M O N N N y>.n sArronMMM O r 0 0 Z O H v3 .»vi fnoo of ea En f» f» .n — z ¢oW e W wa>ph pQ1nc, LL po�� Z O !wam r( O r\ LL -� 000000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 F= 1`^ U w ¢ 00001l10 00000 CD O O f» 0000000 .» e» Wa �.Y 7 f» va f» f» 6s f» o v 0 E» 60 Z M W S G o u 8 0 J _ O F Q r t Qy o q O O �f> �ELL sif?U W o m o o.o 0 0 0 0 0 0 0 0 u i W H Z o 0 0 0 0 0 0000�0 O�tN N 00 M6a6-> fA fA C4 be »��� t Y to E9 E9 E9 64 ¢ U 0 R H tf> 6s QNIL W FM .9 Z OOO...QU nJ 0000000 0000� wNo 01,1„i,� 0� �t'i 7 2 W W W Z H W W m� G O U Mz>¢ Fa0LL 7 w0a O� xxxssxx LL l L 0 0 0 0 0 0 0 U) I LL <L Y 1 m N LL lj . 0 J J U ¢ ¢ L L: J J J ¢ ¢ ¢ ¢ ¢ ¢ ¢ w W W J UJ J J J U7 U7 H a U w W W W W W Z W 7 � W J m a U � J as n � g � n Q Z N U 41 N C N z E ] Q W > v 0 pad mU �_ a m d c `.d m 5 c CwUl a x N T UI U) mz 0 at =Cm Q �U > Np p ��to Lw ca 09 0 to 0 0 °1 M tz Q.00(L n M > n m 0 w 0 J U z w m 0 0 Z J J_ 3 N z w 2 w O IL IL 2 w "> I¢ a W W 3 O x 0 W 0 m J U Z W m O F G W W Z J J 3 N z O U w CDC H I ( UI 01 Z1 Q � d W S N z z w w >O m IL 2 w Q CL a APR-25-06 10:20 FROM- T-160 P.001/002 F-027 DOHN CONSTRUCTION, INC. 2642 Midpoint Drhm. Unit A Fort Collins, Coiomdo 80525 (970) 490.1866 Fax (970) 490-8093 FACSIMII.E TRANSMISSION TO: �I&AN-vL COMPANY: C'-' ty vc- r} CAI AS FAX 27-1 - (0'57 �5 FROM: ` %b P'kcxz- DATE H125t0l� NO. OF PAGES (Including cover sheet): 'L.- is 6C e"LL-' ✓:1 0�- Ott-- clv gcv yfor any reason part of this transmission has faired, please phone (970)490-1855 or fax(970)490-6093 APR-25-05 10:20 FROtI- �ERRARO Developing A Common Future DATE: April 25, 2006 TO: Dohn Construction Attn: Brian Blake FROM: Bill Nicholl RE: 921 E. Hwm-iony Pursuant to your request is the Following: Sewer: Connect to existing line 4" service Water: 3/a" service complete Tire Line: Wet tap assembly 4" DIP and flange riser Water Main: Wet tap assembly 6" DIP 6" elbows (2 each) 6" valve Testing Joint restraints T-160 P.002/002 F-027 1739 South County Road 13c /Loveland, CO 80537 office 970,669.1463 /fax 970.669.1964 $ 670,00 $ 1,450,00 $ 2,795.00 $ 2,310.00 $ 1,605.00 $ 2,950.00 $ 7,995,00 $ 365.00 $ 680.00 $ 730.00 $ 244.00 Wet tap assemblies include the saddle, tap valve, thrust block, City tap charges. 3/a" service is complete with core stop, copper line, curb stop and box, meter pit and yoke (meter is supplied by the City) 921 E Harmony Breakdown �n+.wv wu •wroe e+rn wwws mw+na.r wo w.�