Loading...
HomeMy WebLinkAboutOAKRIDGE BUSINESS PARK THIRTYSEVENTH HOMEWOOD SUITES - Filed CS-COMMENT SHEETS - 2006-09-204 z Project Comments Sheeti.'I Selected Departments City of Fort Collins Department: Engineering Date: October 13, 2004 Project: OAKRIDGE BUSINESS PARK, 37TH FILING, HOMEWOOD SUITES - TYPE II(LUC) All comments must be received by Steve OR in Current Planning, no later than the staff review meeting: October 13, 2004 Note - Please identify your redlines for future reference Issue Contact: Katie Moore Topic: General Number: 15 Created: 10/11/2004 110/11/041 Please use LCUASS Figure 7-16 to calculate the sight distance easements needed from the street intersection and the drive intersections with Oakridge. The shading currently shown falls far short of the required sight distance. Please revise, remove the shading, and show the sight distance easements (areas of sight distance triangles that fall outside of the ROW) needed on all of the plans and add the sight distance easement restriction language to all plans and the plat. Number: 16 Created: 10/11/2004 [10/11/041 Please provide a temporary turnaround at the end of the public street to be partially constructed with Phase 1. This is a requirement of the LUC. Number: 17 Created: 10/11/2004 [10/111041 On the site and utility plans and plat, please clearly show, label, and dimension all ROW and easements. Number: 16 Created: 10/11/2004 [10/11/04] In order to meet the ODP for this area, Tract B will have to come in (in the future) with a public street aligning with Innovation and connecting to the shown unnamed street. Number: 19 Created: 10/11/2004 [10/11/04] Please match all plans and the titles on the plans. This is the 37th Filing of Oakridge Business Park. Signature inl�G Date CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat _� ' Site Drainage Report Other Utility _ �[_ Redline Utility = Landscape Page 1 FINAL PLAN 6a COMMENT SHEET City of Fort Collins Current Planning DATE: June 22, 2005 TO: Engineering PROJECT: #13-82CX Oakridge Business Park, 37th Filing, Homewood Suites, Final Plans These new plans are to replace plans sent out on June 2, 2005. Note that an additional week has been given to review these plans. All comments must be received by Steve Olt no later than the staff review meeting: July 6, 2005 Note - Please identify your redlines for future reference No Problems ❑ Problems or concerns (see below or attached) j , 6&V tj D Pr+-- y t I- E-e 4 I- C t.o_<C . CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS ,Plat _Site _Drainage Report _Other _Utility _Redline Utility Landscape Project Comments Sheet Selected Departments City of Fort Collins Department: Engineering Date: July 11, 2005 Project: OAKRIDGE BUSINESS PARK, 37TH FILING, HOMEWOOD SUITES PDP AND FINAL PLANS All comments must be received by Steve Olt in Current Planning, no later than the staff review meeting: July 06, 2005 Note - Please identify your redlines for future reference Issue Contact: Katie Moore Topic: General Number: 15 Created: 10/11/2004 (714105] Please add this variance to the list of approved variances in the utility plans, and add to the plans that curbs will be painted red and no parking signs will be added along OakRidge. [3/15/05] A variance request was approved for the sight distance easements needed on Oakridge. Please list this approval in the general notes, show the easement on all plans, add the sight distance easement restrictions to the site and landscape plans, and clarify on all plans that no parking will be allowed on Oak Ridge for the project's frontage on Oak Ridge. The sight distance easements shown still do not appear to match the requirements, even the one on Oak Ridge. The 310' distance required is measured along the street centerline, then a straight line connects the spot on the driveway 10' from flowline or the spot on the street 13' from flowline to that location on the curb. All area not within ROW must be dedicated as a sight distance easement and everything within that easement must meet the restrictions of the SDE. No parking lots are allowed within SDE's. See sheet 6, utility plan. [10/11104] Please use LCUASS Figure 7-16 to calculate the sight distance easements needed from the street intersection and the drive intersections with Oakridge. The shading currently shown falls far short of the required sight distance. Please revise, remove the shading, and show the sight distance easements (areas of sight distance triangles that fall outside of the ROW) needed on all of the plans and add the sight distance easement restriction language to all plans and the plat. Number: 16 Signature Created: 10/11 /2004 Date CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS ` Plat Site Drainage Report Other . Utility Redline Utility Landscape Page 1 [7/4/05] How will construction of the turnaround in phase 1 work with the construction of the detention pond? Does the turnaround need to be off -set to the east to avoid grading problems? (3115/051 Please have the Phase 1 line include this turnaround. [10/11/04] Please provide a temporary turnaround at the end of the public street to be partially constructed with Phase 1. This is a requirement of the LUC. Number: 17 Created: 10/11/2004 [7/4/05] Please label the sight distance easments on all plans. [3/15/05] This includes the sight distance easements. (10/11/04] On the site and utility plans and plat, please clearly show, label, and dimension all ROW and easements. Number: 20 Created: 10/11/2004 [7/4/05] The sidewalk is shown to meander on the southwest corner of OakRidge and McMurray. Why? Also, an easement dedicated to the City for public access is required for construction of the sidewalk in that location. 13/15/051 Repeat: [10/11/04] Please show the street sidewalks on Oakridge and McMurry. Number: 33 Created: 10/11/2004 [7/4/05] [3/15105] (10/11/04] Please refer to redlines and utility plan checklist for additional comments. Number: 35 Created: 10/11/2004 [7/4/05] (3/15/051 Phasing of grading still needs some clarification. [10/11104] At final compliance, please provide additional clarification regarding the phasing of the areas contained within the plat. Number: 67 [7/4/05] Created: 3/15/2005 (3/15/05] Please include a copy of the plat in the utility plan set. Number: 68 Created: 3/15/2005 [7/4/05] [3/15/05] All plans still need work to meet the scanability requirements under LCUASS appendix E-6. Please revise. Number: 83 Created: 7/4/2005 [7141051 1 did not receive a landscape plan to review this round. Number: 84 Created: 7/4/2005 [7/4/05] Site plan: please add a legal description of the property to the site plan. Number: 85 Created: 7/4/2005 [714/051 Grass -pave is not allowed within the ROW. Please remove. Number: 86 Created: 7/4/2005 Pagel [7/4/05] Please ensure that the plat matches the utility plans - ROW locations, easement dimensions, etc. (temp turnaround easement dimension doesn't match) Number: 87 Created: 7/4/2005 [7/4/05] Please label all retaining walls on all plans and provide a detail in the utility plans. Any walls 3' or taller must have separate building permits. Number: 89 Created: 7/4/2005 [7/4/05] It appears that the detention pond has grown. Shouldn't the drainage easement grow, too? Topic: Utility Plans Number: 88 Created: 7/4/2005 [7/4105] Please label driveway widths on the utility plans. Number: 90 Created: 7/4/2005 [7/4/05] Please provide intersection spot elevations for Pleasant Oak design. Number: 91 Created: 7/4/2005 [7/4/05] Something is off between the plat and the Pleasant Oak design - the centerline radii don't match. The plat is correct - the dimensions shown on the utility plans don't meet standard. Number: 92 Created: 7/4/2005 [7/4/05] Why does the flowline design for Pleasant Oak end at the end of phase 1? These plans need to show the complete design of Pleasant Oak from Oak Ridge to McMurray. Number: 93 Created: 7/4/2005 [7/4/05] Please add the pavement transition detail at cross -pans to the detail sheet. Number: 94 Created: 7/4/2005 [7/4/05] Please provide specific details of all ped ramps including spot elevations to ensure code -compliant construction. Number: 95 Created: 7/4/2005 [7/4/05] Please label all curb return radii. Number: 96 Created: 7/4/2005 [7/4/05] Please provide stations and elevations at all pc's, driveway intersections and roadway intersections in both plan and profile views. Number: 97 Created: 7/4/2005 [7/4/05] Please use centerline stationing, not a mix of centerline and flowline stationing. Number: 107 Created: 7/11/2005 [7/11/05] There may be some future issues with the road construction if property changes hands prior to the road construction being complete. Consolidation of the road construction (building the road from beginning to end all at once) is highly recommended to avoid issues with possibly needing grading easements at time of construction. Number: 108 Created: 7/11 /2005 Page 3 [7/11/051 Please remove the street name of Innovation from the plans - the entire new road is Pleasant Oak. Page 4 FINAL PLAN REVISION COMMENT SHEET DATE: August 12, 2005 TO: Technical Services PROJECT PLANNER: Steve Olt #13-82CX Oakridge Business Park, 37th Filing, Homewood Suites - Final Plans Please return all comments to the project planner no later than the staff review meeting: August 31, 2005 Note -.Please identify your redlines for future reference ❑Problems ❑ Problems or Concerns (see below or attached) 3ov KY 5 LFG/+& CHOSE Z /_ &,/ <.vr7- /f rlN )-S kVef A r, Name (please print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _Plat _Site _Drainage Report _Other Utility _Redline Utility _Landscape -.® City of Fort Collins imProject Comments Sheet Selected Departments Citv of Fort Collins Department: Engineering Date: September 7, 2005 Project: OAKRIDGE BUSINESS PARK, 37TH FILING, HOMEWOOD SUITES PDP AND FINAL PLANS All comments must be received by Steve Olt in Current Planning, no later than the staff review meeting: August 31, 2005 Note - Please identify your redlines for future reference Issue Contact: Topic: General Number: 86 Created: 7/4/2005 [9/7/05] The site and landscape plans need to have the temporary turnaround design offset to coordinate with the plat and utility plan set. [7/4/05] Please ensure that the plat matches the utility plans - ROW locations, easement dimensions, etc. (temp turnaround easement dimension doesn't match) Issue Contact: Marc Virata Topic: General Number. 120 Created: 9/7/2005 [917/051 It appears some additional information should be specified regarding the construction of the temporary turnaround. Will it be gravel? How will the water drain across the turnaround in the interim? What are the contours/spot elevations? Topic: Subdivision Plat Number: 121 Created: 9/7/2005 [917/05] With the development not fully designing Pleasant Oak Drive out to McMurry, the platted boundary of Pleasant Oak Drive needs to be reduced to the extent in which Pleasant Oak Drive is to be rebuilt. The remaining portion of Pleasant Oak Drive will be dedicated with the plat of the senior housing project. _y D s Date CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _Plat _Site _ i Drainage Report Other _Utility Redline Utility Y Landscape Page I Issue Contact: Topic: Utility Plans Number: 90 Created: 7/4/2005 [9/7/05) This doesn't appear to have been provided (show transition point to remove crown as it approaches the intersection). [7/4/05) Please provide intersection spot elevations for Pleasant Oak design. Issue Contact: Marc Virata Topic: Utility Plans Number: 122 Created: 9/7/2005 [9/7/05] Remove the "Innovation Drive" indication from sheet 5 and correct the spelling of "McMurry" on sheet 8. Page 2 FINAL PLAN REVISION COMMENT SHEET DATE: September 26, 2005 TO: Technical Services M PROJECT PLANNER: Steve Olt #13-82CX Oakridge Business Park, 371h Filing, Homewood Suites Final Plans Please return all comments to the project planner no later than the staff review meeting: October 12, 2005 Note - Please identify your redlines for future reference ❑ No Problems ❑ Problems or Concerns (see below or attached) au�Y#1-t:c-ac- cure. Z, moVE 114.o-r z" iAiro 4r"1 GuR�� Trr3�£ oN Sr4"_rZ. CAk Name (please print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _Plat _Site _Drainage Report _Other _Utility _Redline Utility _Landscape gg PROJECT COMMENT SHEET REC. D Current PlanninLy DATE: September 22, 2004 TO: Engineering Pavement PROJECT: #13-82CV Oakridge Business Park, 361h Filing, Homewood Suites — Type II (LUC) All comments must be received by Steve Olt no later than the staff review meeting: October 13, 2004 Note -PLEASE identify vour redlines for future reference Name (please print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site _Drainage Report _Other _Utility _Redline Utility _Landscape City of Fort Collins 1:20 Number: 20 Created: 10/11/2004 [10/11/04] Please show the street sidewalks on Oakridge and McMurry. Number: 21 Created: 10/11/2004 ✓[10111/04] Is there adequate existing ROW on McMurry and Oakridge, or does more need to be dedicated with this project? McMurry and Oakridge are collectors on the Master Street Plan, both also have parking and should have total ROW of 76 feet. Number: 23 Created: 10/11/2004 [10/11/04] Depending on future access locations onto the new street, additional sight distance easements may be required. Number: 24 Created: 10/11/2004 ./[10/11/04] Please provide typical cross -sections for McMurry and Oakridge. Number: 30 Created: 10/11/2004 [10/11/04] Emergency access easements adjacent to 3+ story buildings are required to be 30' wide. These easements should not overlap any curb, landscaping, walks, or parking. Please revise plans to accommodate this. Also, turns in EAE's are required to have 25' interior and 50' exterior radii measured from the same centerpoint. Number: 31 Created: 10/11/2004 )(10/11/04] Please add standard street cut note to sheets showing street cut: Limits of street cut are approximate. Final limits are to be determined in the field by the City Engineering Inspector. All repairs to be in accordance with City street repair standards. Number: 32 Created: 1011112004 V[10/11/04] ROW dedicated at street corners needs to be enough to locate the ramps and walks within it. Please see attached detail and dedicate additional ROW as necessary. Number: 33 Created: 10/1112004 [10/11/04] Please refer to redlines and utility plan checklist for additional comments. Number: 34 Created: 10/1112004 [10/11/04] There are a number of items that are missing from the list of items required prior to hearing (on the utility plan checklist). Another round of review will be needed prior to hearing. Number: 35 Created: 10/1112004 [10/11104] At final compliance, please provide additional clarification regarding the phasing of the areas contained within the plat. /? Number:43 Created:10/13/2004 [10/13/041 The variance request for driveway separations on Oakridge has not yet been approved or disapproved. An email was sent to Traffic Operations regarding the request, but an answer has not yet been received. Once the variance has been processed, NorthStar engineering will be contacted with that information. Topic: Street Design Number: 25 Created: 10/11/2004 Page 2 PROJECT COMMENT SHEET Citv of Fort Collins Current Plannints DATE: September 22, 2004 TO: Technical Services REC. D PROJECT: #13-82CV Oakridge Business Park, 361h Filing, Homewood Suites — Type II (LUC) All comments must be received by Steve Olt no later than the staff review meeting: 7\ H October 13, 2004 Note - PLEAsE identify your redlines for future reference /, ✓r`<tn1e4't,56'. Z, A/[I1rac"R z,rs r /8m0 (✓%J1+ eZ-"D) /N Tt/L" 3 Tilc ZC L7/2A lntR� cA_vom>r'T AcRw_ + T/2.�__� 15 ti'c7 C 41c4iA13Lcr. t/ w c ,,J1 T-rs� U,n Ac-wcC%2Ac-r�c" 14AT IS -T t-4� 30 5. 07,e> 4,� o= -rHu Tn,4�r A Ai%,!-r Nic Ma�krx�/ / tj k�5 r{T c: F � Oil !S T1fv 30 Gl / o MTh' /� - Se?e/L/d TT 4,2CE La Sf�e�-u e u LUi2Qw'C7. v ttArnc," �rlLFcT P >7c1<<ti P'.icrA.�C_-I3 a �F T/?7� rS . Ee- r /14 cpX1S71ti% Id GLc'� Name (please print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS /Plat _Site _Drainage Report _Other _Utility _Redline Utility _Landscape c ty of Fes° 0 Project Comments Sheet Selected Departments City of Fort Collins Department: Engineering Date: October 14, 2005 Project: OAKRIDGE BUSINESS PARK, 37TH FILING, HOMEWOOD SUITES PDP AND FINAL PLANS All comments must be received by Steve Olt in Current Planning, no later than the staff review meeting: October 12, 2005 Note - Please identify your redlines for future reference Issue Contact: Marc Virata Topic: General Number: 126 Created: 10/10/2005 (10/10/051 I'd greatly suggest that the sidewalk on the east side of Pleasant Oak Drive not be constructed at this time as inidicated and instead be constructed with the Senior Campus project. By installing the sidewalk at this time, it runs the risk of being damaged by the Senior Campus construction and also may not work out well with sequencing utility construction (Light and Power would prefer to install their facilities for the Senior Campus before sidewalk is installed). Topic: Subdivision Plat Number: 124 Created: 10/7/2005 [10/7/05] The plat has the turnaround for Pleasant Oak Drive dedicated as right-of-way, which is reflected as -an access easement on the other documents. From a processing standpoint, it would be easier to vacate an access easement rather than right-of-way. In addition, operating under the assumption that fees are enacted for vacation of right-of-way and vacation of easement, the fee for a vacation right-of-way will likely be twice as costly, which would be required to be paid for by the Senior Campus developer. Topic: Utility Plans Number: 125 Created: 10/10/2005 [10110/051 On Sheet 8, edit the note regarding future construction/extension of Pleasant Oak Drive as it seems to state the entire sheet is not for construction. Number: 127 Created: 10/1112005 Date CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site Drainage Report Other_ Utility Redline Utility Landscape Page I [10/11/051 There is a storm sewer proposed with the 38th Filing that is shown to be constructed across Pleasant Oak Drive which is located such that the road would need to be torn up and reconstructed, which potentially has emergency access implications. Perhaps this can be coordinated to minimize having to reconstruct the rod by the 38th Filing? Page 2 ,/f10111/04] Please provide minimum vertical curve lengths per LCUASS Fig 7-17 and 7-18. Number: 26 Created: 10/11/2004 ✓[10/11/04] Please show the intersection grades through Oakridge and McMurry. ✓ Number: 27 Created: 10/11/2004 [101111041 The grade approaching Oakridge exceeds the maximum of 4.0%. Please revise. Number: 28 Created: 10/11/2004 ✓[10/11/04] Please provide additional ramps at t-intersections as required by LCUASS. Number: 29 Created: 10/11/2004 J [10/11/04] Please use min. 8' crosspans at the intersections with McMurry and Oakridge. Topic: Utility Plans Number: 22 Created: 10/11/2004 [10/11/04] Where drainage over public walks is currently shown to occur, please re -grade . and/or add an under -walk drain to divert water under the walks (D-10, stormwater manual). Page 3 x REVISION ti COMMENT SHEET Current Planning DATE: March 2, 2005 TO: Engineering Pavement PROJECT: #13-82CW Oakridge Business Park, 37th Filing, Homewood Suites PDP All comments must be received by Steve Olt no later than the staff review meeting: March 16, 2005 Note - Please identify your redlines for future reference No Problems X Problems or Concerns (see below or attached) Peaj S o ) 5 P'g-p� Name (please print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _Plat Site _Drainage Report _Other _Utility Redline Utility _Landscape Aft City of Fort Collins s l[7 REVISION COMMENT SHEET Current Planning DATE: March 2, 2005 TO: Technical Services PROJECT: #13-82CW Oakridge Business Park, 37"' Filing, Homewood Suites PDP All comments must be received by Steve Olt no later than the staff review meeting: ` March 16, 2005 ,/'`� Note - Please identify your redlines for future reference ❑ No Problems < Problems or Concerns (see below or attached) I, %IIN DJ1 e4 � i-ec'pi' Z, -rHCP_£ 11 R P'eoE"c E,• i11� I 'Tiaf" gLuizT'�'rua U� � fr/�E .dw ORCRii7GE Tazl✓£ PLrA:ANr OAK L2.1V/c-CAC /41/U'K �T /S C�LI2/es �-!v G�-7 �. l / �c 26 Di?l+ / AJI �"' 1 m l , del LcrT j % / c 17 i2:5 % . $ nr 7 <TI o Gc7- Z �J2� CJni Cv�ttT,a I3�. _ L•'%NEr2J 7i' I E S,"7- I S Na i L.uC.¢ T-.�t- /s iT %c /LrnNly e,nr - % �Cc 1 %7" Jt'T /"-cs47" rnt 714 Name (please print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS V/Plat _Site _Drainage Report _Other _Utility _Redline Utility _Landscape /Adt Oft Project Comments Sheet S City of Fort Collins elected Departments Department: Engineering Date: March 18, 2005 Project: OAKRIDGE BUSINESS PARK, 37TH FILING, HOMEWOOD SUITES - TYPE II(LUC) All comments must be received by Steve Olt in Current Planning, no later than the staff review meeting: March 16, 2005 Note - Please identify your redlines for future reference Issue Contact: Katie Moore Topic: General Number: 15 Created: 10/11/2004 (3/15/05] A variance request was approved for the sight distance easements needed on Oakridge. Please list this approval in the general notes, show the easement on all plans, add the sight distance easement restrictions to the site and landscape plans, and clarify on all plans that no parking will be allowed on Oak Ridge for the project's frontage on Oak Ridge. The sight distance easements shown still do not appear to match the requirements, even the one on Oak Ridge. The 310' distance required is measured along the street centerline, then a straight line connects the spot on the driveway 10' from flowline or the spot on the street 13' from flowline to that location on the curb. All area not within ROW must be dedicated as a sight distance easement and everything within that easement must meet the restrictions of the SDE. No parking lots are allowed within SDE's. See sheet 6, utility plan. [10/11/04] Please use LCUASS Figure 7-16 to calculate the sight distance easements needed from the street intersection and the drive intersections with Oakridge. The shading currently shown falls far short of the required sight distance. Please revise, remove the shading, and show the sight distance easements (areas of sight distance triangles that fall outside of the ROW) needed on all of the plans and add the sight distance easement restriction language to all plans and the plat. Number: 16 Created: 10/11/2004 [3/15/051 Please have the Phase 1 line include this turnaround. [10/11/04] Please provide a temporary turnaround at the end of the public street to be partially constructed with Phase 1. This is a requirement of the LUC. Signature 3.((.v5 Date CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS ✓ Plat ✓ Site Drainage Report ✓ Other ✓I—'3t- ✓ Utility —Redline Utility _„/Landscape Page 1 Number: 17 Created: 10/11 /2004 [3/15/051 This includes the sight distance easements. [10111/04] On the site and utility plans and plat, please clearly show, label, and dimension all ROW and easements. Number: 19 Created: 10/1112004 [3/15/05] Titles still do not match. [10/11/04] Please match all plans and the titles on the plans. This is the 37th Filing of Oakridge Business Park. Number: 20 Created: 10/11 /2004 [3/15/05] Repeat: [10/11/04] Please show the street sidewalks on Oakridge and McMurry. Number: 23 Created: 10/11 /2004 [3/15105] Please see comment 15. [101111041 Depending on future access locations onto the new street, additional sight distance easements may be required. Number: 24 Created: 10/1112004 [3/15/05] Please provide accurate typical cross -sections. [10111/04) Please provide typical cross -sections for McMurry and Oakridge. Number: 33 [3/15/05] Created: 10/11 /2004 [10/11/04] Please refer to redlines and utility plan checklist for additional comments. Number: 34 Created: 10/11 /2004 [3115/051 This comment can be disregarded, assuming the median is removed: There is no information provided for the proposed median, and this information is required prior to hearing. Other items are still inadequate as well. [10/11/04] There are a number of items that are missing from the list of items required prior to hearing (on the utility plan checklist). Another round of review will be needed prior to hearing. Number: 35 Created: 10/11 /2004 [3/15/05] [10/11/041 At final compliance, please provide additional clarification regarding the phasing of the areas contained within the plat. Number: 43 Created: 10/13/2004 [3/15/05] The variance request for driveway separations on Oakridge only, for this project only, has been approved. [10/13/04] The variance request for driveway separations on Oakridge has not yet been approved or disapproved. An email was sent to Traffic Operations regarding the request, but an answer has not yet been received. Once the variance has been processed, NorthStar engineering will be contacted with that information. Number: 67 Created: 3/15/2005 [3/15/05] Please include a copy of the plat in the utility plan set. Page 2 Number: 68 Created: 3/15/2005 [3/15/05] All plans still need work to meet the scanability requirements under LCUASS appendix E-6. Please revise. Number: 70 Created: 3/15/2005 [3/15/05] Since Pleasant Oak Drive has been downgraded to a Connector Local, all driveways must use the standard drive cut (not radius) unless they serve over 350 trip ends per day. If radius drive cuts are desired, please show that they will meet the definition of high -volume. Number: 71 Created: 3/15/2005 [3/151051 Please match the ROW shown for Pleasant Oak Drive on all plan sets and plat. Number: 72 Created: 3/15/2005 [3/15/05] This comment can be removed assuming the driveways are removed from the plans: Driveways newly shown on the north side of Pleasant Oak opposite the hotel driveways do not align or meet separation requirements. Please align. Number: 74 Created: 3/15/2005 13/15/05] Interim Drawing 1606 - somehow the dimensions got off, please correct. Number: 75 Created: 3/15/2005 [3/15/051 Please include detail for standard drive cut. Page 3 lAocom ! FINAL PLAN COMMENT SHEET City of Fort Collins Current Planning DATE: June 22, 2005 TO: Engineering PROJECT: #13-82CX Oakridge Business Park, 37 h Filing, Homewood Suites, Final Plans These new plans are to replace plans sent out on June 2, 2005. Note that an additional week has been given to review these plans. All comments must be received by Steve Olt no later than the staff review meeting: July 6, 2005 Note - Please identify your redlines for future reference ;!g--No Problems ❑ Problems or Concerns (see below or attached) f , 9 uNr7A'+v-Y' t 4-E&14L CLOS5C. CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS ,Plat _Site _Drainage Report _Other _Utility _Redline Utility _Landscape