HomeMy WebLinkAboutFRONT RANGE COMMUNITY COLLEGE 4616 SOUTH SHIELDS STREET PARKING LOT EXPANSION - Filed CS-COMMENT SHEETS - 2006-09-19ITE
City of Fort Collins
Current Planning
PLAN ADVISORY REVIEW
COMMENT SHEET
DATE: March 31, 2006 TO: Engineering Pavement
PROTECT: #10-06 FRONT RANGE COMMUNITY COLLEGE
PARKING LOT EXPANSION — SITE PLAN
ADVISORY REVIEW - TYPE II (LUC)
All comments must be received by Shelby Sommer no later than:
April 5, 2006
Note - PLEASE identify your redlines for future reference
Vame (plea print)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_Plat _Site _Drainage Report Other
_ 6z
_Utility _Redline Utility _Landscape City of Fort Collins
Project Comments Sheet
Selected Departments
ia
Department: Engineering
Date: April 7, 2006
Project:
FRONT RANGE COMMUNITY COLLEGE PARKING LOT EXPANSION -
SITE PLAN ADVISORY REVIEW
All comments must be received by Shelby Sommer in Current Planning, no later
than the staff review meeting:
April 05, 2006
Note - Please identify your redlines for future reference
Issue Contact: Sheri Wamhoff
Topic: General
Number: 14 Created: 4/7/2006
[4/7/06] A final approved set of plans (signed by the City) will be needed before the work
within the right of way can be permitted.
Number: 15 Created: 4/7/2006
(417/06] A development construction permit (DCP) will be needed for the work within the
right-of-way. This permit can not be issued until the plans are approved, copies of such
provided and the inspection fees and security for the public infrastructure work are provided.
Number: 16 Created: 4/7/2006
[4/7/06] City signature blocks are needed on the plans.
Number: 17 Created: 4/7/2006
[4/7/06] The access drive out to shields. It doesn't quite line up with Westbury Drive across
the street. The access drive needs to line up for both intersections to work properly.
Number: 18 Created: 4/7/2006
[4/7/06] The access drive needs to be built in accordance with detail #707 "high volume
driveway'. It will not be a crosspan, but a driveway apron where it is concrete to the
property line. The curb return radii are to be 20 foot.
Number: 19 Created: 4/7/2006
y4Z
Signature Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other
_(.�Utility Redline Utility Landscape
Page 1
[4/7/06] The manhole at the access driveway can not be located within the sidewalk
(crosswalk). Rotate the manhole ring so it is not in the sidewalk or move the tie in further
east a bit.
Number: 20 Created: 4/7/2006
[4/7/06] Need some additional elevations at the access driveway. This is needed to verify
the design and to be able to verify and inspect the construction in the field.
Number: 21 Created: 4/7/2006
[4/7/06] Add the following note regarding street cuts to Sheets C1.0, C2.0, and C1.2: Limits
of street cut are approximate. Final limits are to be determined in the field by the City
Engineering Inspector. All repairs to be in accordance with City street repair standards.
Number: 22 Created: 4/7/2006
[4/7/06] Please take a look at Appendix E for the City's scanning criteria. There is a lot on
these plans and not everything is readable.
Number: 23 Created: 4/7/2006
[4/7/06] Where the bus pullout is being designed. Where the sidewalk is attached adjacent
to the bus pull out it needs to be a minimum of 6 feet wide.
Number: 24 Created: 4/7/2006
[4/7/06] As was discussed in the 2/1/06 meeting additional right-of-way needs to be
dedicated for the area where the sidewalk now extends behind the existing right-of-way. An
easement or right-of-way also needs to be provided for the area where the bus pad and
shelter are to be placed. I can provide standard form for these.
Number: 25 Created: 4/7/2006
[4/7/06] Please coordinate with Transfort regarding the minimum pad size needed for the
bus pullout and show what is to be built for the pad.
Number: 26 Created: 4/7/2006
[4/7106] Please remove details #708 and # 710 from the plans as they are for street
intersections and do not apply to the access driveway installation.
Number: 27 Created: 4/7/2006
[4/7/06] Please provide details #707 high volume driveway detail and #701 vertical curb and
gutter.
Page 2
Project Comments Sheet
Selected Departments
City of Fort Collins
Department:
Date: May 11, 2006
Project:
FRONT RANGE COMMUNITY COLLEGE PARKING LOT EXPANSION -
SITE PLAN ADVISORY REVIEW
All comments must be received by Shelby Sommer in Current Planning, no later
than the staff review meeting:
May 03, 2006
Note - Please identify your redlines for future reference
Issue Contact: Sheri Wamhoff
Topic: General
Number: 14 Created: 4/7/2006
[5/11/06] (417/06] A final approved set of plans (signed by the City) will be needed before
the work within the right of way can be permitted.
Number: 15 Created: 4/7/2006
[5/11/06] Please contact me for application documents and information.
[4/71061 A development construction permit (DCP) will be needed for the work within the
right-of-way. This permit can not be issued until the plans are approved, copies of such
provided and the inspection fees and security for the public infrastructure work are provided.
Number: 20 Created: 4/7/2006
[5/11/06] At the access driveway please provide a flowline elevation at the center of the
driveway. We need enough design and construction information on these plans that they
can be used for inspection and construction of the work. The flowline slope across the
street seems very flat. Is this what is actually out there? It calculates out at .26%. This is
flat enough that if the work is a little off you could have pooling, icing and standing water
problems within the driveway.
[4/7/06] Need some additional elevations at the access driveway. This is needed to verify
the design and to be able to verify and inspect the construction in the field.
Number: 30 Created: 511112006
[5/11/06] This information is just for the designing engineer. These plans do not meet the
City of Fort Collins scanning criteria and would not be accepted as is if this was a developer
Signature
5/l Ile,
([1
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other_
Utility < Redline Utility Landscape
Page 1
project. This is for reference for any future submittals that might be made to the City of Fort
Collins.
Number: 31 Created: 5/11/2006
[5/11/061 Changes made to the plans should not be bubbled. We do not consider a change
to the sheet a revision until plans have been signed and approved. Thus all changes made
before signature show not be bubbled.
Number: 32 Created: 5/1112006
[5/11/06] For the bus bay
Label the depth of the bus bay.
I don't care so much what the profile of the bus bay curb is, since the bus bay is to slope out
to the flowline at a 2% grade. I do need a profile or enough elevations and stationing along
the flowline to build and inspect that. Just drawing a straight line from where the bus curbs
start/end (leaves the flowline) it looks like a portion of the bus bay may not be draining out
toward the street.
If additional row for the bus stop is not going to be provided the easement that is needed is
a Public Access and Transit Easement. This covers the sidewalk use, the bus stop and
associated facilities.
Number: 33 Created: 5/11/2006
[5/11106] The asphalt paving sections need to be labeled for use on site. All paving
sections for work within the row will need to be submitted to and approved by the City after
work has commenced and we have information on what the soil is actually like in the areas
to be paved. This is per City codes and standards.
Number: 34 Created: 5/11/2006
[5/11/06] For the concrete walk section
The bus bay concrete depth is 10 inches Minimum (please add the minimum)
Sidewalk within the public row or the easement (where adjacent to the bus bay) shall be 6
inches thick minimum.
The concrete for the driveway is to be 8 inches thick minimum.
Number: 35 Created: 5/1112006
(5/11/06] 1 can provide base easement or row dedication documents that you can use for
this project. Please email me at swamhoff@fcgov.com
Number: 36 Created: 5/11/2006
[5/11/06] For your information — When the intersection work at Harmony Shields is under
construction the bus stop in the location you are proposing maybe out of service for an
extended period of time. We do not have a design yet for this intersection, so we do not yet
know what impact if any it will be. As with any road project, construction work and detours
will be coordinated with Transfort to keep service and routes as uninterrupted as possible.
Page 2