HomeMy WebLinkAboutPROSPECT I 25 JULY 2006 - Filed CS-COMMENT SHEETS - 2006-08-167Project Comments Sheet
CityofFortCollins Selected Departments
Department: Engineering
Date: July 17, 2003
Project: PROSPECT/1-25 ODP - TYPE II (LUC) #20-03
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
No Review Date
Note - Please identify your redlines for future reference
Issue Contact: Marc Virata
Topic: General
Number: 3 Created: 7/8/2003
Streets on the ODP that are called out as proposed locals or collectors should Instead
be called out as "potential future street" as traffic volumes shown on a PDP TIS may
Indicate a different street classification and general alignment Is necessary. The ODP
does not vest street classification for roadways.
Number. 4 Created: 7/8/2003
In discussions with CDOT, an additional note should be added noting that the 1-25
northbound on -ramp location and alignment may likely shift east with interchange
improvements, which could require additional right-of-way from the site.
Number: 5 Created: 7/8/2003
The arrows indicated as "major point of access" along the northern and southeastern
boundary of the ODP are required to be public streets in accordance with LUC
3.6.3(F). These arrows should be differentiated from "major points of access"
Number: 6
Created: 7/8/2003
In accordance with LUC 2.3.2(H)(5) and 3.6.3(F) an additional public street
connection is required along the northern boundary of the site between the two
"major points of access" currently shown.
Number: 7 Created: 7/8/2003
The TIS acknowledged lack of existing bicycle/pedestrian facilities in the area.
There ma th need for offsite-improvements with development of the pr perty in
.Seonnturo/ .' Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other_
X`Utility Redline Utility Landscape
Page 1
order to meet level of service criteria. A note indicating this should be placed on the
CDP.
Number: 8 Created: 7/8/2003
There may need to be additional public streets required within the property in order
to satisfy addressing requirements for the future parcels.
Number: 9 Created: 7/8/2003
Development of the property will require improvement of Prospect Road (arterial)
and the frontage road to standards. In addition no driveway access will be allowed
on Prospect Road. This should be indicated as a note on the ODP.
Number: 10 Created: 7/8/2003
The Prospect bridge over 1-25 and the operation of this interchange is substandard.
This Development is obligated to upgrade the I-25/Prospect interchange. This
should be indicated as a note on the ODP. The developer should consider perhaps
partnering with other properties in the area (Paradigm Properties, Interstate Lands)
to help facilitate the upgrade of the interchange. Discussion between the developer
and the City, in conjunction with City discussion with CDOT should take place with
regards to the interchange.
Number. 11 Created: 7/8/2003
A note should be added indicating that the access points onto the frontage road will
need more in-depth analysis and approval from CDOT. There may be concerns with
the proximity between the two potential proposed access points and sight distance
easements for both access points are likely based on the curvature of the frontage
road. In addition, access points onto the frontage road may be limited to right -in,
right -out. This will be determined by the type of uses as well as traffic counts for the
development.
Number: 12 Created: 7/8/2003
The curvilinear nature of the two streets indicated as locals may result in sight
distance easements required at access points.
Number: 20 Created: 7/9/2003
The existing frontage road is not within City limits and is required to be annexed as
part of this development.
Page 2
Community Planning and Environmental Services
Current Planning
Citv of Fort Collins
PROJECT:
DATE:
APPLICANTS
NEIGHBORHOOD INFORMATION MEETING
Prospect / I-25, Overall Development Plan (ODP)
November 19, 2003
VF Ripley Associates, Inc.
c/o Cathy Mathis
CITY PLANNER: Steve Olt
The applicants are proposing a mixed -use development on an
undeveloped property that is 135 acres in size. The proposed ODP
consists of commercial, industrial, and single-family residential uses.
The property is located on the north side of East Prospect Road and east
of Interstate 25. The existing Frontage Road curves through the
southwest portion of the property and continues north along the west
side of the property. The property is in the City of Fort Collins and is in
the C - Commercial, I - Industrial, and UE - Urban Estate Zoning
Districts.
.......... QUESTIONS, CONCERNS, COMMENTS, RESPONSES ..........
1. Question: When will East Prospect Road be done (widened,
improved) to 4 lanes?
Answer: (City) It's not yet on the City's timeframe for capital
improvements and, therefore, it would be done by
developing adjacent properties.
2. Question: How long does the process take?
Answer: (City) It could take years, depending on the intricacies
and wants of private development in the area. This is
only an ODP. Subsequent Project Development Plans
(PDP's) will develop the area.
3. Question: All the land east of this proposed development down to
County Road 5, will that become City?
Answer: (City) The area east to County Road 5 is within the
City's Growth Management Area and will eventually be
annexed into and within the City of Fort Collins.
281 .North ('0110go Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 41t,-2020
4. Question: Is it recognized that the Colorado Department of
Transportation (CDOT) does have the ability to
participate in the planning of improvements to this
interchange area?
Answer: (City) Yes, we work together with CDOT on these
issues.
5. Question: How about the Mountain Vista interchange?
Answer: (City) We did not contribute City funds to that project.
6. Question: What is an example of Industrial?
Answer: (City & Developer/Consultant) The permitted uses in
the Industrial Zoning District are delineated in the
Land Use Code (LUC). Residential uses are very
limited. There are a number of commercial / retail and
industrial uses allowed, either as an administrative
(Type I) review and public hearing or as a Planning and
Zoning Board (Type II) review and public hearing.
7. Question: What will happen in the urban estate area? How many
lots will there be and what will the lot sizes be?
Answer: (City & Developer/Consultant) In the Urban Estate
District you cannot have lots smaller than a half acre
in size unless you do cluster development, which
requires preservation of a significant amount of open
space as part of the development plan. The overall
density, whether the plan is for large lots or cluster
development, cannot exceed 2 dwelling units per acre.
8. Question: Will you explain more about the proposed collector
street running north - south and into our development
to the north?
Answer: (Developer/Consultant) It would be built as part of
development on this property. It is shown as a
collector street on the Recommended Roadway
Network Map as part of the adopted I-25 Subarea
Plan.
9. Comment: If you put a Dillard's Department Store there, the
traffic through our neighborhood to the north will be a
nightmare?
10. Question: Why would you connect an industrial use to a
residential area?
Answer: (City) First, this requirement is set forth in our
connectivity standards in the City's LUC. Second,
there are connections directly from industrial areas to
neighborhoods to provide direct access for residents in
the neighborhoods to potential places of employment.
The collector street will carry the industrial employee
traffic for those who do not live in the adjacent
neighborhoods in and out of their place of work to the
arterial street network.
11. Question: What happens if the actual traffic numbers are more
than planned?
Answer: (City) The City would then look into and possibly do
traffic mitigation and apply traffic calming measures.
12. Question: Is Centre Avenue an example of a collector street?
Answer: (City) No, it is more of a minor arterial street.
13. Question: When property is zoned Industrial, what is the limit?
Answer: (Developer/Consultant) There are various setbacks
that we have to adhere to according to the LUC.
14. Question: You have the same restrictions as others?
Answer: (Developer/Consultant) Yes, we do.
15. Question: Is there a Phase 2 on the development plan?
Answer: (Developer/Consultant) There is a mistake on the ODP
drawing. One of the Phase 4's is actually Phase 2.
16. Question: Isn't it like Highway 14, with the frontage roads and
access plans?
Answer: (City) It's a fine line between ensuring connectivity to
surrounding areas and not overburdening a road.
17. Comment: My property values will go down with the collector
street connection.
Response: (City) We disagree. The additional connectivity will be
of benefit to the surrounding area and properties
because it will provide direct access to the commercial,
retail, and employment developments without having
to go out to the arterial streets.
18. Question: I'm curious about the irrigation ditch and how it will
be impacted on the potential high school site with the
widening of East Prospect Road?
Answer: (City) It's not related to this development. Logically we
wouldn't move it to the homes to the south.
19. Question: Does the 1601 process need to be completed before
anything happens on this property?
Answer: (Developer/Consultant) A small development could
conceivably occur before that is completed.
20. Question: What will happen first, the collector street and
associated development or improvements to the
Frontage Road with associated development?
Answer: (Developer/Consultant) It will be dependent on what
retailers are interested or what interest we get from
other potential users. We just don't know at this time.
21. Question: Are we looking at a 2-year or a 5-year development
plan?
Answer: (Developer/Consultant) We would be extremely
surprised, and pleased, if anything happens in 2
years. Probably 4 to 5 years is more realistic.
22. Question: We'll be notified of everything related to development
on this property?
Answer: (City) Yes, you will be notified of neighborhood
meetings, hearings, etc. All public meetings. After
development plans have gone to public hearing you
can appeal, if you feel the need to, any decision of an
administrative hearing officer (Type I review) or the
Planning and Zoning Board (Type II review) to City
Council. Our affected property owner notification
requirements are based on a minimum radius of 500'
from the development property (in all directions),
whether the property owner lives in the City or the
County. There were 543 notices sent for this
neighborhood meeting.
23. Question: Who's the best voice to contact with my concerns, the
mayor? I had to deal with an asphalt plant being built
this close to my house before.
Answer: (City) You can certainly contact the mayor, or your
District's City Council member, if you like. You can
also contact me, the City's project planner, via e-mail,
letters, telephone, etc.
24. Question: To the north of this property, what is the zoning?
Answer: (Developer/Consultant) The property is in Larimer
County. The developer wanted to annex into the City of
Fort Collins but City Council and the developer didn't
see eye to eye on the zoning, so the applicant withdrew
the annexation request.
(City) It is currently zoned FA - Farming in Larimer
County. The City's Structure Plan identifies what the
property should be zoned when annexed. That area is
shown to be LMN - Low Density Mixed -Use
Neighborhood Residential, which has a density range 5
to 8 dwelling units per acre.
25. Question: What will you do with East Prospect Road? I'm not
happy with the status of it at all. I was told by the City
that Vine Drive would be improved and it has not
been. Let's work on East Prospect Road now.
Answer: (City) We will be working on East Prospect Road west
of Summit View Drive as part of the City's capital
improvement priorities. You can contact Marc
Anderson or John Lang at the City's Engineering
Department (221-6605) for the latest information
about the nature and timing of construction. For East
Prospect Road east of Summit View Drive, it is not in
the City's scope of work. However, these developments
may end up improving East Prospect Road as part of
off -site improvement requirements. Development does
not necessarily just do street improvements for
frontages of a property. This will depend on the traffic
study for any development.
PROJECT NOTES
1. Land uses and densities depicted on this Overall Development Plan represent development
intentions at this time, however, the Applicant reserves the right to change land uses and/or
densities in the future consistent with the I, C, and U-E Zoning Districts. Any additional land
uses not allowed in the applicabel zone district must be approved according to the criteria as set
forth by the City of Fort Collins.
2. Land use areas designated on this Overall Development Plans are approximate.
3. Redesign/reconfiguration of the 1-25/Prospect interchange may result in an impact on the
development of the site and may require additional right-of-way.
4. All public streets will be designed to the "Larimer County Urban Area Street Standards".
The access points shown on this ODP are approximate locations only. Precise locations of access
points will be determined at the time of site specific Project Development Plans.
5. The frontage road and Prospect Road does not meet current City standards.
6. Traffic functionality of the frontage road at Prospect Road currently does not meet acceptable
level of service.
7. Traffic functionality of the northbound 1-25 on ramp at Prospect Road currently does not meet
acceptable level of service.
8. The Prospect Road overpass over 1-25 does not meet current City standards.
9. The applicant will work with the City and CDOT with respect to transportation improvements in the
area.
10. Off -site improvements may be required at the time of site specific Project Development Plans in
order to meet level of service for all modes of transportation.
11. Sight distance easements may be required along the public roadways at the time of site specific
Project Development Plans.
12. Per LUC Section 3.7.3(E)(1), all transportation, water and wastewater, storm drainage,
emergency services, and electric power facilities shall meet the minimum requirements for
Adequate Public Facilities at the time of site specific Project Development Plans.
13. The applicant will continue to work with the City and other appropriate agencies to
resolve stormwater and floodplain issues.