Loading...
HomeMy WebLinkAboutFIRST COMMUNITY BANK PLAZA - Filed DCP-DEV. CONSTRUCTION PERMIT - 2006-08-15DEVELOPMENT CONSTRUCTION PERMIT Permit Number: 06-15 Issuance Date: Project Name: First Community Bank Plaza Project A.K.A.: Project Location: West side of JFK Parkway, 2 lots south of Horsetooth Road Permittee: Jennifer Chavies, Dohn Construction (970 49j 0-1855 City and developer contacts: See attached Exhibit "A" for names and phone numbers of all contact persons far this project. Fees: Permit Application Fee (400.00) $ paid Construction Inspection Fee (paid prior to issuance of this permit) $ 3,529.2 Total $ 3,529.20 Development Bond or other approved security: Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. $ 107,091.54 Form of security deposited with the City: Cash Escrow PERFORMANCE REQUIREMENTS OF THIS PERMIT: 1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design drawings and specifications the certification of all materials testing by an Engineer. The Permittee shall have an Engineer prepare revised design drawings and secure City approval for all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required by the City in the Development Agreement, that the improvements are constructed in conformance with the approved Utility Plans and the standards and specifications of the City. The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance of the constructed public improvements. (All references above to the terms "Project Engineer" and "Engineer" shall mean a Professional Engineer licensed in Colorado.) 2. All contractors who perform work on this project must be bonded and licensed in conformance with City requirements. People to Attend: List the peoples names and titles for those who will attend the pre - construction meeting: ESTIMATED COST OF INFRASTRUCTURE IMPROVEMENTS: Provide the estimated value of all public infrastructure improvements that will be constructed and accepted by the City to own and maintain. In addition provide the value of all private infrastructure improvements that the City will inspect and require certification for. The estimate shall be in the same format as the attached sheet titled "Project Quantities and Cost Estimate Sheet." Public infrastructure, estimated cost: $ Private infrastructure, estimated cost: $ 020S). 1011r♦o I certify that the information on this permit application along with the required additional submittals are true and correct to the best of my knowledge, and that in filing this application I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. Applicant S �� }j/ :\ G • w & � Ems/ ez= �I° ( �. @` w�-dJl | ■ I ; ---------- §S]ƒ -------- --- {\\\_- Oil� § | Ili, | U Nil § MIN 1111 {W Y � W N W w � m � E h kd' Q yi - >o g om -O d u O1 W O 3 a 8 •7 m J a Y � ........ ................... ......... .. . ... Y N � C a 9 m N la N n 3 3 3 - - W Q m m O N O N O VI O O O YI VI O O Y1 O H i Y w 01 � N L a € LL 6 '.,❑ � d LL o d �. W d 9 LL N d J m U a W d ii N y� d Ti N d `o N a @ m 1� ?N •� R 3 �. c 'n d c W `� {l W 0 � m p U 2 c p m O �. m > W N i Em Sm wm U w 02 a_ y ao W `ems — �m w IL r a` vm LL m � G m x E g p m m E v _.. 32 yi - i m _ w ? 0 ; °m O g` q u Q1 y m N E a 72 O O O R Q m a Y � C.... ... ... .... ... ..... .... ..... ..... .. y C ii o 0 0 0 0 0 0 o f e o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 n n m N N t2 m L ^ N a a n n n n n n n e m n r n n n n n n n n n n - a� n 0 o O- N c r LL LL LL LL 11 � � LL 11 LL LL � LL LL � F F � F F F R D N D D D O D 'I N D VI 9 O' V O y a D N D N y f0 D O D D W D N D N D N D W D N y P D N a n E a m E w 22 LL O CJ IL E :! C $ y C $ C N f p. LL Q F n F N z W F m r E E co LL N M M 1�1 M M M P P P d d P P d d P Q W a❑ TT w m f r w $ w E E E E r N m c N w w a` u E _ o Z m - - W - f - o O m - O gw � m a = a n n W R Q m a Y � A ' m m • C w� 7 E'm c ................................................ ..... Y E W o v n w� ci a o 0 0 o p ro Q O O O O a D 1 O m O - f o A 9 V 9 V V eg m a NND p m of F N a Y tY $ w U c � a m m C E N I n Z N N y F � E 5o o g� LL � ti p in o a n ap Transportation Services Engineering Department TO: Spiro Palmer FROM MEMORANDUM Dan Delaughter, Civil Engineer/ Nancy Reed DATE: 06/22/2006 RE: Initiate Escrow Account This memo is to acknowledge the receipt of escrow funds in the amount of $107,091.54 as a cash deposit for the guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development: West Side of JFK Parkway, 2 lots South of Horsetooth, First Community Bank Plaza Security deposit to guarantee the completion of public improvements.. When improvements to the Right -of -Way are completed, please call our Inspection recorder at 221-6609 to request an inspection (please allow 24 hours for the inspection to take place). Once the funds in escrow will be released to you. Escrow funds have been received from: Spiro Palmer 3636 S. College Avenue, Suite 201 Fort Collins, CO 80525 204-4000 cc: Initiate Escrow file Subdivision File Judi Vos, Cash Systems Coordinator Permit #D06-15 the improvements have passed inspection, Initiated by: Dan Delaughter 281 North College Avenue • P.O. Box 580 - Fort Collins, CO 80522-0580 • (970) 221-6605 - FAX (970) 221-6378 www.fcgov.com Development Construction Permit, Page 2/6 3. Construction time restrictions: 4. The applicant understands that additional permits maybe required for this development project and the applicant shall secure those permits directly from the issuing departments. 5. This permit, along with a complete set of all approved plans and documents for this project (utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic study, drainage report, plat easements and any other official documents), shall be kept on the development site available for use by City staff doing inspections. 6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable): a. If construction has not begun within sixty (60) days from the date of issuance of this permit, this permit shall expire and the applicant will forfeit the permit fee paid for this permit, whereupon the applicant must re -apply for a new permit. b. In addition, this permit shall expire one year from the date of issuance. The applicant may apply for an extension by reapplication at least two weeks prior to the expiration date. Such application shall contain information sufficient to justify the granting of the extension. An extension may be granted for up to six months. 7. Building permits and certificates of occupancy will only be issued when all conditions contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29- 678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the Development Agreement does not specify times for completion of public improvements, or if there is no Development Agreement, then the improvement requirements specified in Section 24-95 of the City Code shall apply, which provides that construction of all improvements shall be required prior to the time of issuance of the first building permit. 8. Acceptance by the City of the public improvements shall be after (1) final inspection has been conducted by the City; (2) punch list items from the final inspection are completed and accepted by the City; and (3) required certifications from the licensed professional engineer that improvements are completed to City standards, specifications and approved Utility Plans; and the "as -constructed" plans have been received and accepted by the City. 9. The warranty on street improvements is for five (5) years from the date of acceptance by the City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use Code, as applicable. 10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any Development Construction Permit, Page 3/6 planned construction on this project. All required perimeter silt fencing and other erosion/sediment control best management practices (BMP's) that can be installed prior to construction must be in place and inspected by the City Erosion Control Inspector before any land disturbing activity begins. 11. No work (including grading) shall be started in State Highway right-of-way until a permit is issued by the Colorado Department of Transportation to allow such work to begin. 12. Other conditions: Permittee's acknowledgment signature: By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. I also acknowledge that I have read this permit document with all its requirements and conditions, and I agree to all of the terms and conditions so stated in this permit. Applicant/Project Manager' s Signature. in� "`�— Date: Approval for issuance: City Engineer Approval: Date: /� — 7-2 -OCR (Permit Issuance Date) Development Construction Permit, Page 4/6 EXHIBIT "A" DEVELOPMENT PROJECT CONTACT PERSONS Name, address and numbers Project Name: I" Community Bank Plaza Project A.K.A.: City Staff Contact Persons: Development Engineer: Dan DeLaughter 281 N. College Avenue, Fort Collins, CO 80524 (970)221-6605 Construction Inspector: tw r e 0118 - 17ti O 281 N. College Avenue, Fort Collins, CO 80524 Cell: Current Planner: Ted Shepard 281 N. College Avenue, Fort Collins, CO 80524 (970)221-6750 Water Utilities Engineer: Roger Buffington 700 Wood Street, Fort Collins, CO 80521 (970)221-6700 Erosion Control Inspector: Bob Zackley 700 Wood Street, Fort Collins, CO 80521 (970)224-6063 Natural Resources: Doug Moore 281 N. College Avenue, Fort Collins, CO 80524 (970)221-6143 Traffic Operations: Eric Bracke 626 Linden Street, Fort Collins, CO 80524 (970) 221-6630 Street Closures: Syl Mireles 626 Linden Street, Fort Collins, CO 80524 (970) 221-6815 Development Construction Permit, Page 5/6 Transportation Planning: Kurt Ravenschlag 215 N. Mason Street, Fort Collins, CO 80524 (970)416-2040 Forestry: Tim Buchanan 215 N. Mason Street, Fort Collins, CO 80524 (970)221-6361 Light and Power: Alan Rutz 700 Wood Street, Fort Collins, CO 80521 (970) 221-6153 Developer' Contact Persons: Project Manager: Jennifer Chavies, Project Manager Dohn Construction 2642 Midpoint Drive, Unit A, Fort Collins, CO 80525 Office: (970) 490-1855 Fax (970) 490-6093 i chavies(iDdohnconstruction.com Owner/Developer: Brook Tamlin, Owner/Developer Contact Palmer Properties 3636 S. College Avenue, Fort Collins, CO 80525 Office: (970) 204-0081 btamlin(ai)pahnerflowers.com Architect/Planner: Bob Mechels Vaught Frye Architects 401 W. Mountain Avenue, Fort Collins, CO 80521 Office: (970) 224-1191 Fax: (970) 224-1662 bmechels(avfavfr.com Project Engineer: Joe Sparone, P.E. (# 39848) JR Engineering 2620 E. Prospect Road, Ste. 190, Fort Collins, CO 80525 Office: (970) 491-9888 Fax: (970) 491-9984 jsparone@j rengineering.com Development Construction Permit, Page 6/6 General Contractor: Jennifer Chavies Dohn Construction 2642 Midpoint Drive, Unit A, Fort Collins, CO 80525 Office: (970) 490-1855 Fax (970) 490-6093 ichaviesCa�dohnconstruction.com 000000 0000000000 000000 �0000 0000000000 000000 MMNvi.=(6 6666666666 MoUioMo O aomr r NO `ann of 6H M OM Ow0 rOf9 W O OlA fAr N 6964)— 19 to — to fA V 69 0 fA f9 fA a9 fA 64 rM M Vi Z J O 2 F w �w m .raw + � OUJ zLL Z O O O O O O o 0 0 0 0 0 0 0 0 0 00000 0 J r r u)(q 0 0 r r r 0 0 0 0 0 0 0 7 0 o O IT V J F O O M M C M M O O O O O M O 0 0 0 O 00 O w <.i F»ra Vi en O�1 69 fAwr� r�� r»M4�w Ks vs ea i»di Flow j' w IL w O w W O O O o 00 0 O a o N 0 0 0 0 0 0 0 O O O U) O N O 9L Z M IT 0 0 M 0 O V r- 0 0 0 0 0 0 0 O O O N O N O O O a o O O O aa 0 0 0 0 0 0 0 O LL 07r rrr —�O O0 O OM 00fA/Ao000 ifiMN0to W Mir OUO) IM0 M 00O w h ON w�NM�ii��aw�Us 64Vl6 nia % H > wcr It w rn in J N a U) w W - W � wLL zu LU LU w (o M 0 0 v 0 O M n o O o o o O O O O O O O n 0 lz 2 M U)0O—O OWN OOOOOoo o olq wo W 0 0 0 W F O O O C A 60 CO. O C J O O O O O O M M N O M O FQ— Hy N—Or rm fAO r Of9 (A0 a 00 0MI4 Z W Q m f f M r O ()) of (n rn (n (n (n f» (» fA N va LU U F fa (+i ci r in M 6n 6% W M O K W l y 20 0 a fn Vi 6% vi fn G y W 0) �- IL p v ZN2ya� z LLOOLL0 w zuu0eQu 00 M M N N n N O O W N O o M o 0 0 0 (o O O O O: M M O O M CO M (o H W co w M a W Z W W WW u 3 W W M C N� a UZ w O LU a G z LL W O Ny LL LL y>-oo LL LL QU a0 Q00 QU QUU Cl) LL LL LLyi ZK Z W J J U U W LU J J J W W W W W W W J co J J J (Jj U) U O �g Or Z N J LU m Q LU a W (L m too A a� _ — zz Y G:W 2 4) ur w y J w a M Q � — N CO C _U Uyy �.l LL a' J O m Z N c a K— c zCoIL v0 a in F o ; E aJ a ° Ogg CL d 10L_ m c aC c,-cU y yv f0 24 F J W ; S Fa a y d) ; N C '+ U c W Q V a'�Q N t �� y o Z�L� ao v,am� .N+ c W L c o. Qw N H i a c d c c « d o :: S C j p; c m :o (D m o w 2 N o 2 C f0 = a1 a7 C (a `) fO d (0 > 'e a o a' F W— .+ o m as m m x �° M d a) a 2 a LL co y2�U�a� 3tn���ii�>�LL3 rn c�a. 0a a.<0 p _ m N N N N ImV t0 M y Y 6K 616 Eoivorarn� DEVELOPMENT CONSTRUCTION PERMIT APPLICATION (1 / 16/06) For City use only: Application Number: Application Permit application fee: $ 400.00 INSTRUCTIONS: I. Complete this form (some questions may not apply to you) and attach all necessary documents and submit to the Development Engineering+ Section of the City. 2. If you have any questions contact the Development Engineer, , at 221-6605. 3. Submit the Application and pay the Application Fee at the fee at the Engineering counter at 281 N. College Avenue. PROJECT INFORMATION: Project Name (as approved by the City): Project A.K.A. (Marketing name if different from Project Name): Project Location: Nor,�-,ek� k .`fk — A ?a-k S 14 2 -Fie. -1he- Property Owner(At the time of this permit issuance): Individual Name: Company Name : a m2r t^o9er+iGs Address: ?Stsap s. Calleae_ Ave. Cryrk Lokk,.s ?,c)r?.c;, Phone number(s): Office: Q-10- Z04-CACM Cellphone: Fax number: 11-40-ZO4-OOSI Email: Applicant/Project Manager (The primary contact person for all matters regarding this project, and the person responsible for all matters referencing "the Developer" in the Development Agreement for this project): J2nn,4i✓ C'yt(tuleS Individual Name: Company Name : ��r� C or1°�YUL�ior� Address: Llrt,i- A &r- i'_oliinS FiD52c, Phone number(s): Office: 9-4-0 - cAGCt -I byy Cel 1phone: Fax number: 9-40 - 49D - tao93 Email: tr 1-sj antes d c r-,