HomeMy WebLinkAboutFIRST COMMUNITY BANK PLAZA - Filed DCP-DEV. CONSTRUCTION PERMIT - 2006-08-15DEVELOPMENT CONSTRUCTION PERMIT
Permit Number: 06-15 Issuance Date:
Project Name: First Community Bank Plaza
Project A.K.A.:
Project Location: West side of JFK Parkway, 2 lots south of Horsetooth Road
Permittee: Jennifer Chavies, Dohn Construction (970 49j 0-1855
City and developer contacts: See attached Exhibit "A" for names and phone numbers of all
contact persons far this project.
Fees: Permit Application Fee (400.00) $ paid
Construction Inspection Fee (paid prior to issuance of this permit) $ 3,529.2
Total $ 3,529.20
Development Bond or other approved security:
Amount of security deposited with the City to guarantee the completion of all public
improvements to be constructed as shown on the approved plans for the development.
$ 107,091.54
Form of security deposited with the City: Cash Escrow
PERFORMANCE REQUIREMENTS OF THIS PERMIT:
1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design
drawings and specifications the certification of all materials testing by an Engineer. The Permittee
shall have an Engineer prepare revised design drawings and secure City approval for all revisions to
the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required
by the City in the Development Agreement, that the improvements are constructed in conformance
with the approved Utility Plans and the standards and specifications of the City. The Permittee shall
provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance of the
constructed public improvements. (All references above to the terms "Project Engineer" and
"Engineer" shall mean a Professional Engineer licensed in Colorado.)
2. All contractors who perform work on this project must be bonded and licensed in conformance
with City requirements.
People to Attend: List the peoples names and titles for those who will attend the pre -
construction meeting:
ESTIMATED COST OF INFRASTRUCTURE IMPROVEMENTS: Provide the estimated value of
all public infrastructure improvements that will be constructed and accepted by the City to own and
maintain. In addition provide the value of all private infrastructure improvements that the City will
inspect and require certification for. The estimate shall be in the same format as the attached sheet titled
"Project Quantities and Cost Estimate Sheet."
Public infrastructure, estimated cost: $
Private infrastructure, estimated cost: $ 020S). 1011r♦o
I certify that the information on this permit application along with the required additional submittals are
true and correct to the best of my knowledge, and that in filing this application I am acting with the
knowledge, consent, and authority of the owners of the property (including all owners having legal or
equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common
areas legally connected to or associated with the property which is the subject of this application) without
whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said
authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if
necessary, to enter upon such property to perform work required of the applicant if the applicant were to
fail to perform the required work.
Applicant S
��
}j/
:\
G
•
w
&
�
Ems/
ez=
�I°
(
�.
@`
w�-dJl
|
■
I
;
----------
§S]ƒ
--------
---
{\\\_-
Oil�
§
| Ili,
| U
Nil
§
MIN
1111
{W
Y �
W
N
W
w
�
m
�
E
h
kd'
Q
yi
-
>o
g
om
-O
d
u
O1
W
O
3
a
8
•7
m
J
a
Y
�
........
...................
.........
..
. ...
Y
N
�
C
a
9
m
N
la
N
n
3
3
3
-
-
W
Q
m
m
O
N
O
N
O
VI
O
O
O
YI
VI
O
O
Y1
O
H
i
Y
w
01
�
N
L
a
€
LL
6
'.,❑
�
d
LL
o
d
�.
W
d
9
LL
N
d
J
m
U
a
W
d
ii
N
y�
d
Ti
N
d
`o
N
a
@
m
1�
?N
•�
R
3
�.
c
'n
d
c
W
`�
{l
W
0
�
m
p
U
2
c
p
m
O
�. m
>
W
N
i
Em
Sm
wm
U w
02
a_ y
ao
W
`ems
—
�m
w
IL
r
a`
vm
LL
m
�
G
m
x E
g
p
m
m
E v
_..
32
yi
-
i
m
_
w
?
0
;
°m
O
g`
q
u
Q1
y
m
N E
a
72
O O
O
R
Q
m
a
Y
�
C....
...
...
....
...
.....
.... .....
.....
..
y
C
ii
o
0
0
0
0
0
0
o
f
e
o
0
0
0
0
0
0
0
0
0
0
0
0
0
0
n
n
m
N
N
t2
m
L
^
N
a
a
n
n
n
n
n
n
n
e
m
n
r
n
n
n
n
n
n
n
n
n
n
-
a�
n
0
o
O-
N
c
r
LL
LL
LL
LL
11
�
�
LL
11
LL
LL
�
LL
LL
�
F
F
�
F
F
F
R
D
N
D
D
D
O
D
'I N
D
VI
9
O'
V
O
y
a
D
N
D
N
y
f0
D
O
D
D
W
D
N
D
N
D
N
D
W
D
N
y
P
D
N
a
n
E
a
m
E
w
22
LL
O
CJ
IL
E
:!
C
$
y
C
$
C
N
f
p.
LL
Q
F
n
F
N
z
W
F
m
r
E
E co
LL
N
M
M
1�1
M
M
M
P
P
P
d
d
P
P
d
d
P
Q W
a❑
TT
w
m f
r
w
$
w E
E
E E
r
N
m
c
N
w
w
a`
u E
_
o
Z m
-
-
W
-
f
-
o
O m
-
O
gw
�
m
a
= a
n n
W
R
Q m
a
Y
�
A
' m
m
•
C
w�
7
E'm
c
................................................
.....
Y
E
W
o
v n
w�
ci
a
o
0
0
o
p
ro
Q
O
O
O
O
a
D
1
O
m
O
-
f
o
A
9
V
9
V
V
eg
m
a
NND
p
m
of
F N a
Y
tY
$
w
U
c
�
a
m
m
C
E
N
I
n
Z
N
N
y
F
�
E
5o
o
g�
LL
� ti
p
in
o
a
n
ap
Transportation Services
Engineering Department
TO: Spiro Palmer
FROM
MEMORANDUM
Dan Delaughter, Civil Engineer/ Nancy Reed
DATE: 06/22/2006
RE: Initiate Escrow Account
This memo is to acknowledge the receipt of escrow funds in the amount of $107,091.54
as a cash deposit for the guarantee the completion of all public improvements to be
constructed as shown on the approved plans for the development:
West Side of JFK Parkway, 2 lots South of Horsetooth,
First Community Bank Plaza
Security deposit to guarantee the completion of public improvements..
When improvements to the Right -of -Way are completed, please call our
Inspection recorder at 221-6609 to request an inspection (please allow 24 hours
for the inspection to take place). Once
the funds in escrow will be released to you.
Escrow funds have been received from:
Spiro Palmer
3636 S. College Avenue, Suite 201
Fort Collins, CO 80525
204-4000
cc: Initiate Escrow file
Subdivision File
Judi Vos, Cash Systems Coordinator
Permit #D06-15
the improvements have passed inspection,
Initiated by: Dan Delaughter
281 North College Avenue • P.O. Box 580 - Fort Collins, CO 80522-0580 • (970) 221-6605 - FAX (970) 221-6378
www.fcgov.com
Development Construction Permit, Page 2/6
3. Construction time restrictions:
4. The applicant understands that additional permits maybe required for this development project
and the applicant shall secure those permits directly from the issuing departments.
5. This permit, along with a complete set of all approved plans and documents for this project
(utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic
study, drainage report, plat easements and any other official documents), shall be kept on the
development site available for use by City staff doing inspections.
6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or
Section 2.6.3(K) of the Land Use Code, whichever is applicable):
a. If construction has not begun within sixty (60) days from the date of issuance of this
permit, this permit shall expire and the applicant will forfeit the permit fee paid for this
permit, whereupon the applicant must re -apply for a new permit.
b. In addition, this permit shall expire one year from the date of issuance. The applicant
may apply for an extension by reapplication at least two weeks prior to the expiration date.
Such application shall contain information sufficient to justify the granting of the extension.
An extension may be granted for up to six months.
7. Building permits and certificates of occupancy will only be issued when all conditions contained
in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29-
678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the
Development Agreement does not specify times for completion of public improvements, or if there is
no Development Agreement, then the improvement requirements specified in Section 24-95 of the
City Code shall apply, which provides that construction of all improvements shall be required prior
to the time of issuance of the first building permit.
8. Acceptance by the City of the public improvements shall be after (1) final inspection has been
conducted by the City; (2) punch list items from the final inspection are completed and accepted by
the City; and (3) required certifications from the licensed professional engineer that improvements
are completed to City standards, specifications and approved Utility Plans; and the "as -constructed"
plans have been received and accepted by the City.
9. The warranty on street improvements is for five (5) years from the date of acceptance by the City
of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional
Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use
Code, as applicable.
10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any
Development Construction Permit, Page 3/6
planned construction on this project. All required perimeter silt fencing and other erosion/sediment
control best management practices (BMP's) that can be installed prior to construction must be in
place and inspected by the City Erosion Control Inspector before any land disturbing activity begins.
11. No work (including grading) shall be started in State Highway right-of-way until a permit is
issued by the Colorado Department of Transportation to allow such work to begin.
12. Other conditions:
Permittee's acknowledgment signature:
By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of
the owners of the property (including all owners having legal or equitable interest in the real property, as
defined in Section 1-2 of the City Code; and including common areas legally connected to or associated
with the property which is the subject of this application) without whose consent and authority the
requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City
officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such
property to perform work required of the applicant if the applicant were to fail to perform the required
work. I also acknowledge that I have read this permit document with all its requirements and
conditions, and I agree to all of the terms and conditions so stated in this permit.
Applicant/Project Manager' s Signature. in� "`�— Date:
Approval for issuance:
City Engineer Approval: Date: /� — 7-2 -OCR
(Permit Issuance Date)
Development Construction Permit, Page 4/6
EXHIBIT "A"
DEVELOPMENT PROJECT CONTACT PERSONS
Name, address and numbers
Project Name: I" Community Bank Plaza
Project A.K.A.:
City Staff Contact Persons:
Development Engineer: Dan DeLaughter
281 N. College Avenue, Fort Collins, CO 80524
(970)221-6605
Construction Inspector: tw r e 0118 - 17ti O
281 N. College Avenue, Fort Collins, CO 80524
Cell:
Current Planner: Ted Shepard
281 N. College Avenue, Fort Collins, CO 80524
(970)221-6750
Water Utilities Engineer: Roger Buffington
700 Wood Street, Fort Collins, CO 80521
(970)221-6700
Erosion Control Inspector: Bob Zackley
700 Wood Street, Fort Collins, CO 80521
(970)224-6063
Natural Resources: Doug Moore
281 N. College Avenue, Fort Collins, CO 80524
(970)221-6143
Traffic Operations: Eric Bracke
626 Linden Street, Fort Collins, CO 80524
(970) 221-6630
Street Closures: Syl Mireles
626 Linden Street, Fort Collins, CO 80524
(970) 221-6815
Development Construction Permit, Page 5/6
Transportation Planning: Kurt Ravenschlag
215 N. Mason Street, Fort Collins, CO 80524
(970)416-2040
Forestry: Tim Buchanan
215 N. Mason Street, Fort Collins, CO 80524
(970)221-6361
Light and Power: Alan Rutz
700 Wood Street, Fort Collins, CO 80521
(970) 221-6153
Developer' Contact Persons:
Project Manager: Jennifer Chavies, Project Manager
Dohn Construction
2642 Midpoint Drive, Unit A, Fort Collins, CO 80525
Office: (970) 490-1855
Fax (970) 490-6093
i chavies(iDdohnconstruction.com
Owner/Developer: Brook Tamlin, Owner/Developer Contact
Palmer Properties
3636 S. College Avenue, Fort Collins, CO 80525
Office: (970) 204-0081
btamlin(ai)pahnerflowers.com
Architect/Planner: Bob Mechels
Vaught Frye Architects
401 W. Mountain Avenue, Fort Collins, CO 80521
Office: (970) 224-1191
Fax: (970) 224-1662
bmechels(avfavfr.com
Project Engineer: Joe Sparone, P.E. (# 39848)
JR Engineering
2620 E. Prospect Road, Ste. 190, Fort Collins, CO 80525
Office: (970) 491-9888
Fax: (970) 491-9984
jsparone@j rengineering.com
Development Construction Permit, Page 6/6
General Contractor: Jennifer Chavies
Dohn Construction
2642 Midpoint Drive, Unit A, Fort Collins, CO 80525
Office: (970) 490-1855
Fax (970) 490-6093
ichaviesCa�dohnconstruction.com
000000 0000000000 000000
�0000 0000000000 000000
MMNvi.=(6 6666666666 MoUioMo O
aomr r NO `ann of 6H M OM Ow0 rOf9 W
O OlA fAr N 6964)— 19 to — to fA V 69 0
fA f9 fA a9 fA 64 rM M Vi
Z J
O 2
F
w
�w m
.raw + �
OUJ
zLL Z
O O O O O O o 0 0 0 0 0 0 0 0 0 00000 0 J
r r u)(q 0 0 r r r 0 0 0 0 0 0 0 7 0 o O IT V J
F O O M M C M M O O O O O M O 0 0 0 O 00
O w <.i F»ra Vi en O�1 69 fAwr� r�� r»M4�w Ks vs ea i»di
Flow j' w
IL w
O
w
W O O O o 00 0 O a o N 0 0 0 0 0 0 0 O O O U) O N O 9L
Z M IT 0 0 M 0 O V r- 0 0 0 0 0 0 0 O O O N O N O
O O a o O O O aa 0 0 0 0 0 0 0 O
LL 07r rrr —�O O0 O
OM 00fA/Ao000 ifiMN0to W
Mir OUO) IM0 M 00O w h ON
w�NM�ii��aw�Us 64Vl6 nia % H >
wcr
It
w rn in
J N a
U) w
W - W
� wLL zu LU
LU w (o M 0 0 v 0 O M n o O o o o O O O O O O O n 0
lz 2 M U)0O—O OWN OOOOOoo o olq wo W 0 0
0
W F O O O C A 60 CO. O C J O O O O O O M M N O M O
FQ— Hy N—Or rm fAO r Of9 (A0 a 00 0MI4
Z W Q m f f M r O ()) of (n rn (n (n (n f» (» fA N va LU
U F fa (+i ci r in M 6n 6% W
M O K W l y 20 0 a fn Vi 6% vi fn G
y W
0) �- IL p v
ZN2ya� z
LLOOLL0 w
zuu0eQu 00
M M N N n N O O W N O o M o 0 0 0 (o O O O
O: M M O O M CO M (o H
W co w M a
W Z W
W
WW u 3
W W M
C
N� a UZ
w O LU a G
z
LL W O
Ny LL LL y>-oo LL LL QU a0 Q00 QU QUU Cl) LL LL LLyi ZK
Z W J J U U W LU J J J W W W W W W W J co J J J (Jj U) U O
�g Or
Z N
J LU
m
Q LU a
W
(L m too
A a� _ — zz
Y G:W 2 4) ur w y
J w a
M Q � — N CO C _U Uyy �.l LL
a'
J O m Z N c a K—
c zCoIL v0 a in F o ; E aJ
a ° Ogg CL d 10L_ m c aC c,-cU y yv f0 24
F J W ; S Fa a y d) ; N C '+ U c W Q
V a'�Q N t �� y o Z�L� ao v,am� .N+ c W L c o. Qw
N H i a c d c c « d o :: S C j p; c m :o (D m o w 2
N o 2 C f0 = a1 a7 C (a `) fO d (0 > 'e a o a' F
W— .+ o m as m m x �° M d a) a 2 a
LL co
y2�U�a� 3tn���ii�>�LL3 rn c�a. 0a a.<0 p _
m N N N N ImV t0 M y Y
6K 616 Eoivorarn�
DEVELOPMENT CONSTRUCTION PERMIT
APPLICATION
(1 / 16/06)
For City use only: Application Number: Application
Permit application fee: $ 400.00
INSTRUCTIONS:
I. Complete this form (some questions may not apply to you) and attach all necessary documents and
submit to the Development Engineering+ Section of the City.
2. If you have any questions contact the Development Engineer, , at 221-6605.
3. Submit the Application and pay the Application Fee at the fee at the Engineering counter at 281 N.
College Avenue.
PROJECT INFORMATION:
Project Name (as approved by the City):
Project A.K.A. (Marketing name if different from Project Name):
Project Location: Nor,�-,ek� k .`fk — A ?a-k S 14 2 -Fie. -1he-
Property Owner(At the time of this permit issuance):
Individual Name:
Company Name : a m2r t^o9er+iGs
Address: ?Stsap s. Calleae_ Ave. Cryrk Lokk,.s ?,c)r?.c;,
Phone number(s):
Office: Q-10- Z04-CACM
Cellphone:
Fax number: 11-40-ZO4-OOSI
Email:
Applicant/Project Manager (The primary contact person for all matters regarding this project, and the
person responsible for all matters referencing "the Developer" in the Development Agreement for this
project): J2nn,4i✓ C'yt(tuleS
Individual Name:
Company Name : ��r� C or1°�YUL�ior�
Address: Llrt,i- A &r- i'_oliinS FiD52c,
Phone number(s):
Office: 9-4-0 - cAGCt -I byy
Cel 1phone:
Fax number: 9-40 - 49D - tao93
Email: tr 1-sj antes d c r-,