HomeMy WebLinkAboutBLOCK 173 300 SMITH STREET OLD TOWN COMMONS - Filed CS-COMMENT SHEETS - 2005-12-22PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: October 13, 2004 TO: Technical Services
REL . D
PROJECT: 937-04 300 Smith Street, Old Town Commons PDP
- Type II (LUC)
All comments must be received by Anne Aspen no later than the staff
review meeting:
i
November 3, 2004
Note - PLEASE identify your redlines for future reference
77,
3
Name (please print)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_Plat _Drainage Report _Other_
—Utility Redline Utility __Landscape
.� PROJECT
i.AA COMMENT SHEET
City of Fort Coll iris
Current PlanninL REi.'D
DATE: October 13, 2004 TO: Engineering Pavement
PROJECT: #37-04 300 Smith Street, Old Town Commons PDP
- Type II (LUC)
All comments must be received by Anne Aspen no later than the staff
review meeting:
November 3, 2004
Note - PLEASE identify your redlines for future reference
e5,17,fv
K
Name (please print)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
__ Ylat _Site _Drainage Report _Other _-
--Utility Utility _Redline Utility _Landscape
City of Fort Collins
Project Comments Sheet
CAN, of Fort Cotlins Selected Departments
--
Department: Engineering
Date: November 5, 2004
Project: 300 SMITH STREET, OLD TOWN COMMONS PDP - TYPE 11
Issue Contact: Marc Virata
Topic: General
Number: 12 Created: 10/29/2004
[10/29/04] Please ensure all documents are in 24x36 format.
Number: 13 Created: 10/29/2004
[10/29/04] The alley needs to be constructed in concrete from the street to the projection of
the front property 'line for the project.
Number: 16 Created: 10/29/2004
[10/29/041 Provide a concrete ribbon on the east side of the alley in accordance with the
LCLASS.
Number: 17 Created: 10/29/2004
[10/29/041 Expand the patching limits shown along Olive Street to 6' in width (half a lane)
and add the following note referencing these patches: "Limits of street repair are
approximate. Final limits to be determined in the field by the City Engineering Inspector at
the time the cuts are made."
Number: 18 Created: 10/29/2004
[10/29/04] Add a note with regards to the existing sidewalk along Smith Street that all
substandard sidewalk along Smith Street adjacent to the property frontage shall be replaced
by determination of the City Engineering Inspector.
Number: 19 Created: 10/29/2004
[10/29/04] The sidewalk along Olive Street needs to continue across the alley with access
ramps on both sides of the alley.
Number: 20 Created: 10/29/2004
(10/29/04] More information is needed with regards to the existing surrounding area and
what impact the development may cause. Provide additional contours and existing spot
elevations. Will the alley construction result in the need for offsite easements?
Number: 21
Created: 10/29/2004
/i Z5 f
Da e
CHECK; HERK-IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat ,/ Site Drainage Report Other_
_Utility Redline Utility ,''Landscape
Page I
[10/29/041 Additional right-of-way will need to be dedicated along the alley to the back of
(driveover) curb. In addition, 8' of utility easement from behind the right-of-way is also
required. Where does the alley right-of-way end on the ease side of the alley?
Number: 22 Created: 10/29/2004
[10/29/04] The alley design notes a 6' concrete pan instead of the driveover curb and gutter
required with Alley Option (B) in the LCUASS.
Number: 23 Created: 10/29/2004
[10/29/04] There appears to be some discrepancy with regards to the sidewalk connection
from Smith Street to the property. The landscape plan and utility plan appear to show this
existing sidewalk to remain while the site plan apparently shows it to be removed and
replaced. If it is proposed to remain, it appears to be substandard for ADA with regards to
width and the lack of an access ramp connecting to Smith Street.
Number: 24 Created: 10/29/2004
[10/29/04] The site plan shows sidewalk connection out to Olive Street which are not shown
on the utility plan, please coordinate between the drawings.
Number: 25 Created: 10/29/2004
[10/29/04] Site plan, utility plan, and building elevation sets specify information (such as
finish floor elevations) that do not match each other.
Number: 26
Created: 10/29/2004
[10129/04] The window wells along the south side of the building fall within the swale area,
is this a good idea considering flows being directed along the swale? I'd like to see a typical
cross section of the swale and window well situation.
Number: 27 Created: 10/29/2004
[10/29/04] Information will need to be provided indicating how a potential perimeter drain
system (as recommended by the soils report) around the foundation(s) will discharge.
Indicate on the construction plan set where the sump pump pit (or pits) are to be located or
where a pipe (or pipes) are to daylight. Flows are not allowed to cross a sidewalk as well as
enter a public street.
Number: 28 Created: 10/29/2004
[10/29/04] In general, provide standard title blocks, approval blocks (as appropriate), and
other required information on all drawing documents.
Number: 29 Created: 10/29/2004
[10/29/041 The soils report appears to recommend 10% slopes around the foundation(s)
which doesn't appear to be accommodated into the design, though if 10% slopes are to be
designed, could there be a concern with how such a design would tie into existing grades to
the south?
Number: 41 Created: 11/3/2004
[11/3/041 A utility coordination meeting is suggested to discuss utility servicing to the site. I
will send out an ernail to the utilities in order to begin this.
Page 2
Rr', VISION
COMMENT SHEET
t' of Fort Collins
rrent Planning
DATE: January 5, 2005 TO: Technical Services
PROJECT: #39-03A 300 Smith Street PDP
All comments must be received by Steve Olt no later than the staff
review meeting:
January 19, 2005V
Note - Please identify vour redlines for future reference
n
Name (please print)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site _Drainage Report Other
Utility Redline Utility _Landscape
Project Comments Sheet
Selected Departments
Citv of Fort Col" Ills
Department: Engineering
Date: January 21, 2005
Project: 300 SMITH STREET, OLD TOWN COMMONS PDP - TYPE II
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
January 19, 2005
Note - Please identify your redlines for future reference
Issue Contact: Marc Virata
Topic: General
Number: 19 Created: 10/29/2004
[1/18/05] Please ensure LCUASS detail 803 is provided to ensure compliance with the
comment.
[10/29/04] The sidewalk along Olive Street needs to continue across the alley with access
ramps on both sides of the alley.
Number: 20 Created: 10/29/2004
[1 /18/05] With the silt fence shown outside of the property line it appears that a construction
easement will be needed to the south with the adjacent property owner. Also, being able to
grade with equipment such that a landscape wall can be constructed directly adjacent to the
property line, appears to only be possible by getting construction easement permission from
the adjacent property owner.
[10/29/04] More information is needed with regards to the existing surrounding area and
what impact the development may cause. Provide additional contours and existing spot
elevations. Will the alley construction result in the need for offsite easements?
Number: 21 Created: 10/29/2004
[1118/05] With only 4' of utility easement being proposed, a variance request is required
from the Engineering which will be routed to the various utilities in order to verify their
approval.
[10/29/04] Additional right-of-way will need to be dedicated along the alley to the back of
(driveover) curb. In addition, 8' of utility easement from behind the right-of-way is also
required. Where does the alley right -of -way -end on the ease side of the alley?
Z! es—
te
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat ---Site Drainage Report Other
�ZJtility _ Redline Utility ✓Landscape
Page I
Number: 23 Created: 10/29/2004
(1/18/05] Note on the construction plans (existing conditions) that the existing sidewalk
connection from the existing house out to Smith Street is to be removed, which coincides
with the site plan.
[10/29/041 There appears to be some discrepancy with regards to the sidewalk connection
from Smith Street to the property. The landscape plan and utility plan appear to show this
existing sidewalk to remain while the site plan apparently shows it to be removed and
replaced. If it is proposed to remain, it appears to be substandard for ADA with regards to
width and the lack of an access ramp connecting to Smith Street.
Number: 25 Created: 10/29/2004
[1/18/05] This still is apparently an issue, the site plan specifies foundation elevations that
do not match the utility plans.
[10/29/04] Site plan, utillity plan, and building elevation sets specify information (such as
finish floor elevations) that do not match each other.
Number: 55 Created: 1/18/2005
[1/18/051 Is it the case that the drainage collected from the inlet on the west side of the alley
cannot be directed underneath the sidewalk to the west out to Olive Street instead of the
grate system? This would reduce costs as well as general concerns on the amount of
concrete pavement beneath the grate system to ensure it holds up to traffic.
Page
.- �• '.,. vf..,.4�,1i.$mi:]��iLs,vb:.[rti:._..4�s.8.uL,£�dSiS`:'4�.aru�.
Project Comments Sheet
Selected Departments
City of Port Collins
Department: Engineering
Date: April 20, 2005
Project:
300 SMITH STREET, OLD TOWN COMMONS PDP AND FINAL PLANS
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
April 20, 2005
Note - Please identify your redlines for future reference
Issue Contact: Marc Virata
Topic: General
Number: 55 Created: 1/18/2005
[4/19/05] The redesign has concerns. Only .2% of grade is being provided, there's not
enough slope to ensure adequate drainage. In talking with Stormwater, couldn't the design
function better if the grate in the alley was eliminated and a chase was designed from the
alley out to the sidewalk by having the invert elevation at the alley start at 66.42 to daylight
to the street at 66.21? Rather than a grate on the sidewalk, use a metal plate (see attached
detail).
11/18/051 Is it the ease that the drainage collected from the inlet on the west side of the alley
cannot be directed underneath the sidewalk to the west out to Olive Street instead of the
grate system? This would reduce costs as well as general concerns on the amount of
concrete pavement beneath the grate system to ensure it holds up to traffic.
c-U y—
Date
HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other
Utility, Redline Utility Landscape
Page I