Loading...
HomeMy WebLinkAboutHARMONY TECHNOLOGY PARK SECOND - Filed DCP-DEV. CONSTRUCTION PERMIT - 2005-10-28City crf Vot, t'oliins Transportation Services DEVELOPMENT CONSTRUCTION PERMIT Permit Number: Issuance Date: 7 l 5 Project Name: Cambridge As enue (as part of Harmony Technoloay Park 2"a Filinl Project Location: Cambridge Avenue south of Harmony Koact norm of KocK l,reCK vnve Irv_ -6; E- ,-tLaeY4-1 ' Permittee: best v ' ' r City and developer contacts: See attached Exhibit "A" for names and phone numbers of all contact persons for this project. fees: Permit Application Fee (paid at the time of application) $ 300.00 Constructiort Inspection Fee (paid prior to issuance of this permit) $ 24 559.90 Total $ 24,859.00 Development Bond or other approved security: Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. $ 796S3361 Form of security deposited with the City: r, rr _ r, Lsrr PERFORMANCE REQUIREMENTS OF THIS PERMIT: 1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design chawings and specifications the certification of all materials testing by an Engineer. The Permittee shall have an Engineer prepare revised design drawings and secure City approval for all revisions to the tJ:ilily Plans and related documents. The Permittee shall have an Engineer represent, as required by the City in the Development Agreement, that the improvements are constructed in conformance with the approved Utility Plans and the standards and specifications of the City. The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance of the constructed public improvements. (All references above to the terms "Project Engineer" and " Fngincer" shall mean a Professional Engineer licensed in Colorado.) 2. All contractors who perform work on this project must be bonded and licensed in conformance with City requirements. Development Construction Permit, Page 2/5 3. Construction time restrictions: N/A 4. The applicant understands that additional permits maybe required for this development project and the applicant shall secure those permits directly from the issuing departments. 5. 'phis permit, along with a complete set of all approved plans and documents for this project (utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic study.. drainage report, plat easements and any other official documents), shall be kept on the development site available for use by City staff doing inspections. 6. Permit Expiration ( in accordance with Section 29-12 of the Transitional Land Use Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable): a. If construction has not begun within sixty (60) days from the date of issuance of this permit, this permit shall expire and the applicant will forfeit the permit fee paid for this permit, whereupon the applicant must re -apply for a new permit. b. In addition, this permit shall expire one year from the date of issuance. The applicant may apply for an extension by reapplication at least two weeks prior to the expiration date. Such application shall contain information sufficient tojustify the granting of the extension. An extension may be granted for up to six months. 7. Building permits and certificates of occupancy will only be issued when all conditions contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29- 678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the Development Agreement does not specify times for completion of public improvements, or if there is no Development Agreement, then the improvement requirements specified in Section 24-95 of the City Code shall apply, which provides that construction of all improvements shall be required prior to the time of issuance of the first building permit. 8. Acceptance by the City of the public improvements shall be after (1) final inspection has been conducted by the City: (2) punch list items from the final inspection are completed and accepted by the City; and (3) required certifications from the licensed professional engineer that improvements are completed to City standards, specifications and approved Utility Plans; and the "as -constructed" plans have been received and accepted by the City. 9. The warranty on street improvements is for five (5) years from the date of acceptance by the City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional Land Use Regulatiors and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use Code, as applicable. 10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any planned construction on this project. All required perimeter silt fencing and other erosion/sediment control best management practices (BMP's) that can be installed prior to construction must be in Development Construction Permit, Page 3/5 place and inspected by the City Erosion Control Inspector before any land disturbing activity begins. 11. No work (including grading and construction access) shall be started in State Highway right-of- way until a permit is issued by the Colorado Department of Transportation to allow such work to begin. 12. Other conditions: The Pavement design report shall address potential mitigation measures liar stormwatcr utility lines having less than ideal cover on Cambridge Permittee's acknowledgment signature: By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. I also acknowledge that I have read this permit document with all its requirements and conditions, and I agree to all of the terms and conditions so stated iin this permit. Applicant/Projeel Manager' s Signatbre' � �� �"�°" t'"L Date: Approval for issuance: 1 City Engineer Approval ^ - t - / Date: (Permit Issuance Date) Development Construction Permit, Page 4/5 EXHIBIT "A" DEVELOPMENT PROJECT CONTACT PERSONS Name, address and numbers Project Name: Harmony Technology Park 2"d Filing Project A.K.A.: (Cambridge Avenue) City Staff Contact Persons: Development Engineer: Construction Inspector: Marc Virata, P.E. / City of Fort Collins Engineering 281 N. College Avenue / Fort Collins, CO 80524 970 221-6605 Lance Newlin / City of Fort Collins Engineering 281 N. College Avenue / Fort Collins, CO 80524 970 221-6605 Current Planner: Ted Shepard / City of Fort Collins Current Planning 281 N. College Avenue / Fort Collins, CO 80524 970 221-6750 Water Utilities Engineer: N/A (FLWD/SFCSD) Erosion Control Inspector: Bob Zakely / City of Fort Collins, 700 Wood Street, Fort Collins, CO 80521 970 221-6063 Natural Resources: Doug Moore / City of Fort Collins, 281 North College Avenue, Fort Collins, CO 80522 970 224-6143 Traffic Operations: Eric Bracke, P.E. / City of Fort Collins, 625 Linden Street, Fort Collins, CO 80524 970 224-6062 Street closures: Syl Mireles / City of Fort Collins, 625 Linden Street, Fort Collins, CO 80524 970 221-6815 Development Construction Permit, Page 5/5 Transportation Planning: David Averill / City of Fort Collins, 215 N Mason Street, Fort Collins, CO 80524 970 416-2643 Forestry: Tim Buchanan / City of Fort Collins, 291 North College Avenue, Fort Collins, CO 80522 Light and Power: Doug Martine / City of Fort Collins, 700 Wood Street, Fort Collins, CO 80521 970 224-6152 Developer' Contact Persons: Owner/ Developer Project Engineer: Project Manager: Les Kaplan Imago Enterprises, Inc. . 140 Palmer Drive Fort Collins, CO 80525 970 226-6819 (w) 970 207-9256 (f) lesterkaplan@comcast.net Michael S. Brake, P.E. JR Engineering 2620 E. Prospect Road, Suite 190 Fort Collins, CO 80525 970 491-9898 (w) 970 491-9994 (t) mbrake@jrengineering.com Gregg E. Seebohm Double Eagle Construction Services, Inc. 4026 Timberline Road Suite 120 Fort Collins, CO 80525 970 223-3500 (w) 970 222-3875 (c) 970 223-5454 (f) grcuLandble lg com I i 11 �) K)�--- Y ! DCP PRECONSTRUCTION MEETING ATTENDANCE SHEET Contact name Company Name Address Phone Number e C -1c) r- 8,7 ov /64 "I Y u O O O O O O @ O O O O 0000000000 O O O O O O O O O O 0000000 O — O O O O O '. W Z m N N O O V V 64 Eli N N 666600 0 0 o 0 6q E EA E w (H 69 fA 6q Efl O I LO 0 a0 O (O fA W w O VO 61 tom' . m �... Q Lo L6 N9 J U ENA 6co N Z Q W J_ a 0zw �+ F- _ LL O O U 0 0 0 0 0 0 0 0 0 0 0 0 0 00oo000 (O 0 0 0 (O (O vo0. -q U) Z r } O O Ci c7 ri Cl) fA Efl E)? EA O O O O O 6 6 (7 O (n «i EA 6'i fR I� � O ti M M M O C) O EA fli EA fA 69 fA w Z Z F r- 69 EA Hi EA Eli fA w Q _ O W U > I-a'0W �- O S U W > _ CL �-_2 W a0E- W IL w U)wam U. W Z_ LL N O O O O O CO O G] 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O O (O O V O O (O V' O N O O O: ~ K1. > W a' D O O O O p M EA 6Ei EA M 0 0 0 0 0 0 0 0 0 0 fR ffl fA V3 fA fA Efi 69 fA Vi d' N 00 V O V M aD w. M N.: a F- M M O I� N M O MCnN V m O a (O W oZ) � N (fl N M I Z n W W 2 vi ui : W Q U7 E» J Q N F O O, S OcnLL0 F-WU (p a o o O 0upol�l� 0 0 0 0 0 0 0 0 0 0 o000000000 0 0 -- E O M O O Lo. LoCo.0m p WQ w j z W .S; o c i ri N En En� o 0 0 0 0 0 0 0 0 0 vi Eli Eli E»vi ei Eti (n Eli Eli � � r ri o v vi �Ea ui�� U r OZw EA EA Of W N X Q.. m QJ En F- W O Z m z 0 0 LL0 �.. (D co M W 0 IZ 0 W Z W W ((O ((O EO EO (O M O J 2 S F- Z M M N �� y+..J Z mZ cv�0 Zm o 0 a < Z> W W LL t O a in LUa a. ~?U �w wW O (n 2 2 LL LL r Y U U 2 S 2 S S S 2 L LL LL U U U UQQ U U V! } u- U- V L U Of U) �Q J JUU w w QUa JJJ�w W wwlll J(nJJ Jfn (n ZU W E2 x Z ui W LL (n Z J w a> > ZJ QmZ L c w wF¢- F- W a a7 c `L _ J =� W d a) N c (D U o y > W 0 m Z c m a Z Q per, c -000 :° � ~ o a aa)i m 2Z OZrL dU a) a m m a) �Oc 0 n� wp a¢ w a) _ T c U7 (n (9 N �V Q �= o op Z'gs(n� U J 7 a) c c o Na_.� N= c> N `o N t] m (D c0 Wm� o-�a>om=m m�mmm�mm m m `°mom a�i a° aZ 0a.a E7��FU�¢� 3cn���i,=�,•�iZ� in c]aUoaQU DEVELOPMENT CONSTRUCTION PERMIT APPLICATION (Zr 10, 99) S(e only: Application Number: _ Application Date: May 23, 2005 Permit application fee: S 300.00 'TLONS: Complete this tbrm (some questions may not apply to you) and attach all necessary documents and submit to the Development Fngincering Section of the City. If you have any questions contact the Developmcnt Engineer _ at 221-6750. Submit the Application and pay the Application Fee at the fee at the Fngineering counter at 281 No. Colle,c Avenue. F INFORMATION: ame (as approved by the City): Utility Plans for C'ambrid,e Ave. & Harmony Rd. Project A.K.A. (Marketing name if different from Project Name): Harmonv Tcchnoloey Park. Second Filing Project Location: Cambridge Avenue and Harmony Road Property Owner (At the time of this permit issuance): Individual Name: Lester Kaplan Company Name: im,pi p tPm - (varnus awnerg) ;Address: '.40 Palmer Drive Fort Collins CO 80525 Phone number(s): Office: (970) 226-68 t 9 Cell phone: Fax number: (970) 207-9256 Lmail: lesterkaplanevem-ncast.com Applicant/Project Manager (The primary contact person for all matters regarding this project, and the person responsible for al matters referencing "the Developer" in the Development Agreement for this project): Individual Name: Gre�o_,E. Seebohm Company Name: Double Facle Construction Services, Inc. Address: ;026 Fimberline Road Suite t'0 Fort Collins. CO 80525 Phone mtmber(;): Office: (97O 223-3500 _ Cell phone: (970) 222-3875 __-- Fax number: (970) 223-5454 I�mail: rev�rccdbte�l com