HomeMy WebLinkAboutHARMONY TECHNOLOGY PARK SECOND - Filed DCP-DEV. CONSTRUCTION PERMIT - 2005-10-28City crf Vot, t'oliins
Transportation Services
DEVELOPMENT CONSTRUCTION PERMIT
Permit Number: Issuance Date: 7 l 5
Project Name: Cambridge As enue (as part of Harmony Technoloay Park 2"a Filinl
Project Location: Cambridge Avenue south of Harmony Koact norm of KocK l,reCK vnve
Irv_ -6; E- ,-tLaeY4-1 '
Permittee: best v ' ' r
City and developer contacts: See attached Exhibit "A" for names and phone numbers of all
contact persons for this project.
fees: Permit Application Fee (paid at the time of application) $ 300.00
Constructiort Inspection Fee (paid prior to issuance of this permit) $ 24 559.90
Total $ 24,859.00
Development Bond or other approved security:
Amount of security deposited with the City to guarantee the completion of all public
improvements to be constructed as shown on the approved plans for the development.
$ 796S3361
Form of security deposited with the City: r, rr _ r, Lsrr
PERFORMANCE REQUIREMENTS OF THIS PERMIT:
1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design
chawings and specifications the certification of all materials testing by an Engineer. The Permittee
shall have an Engineer prepare revised design drawings and secure City approval for all revisions to
the tJ:ilily Plans and related documents. The Permittee shall have an Engineer represent, as required
by the City in the Development Agreement, that the improvements are constructed in conformance
with the approved Utility Plans and the standards and specifications of the City. The Permittee shall
provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance of the
constructed public improvements. (All references above to the terms "Project Engineer" and
" Fngincer" shall mean a Professional Engineer licensed in Colorado.)
2. All contractors who perform work on this project must be bonded and licensed in conformance
with City requirements.
Development Construction Permit, Page 2/5
3. Construction time restrictions: N/A
4. The applicant understands that additional permits maybe required for this development project
and the applicant shall secure those permits directly from the issuing departments.
5. 'phis permit, along with a complete set of all approved plans and documents for this project
(utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic
study.. drainage report, plat easements and any other official documents), shall be kept on the
development site available for use by City staff doing inspections.
6. Permit Expiration ( in accordance with Section 29-12 of the Transitional Land Use Regulations or
Section 2.6.3(K) of the Land Use Code, whichever is applicable):
a. If construction has not begun within sixty (60) days from the date of issuance of this
permit, this permit shall expire and the applicant will forfeit the permit fee paid for this
permit, whereupon the applicant must re -apply for a new permit.
b. In addition, this permit shall expire one year from the date of issuance. The applicant
may apply for an extension by reapplication at least two weeks prior to the expiration date.
Such application shall contain information sufficient tojustify the granting of the extension.
An extension may be granted for up to six months.
7. Building permits and certificates of occupancy will only be issued when all conditions contained
in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29-
678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the
Development Agreement does not specify times for completion of public improvements, or if there is
no Development Agreement, then the improvement requirements specified in Section 24-95 of the
City Code shall apply, which provides that construction of all improvements shall be required prior
to the time of issuance of the first building permit.
8. Acceptance by the City of the public improvements shall be after (1) final inspection has been
conducted by the City: (2) punch list items from the final inspection are completed and accepted by
the City; and (3) required certifications from the licensed professional engineer that improvements
are completed to City standards, specifications and approved Utility Plans; and the "as -constructed"
plans have been received and accepted by the City.
9. The warranty on street improvements is for five (5) years from the date of acceptance by the City
of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional
Land Use Regulatiors and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use
Code, as applicable.
10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any
planned construction on this project. All required perimeter silt fencing and other erosion/sediment
control best management practices (BMP's) that can be installed prior to construction must be in
Development Construction Permit, Page 3/5
place and inspected by the City Erosion Control Inspector before any land disturbing activity begins.
11. No work (including grading and construction access) shall be started in State Highway right-of-
way until a permit is issued by the Colorado Department of Transportation to allow such work to
begin.
12. Other conditions: The Pavement design report shall address potential mitigation
measures liar stormwatcr utility lines having less than ideal cover on Cambridge
Permittee's acknowledgment signature:
By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of
the owners of the property (including all owners having legal or equitable interest in the real property, as
defined in Section 1-2 of the City Code; and including common areas legally connected to or associated
with the property which is the subject of this application) without whose consent and authority the
requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City
officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such
property to perform work required of the applicant if the applicant were to fail to perform the required
work. I also acknowledge that I have read this permit document with all its requirements and
conditions, and I agree to all of the terms and conditions so stated iin this permit.
Applicant/Projeel Manager' s Signatbre' � �� �"�°" t'"L Date:
Approval for issuance:
1
City Engineer Approval ^ - t - / Date:
(Permit Issuance Date)
Development Construction Permit, Page 4/5
EXHIBIT "A"
DEVELOPMENT PROJECT CONTACT PERSONS
Name, address and numbers
Project Name: Harmony Technology Park 2"d Filing
Project A.K.A.: (Cambridge Avenue)
City Staff Contact Persons:
Development Engineer:
Construction Inspector:
Marc Virata, P.E. / City of Fort Collins Engineering
281 N. College Avenue / Fort Collins, CO 80524
970 221-6605
Lance Newlin / City of Fort Collins Engineering
281 N. College Avenue / Fort Collins, CO 80524
970 221-6605
Current Planner: Ted Shepard / City of Fort Collins Current Planning
281 N. College Avenue / Fort Collins, CO 80524
970 221-6750
Water Utilities Engineer: N/A (FLWD/SFCSD)
Erosion Control Inspector: Bob Zakely / City of Fort Collins, 700 Wood
Street, Fort Collins, CO 80521
970 221-6063
Natural Resources: Doug Moore / City of Fort Collins, 281 North
College Avenue, Fort Collins, CO 80522
970 224-6143
Traffic Operations: Eric Bracke, P.E. / City of Fort Collins, 625 Linden
Street, Fort Collins, CO 80524
970 224-6062
Street closures: Syl Mireles / City of Fort Collins, 625 Linden
Street, Fort Collins, CO 80524
970 221-6815
Development Construction Permit, Page 5/5
Transportation Planning: David Averill / City of Fort Collins, 215 N
Mason Street, Fort Collins, CO 80524
970 416-2643
Forestry: Tim Buchanan / City of Fort Collins, 291 North
College Avenue, Fort Collins, CO 80522
Light and Power: Doug Martine / City of Fort Collins, 700 Wood
Street, Fort Collins, CO 80521
970 224-6152
Developer' Contact Persons:
Owner/
Developer
Project Engineer:
Project Manager:
Les Kaplan
Imago Enterprises, Inc. .
140 Palmer Drive
Fort Collins, CO 80525
970 226-6819 (w)
970 207-9256 (f)
lesterkaplan@comcast.net
Michael S. Brake, P.E.
JR Engineering
2620 E. Prospect Road, Suite 190
Fort Collins, CO 80525
970 491-9898 (w)
970 491-9994 (t)
mbrake@jrengineering.com
Gregg E. Seebohm
Double Eagle Construction Services, Inc.
4026 Timberline Road Suite 120
Fort Collins, CO 80525
970 223-3500 (w)
970 222-3875 (c)
970 223-5454 (f)
grcuLandble lg com
I i 11 �) K)�---
Y !
DCP PRECONSTRUCTION MEETING ATTENDANCE SHEET
Contact name
Company Name
Address
Phone Number
e C -1c) r-
8,7
ov
/64
"I Y
u
O O O O O O
@ O O O O
0000000000
O O O O O O O O O O
0000000
O — O O O O O
'.
W
Z
m
N N O O V V
64 Eli N N
666600 0 0 o 0
6q E EA E w (H 69 fA 6q Efl
O I LO 0 a0 O (O
fA W w O VO 61
tom'
.
m
�...
Q
Lo
L6 N9
J U
ENA
6co
N
Z
Q W
J_
a
0zw
�+
F- _ LL
O O U 0 0 0
0 0 0 0 0 0 0 0 0 0
00oo000
(O 0 0 0 (O (O
vo0. -q
U)
Z
r }
O O Ci c7 ri Cl)
fA Efl E)? EA O O
O O O 6 6 (7 O (n «i
EA 6'i fR I� � O ti M M M
O C) O
EA fli EA fA 69 fA
w
Z Z F
r-
69 EA Hi EA Eli fA
w
Q _
O W U
>
I-a'0W
�- O
S
U W > _
CL
�-_2
W a0E-
W
IL
w
U)wam
U.
W
Z_ LL
N O O O O O
CO O G] 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 O
O O (O O V O O
(O V' O N O O
O:
~
K1. >
W
a'
D
O O O O p
M EA 6Ei EA M
0 0 0 0 0 0 0 0 0 0
fR ffl fA V3 fA fA Efi 69 fA Vi
d' N 00 V O V
M aD
w.
M
N.: a
F-
M M O
I� N M O
MCnN V m O
a
(O W
oZ)
� N (fl
N M I
Z
n W
W 2
vi ui
: W
Q U7
E»
J
Q N
F
O
O,
S
OcnLL0
F-WU
(p a o o O
0upol�l�
0 0 0 0 0 0 0 0 0 0
o000000000
0 0 -- E O M O O
Lo. LoCo.0m
p
WQ
w
j z
W .S; o c i ri
N En En�
o 0 0 0 0 0 0 0 0 0
vi Eli Eli E»vi ei Eti (n Eli Eli
� � r ri o v
vi �Ea ui��
U
r OZw
EA EA
Of
W N
X
Q.. m
QJ En F- W
O
Z m
z 0 0 LL0
�..
(D co
M W 0 IZ 0 W
Z
W W
((O ((O
EO EO (O M O
J 2
S
F- Z
M M
N ��
y+..J
Z
mZ
cv�0
Zm
o
0
a
< Z> W
W LL
t
O
a in
LUa a.
~?U
�w
wW
O
(n
2 2
LL LL r Y U U
2 S 2 S S S 2
L LL LL U U U UQQ U U
V! } u- U- V L
U Of
U)
�Q
J JUU w w
QUa
JJJ�w W wwlll
J(nJJ Jfn (n
ZU
W
E2 x
Z ui
W
LL
(n Z
J w
a>
>
ZJ
QmZ
L
c w
wF¢-
F- W
a
a7 c
`L
_
J =� W
d
a)
N c (D U o
y
> W
0
m
Z c
m a
Z Q per,
c -000
:° � ~ o
a
aa)i m
2Z
OZrL
dU a) a
m m a) �Oc
0 n�
wp
a¢ w
a) _ T
c
U7 (n (9
N
�V Q
�= o
op Z'gs(n�
U J 7
a)
c c
o Na_.�
N= c>
N `o N t] m (D c0
Wm�
o-�a>om=m
m�mmm�mm m m
`°mom a�i a°
aZ
0a.a
E7��FU�¢�
3cn���i,=�,•�iZ�
in c]aUoaQU
DEVELOPMENT CONSTRUCTION PERMIT
APPLICATION
(Zr 10, 99)
S(e only: Application Number: _ Application Date: May 23, 2005
Permit application fee: S 300.00
'TLONS:
Complete this tbrm (some questions may not apply to you) and attach all necessary documents and
submit to the Development Fngincering Section of the City.
If you have any questions contact the Developmcnt Engineer _ at 221-6750.
Submit the Application and pay the Application Fee at the fee at the Fngineering counter at 281 No.
Colle,c Avenue.
F INFORMATION:
ame (as approved by the City):
Utility Plans for C'ambrid,e Ave. & Harmony Rd.
Project A.K.A. (Marketing name if different from Project Name):
Harmonv Tcchnoloey Park. Second Filing
Project Location: Cambridge Avenue and Harmony Road
Property Owner (At the time of this permit issuance):
Individual Name: Lester Kaplan
Company Name: im,pi p tPm - (varnus awnerg)
;Address: '.40 Palmer Drive Fort Collins CO 80525
Phone number(s):
Office: (970) 226-68 t 9
Cell phone:
Fax number: (970) 207-9256
Lmail: lesterkaplanevem-ncast.com
Applicant/Project Manager (The primary contact person for all matters regarding this project, and the
person responsible for al matters referencing "the Developer" in the Development Agreement for this
project):
Individual Name: Gre�o_,E. Seebohm
Company Name: Double Facle Construction Services, Inc.
Address: ;026 Fimberline Road Suite t'0 Fort Collins. CO 80525
Phone mtmber(;):
Office: (97O 223-3500 _
Cell phone: (970) 222-3875 __--
Fax number: (970) 223-5454
I�mail: rev�rccdbte�l com