DATE: August 22, 1997 DEPT: Mapping
PROJECT: #36-95 Great Dane - Type I (LUC) PDP
PLANNER: Ted Shepard
All comments roust be recieved no later than the staff review meeting:
Wednesday, September 10, t997
Njuj'lq DercnmiNpo?
L'NOU6f+ IN(-U2M�T�Oti Ta I7CIE�YhINC TF{l�•
+2CGo�201�JC� INFO )-012 'i-It� OAF SITS= �/->rSEMFW Mu�l—
T G S NoW
c«,1r
c ",41
Date: Signature:
CHECK HERE lF YOU WISH TO RECEIVE COPIES OF REVISIONS
Pit _ Site _ kW Report _ Oier
_ Utility _ Redlie Utility _ Landscape
City of Fort Collins
Current Plannint
PROJECT
COMMENT SHEET
Building Permit Review
DATE: December 23, 1999 DEPT: Mapping and Drafting
PROJECT: Morningside Villas Subdivision and RM Site Plan
Review, (formally Great Dane)
NOTE: Building Permit Review (old use -by -right) The site, landscape
and elevations are to be reviewed under the old RM Zoning Code
PLANNER: Peter Barnes, Zoning
ENGINEER: (Sheri Wamhoff
All comments- must be received by: January 7, 2000
,
i c l
T le )
6,q-w
7.1 c %'� 6J ,,'/y
f
a j
Date: Signature:
Check here if you wish to receive copies of revisions
Plat Site — Drainage Report Other:
Utility —Landscape — Redline Utility
REVISION
'40�COMMENT SHEET
1�®
DATE: August 22, 1997 DEPT: Eh*
PROJECT: #36-95 Great Dane - Type I (LUC) PDP
PLANNER: Ted Shepard
All comments must be recieved no later than the staff review meeting:
Wednesday, September 10, 1997
Great Dane Subdivision September 10, 1997
1. There are no longer Minor Subdivisions so the Minor should be taken out of the title of the
project and the plat. The name of the project will just be: Great Dane Subdivision
2. Need to label the drainage, access and utility easement on each lot on the plat to make it clear
that they are on both lots.
3. Additional off -site easements are needed that are not shown on the plans. A construction
easement on the north side of lot 1 for the construction of the retaining wall and a drainage
easement for the stormwater pipe south of lot 2.
4. What is happening at the end of the street? Is the crown remaining in the street all the way to
the driveway or is it being transitioned out? It is not clear on the plans - provide additional spot
elevations as necessary and/or modify the basin boundaries accordingly.
5. An overlay from the manhole south will probably be required.
6. See plans for additional comments.
7 Discussing how to process the request to end the street without a cul-de-sac. We are looking
at the code to determine as to whether it wilUcan be processed as a compliance review or if it will
need to be a modification that is taken to the board.
Date: Signature: -
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
x Pbt x Sit¢ _ Dcai p Mott _Oder- ^=�6=ffwn
-7 UOV _ Red[= M _ City of Fort Collins
PROJECT
COMMENT SHEET
City of Fort Collins
Current Plannint
DATE: isjlr - DEPT: Engineering
PROJECT:
PLANNER: - T �
ENGINEER: ��Of
❑ No Problems
L� Problems or Concerns (see below or attached)
Great Dane
Plat
• indicate that the off site sewer easement is by separate document
utility Plans
• A cross pan or lip is needed at the driveway to keep the flow out of the pedestrian
crossing.
• The street flow needs to go through a sidewalk chase into the parking area so that it does
not flow across the pedestrians path
• The sidewalk needs to go around the end of the street so that the ramps provide a crossing
across the parking area driveway.
• The curb at the end of the street needs to be a minimum 15 foot radius - as previously
agreed.
• The driveway into the parking area needs to be designed as a driveway cut.
• If this is submitted under the new system (City Plan) than the ramps need to be in
accordance with the new ramp standards.
Date: Signature:
PLEASE SEND COPIES OF MARKED REVISIONS: ❑ PLAT
❑ SITE
❑ UTILITY
❑ LANDSCAPE
City of Fort Collins
Current
PROJECT
COMMENT SHEET
Building Permit Review
DATE: August 1, 2000 DEPT: Engineering
PROJECT: Morningside Villas Subdivision and RM Site Plan
review, (formally Great Dane Sub)
Note: Building Permit Review (old use -by -right) the site, landscape and elevations
are to be reviewed under the old RM Zoning Code.
PLANNER: Peter Barnes, Zoning
ENGINEER: Sheri Wamhoff
All comments must be received by: August 16, 2000
Morningside Villas Subdivision August 15, 2000
Plat
Where is the off -site drainage easement in the process? Who is working on this, stormwater? Parks? TA i w ar 2 f,..,,.,�l.! 6 y
Utility plans
For the ramp on the east side of the driveway you are indicating that need to use vertical curb. That is great, I think the not(
should read: "vertical curb & gutter taper curb from 1 /2"to 5"" instead of V' vertical curb & gutter taper curb from 6" to
5"". Since the curb height will be 1/2" at the driveway and 5" high at the beginning of the ramp. This is shown on several
sheets, so the change needs to be made on all of them. Would also recommend a note: "vertical curb and gutter taper curb
from 6" to 5"" for the piece between the curb chase and the existing curb.
�L! e ✓..,-1 - t .,� n,. e
Date: �� Signature;,
Check ere if you wis to receive copies of revisions
Plat Site _ Drainage Report _ Other:
Utility _ Landscape _ Redline Utility
PROJECT
COMMENT SHEET
City of Fort Collins Building Permit Review
Current Planning
DATE: August 1, 2000 DEPT: Engineering
PROJECT: Morningside Villas Subdivision and RM Site Plan
review, (formally Great Dane Sub)
Note: Building Permit Review (old use -by -right) the site, landscape and elevations
are to be reviewed under the old RM Zoning Code.
PLANNER: Peter Barnes, Zoning
ENGINEER: Sheri Wamhoff
All comments must be received by: August l6, 2000
Morningside Villas Subdivision August 15, 2000
Plat
Where is the off -site drainage easement in the process? Who is working on this, stormwater? Parks?
Utility plans
For the ramp on the east side of the driveway you are indicating that need to use vertical curb. That is great, I think the no
should read: "vertical curb & gutter taper curb from 1 /2"to 5"" instead of "6" vertical curb & gutter taper curb from 6" to
5"". Since the curb height will be 1 /2" at the driveway and 5" high at the beginning of the ramp. This is shown on several
sheets, so the change needs to be made on all of them. Would also recommend a note: "vertical curb and gutter taper curb
from 6" to 5"" for the piece between the curb chase and the existing curb.
Date: �� Signature; ,
Check ere if you wish to receive copies of revisions
_ Plat _ Site _ Drainage Report _ Other:
Utility _ Landscape _ Redline Utility
City of Fort Collins
Current
PROJECT
COMMENT SHEET
Building Permit Review
DATE: May 16, 2000 DEPT: Engineering
PROJECT: MorningsideVillas Subdivision and RM Site Plan
review, (formally Great Dane Sub)
Note: Building Permit Review (old use -by -right) the site, landscape and elevations
are to reviewed under to the old RM 'Zoning Code.
PLANNER: Peter Barnes, Zoning
ENGINEER: Sheri Wamhoff
All comments must be received by: June 6, 2000
Morningside Villas Subdivision June 9, 2000
Landscape Plan
Why not concrete the southwest corner of the street behind the radius where you have indicated gravel. It will be less maintenance and
look better the only thinkg that will need to be done is to make sure that this area can transition down to the ramp correctly.
Thanks for a copy of the sewer easement. Where is the off -site drainage easement in the process?
Replace the attorney certification paragraph with the current version.
Utility plans
I. If drainage is going to come off of the street on only one side (east side) a min 15 foot radius needs to be provided at the end of the
improvements. This will allow the street to be cleaned by a street sweeper. This was discussed several rounds of review ago. This
15-foot radius needs to be provided the driveway access needs to be narrowed if this can not be accommodated with a 24-foot
access. For the number of vehicles using this parking area a 20-foot access drive is adequate.
2. Use a taper versus a blunt tie in to tie in the new wider sidewalk to the existing sidewalk.
3. The standard driveway detail shows a 6-foot transition for the sidewalk ramp. There is only 5 feet on the east side. Will the
transition in 5 feet meet ADA requirements? — you have a note here to taper curb from 6" to 5". I am a little confused. 1 think I
understand what you are trying to do, but where you have the not is where the curb would be transitioning from 0" to 6". 1 think
what you were looking at was that the curb would transition from the existing curb at 6" to 5" and then the ramp would transition
from 5" to 0". Not sure how you are going to transition from the existing 6" curb to 5" in the space allowed. But it may work Is
there enough clearance and volume in the culvert if it only has a 5" opening?
4. Per the standard detail the drive is to rise a min of 'A inch per foot. This is not what is being shown by the elevations on the plan.
Provide a section to show how this works and that the drainage does not sheet flow into the driveway or add the notes to the existing
detail. You say this is no different than a driveway draining on to the street. Well that is not allowed. That is not something we
have never wanted and now it is in the land use code that you cannot drain concentrated flow across a sidewalk into the street.
Therefore, need to provide the lip, but the drive can slope back into site. See notes to add to detail.
Date: (`,-Ila) Signature:c
Check ere if you wish to receive copies of revisions
_ Plat _ Site Drainage Report _ Other:
X" Utility Landscape )C Redline Utility
City of Fort Collins
Current Plannine
PROJECT
COMMENT SHEET
Building Permit Review
DATE: December 23, 1999 DEPT: Engineering
PROJECT: Morningside Villas Subdivision and RM Site Plan
Review, (formally Great Dane)
NOTE: Building Permit Review (old use -by -right) The site, landscape
and elevations are to be reviewed under the old RM Zoning Code
PLANNER: Peter Barnes, Zoning
ENGINEER: Sheri Wamhoff
All comments must be received by: January 7, 2000
Morningside Villas Subdivision January 10, 2000
If drainage is going to come off of the street on only one side (east side) a min IS foot radius needs to be
This will allow the street to be cleaned by a street sweeper. This
provided at the end of the improvements.
was discussed several rounds of review ago. -- � —
iz
Provide elevation at the centerline. of the road where the transition is to start.
atjt'
==Label the driveway width.
ly 5 feet on the
The standard driveway detail shows a 6-foot transition for the sidewalk ramp. There is on
east side. Will the transition in 5 feet meet ADA requirements' I don't think so. =�=_ t. fae—w f m=
re iA`'p tl,�t. 4 i=A F`,;;
Need to provide a section through the driveway. Per the standard detail the drive is to rise a min of/a inch
per foot. This is not what is being shown by the elevations on the plan. The detail on sheet 6 references a
section on sheet 4, but there is not one there. Provide a section to show how this works and that the
drainage does not sheet flow into the driveway.
F• ! - p.
•�f - T ;' _
]'he variance Tor us of the metal culvert is actually a stormwater Issue Pei my conversation with Donnie
with the use of a metal sidewalk culvert and engineering will
Dustin they do not seem to have a problem '
accept a metal sidewalk culvert in this situation.
Date: /0 9 ` Signature:
Check here if you wish to receive copies of revisions
Plat Site _ Drainage Report _ Other:
n(Utility XI-andscape _ Redline Utility
REVISION
COMMENT SHEET
DATE: 5/25/1999 TO: Engineering
PROJECT: #36-95 Morningside Villas (Great Dane
Subdivision) PDP - Type 1 (LUC)
All comments must be received by Ted Shepard no later than the
staff review meeting:
Wednesday, June 16, 1999
No,Comment
Problems or Concerns (see below or attached)
June 17, 1999
Morningside Villas (formally Great Dane Subdivision) f; Au r�
r. No site plan or landscape plan was provided -please provide. - r E
>'- Information sheet provided stated that there was now 10 parking spaces on site, the utility plans only show 81 ti
parking spaces with 3 of those being in front of the garages
(sohe technically
Use n the requirement for acol-de-sac has
In accordance with the provisions of Section 3.6.2 (B)
been modified. In accordance with the code, a letter from Roger Frasco and a converstations with Joe Jaramillo
indicated that no col -de -sac is needed provided the units/ buildings are fire sprinklered. Upon this recQmen anonon
the City Engineer has determined that the cul-de-sac requirement can be waived for this project., r-f-
r` "comment 2 on staff comments" what was comment 2, was this from the
Information sheet provided responded to
planners comments, or another entity? = °x "
r Modify the general notes to reference the City Engineer and not the Director of Engineer.
Use new City signature block rti'`
'file sidewalk chases for now going off the street thru the site need to be concrete chases andnotthe metal -d
sidewalk chases. <: a c.- ; rs•.
The min sidewalk width per standards is 4.5 feet. Adjust to show meeting the minimums.
will need an easement for the installation of the Timber wall as will not be able to install without getting on the
neighboring property. Indicate the maximum height of this wall. : ;r " -. a.' '` 4' `s E `' ` "' �,' 4,
Need to work directly with the City department that owns the property that the easements are needed on.
Easement dedication of City property has to go through City Council (ordinance - two readings). This will
need to occur prior to the hearing for this project occurring.
Add notice of other documents statement to the plat.
Datbee plans for additional comments. `Signature
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
'Plat ,Site _ Drainage Repoli _ Other
utility Rwhe Utility 'landscape
City of Fort Collins
Current Planning
PROJECT
COMMENT SHEET
Building Permit Review
DATE: December 23, 1999 DEPT: Engineering
PROJECT: Morningside Villas Subdivision and RM Site Plan
Review, (formally Great Dane)
NOTE: Building Permit Review (old use -by -right) The site, landscape
and elevations are to be reviewed under the old RM Zoning Code
PLANNER: ]Peter Barnes, Zoning
ENGINEER: Sheri Wamhoff
All comments must be received by: January 7, 2000
Morningside Villas Subdivision January 10, 2000
If drainage is going; to come off of the street on only one side (east side) a min 15 foot radius needs to be
provided at the end of the improvements. This will allow the street to be cleaned by a street sweeper. This
was discussed several rounds of review ago.
Provide elevation at the centerline of the road where the transition is to start.
Label the driveway width.
The standard driveway detail shows a 6-foot transition for the sidewalk ramp. There is only 5 feet on the
east side. Will the transition in 5 feet meet ADA requirements? I don't think so.
Need to provide a section through the driveway. Per the standard detail the drive is to rise a min of1A inch
per foot. This is not what is being shown by the elevations on the plan. The detail on sheet 6 references a
section on sheet A, but there is not one there. Provide a section to show how this works and that the
drainage does not sheet flow into the driveway.
the variance for use of the metal culvert is actually a stormwater issue. Per my conversation with Donnie
with the use of metal sidewalk culvert and engineering will
Dustin they do not seem to have a problem
accept a metal sidewalk culvert in this situation.
Date: <<; Signature,--.- �c;
Check here if you wish to receive copies of revisions;,
L.Plat Iy, site _ Drainage Report Other:
_ Utility __,?,_ll,andscape — Redline Utility