Loading...
HomeMy WebLinkAboutMORNINGSIDE VILLAS - Filed GC-GENERAL CORRESPONDENCE - 2005-10-06Transportation Services Engineering Department City of Fort Collins August 24, 2000 Brett Larimer 1600 W Horsetooth Road Fort Collins, Co 80526 Dear Mr Larimer, For your information, attached are copies of the staffs "Building Permit Review/Utility Plan Review" comments concerning the Morningside Villas Subdivision and RM Site Plan Review. The plans submitted were reviewed by numerous City departments and other agencies. The comments are offered by Staff to assist you in preparing final plans for building permit issuance and utility plan approval. Section 2.2.11 of the Land Use Code requires that an applicant submit revisions based on this letter within 90 days or the project application becomes null and void. Your response to the City's concerns is due by November 24, 2000. A 30-day extension to this deadline is available. All requests for an extension should be directed to the Current Planning Director. If remaining issues are those that do not require plan revisions, a status report verifying continuing efforts toward resolving the issues is required within the same timeline. Mylars for signature can be submitted provided the following are done or have occurred prior to submittal: 1) The plat has had an administrative hearing and received approval. 2) The off -site easement for the storm drain line on the City property has been granted, and 3) All of the comments being returned have; been addressed and the utility plans, site and landscape plans have been updated. Once this has occurred please submit a mylar of the site plan, landscape plan, elevations and the utility plans, return all redlined plans and provide 2 blueline site plans, 2 blueline landscape plans, 1 blueline set of utility plans, and 3 drainage reports for review and approval. The site, landscape and elevation mylars will be kept by the City for filling, the utility plans upon approval will be returned for to the developer, who at such time shall make a mylar copy and 5 blueline sets (stamped and signed by the Engineer) of the signed utility plans and submit them to the City. Please note, if all the comments have not been adequately addressed the mylars will be returned until the plans are updated and/ or the issue(s) resolved. In addition fill out and return "Information for Development Agreements' sheet. Upon receipt of this 1 will start drafting the development agreement for this project. Ted Shepard with the Current Planning Department is in the process of scheduling the type 1 hearing for the plat: associated with this project. Please contact him if you have any questions regarding this. 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6605 • FAX (970) 221-6378 ww"wi.fort-collins.co.us If you should have any questions regarding these comments or if you need to meet to go over them please feel free to contact the department representative that made the comment or myself. Sincerely, Sheri Wamhoff Civil Engineer II Attachments cc: Peter Barnes Ted Shepard Georgiana Deines Dick Rutherford, Stewart and Associates, Inc. ftle