Loading...
HomeMy WebLinkAboutHIGHLINE AUTO PUD - Filed CS-COMMENT SHEETS - 2005-09-27PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: `/l/0 DEPT: Engineering PROJECT: PLANNER: ENGINEER: Sheri Wamhoff No Problems Problems or Concerns (see below or attached) Date: L/// /L Signature" - PLEASE SEND COPIES OF MARKED REVISIONS: ❑ PLA SITE ❑ UTILITY ❑ LANDSCAPE PROJECT COMMENT SHEET City of Fort Collars Current Planning DATE: DEPT: Engineering PROJECT: PLANNER: ENGINEER: Sheri Wamhoff eNo Problems Problems or Concerns (see below or attached) r1 %l7e 5Ldew01W will be cons�w��eel wr�h �1rP.o�ec� Date: 5�// 14�,� Signature., "L """/` PLEASE SEND COPIES OF MARKED REVISIONS: ❑ PLA SITE UTILITY ❑ LANDSCAPE PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: October 20, 1999 DEPT: ENGINEERING PROJECT: Highline Autos PUD - Minor Amendment - Increase the area of auto sales to the rear of the proposed building All comments must be received by Sheri Wamhoff no later than the staff review meeting: Highline Autos Wednesday, November 10, 1999 November 24, 1999 Deed of dedication — modify the dedication as shown. Use the current attorney certification. Need to provide a pedestrian/ bicycle connection out to the multimodal corridor along the railroad tracks. d i CCV!Y1eC-�iC:7 I "���_ N;ai,rMJ.ygi 1/I �t Date: Signature: CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS: _ Plat �ite Drainage Report _ Other LL 4 o. Utility — Redline Utility ,,,:f andscape