HomeMy WebLinkAboutHIGHLINE AUTO PUD - Filed CS-COMMENT SHEETS - 2005-09-27PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: `/l/0 DEPT: Engineering
PROJECT:
PLANNER:
ENGINEER: Sheri Wamhoff
No Problems
Problems or Concerns (see below or attached)
Date: L/// /L Signature" -
PLEASE SEND COPIES OF MARKED REVISIONS: ❑ PLA
SITE
❑ UTILITY
❑ LANDSCAPE
PROJECT
COMMENT SHEET
City of Fort Collars
Current Planning
DATE: DEPT: Engineering
PROJECT:
PLANNER:
ENGINEER: Sheri Wamhoff
eNo Problems
Problems or Concerns (see below or attached)
r1
%l7e 5Ldew01W will be cons�w��eel wr�h �1rP.o�ec�
Date: 5�// 14�,� Signature., "L """/`
PLEASE SEND COPIES OF MARKED REVISIONS: ❑ PLA
SITE
UTILITY
❑ LANDSCAPE
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: October 20, 1999 DEPT: ENGINEERING
PROJECT: Highline Autos PUD - Minor Amendment - Increase the area of auto
sales to the rear of the proposed building
All comments must be received by Sheri Wamhoff no later than the staff review
meeting:
Highline Autos
Wednesday, November 10, 1999
November 24, 1999
Deed of dedication — modify the dedication as shown. Use the current attorney certification.
Need to provide a pedestrian/ bicycle connection out to the multimodal corridor along the railroad tracks.
d
i CCV!Y1eC-�iC:7 I "���_ N;ai,rMJ.ygi
1/I �t
Date: Signature:
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS: _ Plat �ite Drainage Report _ Other LL 4 o.
Utility — Redline Utility ,,,:f andscape