HomeMy WebLinkAboutHARMONY SCHOOL SHOPS SECOND - Filed DCP-DEV. CONSTRUCTION PERMIT - 2005-09-22City of Fort Collins, Colorado
DEVELOPMENT CONSTRUCTION PERMIT
Permit Number: +1- 412 Issuance Date: I i' `I cl
Project Name: Harmony School Shops 2" Filing
Project A.hE.A.:
Project Location: northeast corner of Harmony Road and Timberline Road
Permittee: Stanelv E. Whitaker, Jr, Western VII Investment LLC
City and developer contacts: See attached Exhibit "A"for names and phone numbers of all
contact persons for this project.
Fees: Permit Application Fee $ 300.00
Construction Inspection Fee (paid prior to issuance of this permit) $7, 603.80
Street Cut Permit (paid prior to issuance of this permit) 5 319.00
Total $ 8,222.80
Development Bond or other approved security:
Amount of security deposited with the City to guarantee the completion of all public
improvements to be constructed as shown on the approved plans for the development.
$ 103,282.00
Form of security deposited with the City: VJ
PERFORMANCE REQUIREMENTS OF THIS PERMIT:
1. The Permittee shall be responsible to require their Project Engineer to incorporate into all
design drawings and specifications the certification of all materials testing by an Engineer. The
Pcrmittee shall have an Engineer prepare revised design drawings and secure City approval for
all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer
represent, as required by the City in the Development Agreement, that the improvements are
constructed in conformance with the approved Utility Plans and the standards and specifications
of the City. The Perrmitee shall provide "as -constructed" plans prepared by an Engineer prior to
the City's acceptance of the constructed public improvements. (All references above to the terms
"Project Engineer" and 'Engineer" shall mean a Professional Engineer licensed in Colorado.)
2. All contractors who perform work on this project must be bonded and licensed in
conformance with City requirements.
3. Construction time restrictions: K (A
satisfactorily completed in accordance with approved utility plans, the value of the completed
components may be established from the Development Construction Permit worksheet for
determining costs of infrastructure construction and inspection fees, whereupon the amount of
this Letter of Credit may be reduced by the value of the completed component(s), upon execution
of a "Request for Amendment to Letter of Credit' in the form attached hereto as Exhibit 2.
This Letter of Credit will be automatically extended without amendments for one year from the
present, and each future expiration date thereof, unless Issuer delivers written notice at least sixty
(60) days prior to any such expiration date to the City of Fort Collins of its intent not to renew
this Letter of Credit. Any such notice shall be in writing and shall be delivered with au
acknowledged receipt, either in hand or by certified mail. Any amendments to this Letter of
Credit shall be made in the form of Exhibit 2 hereto.
The City may at any time request that the Bank amend this Letter of Credit by submitting to the
Bank a fully executed certificate in the form of Exhibit 2. The Bank shall thereafter promptly
issue an amendment to the Letter of Credit corresponding to the change or changes requested in
such certificate.
This Letter of Credit shall be governed by the laws of the State of Colorado and is subject to the
Uniform Customs and Practice for Documentary Credits, 1993 Revision, International Chamber
Of Commerce Publication No. 500 as it currently exists.
This Letter of Credit is not transferable.
This Letter of Credit sets forth in full our undertaking, and such undertaking shall not in any way
be modified, amended, amplified or limited by reference to any document, instrument or
agreement referred to herein; except only the certificate and drafts referred to herein; and any
such reference shall not be deemed to incorporate herein by reference any document, insuumcnt
or agreement except for such certificate and dralus).
Sincerely,
Ed Wilkins
Vice President
EXHIBIT 1
CERTIFICATE
The undersigned hereby certifies as follows with respect to the certain Irrevocable Letter
of Credit No. 3055 dated November 22, 1999, established in favor of The City of Fort
Collins, Colorado (the "Letter of Credit'):
(a) He (She) is authorized to execute this Certificate on behalf of The City of
Fort Collins;
(b) The developer, Western VII Investments, LLC is in default;
(c) The sum of , which is the amount of the draft
presented with this Certificate, is the amount currently due to The City of
Fort Collins from Western VII Investments, LLC Applicant/Developer;
(d) The amount of the accompanying draft together with all previous draws
under the Letter of Credit do not exceed in the aggregate Sl 03,282.00, and
(e) The Letter of Credit has not expired.
IN WITNESS WHEREOF, the undersigned has executed this Certificate on behalf on
The City of Fort Collins this day of
THE CITY OF FORT COLLINS, COLORADO
A Municipal Corporation
M
STATE OF COLORADO
County of Larimer
Title:
Subscribed and sworn to before me this day of , 1999, by
as authorized officer of The City of Fort Collins,
Colorado.
Witness my hand and official seal.
Notary Public
My commission expires
EXHIBIT 2
Request for Amendment to Letter of Credit #3055
The City of Fort Collins certifies that the person signing below is authorized to execute this
Request for Amendment to Letter of Credit on behalf of the City of Fort Collins, and further
certifies with respect to the provisions contained in the Development Construction Permit dated
, and/or the Development Agreement dated
between the City of Fort Collins (Beneficiary) and Western VII investment, LLC, a Delaware
Limited Liability Company (Developer), the following:
[Check applicable boxes]
❑ The Letter of Credit is to be reduced to $
C The expiration date of the Letter of Credit is revise to be
CJ The 60-day automatic one-year renewal provision contained in the Letter of
Credit is no longer in effect.
In witness whereof, the undersigned has executed this certificate on behalf of the City of Fort
Collins this day of
CITY OF FORT COLLINS, COLORADO
A Colorado municipal corporation
(Name and Title)
4. The applicant understands that additional permits maybe required for this development
project and the applicant shall secure those permits directly from the issuing departments.
5. This permit, along with a complete set of all approved plans and documents for this project
(utility plans, site plan, landscape plan, development agreement, soils report, pavement design,
traffic study, drainage report, plat easements and any other official documents), shall be kept on
the development site available for use by City staff doing inspections.
6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use
Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable):
a. if construction has not begun within sixty (60) days from the date of issuance of this
permit, this permit shall expire and the applicant will forfeit the permit fee paid for this
permit, whereupon the applicant must re -apply for a new permit.
b. In addition, this permit shall expire one year from the date of issuance. The applicant
may apply for an extension by reapplication at least two weeks prior to the expiration
dale. Such application shall contain information sufficient to justify the granting of the
extension. An extension may be granted for up to six months.
7. Building permits and certificates of occupancy will only be issued when all conditions
contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or
Sections 29-678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable,
arc met. If the Development Agreement does not specify times for completion of public
improvements, or if there is no Development Agreement, then the improvement requirements
specified in Section 24-95 of the City Code shall apply, which provides that construction of all
improvements shall be required prior to the time of issuance of the first building permit .
8. Acceptance by the City of the public improvements shall be after (1) final inspection has
been conducted by the City ; (2) punch list items from the final inspection are completed and
accepted by the City; and (3) required certifications from the licensed professional engineer that
improvements are completed to City standards, specifications and approved Utility Plans; and the
"as -constructed" plans have been received and accepted by the City.
9. The warranty on street improvements is for five (5) years from the date of acceptance by the
City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the
Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of
the Land Use Code, as applicable.
10. The City Erosion Control Inspector must be notified at least twenty four (24) hours prior to
any planned construction on this project. All required perimeter silt fencing and other
erosion/sediment control best management practices (BMP's) that can be installed prior to
construction must be in place and inspected by the City Erosion Control Inspector before any
land disturbing activity begins.
11. No work (including grading) shall be started in State Highway right-of-way until a permit is
issued by the Colorado Department of Transportation to allow such work to begin.
12. Other conditions: (Vr�
Permittee's acknowledgment signature:
By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of
the owners of the property (including all owners having legal or equitable interest in the real property,
as defined in Section 1-2 of the City Code; and including common areas legally connected to or
associated with the property which is the subject of this application) without whose consent and
authority the requested action could not lawfully be accomplished. Pursuant to said authority, t hereby
permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter
upon such property to perform work required of the applicant if the applicant were to fail to perform
the required work. I also acknowledge that I have read this permit document with all its requirements
and conditions, and I agree to all of the terms and conditions so stated in this permit.
Western VII Investment, LLC
Applicant/Project Manager's Signature: Date: l dtO l61
Approvalforissuance: By. Western Propert Advisors, Inc.
As duly authorized agent for
Western VII Inve tmint, LLC
PS anle E. Wh' e Sr., Vice President
City Engineer Approval: bate: PPP cm
(Permit Issuance Date)
EXHIBIT "A"
DEVELOPMENT PROJECT CONTACT PERSONS
Project Name: Harmony School Shops, 2"d Filing
Project A.K.A.:
City Staff Contact Persons:
Development Engineer: Sheri Wamhoff
281 N. College Avenue, Fort Collins, Co 80524
(970)221-6750 x7140
Construction Inspector: Ronda Henson
281 N. College Avenue, Fort Collins, Co 80524
(970)221-6605
Cell (970) 217-4089
Current Planner: Ted Shepard
281 N. College Avenue, Fort Collins, Co 80524
(970)221-6750
Water Utilities Engineer: Roger Buffington
700 Wood Street, Fort Collins, Co 80521
(970)221-6681
Erosion Control Inspector: Bob Zackley
700 Wood Street, Fort Collins, Co 80521
(970)224-6063
Natural Resources: Kim Kreimeyer
281 N. College Avenue, Fort Collins, Co 80524
(970)221-6641
Traffic Operations: Eric Bracke
625 Ninth Street, Fort Collins, Co 80524
(970)224-6062
Street closures: Syl Mireles
625 Ninth Street, Fort Collins, Co 80524
(970)221-6815
Transportation Planning: Kathleen Reavis
210 E. Olive, Fort Collins, Co 80524
(970)224-6140
Forestry: Tim Buchanan
281 N. College, Fort Collins, Co 80524
(970)221-6361
Light and Power: Alan Rutz
700 Wood Street, Fort Collins, Co 80521
(970)224-6153
Developer's Contact Person:
Project Manager:
Mark Van Ronk
Schmidt Earth Builders Inc.
621 Sherry Drive.
Fort Collins, Co 8052
(970)221-1837
Fax (970) 221-1868
Cell (970) 566-5606
Developer/ Owner: Western VII Investment LLC
c/o Western Property Advisors
3555 Stanford Rd
Fort Collins, Co 80525
(970)223-3933
Fax (970)223-4671
Swhitaker(a,westernpropertyadvisor.com
Project Engineer: Stan Meyers PE 418060
Sear Brown Group
209 South Meldrum
Fort Collins, Co 80521
(970) 482-5922
Fax (970) 482-6368
Cell (970) 690-9325
Stan. meversgsearbrown.com
General Contractor/ Mark Van Ronk
Grading Contractor/ Schmidt Earth Builders Inc.
Utility Contractor: 621 Sherry Drive.
Fort Collins, Co 8052
(970) 221-1837
Fax (970) 221-1868
Cell (970) 566-5606
2
Concrete flatwork:
Paving Contractor:
Marshall Erickson
Express Concrete
5305 S. County Rd. 9
Fort Collins, Co 8052
(970)225-1287
Fax (970) 229-0846
Cell (970) 566-0345
Mark Stanley
Lafarge
P.O. Box 2187
(970)407-3629
(970) 407-3900
Landscape Contractor: Allen Patterson
University Lawn and Garden
7852 Vantage View PI
(970)223-7576
Cell (970) 217-4077
11/10/33 11:1.17 VAS u7U 462 1101:15 'Elm 5k AR-HKUwN UKUUr 4yUU[
HARMONY SCHOOL SHOPS SECOND FILING FORT COLLINS, COLORADO
Nw. 16, 1999 L110ee\21Ba6ndi4yO0y Edn lk, brmadalBheen
DESCwpnON
UNITSOP
ESTIMATED
NFRASmUCTUM
TOTAL
NSPEanoN
TOTAL
(LIST ALL PUBLIC AND APPLICALBLE
MEASURE
QUANTITY
C01,I3TRUCTION
ESTIMATED
FEEPERUNrr
INSPECTION
PRIVATE WROVEMEN131
(PROMOEDBYTHE
CAST PER UNIT
INFRBTRUCTURE
(PROVIDED
FEE
PROJECT 6NCINMR)
CF MSASURF
COST
BY THE elm
Storm Sewer
1 24' NRCP
LF.
104
STIm
$41.956
Sam
7 Randolmd cmpeM Plpa(Tem)
LP.
11"
30.m
$am
Sam.40
3 TroIC,
LP.
1154
indlnpbe
Sam
SOCA0
4 CO lw N,s d wag
C.Y.
22
Ta00A0
3490
Sam
$6.60
5 4-mamba
Eom
4
S1Awma
56.00o
390.m
$360.00
5 2Tddde Pan
SF.
leas
$4.75
Sa.721
S0.10
9103m
Water and Sanitary Sewer
I O'Sanibry swnrptin
L.P.
I= (
=00
537.e4P
$0.60
$1.11120
2 walef Mlne-DIP
LF.
970
12520
324.=
30.0
MUM
3 Tmnm
LF.
2022
Id In Pipe
tam
Si A9620
4 V Sewer G"m Una SOIO
am
I
rn0.00
Srso
$60m
Ss9.m
5 C emw 15"ce Line slut
Eem
4
S7®.m
vkw0
Slum
$240.00
6 irDIP
LF.
1M
sn'00
=12
talm
sea,la
7 S water BiwM lane Blob w49Ppine 11ecvc,
EPch
S
STw.00
S3,750
Seam
30a0.00
apNnOvane,tmerpt.am mm uap
a mrdt
6
175
+
550.00
StI$120.00
9 Fia Hydrant
Fm Hyd
Each
A
ezAmaO
mow
10
Each
7
7
512mDa
$we
00.00
�0.00
$030.00
wMialvs
tf 8'Gvle Valyn
EOta
8
3660.m
sima
51,W0
$epm
$IwX0
511mAa
lz wCab Valm
Pam
3
11100.00
$2,4m
Sm.m
$160.00
13 MetarPit(7')
Elm
1
$1Aman
S7.500
330.00
330.00
1A Fee,
Each
a
T44am
$2,440
33a.m
6190Aa
13 Maw wn Cbnedi.
Each
2
$5m.m
$1.100
$0.00
le l51wwet Tapw.Ct1ppIJ10 a
am
1
54,50p.00
�$4.500
S0.00
Total Public Improvements
1O3,W2
TOTAL INSPECTION FEE;
i
i E7,tSO3EO
Private Infrastructura
i
1 Curb and Oumr
L.E.
7m
SIZm
$9A24
3 25'Radhies
Each
2
$7.155D0
- =10
0 cbe mto pars Pin
SF.
on
$4.56
3249
4 S Cmmle Parng
SF.
2705
Me i
$10.095
5 A4meBPal4na
S.Y.
076
$14.76
Si0.3n1
Total Private Irlrrastructura
SSD.t37
ti
®First
National
Bank
IRREVOCABLE LETTER OF CREDIT NO.3055
November 22, 1999
City of Fort Collins, A Municipal Corporation
300 LaPorte Avenue
Fort Collins, CO 80521
Dear Sirs:
NU" office
zo5 oak Sven
LO. B-- 178
Pore 0,11" s, CO 8.,z -8
970_48' 4861
We hereby establish at the request and for the account of Western VII Investment, LLC, a
Delaware Limited Liability Company, Applicant/Developer, in your favor as beneficiary, our
Irrevocable Letter of Credit No. 3055, in the amount of One Hundred Three Thousand, Two
Hundred Eighty -Two and 00/100 Dollars ($103,282.00) (as more fully described below),
effective immediately and expiring at the close of banking business on November 22, 2000, at
our office at First National Bank, 205 West Oak Street, Fort Collins, CO 80521.
This Letter of Credit is intended for the funding required for the Harmony School Shops, Second
Filing Development Project ("Development Project") :or the assurance of the completion of the
construction and the maintenance and repair of the public infrastructure in connection with the
aforesaid Development Project and its associated development agreement and development
construction permit.
Funds under this Letter of Credit are available to you in one or more drawings prior to the close
of business on November 22, 2000, against sight drafts in an aggregate cumulative amount not to
exceed S103,282.00, dated the date of presentment, drawn on our office referred to above,
referring thereon to the number of this Letter of Credit and accompanied by your written
certificate signed by you and acknowledged as therein provided in the form of Exhibit I hereto.
Presentment of such draft and certificate shall be made at our office referred to above.
Upon the earlier of (I) our honoring your draft(s) totaling $103,282.00 in the aggregate presented
on or before this Letter of Credit expires pursuant to the terms herein or (11) the surrender to us
by you of this Letter of Credit for cancellation, this Letter of Credit shall automatically
terminate.
It is understood that the amount of this Letter of Credit may be reduced as public improvements
are constructed and accepted by the City of Foil Collins. As components of the infrastructure are