HomeMy WebLinkAboutHARMONY RIDGE P.U.D. - Filed DCP-DEV. CONSTRUCTION PERMIT - 2005-09-19DEVELOPMENT CONSTRUCTION PERMIT
APPLICATION
(in199)
For City use only: Application Number: A k)- `il�j Application Date: Y - 5 `% `%
Permit application fee: $ � r C
INSTRUCTIONS:
L Complete this form (some questions may not apply to you) and attach all necessary
documents and submit to the Development Engineering Section of the City.
2. If you have any questions contact the Development Engineer
at 22:1-6750.
3. Submit the Application and pay the Application Fee at the fee at the Engineering
counter at 281 No. College Avenue.
PROJECT INFORMATION:
Project Name (as approved by the City):
Project A.K.A. (Marketing name if different from Project Name):
Project Location:
Property Owner(At the time of this permit issuance):,
Name:
Address:_ ,TT
Phone number(s):
Office:
Cellplhone:
Fax number: . ='S` t -r7 T
Email:
Applicant/Project Manager (The primary contact person for all matters regarding this project, and
the person responsible for all matters referencing "the Developer" in the Development Agreement for
this project):
Name: ]` r1 c c
Address
Phone number(s):
Office: 2 --1 < 1 ! 1
Cellphone:
Fax number: 1- ,-) c- .f
Email:
City of Fort Collins, Colorado
DEVELOPMENT CONSTRUCTION PERMIT
Permit Number: 06< Issuance Date:
Project Name: Ilarrnony Ridgc PH). Phase I
Project Location: 11larmony Ridge P.F.D. phase 1, a tract of land situated in the East Half of
the Northwest Quarter of Section 3, 1 ownship 6 North, Range 69 West of
the Sixth Principal Meridian. City of Fort Collins, County of Lai uner, State
of Colorado.
Pcrmittee: Ilarmoriy Ridge Estates, LLC, a Colorado Limited Liability Company
City and developer contacts: See attachetl Fxhibit "A"for names and phone numbers of all
contact persons for this project.
0—
/Fees: Pcrmit Application Fee (paid at the time of application] ($30Paid)
lirosion Control Security Deposit (Rcciept of Payment) ($300— )
Construction Inspection I�cc (paid prior to issuance of this permit) S31,862.50
$l 145.011
L,xcavation Permit Pee
Total $33,007.50
Development Bond or other approved security:
Anxxual of sccuritp deposited with tlu City to guarantee the completion of all public
iniproecmcnts to be constructed as shown on the approved plans for the dcvelopnient.
S 1,237,083.60
Pon,, of security deposited with the City: Letter of Credit
PERE'ORMANCI;, REQUIREMENTS OF THIS PERMIT
I The Pcrmittee ,hall be responsible to require their Project Engineer to incorporate into all
design drawings and specifications the certification of all materials testing by an Fin,i cer. The
Pcrmittee shall have all 1'.ngincer prepare revised design drawings and secure City Li rovat for
all recisions to the t tility Plans and related documents. The Pcrmittee shall have an Engineer
rcpr rnt. as rcyuircd by the City in the Development AgrccmenL, that the iulpiovcincnts Lire
ConSuUeted in con foinrancc with the approved Utility Plans and the standards and specifications
of the City. I he Pcrmittee ,hall provide as-consu ucte(F plans prep u. d by an I:nbineel- prior to
the City's accept-inee of the cousu"ucted public improvements. (All references above to the terms
Project I;ngineei'- and " lingincer" shall mean a Piofessional E:ngit, licensed Colorado.)
1. All contactors w'ho perform wort: on this project must he bonded and licensed in
conformance with City requirements.
3. Construction time restrictions: Normal business hours.
4. 'I he applicant understands that additional permits may be required for this development
project and the applicant shall secure those permits directly from the issuing departments.
s 'I his permit, along with a complete sex of all approved plans and documents for this project
(utilizeplans, site plan. landscape plan, devcloprnent agreement, soils report, pavement design
(when availablc), traffic study, drainage report, plat casements and any other official documents),
shall be kept on the do vclopmcnt site available for use by City staff doim-, inspections.
o. permit Expiration (in accordance with Section 29-12 of the Transitional Land Use
Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable):
a. I I construction has not begun within sixty (60) days from the date of issuance of this
permit, this permit shall expire and the applicant will forfeit the permit fee paid for this
permit. Whereupon the applicant must rc-apply for a new permit.
b. In addition, this permit shall expire one year from the date of -issuance. The applicant
may apply I",r an cxtcnsion by reapplication at least two weeks prior to the expiration
date. Such application shall contain information sufficient to justil}the granting of the
cstension. An extension may be granted for up to six months.
7. Building permits and certificates of occupancies will only he issued when all conditions
contained in the Devclopntent Agreement and Sections 3.3 2(C) and (D)of the Land Use Code or
Sections 29-678 and 29-679 of the'fransitional land Use Regulations, whichever is applicable,
arc mct. It the Development Agreement does not specify times for completion of public
improvements_ or if there is no Development Agreement, then the improvement requirements
specified in Section 24-95 of the City Code shall apply, which provides that construction of all
public improvements shall he required prior to the time of issuance of the first building permit .
8. Acceptance by the City ofthe public improvements shall be after (1) final inspection has
heat conducted by the City' : (2) punch list items from the final inspection are completed and
accepted by the City: and (3) required certifications from the licensed professional engineer that
improccmcnts arc completed to City standards. specifications and approved Utility Plans and the
"as -cons rutted" plans have been received and accepted by the CAN
9. "I he warranty on sweet improvements is for five (5) years from the date of acceptance by the
City of the completed improvements. in accordance. with Sections 29-1 3 and 29 14 of the
transitional Land llse Regulations an&o, Sections 2.2.3(C)(,)(g). 3.3.1(C)(2). and 3.3?(C) of
the Land Use Code. as applicable.
10. The Cn% Lromon Control Inspector must be notified at least twenty four (24) hours prior to
any planned construction on this project. All required perimeter silt fencing and other
erosion%sediment control hest management practices (BMP's) that can be installed prior to
construction must be in place and inspected by the City laosion Control Inspector before any
band disturbing activity begins.
11. No xwt k (including grading) shall be started. in State Highway right-of-way until a permit is
issued by the Colorado Department of Transportation to allow such work to begin.
I I The Natural ResOurCeS' Department and the Developer shall have an agreement separate
f}om this document pertaining to the issuance of an utility casement for construction of the Port
Collins -Loveland Sanitation District's off -site sanitary sewer line on the Cathy Fromme Prairie
Natural Area.
Permittee's acknowledgment signature:
M signing this permit I acknowledges that I am acting with the knowledge, consent, and
authority of the owners ofthe propert% (including all owners having lepl or equitable interest
in the real propa-tN, as dcfincd in Section 1-2 of fhe City Code; and including common areas
Icoallc connected to or associated with the property Whieh is the subject ofthis application)
without whose consent and authority the requested action could not lawfully beaccomplished.
Pursuant to said authority, I hereby permit City officials to enter upon the properly for purposes
y, to enter upon such property to perform wort: required of the
of inspection and- if necessar
applicant if the applicant were to fail to perform the required work_ I also acknowledge that 1
have read this permit document with all its requirements and conditions, and 1 agree to all
of the toms and conditions so stated il.0his permit.
I -(I r- I—
Applicant/Project Manager's Signature �G r IY_, Date ,��
i
Approval for issuance:
r
C'ilvh;ngineerApprov tl _ t
Cam McNair (Permit Issuance Datc)
i
EXHIBIT "A"
DEVELOPMENT PROJECT CONTACT PERSONS
Project Name: Harmony Ridge, P.U.D., Phase 1
City Staff Contact Persons:
Development Engineer: Mark McCallum, City of Fort Collins, 281 N College
Avenue, Fort Collins, CO 80522
970/221.6605 ext. 7128
Construction Inspector: Lance Newlin, City of Fort Collins, 281 N. College Avenue,
Fort Collins, CO 80522
970/416.2011
Contact:
Jeff Baldwin, City of Fort Collins, 281 N. College Avenue,
Fort Collins, CO 80522
970/221-6605 Ext. 7327
Cell: 217.8899
Pager: 635.1245
Current Planner: Steve Olt, City of Fort Collins, 281 N. College Avenue, Fort
Collins, CO 80522
970/221.6750 ext. 6341
Water Utilities Engineer: Roger Buffington, 700 Wood Street, Fort Collins, CO
80521
970/221.6854
Stormwater Engineer: Jay Barber, 700 Wood Street, City of Fort Collins, CO
80521
970/221.6063
Erosion Control Inspector: Bob Zakely, 700 Wood Street, City of Fort Collins, CO
80521
970/221.6063
Natural Resources: Kim Kreimeyer, City of Fort Collins, 281 N. College
Avenue, Fort Collins, CO 80522
970/221.6750 ext. 6641
Traffic Operations: Ward Stanford, 700 Wood Street, City of Fort Collins, CO
80521
970/221.6820
Street closures: N/A
Transportation Planning: Kathleen Reavis, 210 East Olive Street, City of Fort Collins,
CO 80524
970/224.6140
Forestry: Tim Buchanan, City of Fort Collins, 281 N. College Avenue,
Fort Collins, CO 80522
970/221.6361
Light and Power: Janet McTague, 700 Wood Street, City of Fort Collins, CO
80521
970/224.6154
Developer's Contact Persons
Project Manager: Dwayne Walker, Empire Management, Inc., P.O. Box
7447, Loveland, CO 80537
Office: 970/484.5155
Pager: 970/962.1139
fax 970/667.3198
Owner: J.D. Padilla, Harmony Ridge Estates, LLC, 3600 S. College
Ave., Suite 201, Fort Collins, CO 80525
Office: 970/226,4433
Cell: 970/222.1010
fax: 970/225.6490
Developer(s): J.D. Padilla and Michael Sanders
f larmony Ridge Estates, LLC, 3600 S. College Ave., Suite
201, Fort Collins, CO 80525
Office: 970/226.4433
Cell: 970/222.1010
Fax 970/225.6490
Project Engineer: Rick Dvorak, TST, Inc., 748 Whalers Way, Fort Collins, CO
80525
Office: 970/226.0557
fax 970/226.0204
Grading Contractor: Gary Gerrard, Gerrard Excavating, Inc., 1739 S. Cty. Rd.
13C, Loveland, CO 80537
Office: 9701669.1436
Fax 970/669.1964
Utility Contractor: (Same as Grading Contractor)
Concrete Contractor for Flat Work: Llyod Lawson, Lawson Construction
Company, 20 S. Sunset, Longmont, CO
Office: 303/776.3456
2
Fax: 303/938.9955
Concrete Contractor for Structures: Wayne Schell, Concrete Structures, Inc.,
4325 Hilltop Road, Longmont, CO 80504
Office. 970/535.0202
Fax: 970/535.4382
Paving Contractor: Mark Stanley, Lafarge, 1800 N. Taft Hill, Fort Collins, CO
80522
Office: 970/407.3600
Fax 970/407.3900
Landscape Contractor: Mark Stock, Alpine Gardens/ Fossil Creek Nursery, 7029
S. College Avenue, Fort Collins, CO 80525
Office: 970/226.2296
Fax 970/223.6348
Outside Contact Persons:
U.S. West Susan Peterson, 124 W. Magnolia, Fort Collins, CO 80521
970/224.7473
TCI of Fort Collins Dennis Greenwalt, 1201 University Avenue, Fort Collins,
CO 80521
970/226.3104
Public Service Company Jim Slagle, 1901 East tHorsetooth Road, Fort Collins, CO
80525
970/225, 7843
Poudre Fire Authority Ron Gonzales, 102 Remington Street, Fort Collins, CO
80524
970/221,6570
3
Project Engineer (A Colorado licensed professional engineer who is the civil engineer the person
responsible for the design of this project, responsible for certification that improvements are
constructed in accordance with approved plans, responsible for making revisions to plans with City
approval and for providing as -constructed plans):
Name: > �. � J�'I,c-_ ( -'�-t� %��.: t ^
Phone
Office:
Cellphone: r 1. v .
Fax number:
Fmnil
Professional License Number: 0
Developer (The party or parties referenced in the Development Agreement who are responsible for the
Developer's obligations contained in the Agreement —add additional names below):
Name: _ < _ c
Address: _<
Phone number(s):
Office: 1 / ' y z
Cellphone T t'-?ri
Fax number: t r
Email:
General Contractor (The contractor in overall charge of the public infrastructure construction):
Name:
Address: i t i 4 k
Phone number(s):
Office: ,>e,1 - '�f�/ %" 1 J r(_ /_l <Y�i
Cellphone:
Fax number:
Email:
If you have no General Contractor, list all other contractors below.
Grading contractor:
Name:
Address: _
Phone number(s):
Office:
Cellphone: _
Fax number:
Email:
Utility contractor:
Name:
Address: _
Phone number(s):
Office: _
Cellphone: _
Fax number:
Email:
Concrete contractor, for flat work:
Name:
Address: _
Phone number(s):
Office:
Cellphone:
Fax number:
Email:
Concrete contractor, for structures:
Name:
Address: _
Phone number(s):
Office:
Cellphone:
Fax number:
Email:
Paving contractor:
Name:
Address: _
Phone number(s):
Office: _
Cellphone: _
Fax number:
Email:
Landscape contractor:
Name:
Address:
Phone number(s):
Office:
Cellphone: _
Fax number:
Email
Other contractors and parties involved in the project:
3
SUBMIT THE FOLLOWING ITEMS (Required for all projects):
• 81/2"xl 1" copy of the Site Plan
• Proposed Project Schedule
• Project quantities and cost estimate for all of the public improvements to be constructed.
In addition, include all private improvements that are required to be inspected by the City
Construction Inspectors. This information must be submitted in the format shown on the
attached form titled "Project Quantities and Cost Estimate Sheet."
ADDITIONAL SUBMITTALS (Required if checked):
6 Traffic control plan(s) for the project
12' Proposed haul routes shown on a City map
❑ Shop drawings
❑ Other
CONSTRUCTION COORDINATION MEETING: A construction coordination meeting to
discuss plans and special requirements for your project, is required for all development projects. The
people required to attend the meeting are the Project Manager, Project Engineer, Developer,
Architect/Land Planner and General Contractor (if no General Contractor, representatives for each of
the contractors expected to work on this project)
People to Attend: List the peoples names and titles for those who will attend the pre -
construction meeting:
Name
Title
ESTIMATED COST OF INFRASTRUCTURE IMPROVEMENTS: Provide the estimated
value of all public infrastructure improvements that will be constructed and accepted by the City to
own and maintain. In addition provide the value of all private infrastructure improvements that the City
will inspect and require certification for. The estimate shall be in the same format as the attached sheet
titled "Project Quantities and Cost Estimate Sheet."
Public infrastructure, estimated cost: $ (,23 7 ; ! `r
Private infrastructure, estimated cost:
I certify that the information on this permit application along with the required additional submittals are
true and correct to the best of my knowledge, and that in filing this application I am acting with the
knowledge, consent, and authority of the owners of the property (including all owners having legal or
equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common
areas legally connected to or associated with the property which is the subject of this application) without
whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said
authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if
necessary, to enter upon such property to perform work required of the applicant if the applicant were to
fail to perform the required work.
Applicant Signature:_ / _ -' - C - c `.; , Date: Ll I `5
r
I 4
Y�
-------------
41
`S. t /ki: -- ✓' ' J ♦ �� - �� '_-.�`_.. -�' p, bps•
z
r r ,
'\ • �\ I L J I
e
A.
7 i
S'
i � '^ t _#'a -�\ Fce ! i��, • � � ,� fj \ I � L2y\.. ���..\R � Ole
� `•l ��a � �xv � � of �� � 9� �- I L
_ �. -�..m •�: HARMONY MIDGE
PHASE ONE FINAL PLAN
-_ VCALE r = W mLl L
01 q plitl�
PROPLRTADWNLKS: ARMONI-RIPS.L-LL(
"W'D— ARFLLLIL LOVELANSOLO-&APO
VPOSITIVE ENVIRONMENTS INC.
ARCHITECTURE - PLANNING 970-462 6312 - P.O 8aa 98 - Fort Collins. Colorado 80522
HAHIVIVIN Y tUOU . " Yl)l) Pe Ace ONF FINAI
n
ease
04/09/1999 1": 16 9702260204 TST INC
PAGE 02
TST, INC. -
Consulting Engineers QI'INIl7N OF COST
FOient:e VansantJob Ni o.10-875-000 Date:7-29-97
Harmony Fidge P.U.D. Rev. 24-98 By.. E.M.F.
Ilan Qwnlity Unda tfnit Chet ToW Fee Swr Veit TaW J0p Fcu
Qom_ ----- _-
1. orgsm WATER 0
- � $0.60 S658.20
1""'PVC Trencb-1
8^yV'i](Tma=b arty)
107
3170
L.F.
L.E.
524-00
$18.50
$28,7I8.00
S59645A0
_
S0.60
$0.60
51,842.00
570660
6"PVC(T..h mdy)
1281
i_F.
S13-00
S16.653. 0
_ _ -.
12"Q.Ltyalve/Eox
___ 2
EA
S1010.00
SZ 020.00
8" Oak V.hdYkx
30
E.4.
$647,00
S6,47600
F"Caa Valae'0ox
4
E.k
SA85, 00
51,94000
5400-00
12' v 12" T.
1
£A
S 4moo
x8"Te.
i
EA
S32Y.00
DZ5,06
5' x 8" The
8" s 6" Two
3
£A.
5285.00
5855.00
6
EA,
$325 GO
S1.950,00--
8"90 F,16nw
I
EA
$195.00
$195.00
8" 45 Elb.
8" 22 1�2 E1b0w
2
£A.
S195.00
5390.00
2
0A,
$195 00
S390.00
6" 90 Eib.
2
EA
$150.00
_ SS00.00
6"41 Elbow _
4
EA.
315000
S600.00
5"Z21!2 ilbow
2
EA
VS000
MOM
12" x 12" Don
1
BA
E370.00
5370.00
IF, V mae
1
EA
S2S5.60
S295 00
12• x &" Reducer
3
EA
S250.00
I750.00
---W0.00
72`n 6"R.+luc,•s
t
eA
S300.00
_
S" x 6- 8=d-,
3
EA
5150.00
5450.0V
S"_8_TaMAP Valve R sk4a
I LP•• Motes Vonit lireucli
1
21
EA
51.795.00
S1 795,00
1 S"z30.40
EA.
S2,200.00
$48 400 00
1 $0.60
igatw. Tap
I
eA,
$2200.00
$71A0-00
_1r
Fa
"34yot
0
E
19
$650.00
i000
S9,7
SV.60
S738A0
Tie to Fxiatinp Rater Lim
2
EA
I1,400.00
$ 800.00
_
_
Ad W[Valve RaSza _ 16LEA 5150.00 $560.00
prune lva ,Subio/c1 520P, 671. 00
2, OFFSXTE wATlk
12"PVC(IEEO oN
14651
L.F. I S2, 00
$35160.00
50.60
S819.00
1Z" Gate VA,--,B03
12"T.. _
1
EA $1 010.00
$1 010.00
I
E.a. S1,050.00
$1.050-00
I7" W Elbow•
2
EA. 5d00.00
5400,00
AL, Releaw& Vacuum VxNc V.wt
Tia m Existing tauter line:
i
EA. $3.000.00
S3,00000
1
EA I t1,400.00
51,400.00
Adimi Valve B&Xe
l
EA. 5160,06
9160.00
011sae RataSubwroL S42,110.00
Page I of 3
04/09/1999 13:16 9702260204 TST INC
PAGE 03
TST, INC.
Consulting Engineers
OPINION OF COST
Clieut: Joe Vansant Job No. 10-875-000 Date:7-29-97
Project: Harmony Ridge P.U.D. Rev. 2-2-98 Dy: E.M.F,
ltmu
Quahtity
Units Unit Cast
Tom1
F. Pat Unit
Total Jwp. F.
Yo.
3. 5ANITARY SEWER
.3',PVCr Ttanch onl}•1
Mar,hvlcs to 10'
5390
17
L.F.
EA,
S18.6D
Sl 466,00
$98 560.00
$2 922.00
$0.60
S3 120.00
h4�nhvlcz W to 12'
5
FA,
SL577 00
$7 885.00
M.nhvlo 12'to 16'
11
FA-
$1.790.00
S39.690.00
M�nhvl=z 16'to 20'
4" FV_C_S:rrutary $ewer Service(22'
3
130
EA,
E.A.
S2,040.W
S495.00
$6 120.00
$64,350.00
$0.60
$1,656 00
Ti. to Exixtm�Saailary S1 EA- S1 255.00 51255,U
Adjust Manholes _ 36 EA, S2$5.00 510,260.05
Sm ae,y Sewer Sublolal 5233,06Z. 00
4. STORM SEWER
36" RCP
30" RCP
24"RCP
18"RCP
1'--" RCP
lid
167
212
81
1439
2033
L.F.
L.F-
L.F.
LF.
L.E.
L F.
S43.75
$36.20
$36.00
$23.70
$23.00
$6 769.401220
S4 987.50IS06A
$7632.007.20
$1919.708.60
$33,097.0063.40Tench
AO
19.8036'"RCP
FES
3
FA.
$625,00
S1,875.00
30" RCP FPS
2
FA
$400,00
$300,00
24" RCP FES
3
EA,
5335.00
51,005.00
IV RCP FES
2
EA
5310.OQ
5620.00
FFS
6
EA-
S300.00
$1800,00
_5'RCP
4' Ui. Nuowlae to I u
3
F.A.
SI 46609
S7330.0050-00
4' Dia 4fanlalea 12'-10
l
BA
$1 790.00
$1,790.00
5' pu M=zd+olc 10'-12'
1
BA.
S2200.00
S2,200.00
5' Dia Msphole 15'
1
BA,
S2400.00
52,400.00
5' pia Mvnhvle A),
1
EA
1;1600.00
S2 600.00
5"feR"Inlet
'
1
EA
52,759.00
$ 759.00
$90.00
S90.00
"R" lntet _ _
20' T c'R" Lilo
7
1
FAl
EA.
$3 260.00
S6,000.00
$2i,820.005630.00
S6,00000
$90.00
590.U0
$c dwalI w/ Orifice Platc
1
$A.
51.000.D0
$1,OOD.90
S75.00
$75.00
Gancmtr-Lixwd Ditch
450
TT
$15-00
S6,840.00
Clara 12 RipraP
Ctaaa 6 Ri�F____-
21
43
C.X.
C.l'.
t 545.00
54100
S945.00
$2160.00
Srornt Ssw¢r Snblotal S,i,t9,349.60
5, STREETS
Dove-o CwCurb, Gutter R Sidewalk
Drive -over curb & Gutter
11325
683
L.F.
L.F.
513.25
$9.75
$150 056,25
S6.659.25
So-so
$0.80
1 $9,080.00
$566.40
0" Vcrt. Curb & Gutter
1416
L.F.
98,00
$11,328 00
S0.30
2.90
4"As holt
24712
S.X.
55,40
$133,444.80
S0.30
7"Hues Course26934
S.1'.
$3.'0
586,188.80
Pan Gndw
25891
13424
400
S.Y_
L.F.
1-F.
$0.90
S1.15
S1.10
S23301.90
$15437.60
$440.00
157.413-60
Sgwre fo0taga A9ren
HaudicapRamP
%11L4b k Rat'
174
12041
30
41
S.F.
S.F.
EA.
EA
_
$65000
1 $325 00
SI3,500.00
51,300.00
MinT•40
S0.10
$175.40
Lat of amps 544 L.F- 50.80 $455.20
S&ee& Subf01al $446,456,60
P.,2 of 3
04/09/1999 13:16 97022GO204 TST INC PAGE 04
INC.
Cons
Cons111tiing Engineers OPINION OF COST
Client: Joe Vansant
Joh No.
JO-575-000
Aate:7-29-97
Project: Harmony Ridge P.U.D.
Rev.2-2-98
Ry: E_M.F.
Dw
_ _ Item
fUantity
Urots
Unit Cost
'total
Fee per Unit
Total IMP. I-
6. FARTIdwORI{
Cut
39195
C.Y.$39,195.00
Fill ---
24351
C.Y-
$1.00
$i4351.00
15%Shrinks e
EurNrwork Subtotal
563,546.00
7. EROSION CONTROL
Gravel Inlet Filten
9
EA-
$235.00
$2.115.00
Silt Fence
2175
L.F.
$1.93
$4 Z41.23
54zw BaFa Bamrr
14
FA
S250.00
$3 500.00
_
5c4imant Tv.
l
EA.
$500.00
$500.00
Erosfox Control Sublotdl
S10,356 25
SUBTOTAL RECAP
ONSITE WATER
S209,671-00
OFFSITF WATER
SANITARY SFWFR
$42!JS0.00
S233,062.00
STORM SEWER
$119,349.60
STREETS
S446,456.60
EARTITWORK
$63,546.00
EROSION COIF fROL
S10,356.25
CONSTRUCTION COST SUBTOTAL
$1,17A621.45
CONTINGENCY (10%)
$112,462.15
CONSTRUCTION COST TOTAL
$1,237,W3.60
TOTAL INSPECTION FEE
531,W-50
Page 3 of 3