HomeMy WebLinkAboutOVERLOOK AT WOODRIDGE PUD FOURTH - Filed GC-GENERAL CORRESPONDENCE - 2005-09-13.ation Services
Engineering Department
Citv of Fort Collins
April 29, 1996
Mr. Gary Berger, President
Woodcraft Homes
3665 JFK Parkway
Building One, Suite 300
Fort Collins, CO 80525-3987
RE Overlook at Woodridge PUD - 4th Filing - Replat of Lots 22 thru 26
Dear Gary:
I received your letter dated April 23, 1996, stating that you would like to proceed at your own
risk with the revised locations of the water and sewer stubs for the replating of the above five lots
being replated into four lots. This work will precede approval of the replat in process.
Since the revisions to the utility plans is completed, it is acceptable to the City for you to proceed
at your own risk that if the replat should fail to be approved, you will take the necessary measures
to remove the stubs for the four lots planned and reinstall them for five lots. We do not want you
to pave the street over these stubs until the replat is approved and filed with the County.
If you have any questions please call me at 221-6750.
Sincerely,
Mike Herzig
Development Engineering Manager
cc' Roger Buffington
Dave Stringer
'8t \nthCcllc oAkoIIr.lip,,=�O • !'m<olIm,(0-:- „f,:
C it: „i 1 ort ( ollin"
Transpe. .Jion Services
Memo
To:
Sheri Wamhoff, Development Engineer
From:
Cam McNair, City Engineer o lli-0
Date: December 31, 1998
Subject: Variance Request, The Overlook at Woodridge PUD, 4`h Filing, Phase 2
Based on the constraints of the existing grades and elevations, it appears to me that the proposed
alignment of Brixton Road is as close to our design standard as is possible without significant changes
to the layout of the street system. As proposed, the alignment of Brixton Road and its approaches
to both Taft Hill and Mesaview should be adequate and safe Therefore, t will approve the request
for variances to Sections 1.02.03.05a and I.02.03.05c in this instance.
Transpr,. Ation Services
Engineering Department
City of Fort Collins
October 27, 1998
Mr Stan Myers, P.E.
The Sear -Brown Group
209 South Meldrum
Fort Collins, Colorado 80521
RE: The Overlook al: Woodridge PUD, Fourth Filing, Phase 2, Variance Request
Dear Mr. Myers:
This letter is in response to the variance request dated September 30, 1998 for variance to the
approach grade requirement, Section 1.02.03.05.a and 1.02.03.05.c of the Design Criteria and
Standards for Streets.
The request to reduce the length of the approach grade at the intersection of Taft Hill Road and
Brixton Drive, Section 1.02.03.05.a, is granted. The right-of-way (ROW) for Taft Hill Road
through this area is 32.5 feet wider than that required for an Arterial Street section under the
current criteria. It is believed that the extra ROW was dedicated to accommodate the overhead
power lines that run adjacent to Taft Hill. By looking at what the typical ROW location would
be, a distance of greater than 50 feet at a less than 20% grade is accomplished. This is
acceptable for this short section of road, particularly since the road rises up to meet the grade of
Taft Hill Road.
The request to reduce the length of the approach grade at the intersection of Brixton Road and
Mesaview/ Lookout Lane. Section 1.02.03.05.c, to 0 feet is denied. The 50 foot requirement or
at least more than 0 feet should be able to be met by utilizing a vertical curve for the design off of
Mesaview/ Lookout Lane.
If you have any questions regarding this, please contact me at (303) 221-6750.
Sincerely, l
Sheri Wamhoff
Civil Engineer II
cc: The Sear Brown Group
File - Overlook at Woodridge, 4" Filing
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6605
THE SEAR -BROWN GROUP
FULL -SERVICE DESIGN PROFESSIONALS
FORMERLY REID, INC.
209 SnUI'I I MI F)RUM
FnR'f COIL INS Cn LONADO 90521-2604
970-482-5922 FAX 970-482-6368
November 20, 1998
Sheri Wamhoff
Engineering Department City of Fort Collins
281 N. College Avenue
Fort Collins, Colorado 80521
RE: The Overlook at Woodridge P.U.D. Fourth Filing (Phase 2), Variance Request
Dcar Sheri,
I will be using the previous variance request dated August 15, 1998 and your reply letter
dated October 29, 1998 as reference for this letter. We are requesting a variance from
City of Fort Collins Design and Construction Criteria, Standards aid Specifications for
Streets, July 1996, sections 1.02.01.05-a and 1.02.03.05.c.
As per your request, vertical curves were utilized to maximize the length of approach
grade at 2% or less. Using the fact that the right-of-way (ROW) for Taft [Jill Road is
12.5 feet wider Ihau required under the current criteria, we request to reduce the length of
approach grade, to a length of 27.5 LF for Brixton Road at the intersection of Taft I lill
Road and Brixton Road. [a addition, we request to reduce the length of approach grade,
to a length of 41 LF for Brixton Road. at the intersection of Mesaview/Lookout Lane and
Brixton Road.
"Thank you for considering these variance requests. If there is any further information
that is required please contact us.
Sincerely,
Stan Myers, P.E.
The Sear -Brown Group
STANDARDS IN EXCELLENCE EQUAL UPPCCRTUSTT' FVDr (' '. 1,
rI-Ir SEAR--BA'OWN (-,Roil
FULL -SERVICE DESIGN PROFESSIONALS
FORMERLY RBEI INC.
10') (,IIIII VJ(IDI, )V
It,12f,Yq 1.1N, <l I, /,1 HO^.?I-'h0:
970-482-5922 FAX:970-482-6368
September 1 1998
Sheri Wamholf
Engineering Department City of Fort Collins
281 N. College .Avenue
Dort Collins, Colorado 80521
RF: fhe Overlook at Woodridge P.LJ.D. Fourth Filing (Phase 2). Variance Request
Dear Sheri,
As discussed_ we are requesting a variance from City of Fort Collins Design and
Construction Criteria. Standards and Specifications for Streets, July 1996, sections
1 .02.03.05.a and 1.02.03.05.c. We request to reduce the length of approach grade, 2%, to
a length of 20 LT for Brixton Road at the intersection of Taft I fill Road and Brixton
Road. In addition, Nc request to reduce the length of approach grade, 2%, to a length of
0 IT for Brixton Road, at the intersection of MesavieWl,00kout Lane and Brixton Road.
"halt I lill Road can not he changed to accommodate the elevation drop needed. Design
and construction of The Overlook at Woodridge P.U.D. Fourth Filing (Phase f ) placed
Mesav iew Lane at an existing specific elevation. Since these points of intersection of
Brixton Road are fixed, the slope of the street is forced to exceed the maximum 2% slope.
[hank you for considering these variance requests. If there is anv further information
that is required please contact us.
Sincerely,
Stan Myers, P.G.
Scar -Brown Group
FULL -SERVICE DESIGN PROFESSIONALS
FORMERLY RBD, INC.
,IN)5( )IJ I II MI "ILM
I()P1 (UI.I .INS. CO1,0ILID68052I 26M,
970-482-5922 FAR: 970-482-6368
January 14, 1997
Mr. Mike Herzig
Community Planning and
Environmental Services
City of Fort Collins
281 N. College Avenue
Fort Collins, CO 80524
RE: Woodridge 4th Filing
Lot holds on the Overlook 4th Filing
Phase One Subdivision
Dear Mike:
I understand that per the development agreement for The Overlook at Woodridge 4th Filing
Phase 1, lots 1-5. 22-25, 28 and 29 have been put on hold as a result of Taft Hill Road and
Harmony Road completion scheduled for The Overlook at Woodridge 4th Filing Phase 2.
Construction of Harmony Road has just been completed adjacent to lots 22-25, 28 and 29.
These improvements were completed with The Overlook at Woodridge 4th Filing Phase 1 work.
Construction of Taft Hill Road adjacent to lots 1-5 will be completed with The Overlook at
Woodridge 4th Filing Phase 2 approved construction drawings. Construction of the actual Taft
Hill Roadway improvements will be done through the City of Fort Collins and their selected
contractor. During the most recent City review process, you provided review comments related
to Taft Hill Road adjacent to lots 1-5. We have addressed each of your review comments on
Taft Hill Road and found the following has happened:
The length of the curves on Taft Hill Road were adjusted to 150 foot per your
review comment which has resulted in a change of 0.05 feet at the VPI of each
curve.
2. The slope of the tangents have not changed, therefore the maximum change in the
profile design elevations is at the VPFs.
3. This minor change in the profile elevations will not affect The Overlook at
Woodridge 4th Filing lots adjacent to Taft Hill Road. Also note that there is 55
feet from the flow line of Taft Hill Road to the right-of-way which will be
enough room to make minor adjustments in grading.
Given the information above, future Taft Hill Road street improvements can be completed
without the need to enter upon lots I-5 of The Overlook at Woodridge 4th Filing Phase 1. In
addition, harmony Road has just been completed adjacent to lots 22-25, 28 and 29. Therefore
would you please consider removing the temporary hold on lots 1-5, 22-25. 28 and 29 so that
Woodcraft Homes may proceed to construct homes on these lots'?
Thank you for your time and consideration of this matter. We look forward to hearing from
you.
Sincerely,
The Sear -Brown Group
. '.
Kevin W. Gingery,'P.E.--'
Project Manager
Tricia Kroetch, P.E
Project Engineer
cc
Mr. Gary Bagcl
Woodcraft Homes