City of Fort Collins, Colorado
DEVELOPMENT CONSTRUCTION PERMIT
Permit Number: �`1'�Co Issuance Date: (ch-Niq
Project Name: Overlook at Woodridge PUD, 4`h Filing (Phase 2)
Project A.K.A.:
Project Location: West side of Harmony Road and South of Taft Hill Road
Permittee: Gary Bereer, Woodridge Development Group, LLC
City and developer contacts: See attached Exhibit "A"for names and phone numbers of all
contact persons for this project.
Fees: $300 Permit Application Fee (paid at the time of application) $_paid
Construction Inspection Fee (paid prior to issuance of this permit) S 13,002.60
Total $13,002.60
Development Bond or other approved security:
Amount of security deposited with the City to guarantee the completion of all public
improvements to be constructed as shown on the approved plans for the development.
$ 204,044.95 Expiration date:
Form of security deposited with the City:
PERFORMANCE REQUIREMENTS OF THIS PERMIT:
1. The Project Engineer shall be responsible to certify, or have certified, materials testing and
other tests as required; shall, as required by the City in the Development Agreement, certify that
the improvements are constructed in accordance with the approved Utility Plans and the
standards and specifications of the City; shall revise and secure City approval of all revisions to
the utility plans and related documents; and shall prepare and submit to the City "as -constructed"
plans prior to the City's acceptance of "the constructed" public improvements.
2. All contractors who perform work on this project must be bonded and licensed in
conformance with City requirements.
3. Construction time restrictions: KW
4. The applicant understands that additional permits may be required for this development
project and the applicant shall secure those permits directly from the issuing departments.
5. This permit, along with a complete set of all approved plans and documents for this project
(utility plans, site plan, landscape plan, development agreement, soils report, pavement design,
traffic study, drainage report, plat easements and any other official documents), shall be kept on
the development site available for use by City staff doing inspections.
6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use
Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable):
a. If construction has not begun within sixty (60) days from the date of issuance of this
permit, this permit shall expire and the applicant will forfeit the permit fee paid for this
permit, Whereupon the applicant must re -apply for a new permit.
b. In addition, this permit shall expire one year from the date of issuance. The applicant
may apply for an extension by reapplication at least two weeks prior to the expiration
date. Such application shall contain information sufficient to justify the granting of the
extension. An extension may be granted for up to six months.
7. Building permits and certificates of occupancies will only be issued when all conditions
contained in the Development Agreement and Sections 3.3.2(C) and (D)of the Land Use Code or
Sections 29-678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable,
are met. If the Development Agreement does not specify times for completion of public
improvements, or if there is no Development Agreement, then the improvement requirements
specified in Section 24-95 of the City Code shall apply, which provides that construction of all
improvements shall be required prior to the time of issuance of the first building permit .
8. Acceptance by the City of the public improvements shall be after (1) final inspection has
been conducted by the City ; (2) punch list items from the final inspection are completed and
accepted by the City; and (3) required certifications from the licensed professional engineer that
improvements are completed to City standards, specifications and approved Utility Plans and the
"as -constructed" plans have been received and accepted by the City.
9. The warranty on street improvements is for five (5) years from the date of acceptance by the
City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the
Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of
the Land Use Code, as applicable.
10. The City Erosion Control Inspector must be notified at least twenty four (24) hours prior to
any planned construction on this project. All required perimeter silt fencing and other
erosion/sediment control best management practices (BMP's) that can be installed prior to
construction must be in place and inspected by the City Erosion Control Inspector before any
land disturbing activity begins.
1 1. No work (including grading) shall be started in State Highway right-of-way until a permit is
issued by the Colorado Department of Transportation to allow such work to begin.
12. Other conditions:
Permittee's acknowledgment signature:
By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of
the owners of the property (including all owners having legal or equitable interest in the real property,
as defined in Section 1-2 of the City Code; and including common areas legally connected to or
associated with the property which is the subject of this application) without whose consent and
authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby
permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter
upon such property to perform work required of the applicant if the applicant were to fail to perform
the required work. I also acknowledge that I have read this permit document with all its requirements
and conditions, and I agree to all of the terms and conditions so stated in this permit.
Applicant/Project Manager's Signature: Date: C
0l�
Approval for issuance:
City Engineer Approval: M(Yd&?J ( Date: 1
(Permit Is uance Date)
EXHIBIT "A"
DEVELOPMENT PROJECT CONTACT PERSONS
Name, address and numbers
Project Name: Overlook at Woodridge PUD, 4' Filing (Phase 2)
Project A.K.A.:
City Staff Contact Persons:
Development Engineer: Sheri Wamhoff
281 N. College Avenue, Fort Collins, Co 80524
(970) 221-6750 0140
Construction Inspector: Dave Burke
281 N. College Avenue, Fort Collins, Co 80524
(970) 221-6605
Cell (970) 218 - 1740
Current Planner: Ted Shepard
281 N. College Avenue, Fort Collins, Co 80524
(970)221-6765
Water Utilities Engineer: Roger Buffington
700 Wood Street, Fort Collins, Co 80521
(970)221-6854
Erosion Control Inspector: Bob Zackley
700 Wood Street, Fort Collins, Co 80521
(970)224-6063
Natural Resources: Kim Kreimeyer
281 N. College Avenue, Fort Collins, Co 80524
(970)221-6641
Traffic Operations: Eric Bracke
625 Ninth Street, Fort Collins, Co 80524
(970)224-6062
Street closures: Syl•Mireles
625 Ninth Street, Fort Collins, Co 80524
(970)221-6815
Transportation Planning: Kathleen Reavis
210 E. Olive, Fort Collins, Co 80524
(970)224-6140
Exhibit "A" page 1 of 3
Forestry: Tim Buchanan
281 N. College, Fort Collins, Co 80524
(970)221-6361
Light and Power:
700 Wood Street, Fort Collins, Co 80521
(970)224-6152
Developer' Contact Persons:
Project Manager: Gary Berger, Woodridge Development Group, LLC
3665 JFK Parkway, Building 1, Suite 300,
Fort Collins, Co 80525
(970)225-2232
Fax (970) 225-3987
Email - Woodcraft@webaccess.net
Developer/Owner: Gary Berger, Woodridge Development Group, LLC
3665 JFK Parkway, Building 1, Suite 300,
Fort Collins, Co 80525
(970)225-2232
Fax (970) 225-3987
Email - Woodcraft@webaccess.net
Architect/Planner:
Project Engineer: Stan Myers
Sear -Brown Group
209 South Meldrum Street, Fort Collins, Co 80521
(970) 482-5922
Fax (970) 482-6368
Email - stanmyerse.searbrown.com
General Contractor: Clay Crisp
Connell Resources, Inc
4305 E. Harmony Road, Fort Collins, Co 80525
(970) 223-3151
Fax (970) 223-3191
or All Other Contractors:
Concrete/ Flatwork: Ron Dinkel
Advanced Concrete Construction, Inc
2902 W. Mansfield Ave, Sheridan, Co 80110
(303)761-5991
Cell - (970) 396-0603
Fax - (303) 761-0505
Exhibit "A" page 2 of 3
Landscape: Juan J. Gutierrez
Moss Crete, Inc
7373 E County Road 18, Loveland, Co 80537
(970)669-6751
Cell - (970) 566-1342
Other: Tom Dugan
Pinecrest Planning and Design LLC
4225 Westshore Way, Fort Collins, Co 80525
(970)226-1655
Cell - (970)566-4714
Fax - (970) 226-1635
Email - tduganna gateway.net
Exhibit "A" page 3 of 3