October 23, 1.992
Mike Herzig
Community Planning and Environmental Services
City of Fort Collins
281 North College Ave.
Fort Collins, CO 80524
SUBJECT: PROPOSED TAFT HILL ROAD IMPROVEMENTS IMPACT ON ABANDONED
FORT COLLINS LANDFILL (CORNER OF TAFT HILL ROAD AND
HARMONY ROAD)
Reference: (1) The Overlook At Woodridge - Third Filing,
October 1992.
(2) Paul Paulson, Colorado Dept. of Health,
Hazardous Material and Waste Management,
(303)692-3300.
(3) Rich Grossman, Larimer County Dept. of Health
and Environment, (303)498-6775.
Dear Mr. Herzig:
The proposed improvements to Taft Hill Road associated with the
Third Filing of The Overlook at Woodridge development (Ref. 1) will
not impact the abandoned Fort Collins Landfill. However, as Taft
Hill Road is improved South of the Overlook's third filing, our
preliminary design indicates that widening Taft Hill Road will
impact the landfill by cutting into the topsoil, clay cap, and/or
abandoned landfill from 0.5 to 4.0 feet. The Colorado Department
of Health and Larimer County Department of Health and Environment
were contact to determine what requirements\conditions are
necessary to be able to cut into the landfill and widen Taft Hill
Road.
Paul Paulson (Ref. 2) did not have any specific requirements but
was concerned with any possibility of methane buildup near the road
which might create a safety of health hazard. Rich Grossman (Ref.
3) did not foresee any problem with cutting into the landfill so
long as the following requirements are met:
Other ollices. Denver 303 458 5526 • Val 303 4, 6-8340 •Longmont 303" I 9684
1. The cap material (12 to 18 inches of clay), and topsoil
(2 feet) are replaced to the existing depth.
2. Any landfill material removed is disposed of in an
approved landfill.
3. Be:Eore any construction begins, a letter stating the
proposed work and supporting documents is sent to the
La:rimer County Dept. of Health and Environment for
approval.
If you have any questions , please call me or Bud Curtiss.
Sincerely,
RBB/D Inc. Consulting Engineers
Tracy
Design Engineer
cc: 434-008
John Hutchinson
Gary Berger
TK:tk
Bud Curtiss, P.E.
Project Engineer
HUTCHINSON MANAGEMENT INC.
7441 S. Fillmore Circle
Littleton, CO 80122
(303) 771-0129
October 16, 1992
Mr. Mike Hertzig
Planning Department
City of Fort: Collins
281 N. College Ave.
Fort Collins, CO 80522
RE: Woodric e Gates 2
Paving Design Submittal
Dear Mike:
Attached are two copies of the paving design for the Gates,
Second Filing. Lester Litton, form Empire has been in con-
tact with Dick, from your office about the format and design
criteria for this report. We'd like to start as soon as pos-
sible (what's new, right?).
If there is anything else we need to do or if there you re-
quire further information, please call.
s Very Truly,
VgA0 �,j v�
n R. Hutchinson
sident