IWo Lis IMIZS:
l ill117: _:; _ �I this icPcr 1S to S_ i 1.. iln..2 t.tC l;;'. _r't: i' . ;C. 1. --i❑1L d..
h mof in . : d-pn a. 1, I'`-Jrm Apirlon.Ti , 1 iL 1 SkImard Md ums. 111
06 _ I. ii;
hC l911IIt, paicd cO;1SIr w Ion dmo for this :April. .l0r t or 6_ onl :� :Is bA-l'.f17 Cr
Y t " i r C.:,) n 51 d c ra.l.l o n n Ns 6 m c cmrI:;'. on vyulei h0 ru oa apprCCla mod.
5
I:
cc (Ids Allen
`Vic olinici , Corporation
Fn Ct�.'oC•.1 (ttCra.l 7So111
��cS wy,—• �'� V 'U L"i. Y4'-1 1
C I
J
t -
1
\I
r '
�I
M_-D_ra'd's Cor,. ration
Tc . 'Ojav
='I s aa'_
October 20, 1998
Mr. Tim Blandford
P,nginecrin, Department
City of Fort Collins
281 N. College Avenue
Fort Collins. CO 80522-0580
RE: Review comments of Draft for Willox Crossing P.U.D. Development Agreement
Tim,
1 have reviewed the draft copy of the Development Agreement and would like to respectfully request some
changes as follows:
General Conditions:
Paragraph C We sec no reason why a building permit cannot be issued until the completion of the listed
improvements. phis requirement is usually for residential development. We would like this restriction
stricken from the agreement or revised to allow for concurrent completion of public improvements and our
building.
Paragraph I: According to the attached Exhibit" R", we are not eligible for any reimbursement for storm
drainage improvejutaus" The inlets and piping along both College and Willox, excluding the inlet box
South of our College Ave. access which we arc piping to, will only handle oft -site water and should
therefore be eligible for repayment.
Paragraph J: Why are molars of as-builts due after "any phase of construction is complete"? Can this be
revised to require molars of as-builts following final inspection of utilities, storm and street improvements?
Para'nu,h K: in the middle of the pa: rap!; where the agrc..,,._..t states, "The Dcve!eper does he;
indenmifi and hold harmless the Citr from an,, liability whatsoever that may be imposed on the City by
am Governmental authority, penainin,. to the clean-up necessitated by leakin, tanks.._or environmental
cleanup responsibilities of mtp nature whatsoever on, of or related to any property dedicated to the City in
connection with thi,, development'. We feel that this makes our development responsible for cleanup
shoulcl. for instance, a third party accident occur off -site such as a tanker overturning along Southbound
Colle,c Ave. rceultin,-, in contamination or we may be held liable should Mini Mart to the Norht suffer an
ahove or helow,round spill- Please revise the an,uage to address this possibility and relieve us of liability
for contamination caused by a third party_
Storm Drainage Lines and Appurtenances:
Paragraph 2: Regarding the City's right to enter our property to enforce the Criteria and make
improverents to meet the standard's set forth. We request that written notice be given and that we would
have the right to cure within a specified time Fame, perhaps 48 hours.
McDonaid's
A Piace You Can Count On
Storm Drainage Lines and Appurtenances (cont. :
I'aragra� We would like this paragraph stricken from the agreement. In effect, the adjacent property
owners could submit plans for development of the adjacent parcel, which would undoubtedly require grade
revisions as this parcel is in the same Noodplair as our development, and thereby delay our Certificate of
Occupancy. Any proposed development would require engineering review by your department per
Planning requirements and would not be allowed to increase Flows into our storm facilities without
modification to those facilities under their separate P.U.D. Our C.O. should not be contingent on "fhe
Developer obtaining approval._" and adherence to the Final Approved P.U.D. design is addressed
elsewhere in this dOcunlCnt.
Paragraph 4: We request clarification as to what off -site drainage facilities would not be accepted for
mainien<uxe by the City, assuming all facilities are indeed built to Citv standards.
Streets
Paragraph 1: Can you provide us a copy of Section 24-1 12 of the Code of the City for our review. Also,
does "Developer's actual expenses" include em�ineering costs"
Paragraph 2: It is understood that the off -site improvements are "City hrnprovements". The requirement for
competitive bids should have been brought up sooner in the project as we have already awarded this
project to Vanni Construction. Howcvci. it should be noted that Vanni solicited several local contractors
fur bids and only received ( I ). As the contract stands today. Kehn Construction will be doing the street
improvements and it is my understanding that they do quite a bit of City work anyway. It should also be
noted that McDonald's only grants 90,, overhead and profit with no general conditions_ This requirement,
and the lack of prior notification of Such. represents one more major time delay in a project that has taken 2
1 ,'_' years to brio_ to this point We would sugsest that the Citv review Kehn s bid, which we are confident
the City would find to be very reasonable.
Miscellaneous:
I't�raph C. We request that we be allowed to utilize a water truck to mitigate dust rather than have the
job shut down.
One last revision request; for the Developer's approval, we need to revise the contact to Sonny .Jones,
n Construction Maaner as I was unaware that Rarry C. Cordell %.vas leaving on in extended vacation.
'I his constitutes the extent of our review comments. I will fax these to you and would appreciate a phone
conference call to discuss these items as soon as possible.
Sincerely,.
Jim Marlow,
Architectural Coordinator
McDonald's Denver Rceion
cc: file, Gregg Jones
Jillv 14, 1998
tilr. I im Blandford
Decclopment Review Civil Engineer
('its of fort Collins
�81 North College Avenue
Dort Collins. CO 80522-0580
R1: �,killox Crossing Final P.U.D. - Revisions & Resubmittal
Dear Mr, Blandl'ord:
I his letter accompanies three (3) sets of the latest construction plans and drainage reports
liar the ❑hove mentioned project. These plans address the city's comments from May 20,
1 voh_ and the additional comments from your letter dated .Tune 30, 1999,
In response to your meetings with CDOT, we have incorporated all your requests for the
median redesign.
In response to Mr. Buftington's comments
All vertical and horizontal utility separations have been addressed by minimums
or encasement. The proposed RCP is using the same trench as the existing CMP -
NIII(oc and replace. We've shown all waterline crossing elevations per the city's
as -built drawing 3-0034.
In response to Mr. I lamdan comments:
titorm sewer encasement has been shown.
Water quality volume in the detention pond were not considered for storage, see
volume calculations.
O fsite area and basins has been shown. Basin El is historic but we feel it should
he handled by an agreement with the adjoining property owner, rather than an
casement.
I'he emergency overflow from pond I was designed to have a second chance to
get into the pipe.
The detail for the outfall of the storm sewer in College Ave. is shown in the detail
%1-601-12 on sheet C-313.
All other comments have been addressed in the drainage report.
We appreciate the time and effort you have taken in the review of these plans.
I lli� suhmittal addresses the staffs comments and it is our belief that you will find
them complete and ready for final approval. If you have any questions or
comments, please feel free to contact our office and we will assist you as quickly
as possible.
Sincerely.
K & K P:ngineers - Surveyors, Inc.
Robert B. Taylor
Enclosures
cc: Mr. Jim Marlow
me6'_oZkl
Transpor `ion Services
Engineering Department
City of Fort Collins
June 30, 1998
Mr. Robert Taylor
R&R Engineers - Surveyors, Inc.
10 Inverness Drive East, Suite 229
Englewood, CO 80112
Re: Willox Crossing, P.U.D. - North College Avenue median design
Dear Mr. Taylor:
This letter is in response to the meeting City of Fort Collins' staff had with Tess Jones
from the Colorado Department of Transportation (CDOT) Thursday, June 25, 1998.
The items that we discussed were the dimensions of the proposed median along North
College Avenue.
Please find enclosed, a redlined copy of the Offsite Striping Plan for the Willox Crossing
development. We would ask that you make any necessary changes as suggested on
the striping plan and resubmit the utility plans for this project. The major issues that the
State was concerned with are as follows:
a. The Offsite Striping Plan did not show the existing and proposed striping
to the south of the site. Please extend the existing and proposed striping
beyond the carwash and establish how the proposed striping will match
with the existing striping.
b. Please modify the taper ratio so that it reflects a 12:1 ratio rather than a
11.5 1 ratio_ Make sure that your traffic engineer includes this in the
variance that your traffic engineer is preparing.
C. Please check the vehicle turning movements out of the carwash entrance.
You will need to modify the "bulb" of the median so that it has not affected
the turning movements.
d. Since this median is temporary, make sure that the edges of the median
align with the existing 12-foot chicken lane.
The remaining comments shown on the Offsite Striping Plan are minor so I feel I do not
need to expand on them.
If you should have any questions or concerns regarding this matter, please do not
hesitate to contact me at 221-6605.
�RI Nort7 C 0 11 e11e:A% CTI U 0 • PC). B v EAU POrtCol Iin,, ��� yij�"?-0��0 1970,''''1 bb(h
SZ7- - -
Tim R. Blandford
Engineering Department
City of Fort Collins
enclosures
cc: Jim Marlow, McDonald's Corporation
Mike Ludwig, City Planner
Fred Jones, Traffic Systems Technician
Matt Baker, SID Coordinator
Kathleen Reavis, Transportation Planner II
Tess Jones, CDOT
Transpor 'on Services
Engineering Department
City of Fort Collins
June 19, 1998
Mr. Jim Marlow
McDonald's Corporation
5251 DTC Parkway, Suite 300
Englewood, CO 80111
Re: Willox Crossing, P.U.D. - North College Avenue median design
Dear Mr Marlow:
This letter is in response to the meeting City of Fort Collins' staff had with Tess Jones from the
Colorado Department of Transportation (CDOT) on Tuesday, June 16, 1998. The items that
were discussed were the dimensions of the proposed median along North College Avenue
and the requirements for the variances needed with this project.
Please find enclosed, a copy of a sketch of the North College median showing the new
configuration, the various dimensions and taper ratios associated with the median. The
location of the median shown on the sketcin. is approximate and will need to be located
accurately by your engineers. The dimensions, i.e. lengths of the median, are referenced from
the southern edge of the stop bar. What is currently being suggested is shown as follows:
a. 250 feet of lane length
b. 138 feet of taper length (using the minimum taper ratio from the existing access
code which is 11.5:1)
c. Approximately 22 foot long 'bulb" at the end of the median The engineer will be
responsible for seeing to it that turning movements from the carwash will not be
affected by the edge of the median be placed at the north edge of the carwash
access. If turning movements are affected, the median can be constructed as
shown with the dashed line or shifted north 5 to 10 feet
d. Lane transitions will be 120 feet long using a 1 30 redirect taper ratio. All lane
transitions will begin at the location of where the median begins to taper, i.e 250
feet from the southern edge of the stop bar.
e. The edge of asphalt taper will be 75 feet long and started from the curb return.
At that point; the edge of asphalt will follow the lane line for a distance of 45 feet.
Please note that the edge of asphalt will need to be 4 feet from the lane line as
stated in the State Highway Access Code.
f. There will be no landscaping inside the median. It will be constructed with glue -
down curb and filled in with exposed aggregate.
I am requesting that your traffic engineer provide the necessary language for the variances
associated with the median. Currently, the median is deficient in a number of areas when
compared with the allowable conditions in the State Highway Access Code. Please note that
'-81 NoT th -V unuo • PO. Box ;80 - Port Collins; CO 802'-0,580 • (970) 221-600,;
the State is in the process of adopting a new access code. If in fact this code is approved by
State officials, the variances will need to reference the new criteria in the new code. Listed
below are the items that the traffic engineer should address in the variances.
a. Storage Nength deficiency
b. Lane length deficiency
c. You can reference the median on North College at Vine Drive
d. Address the fact that there is no acceleration lane. You may state that traffic
leaving the carwash will not be allowed to enter an acceleration lane and that the
City does not support acceleration lanes to begin with.
e. If the new code is approved, you will need to base the variances off of the
requirements in that document rather than the existing code. For example, the
minimum taper ratio allowed in the new code is 12:1 and not 11.5:1 as stated in
the existing code.
The traffic engineer will need to include the required lane lengths, taper lengths, storage
lengths, etc. and the rToposed lane lengths, taper lengths, storage lengths, etc. in the
variance request language.
If you should have any questions or concerns regarding this matter, please do not hesitate to
contact me at 221-6605.
Sinc
Tim R. Blandford
Engineering Department
City of Fort Collins
enclosures
cc: Dave Stringer, Development Review Manager
Mike Ludwig, City Planner
Fred Jones, Traffic Systems Technician
Kathleen Reavis, Transportation Planner II
Tess Jones, CDOT
kPIATER AND SEWER DEPARTMENT
City of I V,IC 7P,7,4 STPEFT. (-9F�LEv, CCU)RADO 9hl2 SAX ,1,7OI tiSGSSJ',
Greeley
.lamlal'y 12, 1999
Mr. Dave Stringer
City of Fort Collins
Engineering Department
P. O. Box 580
Port Collins, CO 80522-0580
R17: Abandonment and Rededication of an Exclusive Water Easement for the City of Greeley
Located in McDonald's Willox Lane Site, Fort Collins, CO
Dear Mr. Stringer:
The City of Grecley is agreeable to abandoning a water line casement at the location mentioned
ahove. In addition, an exclusive 30 foot water line casement shall be dedicated for an existing
water line located in that same property.
['his agreement is in the conceptual stage at this time. McDonald's and its attorney is in the
process of preparing an agreement for Greeley's review and approval.
If you have any questions, please feel free to contact me at (970) 350-9814.
Sincerely,
Daniel P. Moore. P.E.
Water System Engineer
WATER AND SEWER DEPARTMENT
Cltyof % I('G')T 11IF, fTR�'EI CREE-EY DCOF Al-) 90U` ('I,O� W19 -AX(Iin, L5�-9F0;
Greeley )
June 27, 1997
Mr. Tim Blandford
Engineering Department
City of Fort Collins
281 North College Avenue
P. O. Box 580
Fort Collins, CO 80522-0580
Rl-,,: Greeley Water Main at Willox Crossing
Dear Tim:
Attached please find the redline comments from the Engineering, Water and Wastewater Utility and
the Stonnwater Utility Departments for the above named project. 1 believe that these comments
have been addressed with the corrections made and shown on the attached blue lines and mylar
sheet, and also throughout this letter.
The main concerns from Engineering dealt with highway permits and any necessary city permits.
We will soon apply for the highway crossing pennit from Henry Rangel of CDOT. I have discussed
that issue with Roger Buffington, and we decided that Greeley should be able to make that
application directly with CDOT.
Roger and I also discussed his concerns shown on the redlines and I believe that all these issues have
been addressed.
For Storm Water Utility concerns I talked to Matt Fater. Most of his comments are addressed on the
revised plan. We will be installing a silt fence around the affected area of construction. Because the
impact of the installation ottee water main on this site is minimal (with regard to disturbed surface),
because McDonald'; will soon be developing this site. and due to the fact that we are a neighboring
municipality. we are requesting a waiver from the escrow requirement. If necessary, we can leave
the silt fence in place until McDonald's begins construction or makes other improvements to restore
the surface. We will work with the erosion. control inspector to mitigate erosion in this area.
1 1, , , w I
'c put till �'nl, klf] Re�-,ion !-V
(awaWCo. SU631
l,', 1d1w.. L'osyny ,.ha McDoWds (Aporabon- lAwl CAlens; CA
Dour I ess:
tlp: C(irtlruo(FS 11-1,wowc coconut and 0-1c rcvid ru% tmenr desiQll for %i ori. tiiil,
td:.qv to Go 1 hAmm, 07 (KA WeN. t)t)ni It JX pit "�":t al
1 L L
:)l t i iha�� a T�� Col-� frol Plu ij II I :tj p., ) vi:i 1
poct"l--
Del
is elopwnt R,4
,4t
Mr. Tim Blandford
June 27, 1997
Page 2
We anticipate construction of the water main and bore to begin mid -July and take about four to six
weeks. The boring contractor is yet to be determined and the water main construction will be done
by Greeley water crews.
I appreciate your attention in this matter in the final stages of plan review. If you have any concerns,
please {eel free to contact me at (970) 350-9814. Thank you.
Sincerely,
Daniel F. Moore
Water Systems Engineer
McDonald's
nald's
December 26, 1-000
('try of t. Collins, CO
Engineering Development
Mc Dave Stringer
281 N. College Avenue
P.O. Box 580
Et. Collins. CO 80522-05809
RE: McDonald's Restaurant— 1675 N. College
Dear Dave,
Enclosed are the following for your review and approval:
• Original CDOT access permit dated 7/12/99.
• Notice of Contractor change.
• Pavement design specification update
• Updated site & grading plans.
Per our continued conversations you had indicated that this is all the city and ('DOT would need
to issue a new access permit and notice to proceed. Please confirm this and/or let me know what
is needed to obtain the permit.
Should you have any questions regarding the above information please do not hesitate to contact
me immediately. I can be reached at my office, 303/779-0444 x585, my cell. 303/898-6115 or by
e-mail chi is.allcn(c'mcd.com. Thank you.
Sincerely,
('In istopher D. Allen
McDonald's Project Manager
Denver Region
A, Y6o Con On
XAY.0-12D'l 15:2_'
$7778 P.002/004
�Incaona�a's
re
May 1, 2001
Champney A. McNair, Tr.
Engineering Department
281 North College Avenue
Fort Collins, CO 80522-0580
Dear Cam:
McDonald's Corporation
5251 17TC Parkway
Suits 300
Englewood, Colorado 00111
1303) 779-OW
Thank you for taking the time to meet: with us yesterday. Based on our meeting I am
forwarding the attached informafior, to our bonding agent. This is to bond the work you
requested or Wiilox Avc., to inciudc rile concrete approach. bike paid, and curb and gutter
for die amount of $70,000.
I will have this expedited and will get the bond to you as soon as possible. Jt is our
urderstanding that based on this letter you will release our permit for a TCO that will
allow us to open this Thursday.
Thank you for helping us to get our partners open for business.
Sincer ly,
Sonny Tones
Regional. Development Manager
McDonald's
A Place You Can Count On
City of Fort Collins
Facsimile Transmittal
To: McDonalds Corporation- Chris Allen
Fax: (303) 773-6960
Re: Willox Crossing State Highway Access Permit
Date: 11-17-0
Pages: 2
Chris,
Attached is a detail drawing that Tess sent me regarding the State's new
requirements for construction within their right-of-way. As you can see from the
detail the new pavements are constructed to the R-Value of 40 under the
pavement section and an R-value of 25 outside of the pavement section and
within the right-of-way. In addition, the existing pavement is milled to a minimum
depth of 2" for 1-foot width to provide a smooth transition from the existing to the
new pavement sections. This detail does not suggest removing the existing
pavement and reconstructing to an R-value 40
Dave
Dstringer@ci.fort-collins.co.us
City of Fort Collins Engineering Department
281 N. College Ave.
Fort Collins, Co. 80524
Office: (970) 221-6605
Fax: (970)221-6378
August 28, 2000 r
Mr. Chris Allen
McDonalds Corporation
5251 D.T.C. Parkway, Suite 300
Englewood, Colorado, 80111
RE: Manhole Construction, North College and Willox, Fort Collins, Co
Dear Chris:
The intent of this letter is to inform you that the storm sewer concrete manhole
junction boxes constructed with the Willox Crossing development, in the
Colorado Department of Transportation's right-of-way on State Highway 287
(College Avenue) have been built in accordance with CDOT standards.
As you may recall, I sent a letter to Mr. Doug Dunkin of R&R Engineers on or
about September 9, 1999, requesting some additional information concerning the
redesign of the storm sewer junction boxes. Initially, I had concerns due to the
lack of detail and the size of the proposed redesign. However, in talking to our
construction inspector (Ronda Henson) she stated the manhole junction boxes,
as built in the field, were not sized in accordance with that as proposed by R&R
Engineers. Ronda indicated the size was modified from the R&R proposed
design to accommodate an existing gas line with no box dimension being greater
then 8 feet. Upon further review of the approved plans, I found the CDOT
standard design table includes a manhole design up to 8 foot. Additionally, she
stated that the boxes were built in accordance with the standard reinforcing table
as shown on the approved plan set. Therefore, the manhole junction boxes were
built in accordance with CDOT criteria.
If you have additional questions, please contact me at (970) 221-6605.
Sincerely,
David Stringer
Development review Manager
Cc: R&R Engineers
Ronda Henson
Transportation Services
Engineering Department
City of Fort Collins
R&R Engineers
Doug Dunkin
10 Ivenness Drive fast, Suite 229
Englewood, Co. 80112
Re: Willox Crossing, Junction Box Design
Dear Mr. Dunkin:
I have recently seen the fax that was transmitted to our City Engineering Inspector, Ronda Henson dated 9-
9-99. After quickly reviewing what is proposed I see a few issues that need to be resolved.
I_ These boxes are within the Colorado Department of Transportation's right-of-way and are in the
proposed travel way. The design must comply with their standards, do they meet this, and are they
designed to support the State loading requirements?
2. The fax that I saw did not include any steel reinforcing details, what size rebar, spacing, distance from
walls, slabs, lids and etc.
1 Our inspector has informed me that these boxes are smaller then 4 feet by 10 feet, I understand they
have been built at 4 feet by 8 feet, is this size adequate?
4. What is the elevation of the boxes as it relates to the subgrade and finished street elevation?
5. Please submit to mean Engineers signed and stamped letter stating that the boxes have been designed
and built to meet the appropriate CDOT standard.
Thank you for addressing these concerns, and if you have any questions please call me at 970 221-6605
Sincerely,
David Stringer, Development ReJiBw Supervisor
Cc: Ronda flenson,4-�
TranspoV 'on Services
Engineering Department
City of Fort Collins
February 23, 2000
1.7MT-frCI[t7. We ii71
McDonalds Corporation
5251 DTC Pkwy-Suite 300
Englewood, Co. 80111
RE: McDonalds at North College and Willox — Fort Collins
Dear Mr. Graham:
I am returning the Deed of Dedication For Easement and the Attorneys Certification that
was recently sent to Mr. Hamdin of the City's Storm Water Utility. In my review of
these documents I found missing information that needs to be included in the documents
before I can schedule this for public hearing. An attorney signature is required and
The reception number of the land transaction must be included. I have enclosed an
information sheet for your use.
Please make the necessary corrections and submit these documents to me with a check in
the amount of $20.00 payable to Larimer County Clerk and Recorder.
Once I have received all of the requested documentation I will schedule this easement the
next available hearing date.
Sincerely,
�2 C7
7
David Stringer �
Development Review Manager
'�l V'kith ' .�Ile�- 1 �,=:!i,_ "(l. Roa �. 0 •tort Collin>. r 0 S0,_---( 9'0) 21 oriiL
10/20/98 15: 46 ^Ct303 "'3 6906 MCI) DENVFR RCN 0002
Mc®onalds
October 20, 1998
Mr. Tim Blandford
Engineering Department
City of Fort Collins
281 N. College Avenue
Fort Collins, CO 80522-0580
RE: Review comments of Draft for Willox Crossing P.U.D. Development Agreement
Tim,
McDonald's Corporation
5251 DTC Parkway
Suite 300
Englewood, Colorado 80111
(303)779-0444
1 have reviewed the draft copy of the Development Agreement and would like to respectfully request some
changes as follows:.
General Conditions:
Paragraph C: We see no reason why a building permit cannot be issued until the completion of the listed
improvements -This requirement is usually for residential development. We would like this restriction
stricken from the agreement or revised to allow for concurrent completion of public improvements and our
building.
Paragraph 1: According to the attached Exhibit "B", we are not eligible for any reimbursement for storm
drainage improvements? The inlets and piping along both College and Willox, excluding the inlet box
South of our College Ave. access which we are, piping to, will only handle off -site water and should
therefore be eligible; for repayment.
Paragraph I Why are mylars of as-builts due after "any phase of construction is complete"? Can this be
_ - revised to require mylars of as-builts following final inspection of utilities, storm and street improvements?
Paragraph K: In the middle of the paragraph where the agreement states, "The Developer does hereby
indemnify and hold harmless the City from any liability whatsoever that may be imposed on the City by
any Governmental authority, pertaining to the clean-up necessitated by leaking tanks .... or environmental
cleanup responsibilities of nature whatsoever on, of or related to any property dedicated to the City in
connection with this development". We feel that this makes our development responsible for cleanup
should, for instance, a third patty accident occur off-ste such as a tanker overturning along Southbound
College Ave. resulting in contamination or we may be held liable should Mini Mart to the Norht suffer an
above or below ground spill. Please revise the language to address this possibility and relieve us of liability
for contamination caused by a third party.
Storm Drainage Lines and Appurtenances,•
Paragraph 2: Regarding the City's right to enter our property to enforce the Criteria and make
improvements to meet the standard's set forth. We request that written notice be given and that we would