Re: Willow Springs Grading Along Timherline Road
Project No. 10-695-050
Dear Mike:
November 17, 1995
With regards to your letter dated November 16, 1995, 1 present the following revised certification:
As of today, the lots of Willow Springs P.U.D. - Phase One A have been graded in accordance with the
approved plans for the project as well as in accordance with the Timberline Road improvement plans
which are currently pending approval. The lots as well as the open space between the lots and the Right -
of -Way of Timherline Road (hack of future sidewalk) have been brought to grade such that future
construction of Timberline Road, if constructed per the current construction plans under review, will not
cause tol any disturbance outside of the Timberline Road Right -of -Way.
The future construction of Timherline Road therefore should not affect the grades of the lots or open
space in any way or Cause damage to landscaping or fencing or cause any flooding, or cause any suffering
from the aftermath of construction.
In summary, I am hereby certifying that the lots along Timberline Road in Willow Springs Phase One A
m are ustRICIed aS of today, such that future construction of Timberline Road, if constructed per the plans
currently under review as Prepared by TST, Inc. Consulting Engineers, will cause no physical disturbance
ot'these lots as the grading has been completed to hack of future sidewalk (Right -of -Way).
Please feel free to contact me it you should have any questions or concerns.
Respectfully,
TST, INC.. CONSULTING ENGINEERS
. teve . Humann, .E.
SFH/Ig
cc: Mr. Tom Barlow
TSTINC. IVlh,", Il .d", 1) ,., .,«
7 t( Rnz.00#� $ t 105��
I n u [l:° I 1j;IlI Ti 26 01j? L 1111'n,d, CO d0I I I
r aho U¢rc c; @Itx,5v5 110_ i3. I1 9 79'
Pu> i imp P(-03:1 I,i x i iLLr i I�r-uA �0
Transpc; .ition Sen ices
Eng,ineering I)c1mrtment
City of Fort Collins
November 16, 1995.
Mr. Steve F. Humann, P.E.
TST, Inc., Consulting Engineers
748 Whalers Way, - Building D
Fort Collins, CO 80525
RE: Willow Springs P.U.D. - Permit releases
Dear Steve:
I received your letter dated November 15, 1995, regarding the
Timberline Road design and the certifying the ground elevations and
thereby requesting the release of building permits. The letter is
missing the element of most concern to us.
Your letter says that the lots have been graded according to the
approved construction plans. It also says that the Timberline Road
plans depict grading that ties into the "now existing grading of
Willow Springs. Phase One." Does "now existing" match the approved
plan to which the lots are graded? This was not clear. If it does
not it must be fixed.
We are concerned that the construction of Timberline may affect the
grades of lots in close proximity to the construction. We need to
know that all of the Timberline Road improvements can be
constructed without needing to do work on the lots. In addition,
the construction should not result in conditions outside of the
lots that could cause damage to the lots. The people buying and
landscaping the lots must be assured that their property and
landscaping (1) will not be disturbed; (2) will not be flooded or
disturbed in any other way as a result of construction of
Timberline Road; and (3) will not suffer from the aftermath of
construction.
Resubmit your certification covering all of these potential problem
views. Sign and seal the certification as a Colorado licensed
engineer. If you have any further questions please call.
Sincerely,
Mike Herzig,
Development Engineering Manager
cc: Byron Collins