Loading...
HomeMy WebLinkAboutWILLOW BROOK - Filed DCP-DEV. CONSTRUCTION PERMIT - 2005-09-01City of Fort Collins Transportation Services Engineering Department DEVELOPMENT CONSTRUCTION PERMIT Permit Number: '' 2 - l 5 -Issuance Date: __L041 �Gz Project Name: __ Willow Brook PDP, Phase 2 Project A.K.A.: Observatory Village Project Location: SWC Cinquefoil Laneand Observatory Drive Permittee: Brian Graves Project Manager City and developer contacts: See attached Exhibit "A" for names and phone numbers of all contact persons for this project. Fees: Permit Application Fee (paid at the time of application) $ 300.00 (paid) Construction Inspection Fee (paid prior to issuance of this permit) $ 3,102.30C+�i��i Total $ 3,102.30 Development Bond or other approved security: Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown or, the approved plans for the development. $ 75,042.00 Form of security deposited with the City' _ 'l,etter of Credit —_ PERFORMANCE REQUIREMENTS OF THIS PERMIT: 1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design drawings and specifications the certification of all materials testing by an Engineer. The Permittee shall have an Engineer prepare revised design drawings and secure City approval for all revisions to the Utility Plans and related documents. The Permi ae--steal l have an Engineer represent, as required by the City in the Development Agreement, that the improvements are constructed in conformance with the approved Utility Plans and the standard, and -pecifications of the City. The Permittee shall provide "as -constructed" plans prepared by an Enginetaorior to the City's acceptance of the constructed public improvements. (All references above 'o the terms "Project Engineer" and "Engineer" shall mean a Professional Engineer licensed in ( olorado.) 2. All contractors who perform work on this project must be bonded and licensed in conformance with City requirements. 'FI Nr,rihC0l1t'Vt'Rx'71uc • P.0 Box580 • Fort Collins, CO80522-0580 • (970)221-6605 • FAX (970) 221-6378 www.fcgov.com Development Construction Permit, Page 4/5 EXHIBIT "A" DEVELOPMENT PROJECT CONTACT PERSONS Name, address and numbers Project Name: Willow Brook PDP Phase 1 City Staff Contact Persons: Development Engineer: Marc Virata 281 N. College Avenue, Fort Collins, CO 80524 (970)221-6605 Construction Inspector: Jeff Baldwin 281 N. College Avenue, Fort Collins, CO 80524 (970)218-2157 Current Planner: Ted Shepard 281 N. College Avenue, Fort Collins, CO 80524 (970)221-6750 Water Utilities Engineer: (Fort Collins -Loveland Water District) Erosion Control Inspector: Bob Zackley 700 Wood Street, Fort Collins, CO 80521 (970)224-6063 Natural Resources: Doug Moore 281 N. College Avenue, Fort Collins, CO 80524 (970)224-6143 Traffic Operations: Eric Bracke 625 Ninth Street, Fort Collins, CO 80524 (970)224-6062 Development Construction Permit, Page 515 Street Closures: Syl Mireles 625 Ninth Street, Fort Collins, CO 80524 (970)221-6815 Transportation Planning: Kathleen Reavis 215 North Mason Street, Fort Collins, CO 80524 (970)224-6140 Forestry: Tim Buchanan 281 N. College Avenue, Fort Collins, CO 80524 (970) 221-6361 Light and Power: Janet McTague 700 Wood Street, Fort Collins, CO 80524 (970)224-6154 Developer' Contact Persons: Project Manager/Developer/Owner/General Contractor: Brian Graves Village Homes of Colorado 310 Lashley Street Suite 108, Longmont, CO 80501 Office: (303) 776-3214 Cell: (303) 944-2426 Fax: (303) 772-3445 Email: bgraves@villagehomes.com Project Engineer: Shar Shadowen, TST Inc. 748 Whalers Way, Building D, Fort Collins, CO 80525 Office: (970) 226-0557 Planner: Craig Karns Nuszer Kopatz 1129 Cherokee Street, Denver, CO 80204 Office: (303) 534-3881 DCP PRECONSTRUCTION MEETING ATTENDANCE SHEET Contact name Oavt Company Name Address Phone Number C171 NR�UE DI��KINSo 'I u OTwTi-(� wry' P6 D `j r 540cuuen -�T wll via q,tu) 5% J b �J�J Cczci �/�• 3lo`i X,y �Y Via., N rll fJP5 V: it«�;t NON L G i.c,. <ic i �4(: Cc -�5,05 Yyy ZS2(, i u w im .m II, INS mil SIM11 Ip MR 1 i 2 I• Y , {I; � t i i �% �,j. f\y South tort CoWv 9.dh I I r 7I �; 1• / /-I ��� !i w t �✓ i{ ! I % __Y Yk1iN 0. ORW Yeipgr M i PRCKLtStD Aff S — H . -� MY mr PRLWp,S[p 3.1MIAflY SpfN(F 3 sty W, on I. 'Alen q PM1WSfD NX.WIN) -_T WA M. ) YRN(L ysy sYY�rr. Y I i TJ t '•.\ fkI51wG SAMrAFv wr nadRaMMbn -_ � EDSIING W.1 h.R/N£ ___ __.. _._.. N W WN fvl mM SNIYbn City of Forl Collins Transportation Services t_m, ineering Department DEVELOPMENT CONSTRUCTION PERMIT Permit Number: C.3 — � � Issuance Date: / /<: Project Name: __ Willow Brook PDP, Phase 3 ProjeetA.KA.r Observatory Village Project Location: SWC Cinquefoil Larteand Observatory Drive Permittee: Brian Graves, Project Manager City and developer contacts: See attached Exhibit "A" for names and phone numbers of all contact persons for this project. Fees: Permit Application Fee (paid at the time of arplication) $ 300.00 (paid) Construction Inspection Fee (paid prior to issuanca of this permit) $ — 17.985.40 Total $ 20,985.40 Development Bond or other approved security: Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. $ 355 174.25 Form of security deposited with the City. _ Letter of Credit PERFORMANCE REQUIREMENTS OF THIS PERMIT: 1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design drawings and specifications the certification of all materials testing by an Engineer. The Permittee shall have an Engineer prepare revised design drawings and sr cure City approval for all revisions to the I Itili[y Plans and related documents. The Perrittee shall have an Engineer represent, as required by the City in the Development Agreement, that the improveoncnts are constructed in conformance with the approved Utility Plans and the standards and �pecifi,:ations of the City. The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance of the constructed public improvements. (All references above to the terms "Project Engineer" and "Engineer" shall mean a Professional Engineer licensed in Colorado.) 2. All contractors who perform work on this project must be bonded and licensed in conformance with City requirements. P„�� i' • f'n ' C ulh 1�, CO £tU622_r16fl0 • (970) 21-660� • FAX (970) 221-6375 .r w �c. kgau cum Development Construction Permit, Page 2/5 3. Construction time restrictions: 4. The applicant understands that additional permits maybe required for this development project and the applicant shall secure those permits directly from the issuing departments. 5. This permit, along with a complete set of all approved plans and documents for this project (utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic study, drainage report, plat easements and any other official documents), shall be kept on the development site available for use by City staff doing inspections. 6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable): a. If construction has not begun within sixty (60) days from the date of issuance of this permit, this permit shall expire and the applicant will forfeit the permit fee paid for this permit, whereupon the applicant must re -apply for a new permit. b. In addition, this permit shall expire one year from the date of issuance. The applicant may apply for an extension by reapplication at least two weeks prior to the expiration date. Such application shall contain information sufficient to justify the granting of the extension. An extension may be granted for up to six months. 7. Building permits and certificates of occupancy will only be issued when all conditions contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29- 678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the Development Agreement does not specify times for completion of public improvements, or if there is no Development Agreement, then the improvement requirements specified in Section 24-95 of the City Code shall apply, which provides that construction of all improvements shall be required prior to the time of issuance of the first building permit. 8. Acceptance by the City of the public improvements shall be after (1) final inspection has been conducted by the City; (2) punch list items from the final inspection are completed and accepted by the City; and (3) required certifications from the licensed professional engineer that improvements arc completed to City standards, specifications and approved Utility Plans; and the "as -constructed" plans have been received and accepted by the City. 9. The warranty on street improvements is for five (5) years from the date of acceptance by the City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use Code, as applicable. 10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any Development Construction Permit, Page 3/5 planned construction on this project. All required perimeter silt fencing and other erosion/sediment control best management practices (BMP's) that can be installed prior to construction must be in place and inspected by the City Erosion Control Inspector before any land disturbing activity begins. 11. No work (including grading) shall be started in State Highway right-of-way until a permit is issued by the Colorado Department of Transportation to allow such work to begin. 12. Other conditions: Permittee's acknowledgment signature: By signing this permit I acknowledges that 1 am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. I also acknowledge that I have read this permit document with all its requirements and conditions, and I agree to all of the terms and conditions so stated in this permit. Applicant/Project Manager's Signature: /7f Dater /S-0-31 Approval for issuance: City Engineer Approval �� j�� Date: Arm -it Issuance Date) Development Construction Permit, Page 4/5 EXHIBIT "A" DEVELOPMENT PROJECT CONTACT PERSONS Name, address and numbers Project Name: Willow Brook PDP Phase 3 City Staff Contact Persons: Development Engineer: Marc: Virata 281 N. College Avenue, Fort Collins, CO 80524 (970)221-6605 Construction Inspector: Jeff Baldwin 281 N. College Avenue, Fort Collins, CO 80524 (970)218-2157 Current Planner: Ted Shepard 281 N. College Avenue, Fort Collins, CO 80524 (970)221-6750 Water Utilities Engineer: (Fort Collins -Loveland Water District) Erosion Control Inspector: Bob Zackley 700 Wood Street, Fort Collins, CO 80521 (970)224-6063 Natural Resources: Doug Moore 281 N. College Avenue, Fort Collins, CO 80524 (970)224-6143 Traffic Operations: Eric Bracke 625 Ninth Street, Fort Collins, CO 80524 (970)224-6062 Development Construction Permit, Page 515 Street Closures: Syl Mireles 625 Ninth Street, Fort Collins, CO 80524 (970)221-6815 Transportation Planning: Kathleen Reavis 215 North Mason Street, Fort Collins, CO 80524 (970)224-6140 Forestry: Tim Buchanan 281 N. College Avenue, Fort Collins, CO 80524 (970)221-6361 Light and Power: Janet McTague 700 Wood Street, Fort Collins, CO 80524 (970) 224-6154 Developer' Contact Persons: Project Manager/Developer/Owner/General Contractor: Brian Graves Village Homes of Colorado 310 Lashley Street Suite 108, Longmont, CO 80501 Office: (303) 776-3214 Cell: (303) 944-2426 Fax: (303) 772-3445 Email: bgraves@villagehomes.com Project Engineer: Shar Shadowen, TST Inc. 748 Whalers Way, Building D, Fort Collins, CO 80525 Office: (970) 226-0557 Planner: Craig Kams Nuszer Kopatz 1129 Cherokee Street, Denver, CO 80204 Office: (303) 534-3881 I -- 0 0 00000 0 0 0 0 0 00000000000 o OLEO o 0 0 0 0 0 0 V000000 o r� o N O o n p v z 0 O N NEAEA� do' 0 0 W 0 WfA�EA 0 0 0 O,O di fA 0 EA 0 Vi 0 EAVi 0 O EAO V 0 N W mom m N W � uj 00 JO OW W 69 fA f9 N� fA V3 fA f� w �N ^� O z - J U Z 0 <O 0 V 0 0 0 0 0 0 0 0 O 0 o 0 O 0 o 0 0 0 0 0 0 0 0 0 0 o 0 0 0 (7 o W V W 0 M- 0 _O W r- ZO Z W � C E9 O E9 E9 fA W VliW oO. O) . OOOOOOOO66 f9,fA M fA fA fA fA fA fA fA OOOO60 fA fA fA E9 EA EA (j1 F,. F auof Z J _w 3 w w N 0 O 0 O 0 O 0 O 0 O 0 O 0000000000 O 0 0�0 0 0 00 0 0 0 0 0 0 0 0 0 0 00000 O N P� O O 0 O 0 O LL z z W aJ O,W 0 0 EA 0 0 0 O 0 O O h O) O O EA O O OIL H O N 1� O EA L6 m O O 0- fA W W N 0 W 0 O 0 Vi V f� O � � W ¢ •a W v W W W CD c0m M OO V F W N V O W N (� ^> EA �� �� �fA fA� �WM f9 fA d Q QQjF N d ONaV Z w M H 7 O � H a W ❑ o w O 0 O 0 O 0 O.O 0 o O 0000000000 W 0 0 0 0 0 0 0 0 S o �O u� N o 0 0 0 0 0 0 0 j O '000000 om'.00oO m O mO O � m OON(V ui w 'a fA EA M o o �� 'EA O M W OO N N N= I� C] O n EA EA �H O EA EA _ D0-w n �A w N O d jj2H W Vi fA fA f9 N = < 0 < z ut; 1 U 0 z'. LLUUO W V w n J z R01 V r i Y Um _... �N U W Q D 0 0 0 Ni❑I�n ONM 0- w c1 W I�Or O m NN N N n^ O� N O wW € j�t7v Q m ❑ 0 H m cc W W 3 z LL.Z Q W ? J J m o> w W w J J J ¢o Q 3 u ¢ 0z Z O UZ LU V¢ S S 2 2 S S 2 2 S YILLLLLLLLL y Z0 on LLLLY Y U U I LLLLU Q U QQQQQQ U U U UU fn ? �< J JUUQ Q JJ J W J(nJJJ(❑(n i W W W W W W W W ULL - C7 N O n W O¢ wn C ~ d a H N Z S y N a 0 c J O UJ Q y d o m U 6 > IX _V U LL LL Z w IL V N romo 3m e U.�)nus Qai ' F01z- z 2 - a m �ry a -o Ow m LNidU omO c E L Cm 'wrQ _❑>__ � �m `5m-m m m d'mmm m�'�dD� w a 3:1 a , 3 QOi7Oo — HJ Development Construction Permit, Page 2/5 3. Construction time restrictions: 4. The applicant understands that additional permits maybe required for this development project and the applicant shall secure those permits directly from the issuing departments. 5. This permit, along with a complete set of all approved plans and documents for this project (utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic stud), drainage report, plat easements and any other official documents), shall be kept on the development site available for use by City staff doing inspections. 6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable): a. If construction has not begun within sixty (60) days from the date of issuance of this permit, this permit shall expire and the applicant will forfeit the permit fee paid for this permit, whereupon the applicant must re -apply for a new permit. b. In addition, this permit shall expire one year from the date of issuance. The applicant may apply for an extension by reapplication at least two weeks prior to the expiration date. Such application shall contain information sufficient to justify the granting of the extension. An extension may be granted for up to six months. 7. Building permits and certificates of occupancy will only be issued when all conditions contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29- 678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the Development Agreement does not specify times for completion of public improvements, or if there is no Development Agreement, then the improvement requirements specified in Section 24-95 of the City Code shall apply, which provides that construction of all improvements shall be required prior to the time of issuance of the first building permit. 8. Acceptance by the City of the public improvements shall be after (1) final inspection has been conducted by the City; (2) punch list items from the final inspection are completed and accepted by the City; and (3) required certifications from the licensed professional engineer that improvements arc completed to City standards, specifications and approved Utility Plans; and the "as -constructed" plans have been received and accepted by the City. 9. The warranty on street improvements is for five (5) years from the date of acceptance by the City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional I and Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use Code, as applicable. 10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any DEVELOPMENT CONSTRUCTION PERMIT APPLICATION (2/16/99) For City use only: Application Number: Application Date: Permit application fee: $ 300.00 r: INSTRUCTIONS: 1. Complete this form (some questions may not apply to you) and attach all necessary documents and submit to the Development Engineering Section of the City. 2. If you have any questions contact the Development Engineer, at 221-6605. <<; 3. Submit the Application and pay the Application Fee at the fee at the Engineering counter at 281 N. College Avenue. [fl PROJECT INFORMATION: Project Name (as approved by the City): _Willowbrook Filing 1—Phase Project A.K.A. (Marketing name if different from Project Name): Observatory Village Project Location: Rock Creek Drive and Cinquefoil Lane. Property Owner(At the time of this permit issuance): Individual Name: Company Name: Village Homrs of rolorndo Address: 310 Lashley St. #108 Longmont CO 80501 Phone number(s): Office: _303-776-3214 Cellphone: Fax number: 303-772-3445 Email: Applicant/Project Manager (The primary contact person for all matters regarding this project, and the person responsible for all matters referencing "the Developer" in the Development Agreement for this project): Individual Name: Brian H. Graves Company Name : Village Hnmes ofCnIciado Address: 310 Lashley St. #108 Longmont CO 80501 Phone number(s): Office: 303-776-4162 Cellphone: 303-944-2426 Fax number: _303-772-3445 Email: bgraves@villagehomes.com_ City of Fort Collins Transportation Services Engineering Department DEVELOPMENT CONSTRUCTION PERMIT Permit Number: OS- 27 Issuance Date: Y Project Name: Willow Brook Phase 4 Project A.K.A.: Observato Willa e Project Location: SWC Cinquefoil Laneand Observatory Drive Permittee: Brian Graves Project Mana er City and developer contacts: See attached Exhibit "A" for names and phone numbers of all contact persons for this project. Fees: Permit Application Fee (paid at the time of application) $ 300.00 (paid) Construction Inspection Fee (paid prior to issuance of this permit) $ 12,134.25 12.434.25 Development Bond or other approved security: Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. $ 162 071.00 Form of security deposited with the City: Letter of Credit PERFORMANCE REQUIREMENTS OF THIS PERMIT: 1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design drawings and specifications the certification of all materials testing by an Engineer. The Permittee shall have an Engineer prepare revised design drawings and secure City approval for all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required by the City in the Development Agreement, that the improvements are constructed in conformance with the approved Utility Plans and the standards and specifications of the City. The Penmittee shall provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance of the constructed public improvements. (All references above to the terms "Project Engineer" and "Engineer" shall mean a Professional Engineer licensed in Colorado.) 2. All contractors who perform work on this project must be bonded and licensed in conformance with City requirements. 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6605 • FAX (970) 221-6378 www.fcgov.com C d E E � 3 3 `• 00 i 3 z i O O o o o 0 0 0 0 0 o a o 0 o in o 0 0 ob o g O O O O O O O O O O O O O O O m O O O e 000000 000icc00000 r` oicocir w w w w w w w w N w w w w w w w O r w w O e- N w m m w w O � i V W y W O O O O O O O O O O O O O O O N O O O b b j'i r nLnwoo rrnooS000a e000ee i( o ovi of oim oc0000io ui vi vi o ww ?WU wwww ow ow www rw rwq nw www wwwinww F m w5= wwwwwwwwww wCD Hwwwwww Gi a! � wI co O om Z: Q 4~l LL W ?U FT O O O O O S O O O O O O O O S S O n O S O O W N 000 OG O 000000 G G 00 O [V 0100 N N = W f w wwww w w w w w w w w w w w w� w w O V ew mw f99 OZWQ> V�Kf� H �aQ W0 w2N�Nd _ OOa OY OUO QU W N m m F, Z m=Z LL LL i} i U U LL LL LL zxxmmmm 0000000 Q W Y LL LL LL i i J JUU�� JJJggq W W W W J VIJ J JUJ (A a u 3 3 m a 2 m m d C N a Q O d m C U U V Y c D O h F' '600 3 E O m Tm -`m _ E d U d a N d C m a@@ d F N d m v m an d h d O d c cc r'OSc °'cm= >d d w9 >f Av DEVELOPMENT CONSTRUCTION PERMIT APPLICATION (1 /16/06) For City use only: Application Number: k3 6.-D6 Application Date: Permit application fee: $ 400.00 INSTRUCTIONS: 1. Complete this form (some questions may not apply to you) and attach all necessary documents and submit to the Development Engineering Section of the City. 2. If you have any questions contact the Development Engineer, , at 221-6605. 3. Submit the Application and pay the Application Fee at the fee at the Engineering counter at 281 N. College Avenue. PROJECT INFORMATION: Project Name (as approved by the City): Project A.KA. (Marketing name if different from Project Name): Project Location:_t —mooj �° t ;� �L� �o • L �P� Property Owner(At the time of this permit issuance): Individual Name: M i r k l,( rt% a r k i f. 7- Company Name : V I t Alc We( Address: InO Tnve.-r\�ss T rracc �.sas1 4l � Phonenumber(s): FznytcwoocSq G.o go ttZ Office: '303 - -1 It 5 - I On (a Cellphone: 303 - 44 Let - 54LI 9 Fax number: =�> 5 . 'I - t 1 Email: KAAAr:6in&7 U, 11"�{ron�e.S. Applicant/Project Manager (The primary contact person for all matters regarding this project, and the person responsible for all matters referencing "the Developer" in the Development Agreement for this project): Individual Name: Company Name : Address: Phone number(s): Office: Cellphone: Fax number: Email: S Pk tH,.e.. — City of Fort Collins Transportation Services Cngrneenng Department DEVELOPMENT CONSTRUCTION PERMIT Permit Number: _ 01 - OZ Issuance Date: i AI A Project Name: _ Willow Brook Phases 5-7 ---- ProjectA.KA.; Observato Villa e Project Location: SWC Cinguefgfl I aneand Observatory Drive --- rr Permittee: 6e11 Martine Cona»zuni Develo ment Su erintendent City and developer contacts: See attached Exhibit "A" for names and phone numbers of all contact persons for this project. 00 (paid) Fees: Permit Application Fee (paid at the time of application) $ 400.S4 Construction Inspection Fee (paid prior to issuance of this pTmtat' Development Bond or other approved security: Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. S (a.M Form of security deposited with the Citv: _ rr" Dr: -- PERFORMANCE REQUIREMENTS OF THIS PERMIT: 1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design drawings and specifications the certification of all materials testing by an Engineer. The Permittee shall have an Engineer prepare revised design drawings and secure City approval for all revisions to the Utility Plans and related documents. The Pennittee shall have an Engineer represent, as required by the City in the Development Agreement, that the improvements are constructed in conformance with the approved Utility _Plans and the standards and specifications of the City. The Pennittee shall provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance of the constructed public improvements. (All references above to the terms "Project Engineer" and "Engineer" shall mean a Professional Engineer licensed in Colorado.) 2. All contractors who perform work on this project must be bonded and licensed in conformance with City requirements. 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6605 • FAX (970) 221-6378 www.fcgov.com Development Construction Permit, Page 2/5 3. Construction time restrictions: 4. The applicant understands that additional permits maybe required for this development project and the applicant shall secure those permits directly from the issuing departments. 5. This permit, along with a complete set of all approved plans and documents for this project (utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic study, drainage report, plat easements and any other official documents), shall be kept on the development site available for use by City staff doing inspections. 6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable): a. If construction has not begun within sixty (60) days from the date of issuance of this permit, this permit shall expire and the applicant will forfeit the nermit fee paid for this permit, whereupon the applicant must re -apply for a new permit. b. In addition, this permit shall expire one year from the date of issuance. The applicant may apply for an extension by reapplication at least two weeks prior to the expiration date. Such application shall contain information sufficient to justify the granting of the extension. An extension may be granted for up to six months. 7. Building permits and certificates of occupancy will only be issued when all conditions contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29- 678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the Development Agreement does not specify times for completion of public improvements, or if there is no Development Agreement, then the improvement requirements specified in Section 24-95 of the City Code shall apply, which provides that construction of all improvements shall be required prior to the time of issuance of the first building permit. 8. Acceptance by the City of the public improvements shall be after (1) final inspection has been conducted by the City; (2) punch list items from the final inspection are completed and accepted by the City; and (3) required certifications from the licensed professional engineer that improvements are completed to City standards, specifications and approved Utility Plans; and the "as -constructed" plans have been received and accepted by the City. 9. The warranty on street improvements is for five (5) years from the date of acceptance by the City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use Code, as applicable. 10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any Development Construction Permit, Page 3/5 planned construction on this project. All required perimeter silt fencing and other erosion/sediment control best management practices (BMP's) that can be installed prior to construction must be in place and inspected by the City Erosion Control Inspector before any land disturbing activity begins. 11. No work (including grading) shall be started in State Highway right-of-way until a permit is issued by the Colorado Department of Transportation to allow such work to begin. 12. Other conditions: Permittec's acknowledgment signature: By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. I also acknowledge that I have read this permit document with all its requirements and conditions, and I agree to all of the terms and conditions so stated in this permit. Applicant/Project Manager's Signature: Date: t Approval for issuance: -6f City Engineer Approva — Date: /1 (Permit Issuance Date) Development Construction Permit. Page 4/5 EXHIBIT "A" DEVELOPMENT PROJECT CONTACT PERSONS Name, address and numbers Project Name: Willow Brook Phases 5-7 City Staff Contact Persons: Development Engineer: Marc Virata 281 N. College Avenue, Fort Collins, CO 80524 (970)221-6605 Construction Inspector: Jeff Baldwin 281 N. College Avenue, Fort Collins, CO 80524 (970)218-2157 Current Planner: Ted Shepard 281 N. College Avenue, Fort Collins, CO 80524 (970) 221-6750 Water Utilities Engineer: (Fort Collins -Loveland Water District) Erosion Control Inspector: Bob Zackley 700 Wood Street, Fort Collins, CO 80521 (970)224-6063 Natural Resources: Karen Manci 281 N. College Avenue, Fort Collins, CO 80524 (970) 221-6310 Traffic Operations: Eric Bracke 625 Linden Street, Fort Collins, CO 80524 (970)224-6062 Development Construction Permit, Page 515 Street Closures: Syl Mireles 625 Linden Street, Fort Collins, CO 80524 (970)221-6815 Transportation Planning: David Averill 215 North Mason Street, Fort Collins, CO 80524 (970)416-2643 Forestry: Tim Buchanan 215 North Mason Street, Fort Collins, CO 80524 (970)221-6361 Light and Power: Janet McTague 700 Wood Street, Fort Collins, CO 80524 (970) 224-6154 Developer' Contact Persons: Project Manager/Developer/Owner/General Contractor: Kelly Martinez Village Homes of Colorado 100 Inverness Terrace East, Suit 200, Englewood, CO 80112 Office: (303) 795-1976 Cell: (303) 419-3979 Fax: (303)303 795-1467 Email: kmartinez@villagehomes.com Project Engineer: Shar Shadowen, TST Inc. 748 Whalers Way, Building D, Fort Collins, CO 80525 Office: (970) 226-0557 Planner: Craig Karns Nuszer Kopatz 1129 Cherokee Street, Denver, CO 80204 Office: (303) 534-3881 Development Construction Permit, Page 3/5 planned construction on this project. All required perimeter silt fencing and other erosion/sediment control best management practices (BMP's) that can be installed prior to construction must be in place and inspected by the City Erosion Control Inspector before any land disturbing activity begins. 11. No work (including grading) shall be started in State Highway right-of-way until a permit is issued by the Colorado Department of Transportation to allow such work to begin. 12. Other conditions: Permittee's acknowledgment signature'. By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as delincd in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. I also acknowledge that I have read this permit document with all its requirements and conditions, and I agree to all of the terms and conditions so stated in this permit. Applicant/Project Manager's Signature s A4.,!, A Date: /6-7-02- 4,Z �,at•,A G¢�Ns' Approval for issuance: City Engineer Approval:b.- -A-. Date: l/C Z. 11 (Permit Issuance Date) Development Construction Permit, Page 4/5 EXHIBIT "A" DEVELOPMENT PROJECT CONTACT PERSONS Name, address and numbers Project Name: Willow Brook PDP Phase 2 City Staff Contact Persons: Development Engineer: Marc: Virata 281 N. College Avenue, Fort Collins, CO 80524 (970)221-6605 Construction Inspector: Jeff Baldwin 281 N. College Avenue, Fort Collins, CO 80524 (970)218-2157 Current Planner: Ted Shepard 281 N. College Avenue, Fort Collins, CO 80524 (970) 221-6750 Water Utilities Engineer: (Fort Collins -Loveland Water District) Erosion Control Inspector: Bob Zackley 700 Wood Street, Fort Collins, CO 80521 (970)224-6063 Natural Resources: Doug Moore 281 N. College Avenue, Fort Collins, CO 80524 (970)224-6143 Traffic Operations: Eric Bracke 625 Ninth Street, Fort Collins, CO 80524 (970)224-6062 Development Construction Permit, Page 5/5 Street Closures: Syl Mireles 625 Ninth Street, Fort Collins, CO 80524 (970)221-6815 Transportation Planning: Kathleen Reavis 215 North Mason Street, Fort Collins, CO 80524 (970) 224-6140 Forestry: Tim Buchanan 281 N. College Avenue, Fort Collins, CO 80524 (970)221-6361 Light and Power: Janet McTague 700 Wood Street, Fort Collins, CO 80524 (970)224-6154 Developer' Contact Persons: Project Managcr/Developer/Owner/General Contractor: Brian Graves Village Homes of Colorado 310 Lashley Street Suite 108, Longmont, CO 80501 Office: (303) 776-3214 Cell: (303) 944-2426 Fax: (303) 772-3445 Email: bgraves@villagehomes.com Project Engineer: Shar Shadowen, TST Inc. 748 Whalers Way, Building D, Fort Collins, CO 80525 Office: (970) 226-0557 Planner: Craig Karns Nuszer Kopatz 1129 Cherokee Street, Denver, CO 80204 Office: (303) 534-3881 Transportation Services A City of Fort Collins Permit Number: Lngineering Department DEVELOPMENT CONSTRUCTION PERMIT 01-35 Issuance Date: /i �Eev�scP� Project Name: Willow Brook PDP, Phase I Project A.K.A.: Observatory Village Project Location: _ Kechter Road and Cinquefoil Lane Permittee: Brian Graves, Project Manager City and developer contacts: See attached Exhibit "A" for names and phone numbers of all contact persons for this project. Fees: Permit Application Fee (paid at the time of application) $ 300.00 (paid) Construction Inspection Fee (paid prior to issuance of this permit) $ 83.033.00+ l3 cz z , C/C Total $ A AJ ✓, To r Development Bond or other approved security: P PP t: Y 3r G ymfE (l��e�K t gEsc�1) °! Amount of security deposited with the City to guarantee the completion of all public - improvements to be constructed as shown on the approved plans for the development. $ 4,024,753.00 Form of security deposited with the City: Two 2) Development Bonds (Phase 1 onsite for $2,014,232 & offsite improvements for $2,Q10 521)__ PERFORMANCE REQUIREMENTS OF THIS PERMIT: 1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design drawings and specifications the certification of all materials testing by an Engineer. The Permittee shall have an Engineer prepare revised design drawings and .secure City approval for all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required by the City in the Development Agreement, that the improvements are constructed in conformance with the approved Utility Plans and the standards and specifications of the City. The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance of the constructed public improvements. (All references above to the terms "Project Fngineer" and "Engineer" shall mean a Professional Engineer licensed in Colorado.) All contractors who perform work on this project must be bonded and licensed in conformance with City requirements. '_til'VoithCofl(,l,,( A. i,nt, • PO.Box 580 • Fort Collin', Co 80J22-0580 • (970)221-6605 • FAX(970)221-6378 ww�%Jcgov.com City of Fort Collins Transport, —ton Services Engineering Department DEVELOPMENT CONSTRUCTION PERMIT Permit Number: 01-35 Issuance Date: Sh 3 10 Project Name: — Willow Brook PDP Phase 1 Project A.K.A.: Observatory Villa e Project Location: Kechter Road and Cinquefoil Lane Permittee: Brian Graves Project Mana er City and developer contacts: See attached Exhibit "A" for names and phone numbers of all contact persons for this project. Fees: Permit Application Fee (paid at the time of application) $ 300.00 (paid) Construction Inspection Fee (paid prior to issuance of this permit) $ 83 033.00 Total $ 83,333.00 Development Bond or other approved security: Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. $ 4,02:4,753.00 Form of security deposited with the City: _ Two 2 Development Bonds (Phase 1 onsite for $2,014,232 & offsite improvements for $2 010,521) PERFORMANCE REQUIRF,MENTS OF THIS PERMIT: 1. The Permittee shall be responsible to require their Protect Engineer to incorporate into all design drawings and specifications the certification of all materials testing by an Engineer. The Permittee shall have an Engineer prepare revised design drawings and secure City approval for all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required by the City in the Development Agreement, that the improvements are constructed in conformance with the approved Utility Plans and the standards and specifications of the City. The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance of the constructed public improvements. (All references above to the terms "Project Ingineer' and "Engineer' shall mean a Professional Engineer licensed in Colorado.) 2. All contractors who perform work on this project must be bonded and licensed in conformance with City requirements. fir' 11, ( oilIu(' • IIO Boy 51,0 • Fo t Collins, CC) 80522-0;80 • (970) 221-6603 • FAX (970) 221-6378 ic�cw. rCgo%.Ccvn Development Construction Permit, Page 2/ 3. Construction time restrictions: ThE l'ei2A11TT£E _5NA« r Cow s,—r < c r AY 4. The applicant understands that additional permits maybe required for this development project and the applicant shall secure those permits directly from the issuing departments. 5. This permit, along with a complete set of all approved plans and documents for this project (utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic study, drainage report, plat easements and any other official documents), shall be kept on the development site available for use by City staff doing inspections. 6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable): a. If construction has not begun within sixty (60) days from the date of issuance of this permit, this permit shall expire and the applicant will forfeit the permit fee paid for this permit, whereupon the applicant must re -apply for a new permit. b. In addition, this permit shall expire one year from the date of issuance. The applicant may apply for an extension by reapplication at least two weeks prior to the expiration date. Such application shall contain information sufficient to justify the granting of the extension. An extension may be granted for up to six months. 7. Building permits and certificates of occupancy will only be issued when all conditions contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29- 678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the Development Agreement does not specify times for completion of public improvements, or if there is no Development .Agreement, then the improvement requirements specified in Section 24-95 of the City Code shall apply, which provides that construction of all improvements shall be required prior to the time of issuance of the first building permit. 8. Acceptance by the City of the public improvements shall be after (1) final inspection has been conducted by the City; (2) punch list items from the final inspection are completed and accepted by the City; and (3) required certifications from the licensed professional engineer that improvements arc completed to City standards, specifications and approved Utility Plans; and the " as -constructed" plans have been received and accepted by the City. 9. The warranty on street improvements is for five (5) years from the date of acceptance by the City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use Code, as applicable. 10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any Development Construction Permit, Page 3/5 planned construction on this project. All required perimeter silt fencing and other erosion/sediment control best management practices (BMP's) that can be installed prior to construction must be in place and inspected by the City Erosion Control Inspector before any land disturbing activity begins. 11. No work (including grading) shall be started in State Highway right-of-way until a permit is issued by the Colorado Department of Transportation to allow such work to begin. 12. Other conditions: Al' Permittee's acknowledgment signature: By signing this pennit I acknowledges that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. I also acknowledge that I have read this permit document with all its requirements and conditions, and I agree to all of the terms and conditions so stated in this permit. ce--� Applicant/Project Manager's Signature: _ / Date: Approval for issuance: City Engineer Approval: C Date: 8 13 �I (Permit Issuance Date)