Loading...
HomeMy WebLinkAboutWESTBROOKE PUD SECOND - Filed DCP-DEV. CONSTRUCTION PERMIT - 2005-08-25City of Fort Collins Transportation Services Engineering Department DEVELOPMENT CONSTRUCTION PERMIT Permit Number: 01-18 Issuance Date: d - :9 1 -C)1 Project Name: Westbrooke P.U.D. 2nd Filing Project Location: South of Horsetooth Road, North of Harmony Road and East of Seneca Street Permittee: Summit Land Management Services, Inc. City and developer contacts: See attached Exhibit A for names and phone numbers of all contact persons for this project. Fees: Permit Application Fee (paid at the time of application) $300.00 Erosion Control fee (Paid prior to issuance of this permit $17,527.50 Construction Inspection Fee (paid prior to issuance of this permit) $20,796.00 TOTAL $38, 623.50 Development Bond or other approved security: Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. $445,143.00 Form of security deposited with the City: Letter of Credits each in the amount of $222,571.50. Numbers 81825 and 81828,Avantage Bank PERFORMANCE: REQUIREMENTS OF THIS PERMIT: 1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design drawings and specifications the certification of all materials testing by an Engineer. The Permittee shall have an Engineer prepare revised design drawings and secure City approval for all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required by the City in the Development Agreement, that the improvements are constructed in conformance with the approved Utility Plans and the standards and specifications of the City. The Permittee shall provide as -constructed plans prepared by an Engineer prior to the City's acceptance of the constructed public improvements. (All references above to the terms "Project Engineer and Engineer shall mean a Professional Engineer licensed in Colorado.) 2. All contractors who perform work on this project must be bonded and licensed in conformance with City requirements. „�-•.ilhrnll ,.A,.nav f lI. Rot5H11 • FnriCAIjna.COH0522-0F80 • (970)'_'-1-i605 • FA\(970)2'_1-6T8 icww.A goxccom Development Construction Permit, Page 2/3 3. Construction time restrictions: Normal Work Hours as allowed by City code 4. The applicant understands that additional permits maybe required for this development project and the applicant shall secure those permits directly from the issuing departments. 5. This permit, along with a complete set of all approved plans and documents for this project (utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic study, drainage report, plat easements and any other official documents), shall be kept on the development site available for use by City staff doing inspections. 6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable): a. If construction has not begun within sixty (60) days from the date of issuance of this permit, this permit shall expire and the applicant will forfeit the permit fee paid for this permit, whereupon the applicant must re -apply for a new permit. b. In addition, this permit shall expire one year from the date of issuance. The applicant may apply for an extension by reapplication at least two weeks prior to the expiration date. Such application shall contain information sufficient to justify the granting of the extension. An extension may be granted for up to six months. 7. Building permits and certificates of occupancy will only be issued when all conditions contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29-678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the Development Agreement does not specify times for completion of public improvements, or if there is no Development Agreement, then the improvement requirements specified in Section 24-95 of the City Code shall apply, which provides that construction of all improvements shall be required prior to the time of issuance of the first building permit. 8. Acceptance by the City of the public improvements shall be after (1) final inspection has been conducted by the City; (2) punch list items from the final inspection are completed and accepted by the City; and (3) required certifications from the licensed professional engineer that improvements are completed to City standards, specifications and approved Utility Plans; and the Aas-constructed@ plans have been received and accepted by the City. 9. The warranty on street improvements is for five (5) years from the date of acceptance by the City of the completed improvements, in accordance with Sections 29-13 and 29- 14 of the Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use Code, as applicable. Development Construction Permit, Page 3/3 10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any planned construction on this project. All required perimeter silt fencing and other erosion/sediiment control best management practices (BMPs) that can be installed prior to construction must be in place and inspected by the City Erosion Control Inspector before any land disturbing activity begins. 11. No work (including grading) shall be started in State Highway right-of-way until a permit is issued by the Colorado Department of Transportation to allow such work to begin. 12. Other conditions: N/A Permittees acknowledgment signature: By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. I also acknowledge that I have read this permit document with all its requirements and conditions, and I agree to all of the terms and conditions so stated in this permit. Applicant/Project Signature: Approval for issuance: City Engineer /l f APprroval: li c�la-"F Date: Zt j�( (Permit Issuance Date) Project Name: City Staff contacts: Development Engineer: Construction Inspector: EXHIBIT A Dave Stringer 281 N. College Ave. Fort Collins, Co. 80524 970 221- 6765 Lance Newlin 281 N. College 970 221-6605 970 222- 0854 Water utilities Engineer: Roger Buffington 700 Wood Street 970 221- 6854 Erosion Control Inspector: Bob Zakley 700 Wood Street 970 221- 6063 Traffic Operations: Ward Stanford 625 Ninth Street 970 221 - 6615 Street Closures: Sly Mireles 625 Ninth Street 970 221- 6815 Transportation Planner: Kathleen Reavis 210 E. Olive 970 221- 6140 Forestry: Tim Buchanan 281 N. College 970 221- 6361 Light & Power: Doug Martine 700 Wood Street 970 224 — 6700 Permittee (Person who is to sign the Development Construction Permit): Individual Name: Andy Krill Company Name: Summit Land Management Services Inc Address: _ 1166 Silver Fir Dr. — Loveland CO 80538 Phone number(s): Office: (970) 593-0946 Cellphone: (,g7n)_29n-9499 Fax number: (970) 613-8479 Email: andyCc clmei com Project Engineer (A Colorado licensed professional engineer who is the civil engineer, the person, responsible for the design of this project, responsible for certification that improvements are constructed in accordance with approved plans, responsible for making revisions to plans with City approval and for providing as -constructed plans): Individual Name: Jeff Couch P.E. Company Name: Taam Fngineerin9 Inc. Address: _ 906 Richmond Drive Unit 2 Phone number(s): Office: (970) 221-3600 Cellphone: Fax number: (970) 221-9933 Email: effc balloffet.net Professional License Number: ArchiteeManner (The person responsible for the site design of this project) Individual Name: Jeff Couch P.E. Company Name: Taam Fn96naarinq. Inr. Address: _ 906 Richmond Drive, Unit 2 Phone number(s): Office: (970) 221-3600 Cellphone: Fax number: (970) 221-9933 Email: ieffcna balloffet.net Developer (The party or parties referenced in the Development Agreement who are responsible for the Developer's obligations contained in the Agreement —add additional names below): Individual Name: Charles M. Betters — General Partner Company Name: P & B Partnership Address: 2803 East Harmonv Road, Fort Collins, CO. 80528 Phone number(s): Office: (970) 3774913 Cellphone: (970) 690-7101 Fax number: (970) 223-7887 Email: General Contractor (The contractor in overall charge of the public infrastructure construction): Individual Name: Company Name: Address: Phone number(s): Office: _ Cellphone: _ Fax number: Email: If you have no General Contractor, list all other contractors below. Grading contractor: Individual Name: Floyd Danczak Company Name: Gerrard Excavating Inc Address: _ 1739 South County Rd. 13C — Loveland CO. 80537 Phone number(s): Office: (970) 669-1463 Cellphone: (970) 566-0324 Fax number: (970) 669-1964 Email: Utility contractor: Individual Name: Floyd Danczak Company Name: Gerrard Excavating, Inc Address: _ 1739 South County Rd 13C — Loveland CO 80537 Phone number(s): Office: (970) 669-1463 Cellphone: (970) 566-0324 Fax number: (970) 669-1964 Email: Concrete contractor for flat work: Individual Name: Marshall Erickson Company Name: Express Concrete Inc. Address: _ 5305 S. County Rd. 9 — Fort Collins CO. 80528 Phone number(s): Office: (970) 225-1287 Cellphone: (970) 566-0345 Fax number: (970) 669-1964 Email: Concrete contractor for structures: Individual Name: Wayne Shell Company Name: Concrete Structures Address: _ 4325 Hilltop Rd. — Longmont CO. 80504 Phone number(s): Office: (970) 535-0202 Cellphone: Fax number: (970) 535-4382 Email: Paving contractor: Individual Name: William Welch Company Name.. Connell Resources Inc. Address: _ 4305 E. Harmony Rd. — Fort Collins, CO. 80528 Phone numbecr(s): Office: (970) 223-3151 Cellp hone: Fax number: (970) 223-3191 Email: Landscape contractor: Individual Name: Kevin Laman Company Name: Bath LandSr-qpe Address: _ 2000 E Prospect Street — Fort Collins CO 80525 Phone number(s): Office: (970) 484-5022 Cellphone: (970) 218-1678 Fax number: (970) 484-3718 Email: Other contractors and parties involved in the project: SUBMIT THE FOLLOWING ITEMS (Required for all projects): • 81/2"xl 1" copy of the Site Plan • Proposed Project Schedule • Project quantities and cost estimate for all of the public improvements to be constructed. In addition, include all private improvements that are required to be inspected by the City Construction Inspectors. This information must be submitted in the format shown on the attached form titled "Project Quantities and Cost Estimate Sheet." ADDITIONAL SUBMITTALS (Required if checked): ❑ Traffic control plan(s) for the project ❑ Proposed haul routes shown on a City map ❑ Shop drawings ❑ Other CONSTRUCTION COORDINATION MEETING: A construction coordination meeting to discuss plans and special requirements for your project, is required for all development projects. The people required to attend the meeting are the Project Manager, Project Engineer, Developer, Architect/Land Planner and General Contractor (if no General Contractor, representatives for each of the contractors expected to work on this project) advantage Bank November 20. 2001 City of Fort Collins Attn: Dave Stringer 281 N. College Avenue Fort Collins, Colorado 80522 Dear Sirs: We hereby establish, at the request and for the account of Charles M. and Nancy S. Betters, in your lavor as beneficiary, our Irrevocable Letter of Credit No. 81825, in the amount of Two Hundred Twenty Two 'Thousand Five Hundred Seventy One Dollars and Fifty Cents ($222,571.50) (as more fully described below), effective immediately and expiring at the close of banking business on November 20, 2002, at our office at 1473 E. Eisenhower Blvd., Loveland, Colorado 80537. This Letter of Credit is intended for the Westbrooke PUD 2"d Filing development project for the assurance of the completion of the construction and the maintenance and repair of the public infrastructure in connection with the aforesaid development project and its' associated development agreement and development construction permit. Funds under this Letter of Credit are available to you for one or more drawings prior to the close of business on November 20, 2002 against sight drafts in an aggregate cumulative amount not to exceed $222,57 L50, dated the date of presentment, drawn on our office referred to above, referring thereon to the number of this Letter of Credit and accompanied by your written certificate signed by you and acknowledged as therein provided in the form of Exhibit 1 hereto. Presentation of such draft and certificate shall be made at our office referred to above. Upon the earlier of (i) our honoring your draft(s) totaling $222,571.50 in the aggregate presented on or before this Letter of Credit expires pursuant to the terms herein or (ii) the surrender to us by you of this Letter of Credit for cancellation, this Letter of Credit shall automatically terminate. This letter of credit shall be subject to the Uniform Commercial Code as in effect in the State of Colorado, and, to the extent not inconsistent with the terms of this Letter of Credit and the Uniform Commercial Code, the Uniform Customs and Practice for Documentary Credits, 1993 revision, ICC publication number 500. IV 14711 nx E,,,H ,.eia B,cc. I_o" [ ww, ( 0 W537. 970/61 19H2 • Fxx: 970/61 ;-i 853 ninrr4711Ab, YOnti,.Ci,.IF, Ii.(;xi[,o(0W1634• 9701540047• Fix:`J%0 1 51-04i3 This Letter of Credit will be automatically extended without amendments for one year from the present, and each future, expiration date thereof, unless Issuer delivers written notice with sixty (60) days prior to any such expiration date to the City of Fort Collins of its intent not to renew this Letter of Credit. Any such notice shall be in writing and shall be delivered with an acknowledged receipt, either in hand or by certified mail. Any amendments to this Letter of Credit shall be made in the form of Exhibit 2 hereto. This Letter of Credit is not transferable. This Letter of Credit sets forth in full our undertaking, and such undertaking shall not in any way be modified, amended, amplified or limited by reference to any document, instrument or agreement referred to herein, except only the certificate and draft(s) referred to herein; and any such reference shall not be deemed to incorporate herein by reference any document, instrument or agreement except for such certificate and draft(s). Si�ncere�ly, Dan Springob Vice President, Advantage Bank STATE OF COLORADO ) ss. COUNTY OF LAPUMER ) subscribed and sworn to before me thisp�t�- day of �-At - -�r. ,o?OD / , by A /CLj1 ri ti as Vice President of Advantage Bank. Witness my hand and official seal. 0�1 Public My commission expires: