HomeMy WebLinkAboutWATERGLEN PUD REPLAT - Filed CS-COMMENT SHEETS - 2005-08-25/100, "k
091"
Citv of Fort Collins
Current Planning
PROJECT
COMMENT SHEET
DATE: February 7, 2001 TO: Engineering
PROJECT: #71-93C WATERGLEN P.U.D.-REPLAT No. 1, TRACTS
P AND Q - TYPE 1 (LUC)
All comments must be received by Brian Grubb in Current Planning no
later than the staff review meeting:
March 7, 2401
Note- Please identify your redlines for future reference
Z Gi4c< sc/fav����
�LS_i
XF )16� v.tn� ar
.71
rL /1") ry O
Signature
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report _Other
Utility _Redline Utility --Landscape
(00, in R �--)=
Citv of Fort Collins
PROJECT `A0V
City --�="ns COMMENT SHEET
Current Planning
DATE: 4/25/01
DEPT: Engineering
PROJECT: 71-93C Waterglen , Replat #1, Tracts P&Q, Type I
PLANNER: Brian Grubb
ENGINEER: Dave Stringer
All comments must be received by: April 25,2001
No Problems
Problems or Concerns (see below or attached)
1. Only include the boundaries of this replat, do not show right of way of Vine
Drive and etc.
2 Comments on redline plans with Technical Services comments
Date: 4-27-01 Signature:
PLEASE SEND COPIES OF MARKED REVISIONS
n PLAT
rl UTILITY
n LANDSCAPE
SITE