Loading...
HomeMy WebLinkAboutWAGNER FRATERNITY PARK LOT 7 REPLAT - Filed CS-COMMENT SHEETS - 2005-08-16® l AFFORDABLE HOUSING ®r NO ) PROJECT COMMENT SHEET Current Planning DATE: November 27, 2002 TO: Technical Services PROJECT: #37-02A CLOCK TOWER APARTMENTS PDP — TYPE I (LUC) All comments must be received by Bob Barkeen no later than the staff review meeting: Wednesday, December 11, 2002 Note- Please identify your redlines for future reference �ji 10C) 'F�q-� �0 G�eC1�, Signature Date CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _Plat Site _Drainage Report _Other _Utility _Redline Utility _Landscape Citv of Fort Collins 3 � ® AFFORDABLE HOUSING ® ® PROJECT COMMENT SHEET LL _ ,J Current Planning DATE: November 27, 2002 TO: Engineering Pavement PROJECT: #37-02A CLOCK TOWER APARTMENTS PDP — TYPE I (LUC) All comments must be received by Bob Barkeen no later than the staff review meeting: Wednesday, December 11, 2002 Note- Please identify your redlines for future reference r7dC, ce_10, 0,1,1� << =�,,'- Signature '2 Date CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _Plat _Site _Drainage Report _Other _Utility _Red'ine Utility _Landscape City of Fort Collins iliuo AFFORDABLE HOUSING PROJECT COMMENT SHEET Current Planning DATE: November 27, 2002 TO: Street Oversizing PROJECT: #37-02A CLOCK TOWER APARTMENTS PDP — TYPE I (Lt1C) All comments must be received by Bob Barkeen no later than the staff review meeting: Wednesday, December 11, 2002 Note- Please identify your redlines for future reference %( Y Signature Date CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _Plat _Site _Drainage Report _Other _Utility _Redline utility _Landscape City of Fort Collins Project Comments Sheet Selected Departments City of Fort Collins Department: Engineering Date: December 24, 2002 Project: CLOCK TOWER APARTMENTS PDP - TYPE I (LUC) #37-02A All comments must be received by BOB BARKEEN in Current Planning no later than the staff review meeting: December 18, 2002 Note - Please identify your redlines for future reference Issue Contact: Sheri Wamhoff Topic: General 37 The existing plat has a 30 foot BSB (building setback line) line adjacent to all row. The building you are proposing goes beyond this line. 1 don't know for sure how you can getrid of this line. Since it is on the plat, a replat maybe required. 38 An access easement needs to be dedicated for the access driveway. An access easement does not exist here unless it was dedicated by separate dociment at some time. If so please provide the reception number and a copy of the easement. If half of the drive is on the adjacent property, an access easement on that property is needed as well. 39 Need to see 150 feet of off site area surrounding the lot. What is there - need to show grade lines beyond the property boundaries. 40 There is a 40 foot parking setback for. the parking spaces on the driveway from the street. This will eliminate a few spaces. 41 What is the actual pavement width of the private drive? Is it wide enough to provide the head in parking you are showing and the parallel parking that is existing (or being done) today on the west side? 42 Sidewalk in front of the parking spaces needs to be a minimum of b feet wide. It is being shown as 4 feet. 43 What is the width of the existing sidewalk on Birch? May need to be widened if it doesn't meet requirements. 44 Drainage can not drain across the sidewalk from the private drive. It will need to get out to the street via a sidewalk chase or an inlet. Signa ure Dall CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat y— Site Drainage Report Other_ Utility __Z_ Redline Utility, _X Landscape Page 1 45 Will need to dedicate easements as needed for the site either by separate document or by plat if you end up replating. 46 Need to provide curb and gutter details. 47 What is the proposed parkway width on Wagner? The walk needs to go around the fire hydrant. 48 Need to dedicate row to the back of the new sidewalk on Wagner. 49 No sewer services are shown. 50 Use current general notes. See appendix E-1 of LCUASS. 51 Provide applicable construction notes from appendix E-I of LCUASS. 52 See Check sheet for other missing information. 53 Need a detail of how the new sidewalk will tie into the existing sidewalk and ramp. 54 Add the following note where the pavement will be cut to install the curb chase(s). Limits of street cut are approximate. Final limits are to be determined in the field by the City Engineering Inspector. All repairs to be in accordance with City street repair standards. 55 What do the walls look like? Need to provide details and x-sections of the walls. Provide top of wall and bottom of wall elevations. Are these retaining walls or just landscape walls? 56 How does the 15 in dia drainage pipe tie into the 4 5/8 in high curb chase? Page 2 rp;'N ::® Current Planning AFFORDABLE HOUSING PROJECT COMMENT SHEET DATE: January 15, 2003 TO: Technical Services PROJECT: #37-02B CLOCK TOWER APARTMENTS PDP — TYPE I (LUC) - REPLAT All comments must be received by Bob Barkeen no later than the staff review meeting: Wednesday, January 29, 2003 Note- Please identify your redlines for future reference 1, P2u, A)Pi- k4 V �C.05c5. Signature Date CHECK HERE IF YOU. WISH TO RECEIVE COPIES OF REVISIONS "Plat Site _Drainage Repoli _Other _Utility _Redline Utility _Landscape City of Fort Collins �� a Project Comments Sheet Selected Departments City of Fort Collins Department: Engineering Date: February 3, 2003 Project: CLOCK TOWER APARTMENTS REPLAT #37-02B All comments must be received by BOB BARKEEN in Current Planning no later than the staff review meeting: January 29, 2003 Note - Please identify your redlines for future reference Issue Contact: Sheri Wamhoff Topic: General 7 The easement under the shared driveway needs to be dedicated as a utility drainage and access easement. 8 V an emergency access easement is needed it will need to be defined and shown on the plat. Add the notice regarding private drive maintenance. Signature 7'3 p 3 Date CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat X Site Drainage Report Other _ Utility K Redline Utility h Landscape Pale I Project Comments Sheet .t+r Selected Departments Citv of Port Collins Department: Engineering Date: February 3, 2003 Project: CLOCK TOWER APARTMENTS PDP - TYPE I (LUC) #37-02A All comments must be received by BOB BARKEEN in Current Planning no later than the staff review meeting: January 29, 2003 Note - Please identify your redlines for future reference Issue Contact: Sheri Wamhoff Topic: General 38 An access easement needs to be dedicated for the access driveway. An access easement does not exist here unless it was dedicated by separate document at some time. If so please provide the reception number and a copy of the easement. If half of the drive is on the adjacent property, an access easement on that property is needed as well. 2/3/03 The easement document that was provided is for lot 5 only it does not cover the shared driveway area. An off -site easement is still needed. 47 What is the proposed parkway width on Wagner? The walk needs to go around the fire hydrant. 2/3/03 Identify the parkway width on Wagner or provide a x-section that shows it. 52 See Check sheet for other missing information. 2/3/03 Add the following information as required by the checksheet. Add the two notes indicated on the plans onto the cover sheet of the plans. Provide the names, addresses and phone numbers for the Developer(s) and Owner(s) to the plans. Provide two benchmarks. Add note regarding variances and indicate that none have been granted. 74 Add the two notes Indicated on the plans onto the cover sheet of the plans. 75 Add a copy of the plat into the final utility plan set for reference. 76 The landscape walls need to be placed a minimum of 2 feet behind the sidewalk or the detached sidewalk on Wagner needs to be 6.5 feet wide minimum and 2 feet can be added to the attached sidewalk on Birch Street to achieve the required separation. The sidewalk along Wagner is shown on the site plan to be 4 feet wide whereas it is shown to be 6 feet on the utility plans. For a detached walk it is to be a minimum of 4.5 feet wide unless it is adjacent to the landscape wall in which case it would need to be 6.5 feet wide or placed 2 feet away from the wall. Signature Date CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site Drainage Report Other_ Utility X Redline Utility _� Landscape Page I 77 The landscape walls can not be located or placed within the row. 78 Show the pavement patches for the cuts into Birch Street also. 79 The scale Is wrong on Sheet 4. 80 Detail sheet - .Use the current detail 706 for the low volume driveway construction. Use current detail 710 for the asphalt paving at crosspans. Make the changes shown to the curb gutter and walk detail, so that all the notes and information from the new details are here or provide the new details. (701 and 702) Label the inflow vertical curb and gutter and the outfall curb and gutter details for on -site use only. Provide detail 707 high volume driveway detail for how to rebuild the ramp and curb at the shared driveway. Add details showing the ADA requirements at the ramps (see attached for CDOT and Greeley details being used). Provide details 1601 and 1602. 81 Is an emergency access easement needed? Page 2