Loading...
HomeMy WebLinkAboutBLOCK 132 226 REMINGTON STREET LOT 15 - Filed GC-GENERAL CORRESPONDENCE - 2005-08-10Aa LAFAR G E August 17, 1999 Engineering Department 281 North College Ave. Et. Collins, co 80522-0580 hear Sir or M.udam This Memo is regarding the pavement repair at 226 Remington Street for Kitchen Design Center. Bob Ca,,mer has been in constant contact with Lafarge with respect to the required repairs. Kitchen Design Center currently has a contract with Lafarge to have said repairs completed. I lowcver, due to the requirements of the repair to comply with the City of Dort Collins Standards, i.c. mill and inlay, Lafarge is currently attempting to schedule the repair with other milling projects, thus, lowering the cost to the customer. If this poses a problem, please do not hesitate to contact me at 407-3600. We at Lafarge thank you for your patience on this matter. Sincerely, Andy Laycock Estimator / Project Manager WESTERN MOBILE NORTHERN, INC, a subsidiary of Lafarge Corporation NORTHERN COLORADO DIVISION 1800 North Taft Hill Rd., Post Office Box 2187, Fort Collins, Colorado 80522 office: (970) 407-3600 Fax: (970) 407-3900 P,,,,er 0, alc.li.a Pace, Tran.spor 'on Services Engineering Department r-'ity of Fort Collins July 23, 1998 Bob Castner Kitchen Design Center 140 W. Oak, #110 Fort Collins, CO 80524 Dear Bob: The following are comments from various departments on the proposed building at 226 Remington: ZONING (comments also include Current Planning and Advance Planning issues): 1. Include not on Landscape plan regarding letter of credit, escrow or installation of landscaping prior to issuance of CO. 2. Need bike rack located near the building entrance 3. Waht are the overall heights of the building and the garage? 4. What colors are planned for building exteriors? 5. What type/ clor shingles on both buildings? 6. There doesn't seem to be a trash enclosure located anywhere. T Indicate the square footage of each building on the site plan. 8. Indicate the proposed building usage on the site plan. 9. One tree every 40 feet is required in the parking lot perimeter landscaping area 10. A 6 foot fence is required along the north and south lot lines adjacent to the parking lot. 11. Site plan shows "land Use Date" but square footage % aren't given. 12. High profile d;°mensional shingles should be used. 13. Provide screening of the mechanical units 14. Add general riot that bike parking must be designed according to the requirements of the LUC. TRANSPORTATION PLANNING 15. Provide bike parking at building entrances. ENGINEERING PAVEMENT 16. If alley street improvements are required a soils and pavement design report wil be '81 North College Avenue • PC). Box 580 • Fort Collins, CO 80522-0580 • (q70) 21-6605 needed. See additional attached comments from Water Conservation, Forestry (landscape notes to be added), Poudre Fire Authority, Engineering, Stormwater and Water/Wastewater and marked up plans from Engineering, Stormwater, Water and Wastewater. Please return all reclined plans and 6 site plans, 5 landscape plans, 4 copies of the existing plat, 4 sets of utility plans, and 2 drainage reports for review. In addition fill out and return "Information for Development Agreements' sheet and provide copies of the easement dedications for review. If you should have any questions regarding these comments or if you need to meet to go over them please feel free to contact us. Sincerely, Sheri Wamhoff Civil Engineer Attachments. cc: Peter Barnes file