HomeMy WebLinkAbout243 NORTH COLLEGE AVENUE CAR WASH - Filed DA-DEVELOPMENT AGREEMENT - 2005-08-09DEVELOPMENT AGREEMENT
nl
THIS AGREEMENT, made and entered into this day of Est 'ice �
199j,', by and between the CITY OF FOR"' COLLINS, COLORADO, a
Municipal Corporation, hereinafter referred to as the "City"; and
WILLIAM C. STOCKOVER, an individual, and MAUREEN D. STOCKOVER, an
individual, collectively hereinafter referred to as the
"Developer".
WITNESSETH:
WHEREAS, the Developer is the Owner of certain property
situated in the County of Larimer, State of Colorado, (hereafter
referred to as the "Property") and legally described as follows, to
wit:
243 NORTH COLLEGE AVENUE CAR WASH, being lots
8, 9, 10, 11, 12, 13,'_4, and 15 of Block 22 of the City of Fort
Collins located in the Northeast 1/4 of Section 11, Township
7 North, Range 69 West of the 6th P.M., City of Fort Collins,
County of Larimer, State of Colorado.
WHEREAS, the Developer desires to develop the Property and has
submitted to the City a subdivision plat and/or a site plan and
landscape plan, a cony of which is on file in the office of the
Director of Engineering and made a part hereof by reference; and
WHEREAS, the Developer has further submitted to the City
utility plans for the Property, a copy of which is on file in the
office of the Director of Engineering and made a part hereof by
reference; and
WHEREAS, the parties hereto have agreed that the development
of the Property will require increased municipal services from the
City in order to serve such area and will further require the
installation of certain improvements primarily of benefit to the
lands to be developed and not to the City of Fort Collins as a
whole; and
WHEREAS, the City has approved the subdivision plat and/or
site plan and landscape plan submitted by the Developer subject to
certain requirements and conditions which involve the installation
of and construction of utilities and other municipal improvements
in connection with the Property.
NOW, THEREFORE, in consideration of the promises of the
parties hereto and other good and valuable consideration, the
receipt and adequacy of which is hereby acknowledged, it is agreed
as follows:
EXHIBIT "A"
1. Schedule of water lines to be installed out of sequence.
Not Applicable.
2. Schedule of sanitary sewer lines to be installed out of
sequence.
Not Applicable.
3. Schedule of street improvements to be installed out of
sequence.
Not Applicable.
4. Schedule of storm drainage improvements to be installed out
of sequence.
Not Applicable.
EXHIBIT "B"
NOT APPLICABLE
11
I. General Conditions
A. The terms of this Agreement shall govern all development
activities of the Developer pertaining to the Property. For the
purposes of this Agreement, "development activities" shall include,
but not be limited to, the following: (1) The actual construction
of improvements, (2) obtaining a building permit therefor, or (3)
Any change in grade, contour or appearance of said property caused
by, or on behalf of, the Developer with the intent to construct
improvements thereon.
B. All water lines, sanitary sewer collection lines, storm
sewer lines and facilities, streets, curbs, gutters, sidewalks, and
bikepaths shall be installed as shown on the approved utility plans
and in full compliance with the Council -approved standards and
specifications of the City on file in the office of the Director of
Engineering at: the time of approval of the utility plans relating
to the specific utility, subject to a three (3) year time
limitation from the date of execution of this Agreement. In the
event that the Developer commences or performs any construction
pursuant hereto after three (3) years from the date of execution of
this agreement, the Developer shall resubmit the project utility
plans to the Director of Engineering for reexamination. The City
may require the Developer to comply with approved standards and
specifications of the City on file in the office of the Director of
Engineering at the time of resubmittal.
C. No building permit for the construction of any structure
within the development shall be issued by the City until the water
lines, fire hydrants, sanitary sewer lines and streets (including
curb, gutter and sidewalk and pavement with at least the base
course completed) serving such structure have been completed and
accepted by the City. Notwithstanding the foregoing, the Developer
shall be entitled to receive a footing and foundation permit for
the construction of improvements within the development upon the
installation of access to provide fire protection and other
emergency services to the site during construction. Adequate water
lines and fire hydrants shall be installed prior to the Developer
being allowed to place combustible materials on the site. All such
access (temporary or permanent) completed prior to footing and
foundation permit and water lines and fire hydrants (temporary or
permanent) completed prior to the placement of combustible material
on the site shall be accepted by the Director of Engineering. No
building permits shall be issued for any structure located in
excess of nine hundred feet (9001) from a single point of access.
D. Any water lines, sanitary sewer lines, storm drainage
lines, and/or streets described on Exhibit "A," attached hereto,
shall be installed within the time and/or sequence required on
Exhibit "A." If the Director of Engineering has determined that
any water lines, sanitary sewer lines, storm drainage facilities
and/or streets; are required to provide service or access to other
areas of the City, those facilities shall be shown on the utility
plans and shall be installed by the Developer within the time as
established under "Special Conditions" in this document.
E. Except as otherwise herein specifically agreed, the
Developer agrees to install and pay for all water, sanitary sewer,
and storm drainage facilities and appurtenances, and all streets,
curbs, gutters, sidewalks, bikeways and other public improvements
required by this development as shown on the plat, site, landscape
and utility plans, and other approved documents pertaining to this
development on file with the City.
F. Street improvements (except curbs, gutters and walks)
shall not be installed until all utility lines to be placed therein
have been completely installed, including all individual lot
service lines leading in and from the main to the property line.
G. The installation of all utilities shown on the utility
plans shall be inspected by the Engineering Department of the City
and shall be subject to such department's approval. The Developer
agrees to correct any deficiencies in such installations in order
to meet the requirements of the plans and/or specifications
applicable to such installation. In case of conflict, the utility
plans shall supersede the standard specifications.
H. All storm drainage facilities shall be so designed and
constructed by the Developer as to protect downstream and adjacent
properties against injury and to adequately serve the Property (and
other lands as may be required, if any). The Developer shall meet
or exceed the minimum requirements for storm drainage facilities as
have been established by the City in its Drainage Master Plans and
Design Criteria. The Developer does hereby indemnify and hold
harmless the City from any and all claims that might arise,
directly or indirectly, as a result of the discharge of injurious
storm drainage or seepage waters from the development in a manner
or quantity d-ifferent from that which was historically discharged
and caused by the design or construction of the storm drainage
facilities, except for (1) such claims and damages as are caused by
the acts or omissions of the City in maintenance of such facilities
as have been accepted by the City for maintenance; (2) errors, if
any, in the general concept of the City's master plans (but not to
include any details of such plans, which details shall be the
responsibility, of the Developer); and (3) specific directives that
may be given to the Developer by the City. Approval of and
acceptance by the City of any storm drainage facility design or
construction shall in no manner be deemed to constitute a waiver or
relinquishment by the City of the aforesaid indemnification. The
Developer shall engage a licensed professional engineer to design
the storm drainage facilities as aforesaid and it is expressly
affirmed hereby that such engagement shall be intended for the
c3
benefit of the City, and subsequent purchasers of property in the
development.
I. The Developer shall pay storm drainage basin fees in
accordance with Chapter 26, Article VII of the City Code. Storm
drainage improvements eligible for credit or City repayment under
the provisions of Chapter 26 are described together with estimated
cost of the improvements on the attached Exhibit "B," which
improvements, if applicable, shall include right-of-way, design and
construction costs. See Section II.C, Special Conditions, Storm
Drainage Lines and Appurtenances, for specific instructions.
J. The Developer shall provide the Director of Engineering
with certified Record Plan Transparencies on Black Image Diazo
Reverse Mylars upon completion of any phase of the construction.
K. The Developer specifically represents that to the best of
its knowledge all portions of the Property dedicated to the City
associated with this development are in compliance with all
environmental protection and anti -pollution laws, rules,
regulations, orders or requirements, including solid waste
requirements, as defined by the U. S. Environmental Protection
Agency Regulations at 40 C.F.R., Part 261, and that such portions
of the Property as are dedicated to the City pursuant to this
development, are in compliance with all such requirements
pertaining to the disposal or existence in or on such dedicated
property of any hazardous substances, pollutants or contaminants,
as defined by the Comprehensive Environmental Response Compensation
and Liability Act of 1980, as amended, and regulations promulgated
thereunder. The Developer does hereby indemnify and hold harmless
the City from any liability whatsoever that may be imposed upon the
City by any governmental authority, pertaining to the disposal of
hazardous substances, pollutants or contaminants, and cleanup
necessitated by leaking underground storage tanks, excavation
and/or backfill of hazardous substances, pollutants or
contaminants, or environmental cleanup responsibilities of any
nature whatsoever on, of or related to any property dedicated to
the City pursuant to this development. The Developer further
agrees to indemnify and hold harmless the City from any claims or
actions based directly, indirectly or in any manner on any of the
aforementioned environmental risks brought against the City by
third parties arising as a result of the dedication of portions of
the Property to the City pursuant to this development. Said
indemnification shall not extend to claims, actions or other
liability arising as a result of any hazardous substance, pollutant
or contaminant generated or deposited by the City, its agents or
representatives, upon portions of the Property dedicated to the
City pursuant to this development.
II. Special Conditions
A. Water Lines
Not Applicable
B. Sewer Lines
Not Applicable
C. Storm Drainage Lines and Appurtenances
1. The Developer and the City agree that all on -site and
off -site storm drainage improvements shall be completed by the
Developer in accordance with the approved plans prior to the
issuance of any certificate of occupancy. Completion of
improvements shall include the certification by a licensed
professional engineer that the drainage facilities which serve this
development have been constructed in conformance with said approved
plans. Said certification shall be submitted to the City at least
two weeks prior to the date of issuance for any certificate of
occupancy.
2. The Developer agrees to provide and maintain erosion
control improvements as shown on the approved utility plans to
stabilize all over -lot grading in and adjacent to this development.
The Developer shall also be required to post a security deposit in
the amount of $ 1,696.00 prior to beginning construction to
guarantee the proper installation and maintenance of the erosion
control measures shown on the approved Plan. Said security deposit
shall be made in accordance with the criteria set forth in the
Storm Drainage Design Criteria and Construction Standards.
3. The Developer and the City agree that the storm
drainage facilities for this development have been designed to
incorporate a high water depth of 18 (eighteen) inches in the
parking lot detention pond. Prior to the issuance of any
certificate of occupancy, the Developer shall post a permanent sign
in said parking lot to notify the public of the potential for 18
inch stormwater depths in the parking lot detention pond. The
Developer and the City further agree that the City shall have the
right to reevaluate the function of, and may require the redesign
and reconstruction of, the storm drainage system serving this
development with any change in use of the Property and/or any
expansions or additions to the structures and appurtenances shown
on the approved utility, site, and landscape plans.
4. The Developer and the City agree that the Developer
shall complete the design plans and drainage report for all on -site
and off -site storm drainage facilities and obtain City approval of
said plans and. report prior to beginning construction of said storm
drainage improvements.
W
D. Streets
1. The Developer and the City agree that no street
oversizing reimbursement is due the Developer for this development.
2. The Developer and the City agree that a State Highway
Access Permit must be obtained prior to the construction of any new
access or the removal of any existing accesses on North College
Avenue (U.S. Highway 287) adjacent to the Property.
3. The Developer and the City agree that the access
point to the alley adjacent to the site on the west side, shown on
the approved utility plans, is for emergency and service vehicles
only. The City may require the developer to place bollards, a
gate, or other barricades to restrict general public access to the
Property from the alley. In addition, the access to the alley may
be required to be removed entirely at such time as the City deems
necessary.
4. The Developer and the City agree that the Developer
shall complete the design and construction of all public
improvements including repair, removal, and/or reconstruction of
curb, gutter, sidewalk, and driveways as shown on the approved
utility plans prior to the issuance of any certificate of
occupancy. The Developer shall complete the design plans and
obtain City approval of said plans prior to beginning construction
of said improvements.
E. Hazards and Emergency Access.
1. No combustible material will be allowed on the site
until a permanent water system is installed by the Developer and
approved by the City.
2. Prior to beginning any building construction, the
Developer shall provide and maintain at all times an accessway to
said building or buildings. Such accessway shall be adequate to
handle any emergency vehicles or equipment, and the accessway shall
be kept open during all phases of construction. Prior to the City
allowing combustible material on the site (other than forming
material for concrete footings, foundations and/or concrete walls)
such accessway shall be improved to a width of at least 20 feet
with 4 inches of aggregate base course material compacted according
to City Standards and with an 80 foot diameter turnaround at the
building end of said accessway. The turnaround is not required if
an exit point is provided at the end of the accessway.
3. The issuance of any building permit by the City is
made solely at the Developer's own risk and the Developer shall
hold the City harmless from any and all damages or injuries arising
directly or indirectly out of the issuance of said permit prior to
ri
the completion of the requirements in accordance with Section 29-
678 of the Code of the City.
III. Miscellaneous
A. The Developer agrees to provide and install, at its
expense, adequate barricades, warning signs and similar safety
devices at all construction sites within the public right-of-way
and/or other areas as deemed necessary by the Director of
Engineering in accordance with the City's "Work Area Traffic
Control Handbook" and shall not remove said safety devices until
the construction has been completed and approved by the Director of
Engineering.
B. The Developer shall, at all times, keep the public right-
of-way free from accumulation of waste material or rubbish caused
by the Developer's operation; shall remove such rubbish no less
than weekly and; at the completion of the work, shall remove all
such waste materials, rubbish, tools, construction equipment,
machinery, and surplus materials from the public right-of-way. The
Developer further agrees to maintain the finished street surfaces
so that they are free from dirt caused by the Developer's
operation. Any excessive accumulation of dirt and/or construction
materials shall be considered sufficient cause for the City to
withhold building permits and/or certificates of occupancy until
the problem is corrected to the satisfaction of the Director of
Engineering. If the Developer fails to adequately clean such
streets within two (2) days after receipt of written notice, the
City may have the streets cleaned at the Developer's expense and
the Developer shall be responsible for prompt payment of all such
costs.
C. The Developer hereby agrees that it will require its
subcontractors to cooperate with the City's construction inspectors
by ceasing operations when winds are of sufficient velocity to
create blowing dust which, in the inspector's opinion, is hazardous
to the public health and welfare.
D. The Developer shall, pursuant to the terms of this
Agreement, complete all improvements and perform all other
obligations required herein, as such improvements or obligations
may be shown on the original plat and related documents, or any
replat as subsequently filed by the Developer, and the City may
withhold such building permits and certificates of occupancy as it
deems necessary to ensure performance hereof.
E. Nothing herein contained shall be construed as a waiver of
any requirements of the City Code, and the Developer agrees to
comply with all requirements of the same.
7
F. In the event the City waives any breach of this Agreement,
no such waiver shall be held or construed to be a waiver of any
subsequent breach hereof.
G. Financial obligations of the City of Fort Collins payable
after the current fiscal year and/or not appropriated or budgeted
are contingent upon funds for that purpose being appropriated,
budgeted and otherwise made available.
H. This Agreement shall run with the Property and shall be
binding upon the parties hereto, their personal representatives,
heirs, successors, grantees and assigns. It is agreed that all
improvements required pursuant to this Agreement touch and concern
the Property regardless of whether such improvements are located on
the Property. Assignment of interest within the meaning of this
paragraph shall specifically include, but not be limited to, a
conveyance or assignment of any portion of the Developer's real or
proprietary interest in the Property, as well as any assignment of
the Developer's rights to develop the Property under the terms and
conditions of this Agreement.
I. In the event the Developer transfers title to the Property
and is thereby divested of all equitable and legal interest in the
Property, the City hereby agrees to release said Developer from
liability under this Agreement with respect to any breach of the
terms and conditions of this Agreement occurring after the date of
any such transfer of interest. In such event, the succeeding
property owner shall be bound by the terms of this Agreement.
J. Each and every term of this Agreement shall be deemed to
be a material element hereof. In the event that either party shall
fail to perform according to the terms of this Agreement, such
party may be declared in default. In the event that a party has
been declared in default hereof, such defaulting party shall be
given written notice specifying such default and shall be allowed
a period of five (5) days within which to cure said default. In
the event the default remains uncorrected, the party declaring
default may elect to: (a) terminate the Agreement and seek damages;
(b) Treat the Agreement as continuing and require specific
performance or; (c) avail itself of any other remedy at law or
equity.
K. In the event of the default of any of the provisions
hereof by either party which shall require the party not in default
to commence legal or equitable action against said defaulting
party, the defaulting party shall be liable to the non -defaulting
party for the non -defaulting party's reasonable attorney's fees and
costs incurred by reason of the default. Nothing herein shall be
construed to prevent or interfere with the City's rights and
remedies specified in Paragraph III.D of this Agreement.
e
L. The Owner is made a party to this Agreement solely for the
purpose of subjecting the Property to the covenants contained in
this Agreement:. The City and the Developer expressly acknowledge
and agree that the Owner shall not be liable for any obligations of
the Developer under this Agreement, unless the Owner were to
exercise any of the rights of the Developer in which event the
obligations of the Developer shall become those of the Owner.
M. This Agreement shall not be construed as or deemed to be
an agreement for the benefit of any third party or parties, and no
third party or parties shall have any right of action hereunder for
any cause whatsoever.
THE CITY OF FORT COLLINS, COLORADO,
a Municipal Corporation
By: �nI• .L
Cit Manager
ATTEST:
CITY CLERK -
J
APPROVED AS TO CONTENT:
Director of Engineerir�g
APPROVED 1/4 TO FC�RM-
Ci Attorney
DEVELA
OPER:
By: �
William C. Stockover, an individual
By:
M ure n clove divi dual
7