HomeMy WebLinkAboutPARK SOUTH COMMERCIAL PLAZA FOURTH - Filed CS-COMMENT SHEETS - 2005-08-03Project Comments Sheet
Selected Departments
wmmw�_
Department: Engineering
Date: January 5, 2004
Project:
PARK SOUTH COMMERCIAL PLAZA, 2ND FLG LOT 2B, VALVOLINE OIL
CHANGE -TYPE I
All comments must: be received by Steve Olt in Current Planning, no later than the
staff review meeting:
January 07, 2004
Note - Please identify your redlines for future reference
Issue Contact: Katie Moore
Topic: General
Number: 11 Created: 12/30/2003
[ 12/30/031 Reading the conceptual review letter sent to the applicant by Current Planning, then reading conceptual
review comments in the Engineering file, it appears that engineering was mis-quoted in the letter sent to the applicant.
That letter stated that: "Development of this property will have to dedicate necessary additional street right-of-way (ROW)
and easements behind the ROW for West Horsetooth Road. There currently is 50' of right-of-way (south of the centerline
of the street) and 57.5' is ultimately required." Engineering's file comments state that the existing ROW on Horsetooth is
50' plus 12' for the right turn lane, and 7.5' of additional ROW is needed, and that the utility easement should be a total
of 15' beyond the new ROW. The additional 7.5' of ROW is still required, as is the 15' utility easement behind that.
Number: 12 Created: 12/30/2003
[ 12/30/031 On the landscape plan, please be sure to show existing features in a ghosted or alternate -weight line lie curb
and gutter in the movie theatre parking lot).
Number: 13 Created: 12/30/2003
[ 12/30/031 Please show phasing clearly, and match the utility plans to the site and landscape plan phasing. (Required for
Final Compliance).
Number: 16 Created: 12/30/2003
[ 12/30/031 Please see reclined plans and utility plan checklist for any additional comments.
Topic: Utility Plans
Number: 14 Created: 12/30/2003
[ 12/30/031 Overall utility plan: please label the easement types.
Number: 15 Created: 12/30/2003
[ 12/30/031 Grading plan: It appears that some grading and curb and gutter work will be done on the movie theatre
property. Please obtain easements from the property owner for this work.
Signature Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat _� Site Drainage Report Other
Utility _� Redline Utility / Landscape
Page 1
mmwdmmww�_
Project Comments Sheet
Selected Departments
Department: Engineering
Date: January 8, 2004
Project:
PARK SOUTH COMMERCIAL PLAZA, 2ND FLG LOT 2B, VALVOLINE OIL
CHANGE -TYPE I
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
January 07, 2004
Note - Please identify your redlines for future reference
Issue Contact: Katie Moore
Topic: General
Number: 11 Created: 12/30/2003
[12/30/031 Reading the conceptual review letter sent to the applicant by Current Planning, then reading conceptual
review comments in the Engineering file, it appears that engineering was mis-quoted in the letter sent to the applicant.
That letter stated that: "Development of this property will have to dedicate necessary additional street right-of-way (ROW)
and easements behind the ROW for West Horsetooth Road. There currently is 50' of right-of-way (south of the centerline
of the street) and 57.5' is ultimately required." Engineering's file comments state that the existing ROW on Horsetooth is
50' plus 12' for the right turn lane, and 7.5' of additional ROW is needed, and that the utility easement should be a total
of 15' beyond the new RC W. The additional 7.5} of ROW is still required, as is the 1 5' utility easement behind that.
* * 1.8.03 - Following a meeting of the Transportation Coordination group this morning, it was agreed that the City would
be willing to accept ROW cledication to the back of the existing sidewalk, approximately 4' as shown on the plans, in lieu of
the standard 7.5' ROW. Please note this as an approved variance on the utility plans. Variance of the utility easement
width would need to meet the approval of possibly affected utilities. If a narrower utility easement is requested, please
submit an 8 1 /2 x I I sketch of the area showing the proposed utility easement, and I will route it to the appropriate
utilities for their approval. The utilities are given 2 weeks to respond to these requests.
Number: 12 Created: 12/30/2003
[ 121301031 On the landscape plan, please be sure to show existing features in a ghosted or alternate -weight line Ile curb
and gutter in the movie theatre parking lot).
Number: 13 Created: 12/30/2003
[ 12/30/031 Please show phasing clearly, and match the utility plans to the site and landscape plan phasing. (Required for
Final Compliance).
Number: 16 Created: 12/30/2003
[ 12/30/031 Please see reclined plans and utility plan checklist for any additional comments.
Topic: Utility Plans
Number: 14 Created: 12/30/2003
[ 12/30/03J Overall utility plan: please label the easement types.
Number. 15 Created: 12/30/2003
[ 12/30/03] Grading plan: It appears that some grading and curb and gutter work will be done on the movie theatre
property. Please obtain easements from the property owner for this work.
&_,I� a� 1 1, 0 _L—
.Signatare Date
CHECK HERE. IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Re ort nth
P er
Utility —/ Redline Utility ✓ Landscape
Page I
Project Comments Sheet
bil C itj= of Fort Collins
Selected Departments
Department: Engineering
Date: Nlay 21, 2004
Project:
PARK SOUTH COMMERCIAL PLAZA, 2ND FLG LOT 213, HORSETOOTH
CARWASIH-TYPE
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
May 19, 2004
Mote - Please identify your redlines for future reference
Issue Contact: Katie Moore
Topic: General
Number: 11 Created: 12/30/2003
[4/30/04) Clearly label and dimension the proposed ROW for Horsetooth and the utility easement behind it on the site
and landscape plans.
Also, please work with XCEL/PSCO to address their concerns with the building placement in relation to their gas line in
the utility easement on Horsetooth. Comment from Jim DeWilde: "PSCO has an existing 4" PED gas main
laying 12' into the existing 15' U.E. PSCO needs min. 3' clearance from gas main to proposed building wall.
Any relocation of main would be at developer's expense."
[12/30/03] Reading the conceptual review letter sent to the applicant by Current Planning, then reading conceptual
review comments in the Engineering file, it appears that engineering was mis-quoted in the letter sent to the applicant.
That letter stated that: "Development of this property will have to dedicate necessary additional street right-of-way
(ROW) and easements behind the ROW for West Horsetooth Road. There currently is 50' of right-of-way (south of the
centerline of the street) and 57.5' is ultimately required." Engineering's file comments state that the existing ROW on
Horsetooth is 50' plus 12' for the right turn lane, and T5' of additional ROW is needed, and that the utility easement
should be a total of 15' beyond the new ROW. The additional 7-9 of ROW is still required, as is the 15' utility easement
behind that.
1.8.03 - Following a meeting of the Transportation Coordination group this morning, it was agreed that the City would
be willing to accept ROW dedication to the back of the existing sidewalk, approximately 4' as shown on the plans, in
lieu of the standard 7.5' ROW. Please note this as an approved variance on the utility plans. Variance Df the utility
easement width would need to meet the approval of possibly affected utilities. If a narrower utility easement is
requested, please submit an 8 1/2 x 11 sketch of the area showing the proposed utility easement, and I will route It to
the appropriate utilities for their approval The utilities are given 2 weeks to respond to these requests_
Number: 13 Created. 12/30!2003
1413Qr04j Repeat.
REVISION
COMMENT SHEET
DATE: November 12, 2004 TO: Technical Services
PROJECT: #37-94E — Park South Commercial Plaza, 2nd
Filing, Lot 2B, Horsetooth Carwash — Type I
(LUC)
All comments must be received by Steve Olt no later than the staff
review meeting:
December 1, 2004
❑ No Comment
ElProblems or Concerns (see below or attached)
**PLEASE IDENTIFY YOUR REDLINES FOR FUTURE
REFERENCE**
Name (please print) Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat _Site _Drainage Report _Other
Utility _Redline Utility _Landscape
Citv of Fort Collins
Project Comments Sheet
(06"� 1 Selected Departments
City of Fort Collins
Department: Engineering
Date: November 16, 2004
Project:
PARK SOUTH COMMERCIAL PLAZA, 2ND FLG LOT 213, HORSETOOTH
CARWASH-TYPE I
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
December 01, 2004
Note - Please identify your redlines for future reference
Issue Contact: Katie Moore
Topic: General
Number: 11 Created: 12/30/2003
[11/16/04] Has the PSCO issue been resolved? See below.
[4/30/04] Clearly label and dimension the proposed ROW for Horsetooth and the utility
easement behind it or, the site and landscape plans.
Also, please work with XCEUPSCO to address their concerns with the building placement in
relation to their gas line in the utility easement on Horsetooth. Comment from Jim DeWilde:
"PSCO has an existing 4" PED gas main laying 12' into the existing 15' U.E. PSCO needs
min. 3' clearance from gas main to proposed building wall. Any relocation of main would be
at developer's expense."
[12/30/03] Reading the conceptual review letter sent to the applicant by Current Planning,
then reading conceptual review comments in the Engineering file, it appears that
engineering was mis-quoted in the letter sent to the applicant. That letter stated that:
"Development of this property will have to dedicate necessary additional street right-of-way
(ROW) and easements behind the ROW for West Horsetooth Road. There currently is 50'
of right-of-way (south of the centerline of the street) and 57.5' is ultimately required."
Engineering's file comments state that the existing ROW on Horsetooth is 50' plus 12' for the
right turn lane, and 7.6 of additional ROW is needed, and that the utility easement should be
a total of 15' beyond the new ROW. The additional 7.5' of ROW is still required, as is the 15'
utility easement behind that.
1.8.03 - Following a meeting of the Transportation Coordination group this morning, it was
agreed that the City would be willing to accept ROW dedication to the back of the existing
sidewalk, approximately 4' as shown on the plans, in lieu of the standard 7.5' ROW. Please
note this as an approved variance on the utility plans. Variance of the utility easement width
3r1 , Z �.
Signature Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other
Utility Redline Utility Landscape
Page 1
would need to meet the approval of possibly affected utilities. If a narrower utility easement
is requested, please submit an 8 1/2 x 11 sketch of the area showing the proposed utility
easement, and I will route it to the appropriate utilities for their approval. The utilities are
given 2 weeks to respond to these requests.
Number: 13 Created: 12/30/2003
[11/16/04]
[4/30/04] Repeat:
[12/30/031 Please show phasing clearly, and match the utility plans to the site and
landscape plan phasing. (Required for Final Compliance).
Number: 16 Created: 12/30/2003
[11/16/04] No utility plan checklist was resubmitted.
[4/30/04] Repeat:
[12/30/03) Please see: redlined plans and utility plan checklist for any additional comments.
Number: 48 Created: 4/30/2004
[11/16/04] A note was added to the utility plans, but not to the site/landscape plans. Also,
the overhang was shown outside of the easement on the site plan, but not on the utility
plans. Please coordinate.
[4/30/04] Building envelopes/outlines are not allowed over utility easements. Overhangs
extending no farther than 2.5' into the utility easement are permissible. If this is an
overhang, please clearly label it as such.
Number: 49 Created: 5/4/2004
[11/16/04] It is still unclear how the emergency access easement for the fire lane will be
connected to another EAE or public street ROW, as needed. Also, it is unclear whether the
radii used for the curves on the EAE meet the LUC requirement: 25' interior radius and 50'
exterior radius (same centerpoint).
[5/4/04] A fire lane is shown on the plans, but is shown only as a 'u' and isn't shown to
connect to another fire lane or street. Usually an emergency access easement is required
to be dedicated for fire lanes, and the EAE would connect to a public ROW or another EAE.
Please work with PFA., and if they require an easement, please show it on all plans and
provide a legal, sketch, and deed of dedication using the City's standard language. Please
contact me if you need a copy of this language.
Number: 50 Created: 5/4/2004
[11/16/04] The utility plan title needs to be revised - it says 3rd filing.
[5/4/04] Please match the titles on the plans; some say Lot 2-B Park South, but the utility
plan says park south commercial plaza minor subdivision 2nd filing, lot 2-b. In the City's
system, it is Park South Commercial Plaza, 2nd Filing, Lot 2B, Horsetooth Carwash.
Number: 114 Created: 11/16/2004
[11/16/04] Please review all plans for scanability and revise as necessary. LCUASS
appendix E-6 explains scanning requirements.
Topic: Transportation
Number: 98
[11/16/041
Page 2
Created: 5/21 /2004
[5/21/04] Comment inserted for Tom Reiff: [5/19/04] Currently the retail building identified
in Phase II is not in compliance with the connecting walkway standard. A follow-u1pp�,,meeting
is requested to discuss a couple of options regarding the layout of the building. ( 041-i Ca,{tiain hLC60
Number: 99 Created: 5/21/2004
[11 /16/04]
[5/21/04] Comment inserted for Tom Reiff: (5/19/04] Why is there a crosswalk that leads
from the car wash to the trash enclosure for Auto Zone? Is it intended to connect to the Auto
Zone parking lot?
S AA,e-c� oC'�i lG eSIM� - `'I'j [
o rtte¢ flit
e t ^' +-j -too
Page 3
City of Fort Collins
Current Planning
FINAL PLAN
COMMENT SHEET
MAR 0 8 2005
DATE: March 7, 2005 TO: Technical Services
PROJECT: #97-34F Park South Commercial Plaza, Lot 2B,
Horsetooth Carwash, 2nd Filing, Type I,
Final Compliance
All comments must be received by Steve Olt no later than the staff
review meeting:
March 23, 2005 � tyk
Note - Please identify your redlines for future reference
No Problems
s[�Problems or Concerns (see below or attached)
gou,✓pAeY -e1-f6.4COSE,
�Gccss ? /Vo �Ci�Z6 Gry�
o,
iti'l f9GCESJJi�/i75Q�j
_,4,3 _� �6 c x.��1T
ON . 56u it t-I f t O e'
Name (please rint)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
J/Plat _Site _Drainage Report _Other
_Utility _Redline Utility _Landscape City of Fort Collins
Project Comments Sheet
Selected Departments
City of Fort Collins
Department: Engineering
Date: March 16, 2005
Project:
PARK SOUTH COMMERCIAL PLAZA, 2ND FLG LOT 2B, HORSETOOTH
CARWASH-TYPE I/FC
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
March 23, 2005
Note - Please identify your redlines for future reference
Issue Contact: Katie Moore
Topic: General
Number: 13 Created: 12/30/2003
13/16/05] Grading phasing shown, but it doesn't include the utilites. Please show phasing
for utilities.
[11/16104]
[4/30/04] Repeat:
[12/30/03] Please show phasing clearly, and match the utility plans to the site and
landscape plan phasing. (Required for Final Compliance).
Number: 16 Created: 12/30/2003
[3/16/05]
[11/16/04] No utility plan checklist was resubmitted.
[4/30/04] Repeat:
112/30/03] Please see redlined plans and utility plan checklist for any additional comments.
Number: 114
Created: 11 /16/2004
13/16/051
111/16/04] Please review all plans for scanability and revise as necessary. LCUASS
appendix E-6 explains scanning requirements.
Number: 135 Created: 3/16/2005
[3/16/05] Redlines for plat and landscape plan were not received. Please remember to
resubmit all redlines.
Number: 136 Created: 3/16/2005
[3/16/p5] Plat is missing a paragraph, and has several typos.
Signature
3, 25.05
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat _ ✓ Site Drainage Report Other
Utility _� Redline Utility Landscape